SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
PERSONAL DETAILS
SURNAME : MEYER
FIRST NAMES : CORNELIS ARNOLDUS (NICK)
DATE OF BIRTH : 28/12/1950
SEX : MALE
NATIONALITY : SOUTH AFRICAN
HOME LANGUAGE : ENGLISH
OTHER LANGUAGES : AFRIKAANS
MARITAL STATUS : MARRIED
RESIDENTIAL ADDRESS : 14 Baltimore, Honeydew Ridge Estate
Melba St, Honeydew Ridge, Randburg
POSTAL ADDRESS : PO Box 112, Wilgeheuwel, 1736
CONTACT NO’S : Home: 0116751656
Cell: 0829227121
Cell: 0825663239 (Alt)
Email: nckmeyer111@gmail.com
EDUCATIONAL QUALIFICATIONS : Alan Wilson Technical High School
G.C.E. “A” Level – Technical Drawing
G.C.E. “M” Level – Four Subjects
G.C.E. “O” Level – Six subjects
TERTIARY EDUCATION : Bulawayo Technical College
Mechanical Engineering Technician Diploma
City & Guilds of London T4
TRADE QUALIFICATIONS : Certified Journeyman
Fitter and Turner (Including Machinery)
5th Engineer (Marine)
COMPUTER LITERACY : Microsoft Office, Microsoft Projects
-1-
October 2009 TO 2013 – CONSTRUCTION MANAGER / PROJECT MANAGER
Employed as a Project/Construction Manager for “stay in business“ projects at a open pit Iron Ore mine
in the Northern Cape, South Africa.
The company follows strong corporate governance, and has developed a “Project Way” which is referred
to as the ADM. ( Asset Development Management ) This guides the Project Manager through the study
phase of the project from concept, per-feasibility ,feasibility, funds release, procurement,
implementation and finally, close out. The ADM, was introduced when I started as PM, and had it’s
teething problems but I gained valuable experience through being involved with the consultants and
networking with the other PM's. As a team we would hold workshops on issues with the system
and recommend corrective measures.
Head Office project assurance team reviewed project progress at regular intervals so by the time the PM
reached the Funds Release gate he could satisfied all stake holders that the risks ( business, health and
safety, etc.) had been identified and mitigation mechanisms were in place.
As with all projects today Safety, Health and Environment considerations played a vital part in the
success of all projects and special attention to these requirements necessitated close liaison with the
guardians of these disciplines.
Initially employed as Construction Manager at the same mine. My responsibility was to manage the
implementation of a group of projects that were referred to as the "Mini Projects", the total value of
these projects was +/- R 180 mil. With a relatively small team of sub contractors, we managed to
complete these projects in less than a year. The disciplines involved in these projects was structural, civil,
mechanical and electrical.
May 2006 to August 2009
SITE ERECTION CONSULTANT
Responsible for the site erection of communication towers in a number of African countries. Towers
were supplied by the company to clients who erect them in the field. I traveled to these sites and
advised the local contractors on the correct erection methods including the civils and structural steel
erection. The job entailed close liaison with client, subcontractors and the logistics of work in Africa and
technical support in the field.
CONSTRUCTION MANAGER
Construction Manager at Sishen Iron Ore Mine. Responsible for the structural erection of buildings and
installation of all crusher related equipment i.e. conveyors, feeders and chutes etc. for the primary,
secondary and tertiary crusher plants. Disciplines involved Structural, mechanical and piping. The site
labour peaked at 380 site personnel. Contract value +/-150 mil
2/…..
-2-
JAN 1994 TO APRIL 2006 – SELF EMPLOYED ON ENGINEERING PROJECTS
PROJECT SITE MANAGEMENT AND MACHINE BUILDING PROJECTS:
Mechanical sub-contractor for upgrade of assembly hall at Toyota SA. Employed at peak 40 skilled and
semi-skilled engineering artisans.
RECENT PROJECTS COMPLETED:
• Re-build and upgrade press section for PG Bison Board including mechanicals and oil piping.
• Site manager installation of surface refrigeration plant at gold mine (West Rand)
• Site manager installation of chilled water plant at petro chemical plant. Set up and maintain QC
function of project.
• Mechanical and Piping Superintendent for installation of services piping and equipment for new
stainless steel cold rolling mill. Project value+/-R600 million. I was responsible for the hydraulic
system operating at 30 mpa 750Lt./min. Roll lubrication system capacity of 250 000 lt. Pipe
diameters varied from 500 NB down to ¼ inch API and Sched.160 down to Sched.40. Included in
the project were all the service lines i.e. air, pure water, potable water and instrumentation lines.
2400 different spool pieces were prefabricated, pickled and passivated then installed.
• Site Manager, turnkey project for installation of two ammonia refrigeration surface plants for
gold mines. Sub contract disciplines, Civil, Structural, Piping and Mechanicals and E&I.
• Site Manager Turnkey project for the installation of Off-Gas (Carbon Monoxide) Distribution
system at titanium Smelter Plant. Sub contract disciplines included civil works, structural steel,
Piping, Mechanicals, Electrical / Instrumentation.
ENGINEERING PROJECTS:
PULP AND PAPER
• Installation and polishing of approach flow piping (Paper Machine)
• Build, install and commission Unwind and Rewind stands for Paper to Foil Laminating Plant
• Build core sampling machine for moisture content of paper bales
• Remove, balance and replace carrier rolls from Paper Machine
• Install and align various piping, pumps and equipment in Paper Mills
• Strip, refurbish and ship equipment from paper mill to new owners
• Strip, inspect, repair and reassemble gearbox for cutter rolls on paper Sheeter
• Strip, pack and ship the Sheeter to India. Travel to India to re-install and commission.
3/...
-3-
PIPING PROJECTS
Pipe bending (Hydraulic mandrel bending machines) Pipe manipulation (ring rolling, etc.) Pre-fab, site
fabrications and installations of Stainless Steel and Carbon Steel piping systems
TYPICAL PROJECT COMPLETED
• Manufacture, supply and installation of the process control, compressed air lines, (Carbon Steel
seamless tube) at a number of Aluminum Smelter Plants
• Pulp, water and airlines common to the Paper Industry
• Gas Lines (Ammonia) Water reticulation, oil etc., and common to refrigeration plant
• Target industries: Pulp and Paper, Petro-chemical and Material Handling of conveyors and
packaging etc.
Staff employed: Boilermakers, fitter and turners, coded welders, pipe fitters
Client reference: Mr B Volk
Cell: 0824580826
brian@phcprojects.co.za
Mr Luigi Angelozzi
031-7633933
Project’s Director –
MAY 1988 TO DECEMBER 1993
WORKS MANAGER STAINLESS STEEL TUBE MANUFACTURER – ACME INSTALLATIONS IN DURBAN
• General Management of production, sales and maintenance
• The company produced thin walled stainless steel tube to the Paper, Food and beverage and
Architectural industries
• Responsible for the design and manufacture of plant and equipment related to this industry, e.g.
the design manufacture and commissioning of a tube mill producing Stainless Steel tube up to
168mm dia. by continuous fusion (TIG) weld.
Staff employed: Boilermakers, coded welders, trade qualified maintenance staff
Reference: Mr Philippe Lenferne De La Motte
Tel: 031-2612459
4/…..
-4-
JULY 1982 TO APRIL 1988
WORKS / ENGINEERING MANAGER: CONSTRUCTION INDUSTRY
• Mechanical Workshop (Foreman)
• Maintenance of construction related plant and equipment, i.e., earth moving machinery,
conveyors, etc. The rebuild and modification of above plant and equipment
• Bar Yard (Works manager)
• Day to day running of Reinforcing Bar yard and Mesh factory, on-site fixing of reinforcing steel
including concrete work (Roads, Bridges, Buildings, etc.)
• Site supervision of pre-cast concrete yard
• Full management responsibility of the above facility (Labour, Profitability, budgets and
projections)
SEPTEMBER 1979 TO MAY 1982
ENGINEERING PRODUCTION MANAGER BUILDING / CIVIL CONSTRUCTION INDUSTRY
• Design and manufacture of construction related machinery and equipment such as concrete
truck mixers, block making machines, block stacking machines, forklift dumpers, lift dump trucks
and tipper trucks for the civil/structural engineering industry.
• Project planning and management
• Responsibility for operation of boiler shop, machine shop and drawing office, estimating and
planning.
• Manufacturing processes included CNC lathes and machine centers, general machine tools and
heavy plate rolls,guillotines,profile cutters and various welding systems including submerged arc,
MIG and TIG
• Staff employed: Artisans, boilermakers, fitter and turners, coded welders and semi-skilled
laborers
APRIL 1978 TO MAY 1979
MAINTENANCE FOREMAN FOR PLASTIC COMPANY SALTRAMA PLASTICS (HARARE, ZIMBABWE)
• Planning and implementation of preventative maintenance scheme
• Responsible for new projects such as installation of new plant, design and manufacture of new
plant and equipment, modifications to existing plant
• Responsible for the efficient running of the services plant, air compressors, refrigeration plant,
electrical distribution, gas supply
• Staff employed: Artisans, semi-skilled workshop personnel
5/….
-5-
JUNE 1976 TO APRIL 1978
MECHANICAL ESTIMATOR AND PRODUCTION SUPERVISOR FOR ARMAMENTS MANUFACTURER
• Project planning and scheduling, shop floor supervision
• Manufacturing processes: automatic latches, milling machines, press shop, welding shop,
assembly, dispatch
• Staff employed: Artisans, semi-skilled machine operators / assembly workers
1974 to 1976
ENGINEERING OFFICER – MERCHANT NAVY – SAFMARINE
1968 TO 1973
APPRENTICESHIP FITTER AND TURNER – NIMR & CHAPMAN, BULAWAYO, ZIMBABWE
5/….
-5-
JUNE 1976 TO APRIL 1978
MECHANICAL ESTIMATOR AND PRODUCTION SUPERVISOR FOR ARMAMENTS MANUFACTURER
• Project planning and scheduling, shop floor supervision
• Manufacturing processes: automatic latches, milling machines, press shop, welding shop,
assembly, dispatch
• Staff employed: Artisans, semi-skilled machine operators / assembly workers
1974 to 1976
ENGINEERING OFFICER – MERCHANT NAVY – SAFMARINE
1968 TO 1973
APPRENTICESHIP FITTER AND TURNER – NIMR & CHAPMAN, BULAWAYO, ZIMBABWE

More Related Content

What's hot

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2Omar Kalamchi
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15Pieter Manders
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
Building Construction Class 2. definitions
Building Construction Class 2. definitionsBuilding Construction Class 2. definitions
Building Construction Class 2. definitionsHamdija Velagic
 
Karl James updated CV
Karl James updated CVKarl James updated CV
Karl James updated CVKarl James
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016eslam orabi
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015mohammed bataiha
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Muhammad Hegazy
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 

What's hot (20)

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 
ahmed cv finall ing
ahmed cv finall ingahmed cv finall ing
ahmed cv finall ing
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Building Construction Class 2. definitions
Building Construction Class 2. definitionsBuilding Construction Class 2. definitions
Building Construction Class 2. definitions
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
mahmoud CV-25-10-2017
mahmoud CV-25-10-2017mahmoud CV-25-10-2017
mahmoud CV-25-10-2017
 
Tech Proposal
Tech Proposal Tech Proposal
Tech Proposal
 
Karl James updated CV
Karl James updated CVKarl James updated CV
Karl James updated CV
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
CVBERTRANDeng
CVBERTRANDengCVBERTRANDeng
CVBERTRANDeng
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
CV of Md.Abul Kashem
CV of Md.Abul KashemCV of Md.Abul Kashem
CV of Md.Abul Kashem
 
Basheer C.V.1
Basheer C.V.1Basheer C.V.1
Basheer C.V.1
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 

Similar to Curriculum Vitae for Mechanical Engineer with 40+ Years Experience

Similar to Curriculum Vitae for Mechanical Engineer with 40+ Years Experience (20)

Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
ibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOCibrahim moustafa_CV_Last update dated8_2016.DOC
ibrahim moustafa_CV_Last update dated8_2016.DOC
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
Copy of Eng.OMARA CV
Copy of Eng.OMARA CVCopy of Eng.OMARA CV
Copy of Eng.OMARA CV
 
WALID BESHARA CV- 06-2016
WALID BESHARA CV- 06-2016WALID BESHARA CV- 06-2016
WALID BESHARA CV- 06-2016
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
C.V.
C.V.C.V.
C.V.
 
STEVEN cv
STEVEN cvSTEVEN cv
STEVEN cv
 
G.McMORRAN - CV
G.McMORRAN - CV G.McMORRAN - CV
G.McMORRAN - CV
 

Curriculum Vitae for Mechanical Engineer with 40+ Years Experience

  • 1. CURRICULUM VITAE PERSONAL DETAILS SURNAME : MEYER FIRST NAMES : CORNELIS ARNOLDUS (NICK) DATE OF BIRTH : 28/12/1950 SEX : MALE NATIONALITY : SOUTH AFRICAN HOME LANGUAGE : ENGLISH OTHER LANGUAGES : AFRIKAANS MARITAL STATUS : MARRIED RESIDENTIAL ADDRESS : 14 Baltimore, Honeydew Ridge Estate Melba St, Honeydew Ridge, Randburg POSTAL ADDRESS : PO Box 112, Wilgeheuwel, 1736 CONTACT NO’S : Home: 0116751656 Cell: 0829227121 Cell: 0825663239 (Alt) Email: nckmeyer111@gmail.com EDUCATIONAL QUALIFICATIONS : Alan Wilson Technical High School G.C.E. “A” Level – Technical Drawing G.C.E. “M” Level – Four Subjects G.C.E. “O” Level – Six subjects TERTIARY EDUCATION : Bulawayo Technical College Mechanical Engineering Technician Diploma City & Guilds of London T4 TRADE QUALIFICATIONS : Certified Journeyman Fitter and Turner (Including Machinery) 5th Engineer (Marine) COMPUTER LITERACY : Microsoft Office, Microsoft Projects
  • 2. -1- October 2009 TO 2013 – CONSTRUCTION MANAGER / PROJECT MANAGER Employed as a Project/Construction Manager for “stay in business“ projects at a open pit Iron Ore mine in the Northern Cape, South Africa. The company follows strong corporate governance, and has developed a “Project Way” which is referred to as the ADM. ( Asset Development Management ) This guides the Project Manager through the study phase of the project from concept, per-feasibility ,feasibility, funds release, procurement, implementation and finally, close out. The ADM, was introduced when I started as PM, and had it’s teething problems but I gained valuable experience through being involved with the consultants and networking with the other PM's. As a team we would hold workshops on issues with the system and recommend corrective measures. Head Office project assurance team reviewed project progress at regular intervals so by the time the PM reached the Funds Release gate he could satisfied all stake holders that the risks ( business, health and safety, etc.) had been identified and mitigation mechanisms were in place. As with all projects today Safety, Health and Environment considerations played a vital part in the success of all projects and special attention to these requirements necessitated close liaison with the guardians of these disciplines. Initially employed as Construction Manager at the same mine. My responsibility was to manage the implementation of a group of projects that were referred to as the "Mini Projects", the total value of these projects was +/- R 180 mil. With a relatively small team of sub contractors, we managed to complete these projects in less than a year. The disciplines involved in these projects was structural, civil, mechanical and electrical. May 2006 to August 2009 SITE ERECTION CONSULTANT Responsible for the site erection of communication towers in a number of African countries. Towers were supplied by the company to clients who erect them in the field. I traveled to these sites and advised the local contractors on the correct erection methods including the civils and structural steel erection. The job entailed close liaison with client, subcontractors and the logistics of work in Africa and technical support in the field. CONSTRUCTION MANAGER Construction Manager at Sishen Iron Ore Mine. Responsible for the structural erection of buildings and installation of all crusher related equipment i.e. conveyors, feeders and chutes etc. for the primary, secondary and tertiary crusher plants. Disciplines involved Structural, mechanical and piping. The site labour peaked at 380 site personnel. Contract value +/-150 mil 2/…..
  • 3. -2- JAN 1994 TO APRIL 2006 – SELF EMPLOYED ON ENGINEERING PROJECTS PROJECT SITE MANAGEMENT AND MACHINE BUILDING PROJECTS: Mechanical sub-contractor for upgrade of assembly hall at Toyota SA. Employed at peak 40 skilled and semi-skilled engineering artisans. RECENT PROJECTS COMPLETED: • Re-build and upgrade press section for PG Bison Board including mechanicals and oil piping. • Site manager installation of surface refrigeration plant at gold mine (West Rand) • Site manager installation of chilled water plant at petro chemical plant. Set up and maintain QC function of project. • Mechanical and Piping Superintendent for installation of services piping and equipment for new stainless steel cold rolling mill. Project value+/-R600 million. I was responsible for the hydraulic system operating at 30 mpa 750Lt./min. Roll lubrication system capacity of 250 000 lt. Pipe diameters varied from 500 NB down to ¼ inch API and Sched.160 down to Sched.40. Included in the project were all the service lines i.e. air, pure water, potable water and instrumentation lines. 2400 different spool pieces were prefabricated, pickled and passivated then installed. • Site Manager, turnkey project for installation of two ammonia refrigeration surface plants for gold mines. Sub contract disciplines, Civil, Structural, Piping and Mechanicals and E&I. • Site Manager Turnkey project for the installation of Off-Gas (Carbon Monoxide) Distribution system at titanium Smelter Plant. Sub contract disciplines included civil works, structural steel, Piping, Mechanicals, Electrical / Instrumentation. ENGINEERING PROJECTS: PULP AND PAPER • Installation and polishing of approach flow piping (Paper Machine) • Build, install and commission Unwind and Rewind stands for Paper to Foil Laminating Plant • Build core sampling machine for moisture content of paper bales • Remove, balance and replace carrier rolls from Paper Machine • Install and align various piping, pumps and equipment in Paper Mills • Strip, refurbish and ship equipment from paper mill to new owners • Strip, inspect, repair and reassemble gearbox for cutter rolls on paper Sheeter • Strip, pack and ship the Sheeter to India. Travel to India to re-install and commission. 3/...
  • 4. -3- PIPING PROJECTS Pipe bending (Hydraulic mandrel bending machines) Pipe manipulation (ring rolling, etc.) Pre-fab, site fabrications and installations of Stainless Steel and Carbon Steel piping systems TYPICAL PROJECT COMPLETED • Manufacture, supply and installation of the process control, compressed air lines, (Carbon Steel seamless tube) at a number of Aluminum Smelter Plants • Pulp, water and airlines common to the Paper Industry • Gas Lines (Ammonia) Water reticulation, oil etc., and common to refrigeration plant • Target industries: Pulp and Paper, Petro-chemical and Material Handling of conveyors and packaging etc. Staff employed: Boilermakers, fitter and turners, coded welders, pipe fitters Client reference: Mr B Volk Cell: 0824580826 brian@phcprojects.co.za Mr Luigi Angelozzi 031-7633933 Project’s Director – MAY 1988 TO DECEMBER 1993 WORKS MANAGER STAINLESS STEEL TUBE MANUFACTURER – ACME INSTALLATIONS IN DURBAN • General Management of production, sales and maintenance • The company produced thin walled stainless steel tube to the Paper, Food and beverage and Architectural industries • Responsible for the design and manufacture of plant and equipment related to this industry, e.g. the design manufacture and commissioning of a tube mill producing Stainless Steel tube up to 168mm dia. by continuous fusion (TIG) weld. Staff employed: Boilermakers, coded welders, trade qualified maintenance staff Reference: Mr Philippe Lenferne De La Motte Tel: 031-2612459 4/…..
  • 5. -4- JULY 1982 TO APRIL 1988 WORKS / ENGINEERING MANAGER: CONSTRUCTION INDUSTRY • Mechanical Workshop (Foreman) • Maintenance of construction related plant and equipment, i.e., earth moving machinery, conveyors, etc. The rebuild and modification of above plant and equipment • Bar Yard (Works manager) • Day to day running of Reinforcing Bar yard and Mesh factory, on-site fixing of reinforcing steel including concrete work (Roads, Bridges, Buildings, etc.) • Site supervision of pre-cast concrete yard • Full management responsibility of the above facility (Labour, Profitability, budgets and projections) SEPTEMBER 1979 TO MAY 1982 ENGINEERING PRODUCTION MANAGER BUILDING / CIVIL CONSTRUCTION INDUSTRY • Design and manufacture of construction related machinery and equipment such as concrete truck mixers, block making machines, block stacking machines, forklift dumpers, lift dump trucks and tipper trucks for the civil/structural engineering industry. • Project planning and management • Responsibility for operation of boiler shop, machine shop and drawing office, estimating and planning. • Manufacturing processes included CNC lathes and machine centers, general machine tools and heavy plate rolls,guillotines,profile cutters and various welding systems including submerged arc, MIG and TIG • Staff employed: Artisans, boilermakers, fitter and turners, coded welders and semi-skilled laborers APRIL 1978 TO MAY 1979 MAINTENANCE FOREMAN FOR PLASTIC COMPANY SALTRAMA PLASTICS (HARARE, ZIMBABWE) • Planning and implementation of preventative maintenance scheme • Responsible for new projects such as installation of new plant, design and manufacture of new plant and equipment, modifications to existing plant • Responsible for the efficient running of the services plant, air compressors, refrigeration plant, electrical distribution, gas supply • Staff employed: Artisans, semi-skilled workshop personnel
  • 6. 5/…. -5- JUNE 1976 TO APRIL 1978 MECHANICAL ESTIMATOR AND PRODUCTION SUPERVISOR FOR ARMAMENTS MANUFACTURER • Project planning and scheduling, shop floor supervision • Manufacturing processes: automatic latches, milling machines, press shop, welding shop, assembly, dispatch • Staff employed: Artisans, semi-skilled machine operators / assembly workers 1974 to 1976 ENGINEERING OFFICER – MERCHANT NAVY – SAFMARINE 1968 TO 1973 APPRENTICESHIP FITTER AND TURNER – NIMR & CHAPMAN, BULAWAYO, ZIMBABWE
  • 7. 5/…. -5- JUNE 1976 TO APRIL 1978 MECHANICAL ESTIMATOR AND PRODUCTION SUPERVISOR FOR ARMAMENTS MANUFACTURER • Project planning and scheduling, shop floor supervision • Manufacturing processes: automatic latches, milling machines, press shop, welding shop, assembly, dispatch • Staff employed: Artisans, semi-skilled machine operators / assembly workers 1974 to 1976 ENGINEERING OFFICER – MERCHANT NAVY – SAFMARINE 1968 TO 1973 APPRENTICESHIP FITTER AND TURNER – NIMR & CHAPMAN, BULAWAYO, ZIMBABWE