1 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Mechanical Engineering Design
Portfolio
Ngai Chung Lau (B. Mechanical Engineering)
2 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Index
1 CONTENTS
2 About Me ....................................................................................................................................................... 1
2.1 Summary ................................................................................................................................................. 1
2.2 Education and Qualification................................................................................................................ 1
2.3 Work Experience .................................................................................................................................... 1
2.4 Achievements ........................................................................................................................................ 2
2.5 Skills........................................................................................................................................................... 2
3 Mechanical Design Components .............................................................................................................. 3
3.1 Q3-Service Cases Wedge Master Shelf .............................................................................................. 3
3.2 Q3 Series Case Alignment Issue........................................................................................................... 5
3.3 R3 Service Master Shelf and Finite Element Analysis (FEA)............................................................... 7
3.4 Bakery Case Service Master Shelf ....................................................................................................... 9
4 Project Management................................................................................................................................. 10
4.1 Wire Rack Project................................................................................................................................. 10
4.2 Missed Wire Diagrams on PLM System .............................................................................................. 12
4.3 Joint Trim Check Sheet Project .......................................................................................................... 13
1 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
2 ABOUT ME
2.1 SUMMARY
Passionate about designing, proficient in CAD modeling and Drafting with 1 year working experience
in designing sheet metal in Solid Edge as contract engineer at Hussmann, which provide display
merchandisers, refrigeration systems, installation and services to food retailers worldwide. Proven
ability to successfully and simultaneously manage multiple design projects within or ahead of
schedule. Ability to review designs, and look for improvements to reduce cost and assembly time.
Core competencies include:
 Engineering documentation
 Estimating part cost
 Finite element analysis (FEA/FMEA)
 Multiple CAD software knowledge
 PLM- Team Center
 Project Management
Career Summary:
 Made design changes on over 1,000 parts.
 Modified and updated over 1,500 engineering drawings.
 Created over 80 prototypes and submitted to manufacturing factory for testing.
 Designed and created more than 100 new sheet metal parts and 10 master parts in 3D CAD
program Solid Edge ST6.
 Checked and updated Bill of materials (BOM) using Bann, an enterprise resource planning
(ERP) software.
 Created Process Requests (PR) and assigned Engineering Change Notices (ECN) using Product
lifecycle management (PLM) Team Center.
 Managed over 1,000 ECNs and assigned them to corresponding designers.
 Assisted Engineers to build testing model structures on Team Center. Tested and looked for
solution on accelerating ECN completion process time.
1 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
2.2 EDUCATION AND QUALIFICATION
Bachelor of Science in Mechanical Engineering Aug 2012 – May 2016
California Baptist University, Riverside, CA GPA: 3.3
2.3 WORK EXPERIENCE
Hussmann Corporation, Chino, CA
Temporary Engineer August 2016 –Dec 2016
 VAVE Q3-Service Cases Wedge Master Shelf
- Designed and delivered new concepts to Engineering Leads.
- Reduced total shelf parts from 8 parts to 3 parts
- Enhanced total performance and fulfilled engineering and marketing requirement.
 Q3 series Case Alignment Issue
- Designed and presented 4 concept designs to Engineering Leads.
- 3 concept designs fulfilled engineering and marketing requirement.
- 2 concepts designs were built as prototypes and pending to test.
 VAVE R3, Q-DV and BC Cases Master Shelf Project
- Designed new master shelf for display cases, reduced shelf parts from 7 pieces to 1 piece.
- Maintained same performance as original design.
- Greatly reduced assemble time and total cost.
 VAVE Q-Series Project
- Designed new panel and bracket for Q1-SS & Q3-SS cases.
- Reduced material cost by 20% and assembling time by 30%.
 Wiring Diagrams Project
- Assisted electrical engineer to update hundreds of wire diagrams.
- Revise and updated diagrams to PLM system.
 Joint Trim Check Sheet Project
- Designed new joint trims for existing case models.
- Created exploded views of 30 case models in Solid Edge ST6.
- Created In and Out lists of 30 case models to configuration team for BoM.
- Revised, redesigned and updated 30 check sheets to PLM system.
 Shelf Project, researched to minimize all shelfs’ cost.
 Team Center Super user, Designer and Change Specialist.
2 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Engineering Intern June 2016 - August 2016
 Accelerated engineering processes as being a role of Change Specialist on PLM system.
 Delivered tasks and created Engineering Change Notices to designers.
 Drafted Method of Assembly for the display cases.
 Revised drawings and made changes on designed products in Solid Edge ST6.
California Baptist University, Riverside, CA
Mechanical Engineering Undergraduate Assistant May 2014 – June 2014
● Supported operations at manufacturing research center.
● Increased the utilization of laboratory resources by 40%.
AutoCAD Undergraduate Grader Oct 2013 – Dec 2013
● Delivered weekly class reports in a timely manner.
Sun Fat Electric Products (Intl.) Co., Ltd, Hong Kong
Summer Engineer July 2012 – Aug 2012
● FEA and structure calculation for an evaporative mini-air cooler fan.
● CAD design on evaporative mini-air cooler fan.
2.4 ACHIEVEMENTS
Project, Underground Water Source Detector, California Baptist University 2016
● Developed a water source detector with Geophones, using off-center mass technique.
● Designed mechanical components in Auto Desk.
Project, Free-Fall Water Alternator, California Baptist University 2013
● Designed all necessary mechanical and electrical components in SolidWorks.
● Assembled and tested prototype system.
● Integrated a rechargeable battery and demonstrated capability by powering a light bulb.
2.5 SKILLS
Engineering Software: Auto CAD, Auto Desk, Lab view, SolidWorks, Solid Edge, Team Center
Computer Language/ Operating System: C++, MATLAB, Microsoft Office
Languages: native in Cantonese, professional in English and Mandarin
3 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
3 MECHANICAL DESIGN COMPONENTS
3.1 Q3-SERVICE CASES WEDGE MASTER SHELF
Problem Statement
The dimension from the original shelf design was fixed. The shelf was unable to slide and adjust on a
wedge key rail attached on the case. Engineering, manufacturing and marketing Leads requested
an engineering solution to design a high performance shelf.
Shelf was unable to adjust. It
was causing a huge labor
cost and time for assembling.
4 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Solution Provided
 Delivered and presented a new concept design to engineering leads.
 Designed and built two prototypes with clearance for adjustment.
 New design was able to slide on wedge key rail.
 Reduced to 3 total parts from original 7 parts for shelf.
Prototypes were built and applied on Q3-DV 22.5 Case. New design brought out flexibility and high
performance to slide and adjust after attaching on the key rails of the display case. New design also
contained high strength for supporting 230 lb. force load. It also provided high visibility for customers
to see through products under the shelf.
Result
Engineering solution fulfilled and approved by Engineering, manufacturing and marketing
departments. Design concept can be applied on all wedge-series cases for future improvement.
5 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
3.2 Q3 SERIES CASE ALIGNMENT ISSUE
Problem Statement
The Brackets for case-to-case alignment did not align properly due to whole case sheet metal
bending factors and assembly errors on manufacturing factory. Manufacturing building line required
extra time putting two cases together. Request was received to deliver an engineering mechanism
solution. No constrains were mentioned.
Solution Provided
Note: The size of original design was 1.1’ x 1.03’ 2.166’ and new design should maintain inside the
front cover.
6 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Four concept designs were created after model cases investigation:
Design 1:
Reduced holes on right
side to. 187ø. Created ‘X’
slot on left bracket
Design 2:
Reduced holes on right
side to. 187ø. Created total
of 7 holes on left bracket,
with .252 inch few from
center and 60 degree
angle each
Design 3:
Reduced lower holes on
both side to .375ø. Created
.187ø X.3 horizontal slot on
right bracket and .187ø X.3
vertical slot on left bracket
Design 4:
Created new bracket
with 2 round slots.
Connecting 2 brackets
with a beam. Add
washer to increase up
down distance.
7 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Results
Design 3& 4 got approved from engineering leads and were submitted to fabricate prototypes.
Testing and review was pending.
3.3 R3 SERVICE MASTER SHELF AND FINITE ELEMENT ANALYSIS (FEA)
Problem Statement
Original shelf contained 7 sub-parts. Engineering department requested an engineering solution that
to reduce total sub-parts, cost and assembly time.
Solution Provided
Designed a new master shelf with reducing total sub-parts from 7 to 1 piece, materials in galvanize
and stainless steel.
8 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Old-New Shelf Comparison:
Finite Element Analysis (FEA):
Shelf Material: 2750008, .071 MIN G60 GL. Simulating as the shelf was fixed on two brackets at the back and received a
230lbf evenly down on the surface. Yield Stress was at 38 ksi and it passed the FEA
Results
Master shelf got approved from engineering and manufacturing lead. 4’, 5’ and 6’width with 10” and
12” length solid and glass see-through R3 case shelfs were created base on the master shelf.
Concept was also applied on other model cases’ master shelf projects.
New design built in one piece of
sheet metal and provided same
strength as the old design. Assemble
time and labor cost was greatly
reduced.
9 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
3.4 BAKERY CASE SERVICE MASTER SHELF
Problem Statement
Original shelf contained 7 sub-parts. Engineering department requested an engineering solution that
to reduce total sub-parts, cost and assembly time.
Solution Provided
Applied the same design concept as R3 case master shelf but followed all constrains as of the
original BC shelf.
Old-New Shelf assembled on Bakery Case:
Results
Master shelf got approved from engineering and manufacturing lead. 14 child shelves were created
base on the master shelf. Concept was also applied on other model cases’ master shelf projects.
10 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
4 PROJECT MANAGEMENT
4.1 WIRE RACK PROJECT
Problem Statement
Wire Racks were fabricated by other companies. Engineering department found a new supplier and
would like to compare the cost. However, most wire rack engineering drawings was out of dated
and did not have 3D model. It made confusion for new supplier to follow direction. Engineering
department required to complete a detail package for all wire racks included engineering drawing,
DXF and IGS files. Only wire rack part numbers were listed in corresponding case type, 3D models,
PDF, DXF and IGS were missing.
Solution Provided
Checked with PLM system Team Center and located existing wire racks. Prepared an excel sheet and created a
checklist for each wire racks.
Created all missing 3D models, DXF, IGS and PDF with updated information on each individual wire
rack.
11 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Completed excel sheet and zip files for each cases.
Results
New Supplier was able to follow the package and offered their price to engineering department.
Engineering department compared the cost difference between two suppliers and pended for
further decision.
12 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
4.2 MISSED WIRE DIAGRAMS ON PLM SYSTEM
Problem Statement
Company swiped to different PLM system at 2013 and majority of the engineering data were missing
or not up-to-date. Wire Diagrams of many display cases did not exist on the new PLM system.
Manufacturing factory was not able to receive updated wire diagrams, which created a huge
amount of building errors. Whole production process was delayed and it caused extra labor cost and
time as scheduled.
Solution Provided
Assisted electrical engineer to locate corresponding wire diagrams in company’s in-network storage
driver. Created excel sheet to identify which wire diagrams were missing on PLM system. Created PRs
and assigned ECNs on PLM system. Updated over 100 wire diagrams with new engineering template.
Uploaded all updated wire diagrams in .pdf formats on PLM system.
13 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
Results
Successfully delivered all first priority wires diagrams to PLM system. Manufacturing production lines
were able to get updated drawings on their system.
4.3 JOINT TRIM CHECK SHEET PROJECT
Problem Statement
Manufacturing factory required to follow joint trim check sheet when putting display cases together.
Joint trim check sheet gave details information for all essential parts such as trims’ part numbers,
quantities, and direction where the corresponding joint trims located. Engineering department and
BoM specialists reported many check sheets were outdated. Trim part numbers, quantities were
incorrect and misleading. It made new employees hard to follow.
Solution Provided
Worked with engineering configuration team and manufacturing engineer and located outdated
check sheets.
 Updated over 30 engineering drawings for Joint Trim Checklist
14 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
 Created joint trim explored view for 30 cases
 Created new joint trims as required from manufacturing engineers and released parts on PLM
system
15 | P a g e
Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798
 Corrected and Confirmed the Item description, part numbers and quantities in each check
sheets
 Created IN and Out List for each check sheets and submitted to BOM Specialists
Results
Fulfilled Engineering and Manufacturing department needed. Responsible to update check
sheet when new parts are designed and provide in and out list for engineering configuration
team.

More Related Content

What's hot

Ptc creo aax_user-cases
Ptc creo aax_user-casesPtc creo aax_user-cases
Ptc creo aax_user-casesVictor Mitov
 
sudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectricsudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectricsudhakar sapuram
 
Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyKevin Fust
 
Ptc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationPtc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationVictor Mitov
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill
 
Isdx2 success slides
Isdx2 success slidesIsdx2 success slides
Isdx2 success slidesVictor Mitov
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3Elbert Speed III
 
Curtins Summer Placement Review
Curtins Summer Placement ReviewCurtins Summer Placement Review
Curtins Summer Placement ReviewKelvin Gwaruka
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeRené Rodríguez, Jr.
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineerMohammed Obeidat, I.A
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5WarrenFaeth
 
Creo essentials ptc solutions success slide
Creo essentials ptc solutions success slideCreo essentials ptc solutions success slide
Creo essentials ptc solutions success slideVictor Mitov
 

What's hot (20)

Ptc creo aax_user-cases
Ptc creo aax_user-casesPtc creo aax_user-cases
Ptc creo aax_user-cases
 
sudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectricsudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectric
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Showcase slide
Showcase slideShowcase slide
Showcase slide
 
Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case Study
 
Ptc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationPtc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentation
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
Tdo case studies
Tdo case studiesTdo case studies
Tdo case studies
 
Isdx2 success slides
Isdx2 success slidesIsdx2 success slides
Isdx2 success slides
 
Suraj_Curriculum Vitae
Suraj_Curriculum VitaeSuraj_Curriculum Vitae
Suraj_Curriculum Vitae
 
Tolcap Training
Tolcap TrainingTolcap Training
Tolcap Training
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
 
Curtins Summer Placement Review
Curtins Summer Placement ReviewCurtins Summer Placement Review
Curtins Summer Placement Review
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
 
Madhu_LPD.doc
Madhu_LPD.docMadhu_LPD.doc
Madhu_LPD.doc
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
External Resume
External ResumeExternal Resume
External Resume
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
Creo essentials ptc solutions success slide
Creo essentials ptc solutions success slideCreo essentials ptc solutions success slide
Creo essentials ptc solutions success slide
 
kushal kumar srivastava
kushal kumar srivastavakushal kumar srivastava
kushal kumar srivastava
 

Viewers also liked

Mechanical_Engineering_Portfolio_2016_6_16
Mechanical_Engineering_Portfolio_2016_6_16Mechanical_Engineering_Portfolio_2016_6_16
Mechanical_Engineering_Portfolio_2016_6_16Zach Howard
 
RoboticsProject2Report (1)
RoboticsProject2Report (1)RoboticsProject2Report (1)
RoboticsProject2Report (1)Agraj Sobti
 
Robot Simulation final
Robot Simulation finalRobot Simulation final
Robot Simulation finaladityamadhwa
 
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM IAEME Publication
 
Simulink for Work Groups Using Simulink Projects
Simulink for Work Groups Using Simulink ProjectsSimulink for Work Groups Using Simulink Projects
Simulink for Work Groups Using Simulink ProjectsJoachim Schlosser
 
application based Presentation on matlab simulink & related tools
application based Presentation on matlab simulink & related toolsapplication based Presentation on matlab simulink & related tools
application based Presentation on matlab simulink & related toolsEshaan Verma
 
Matlab simulink introduction
Matlab simulink introductionMatlab simulink introduction
Matlab simulink introductionAmeen San
 
Introduction to MATLAB
Introduction to MATLABIntroduction to MATLAB
Introduction to MATLABRavikiran A
 
MATLAB/SIMULINK for engineering applications: day 3
MATLAB/SIMULINK for engineering applications: day 3MATLAB/SIMULINK for engineering applications: day 3
MATLAB/SIMULINK for engineering applications: day 3reddyprasad reddyvari
 

Viewers also liked (11)

Mechanical_Engineering_Portfolio_2016_6_16
Mechanical_Engineering_Portfolio_2016_6_16Mechanical_Engineering_Portfolio_2016_6_16
Mechanical_Engineering_Portfolio_2016_6_16
 
RoboticsProject2Report (1)
RoboticsProject2Report (1)RoboticsProject2Report (1)
RoboticsProject2Report (1)
 
Robot Simulation final
Robot Simulation finalRobot Simulation final
Robot Simulation final
 
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM
MODELLING SIMULATION AND CONTROL OF AN ACTIVE SUSPENSION SYSTEM
 
Simulink for Work Groups Using Simulink Projects
Simulink for Work Groups Using Simulink ProjectsSimulink for Work Groups Using Simulink Projects
Simulink for Work Groups Using Simulink Projects
 
application based Presentation on matlab simulink & related tools
application based Presentation on matlab simulink & related toolsapplication based Presentation on matlab simulink & related tools
application based Presentation on matlab simulink & related tools
 
Eot Cranes Types And Their Uses
Eot Cranes Types And Their UsesEot Cranes Types And Their Uses
Eot Cranes Types And Their Uses
 
Engineering design portfolio
Engineering design portfolioEngineering design portfolio
Engineering design portfolio
 
Matlab simulink introduction
Matlab simulink introductionMatlab simulink introduction
Matlab simulink introduction
 
Introduction to MATLAB
Introduction to MATLABIntroduction to MATLAB
Introduction to MATLAB
 
MATLAB/SIMULINK for engineering applications: day 3
MATLAB/SIMULINK for engineering applications: day 3MATLAB/SIMULINK for engineering applications: day 3
MATLAB/SIMULINK for engineering applications: day 3
 

Similar to NgaiChung Lau, Portfolio

Similar to NgaiChung Lau, Portfolio (20)

Sampath_Resume
Sampath_ResumeSampath_Resume
Sampath_Resume
 
Chetan Kumar_LR
Chetan Kumar_LRChetan Kumar_LR
Chetan Kumar_LR
 
Simon Bainbridge
Simon BainbridgeSimon Bainbridge
Simon Bainbridge
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
 
Resume - Merwyn Cheruvathur
Resume - Merwyn CheruvathurResume - Merwyn Cheruvathur
Resume - Merwyn Cheruvathur
 
Ashwin_L&T
Ashwin_L&TAshwin_L&T
Ashwin_L&T
 
Resume-Aditya More
Resume-Aditya MoreResume-Aditya More
Resume-Aditya More
 
sathish_DESIGN_ENGINEER
sathish_DESIGN_ENGINEERsathish_DESIGN_ENGINEER
sathish_DESIGN_ENGINEER
 
CHANDRU RESUME DESIGN
CHANDRU RESUME DESIGNCHANDRU RESUME DESIGN
CHANDRU RESUME DESIGN
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013
 
225652649 sant-hosh
225652649 sant-hosh225652649 sant-hosh
225652649 sant-hosh
 
Resume_Pranab Kumar Samanta
Resume_Pranab Kumar SamantaResume_Pranab Kumar Samanta
Resume_Pranab Kumar Samanta
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
 
AES_Capabilities_09012016
AES_Capabilities_09012016AES_Capabilities_09012016
AES_Capabilities_09012016
 
Resume_Venkatesh
Resume_VenkateshResume_Venkatesh
Resume_Venkatesh
 
resume chetan (4)
resume chetan (4)resume chetan (4)
resume chetan (4)
 
Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017
 
Nagendra_Resume
Nagendra_ResumeNagendra_Resume
Nagendra_Resume
 
Tony resume
Tony resumeTony resume
Tony resume
 

NgaiChung Lau, Portfolio

  • 1. 1 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Mechanical Engineering Design Portfolio Ngai Chung Lau (B. Mechanical Engineering)
  • 2. 2 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Index 1 CONTENTS 2 About Me ....................................................................................................................................................... 1 2.1 Summary ................................................................................................................................................. 1 2.2 Education and Qualification................................................................................................................ 1 2.3 Work Experience .................................................................................................................................... 1 2.4 Achievements ........................................................................................................................................ 2 2.5 Skills........................................................................................................................................................... 2 3 Mechanical Design Components .............................................................................................................. 3 3.1 Q3-Service Cases Wedge Master Shelf .............................................................................................. 3 3.2 Q3 Series Case Alignment Issue........................................................................................................... 5 3.3 R3 Service Master Shelf and Finite Element Analysis (FEA)............................................................... 7 3.4 Bakery Case Service Master Shelf ....................................................................................................... 9 4 Project Management................................................................................................................................. 10 4.1 Wire Rack Project................................................................................................................................. 10 4.2 Missed Wire Diagrams on PLM System .............................................................................................. 12 4.3 Joint Trim Check Sheet Project .......................................................................................................... 13
  • 3. 1 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 2 ABOUT ME 2.1 SUMMARY Passionate about designing, proficient in CAD modeling and Drafting with 1 year working experience in designing sheet metal in Solid Edge as contract engineer at Hussmann, which provide display merchandisers, refrigeration systems, installation and services to food retailers worldwide. Proven ability to successfully and simultaneously manage multiple design projects within or ahead of schedule. Ability to review designs, and look for improvements to reduce cost and assembly time. Core competencies include:  Engineering documentation  Estimating part cost  Finite element analysis (FEA/FMEA)  Multiple CAD software knowledge  PLM- Team Center  Project Management Career Summary:  Made design changes on over 1,000 parts.  Modified and updated over 1,500 engineering drawings.  Created over 80 prototypes and submitted to manufacturing factory for testing.  Designed and created more than 100 new sheet metal parts and 10 master parts in 3D CAD program Solid Edge ST6.  Checked and updated Bill of materials (BOM) using Bann, an enterprise resource planning (ERP) software.  Created Process Requests (PR) and assigned Engineering Change Notices (ECN) using Product lifecycle management (PLM) Team Center.  Managed over 1,000 ECNs and assigned them to corresponding designers.  Assisted Engineers to build testing model structures on Team Center. Tested and looked for solution on accelerating ECN completion process time.
  • 4. 1 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 2.2 EDUCATION AND QUALIFICATION Bachelor of Science in Mechanical Engineering Aug 2012 – May 2016 California Baptist University, Riverside, CA GPA: 3.3 2.3 WORK EXPERIENCE Hussmann Corporation, Chino, CA Temporary Engineer August 2016 –Dec 2016  VAVE Q3-Service Cases Wedge Master Shelf - Designed and delivered new concepts to Engineering Leads. - Reduced total shelf parts from 8 parts to 3 parts - Enhanced total performance and fulfilled engineering and marketing requirement.  Q3 series Case Alignment Issue - Designed and presented 4 concept designs to Engineering Leads. - 3 concept designs fulfilled engineering and marketing requirement. - 2 concepts designs were built as prototypes and pending to test.  VAVE R3, Q-DV and BC Cases Master Shelf Project - Designed new master shelf for display cases, reduced shelf parts from 7 pieces to 1 piece. - Maintained same performance as original design. - Greatly reduced assemble time and total cost.  VAVE Q-Series Project - Designed new panel and bracket for Q1-SS & Q3-SS cases. - Reduced material cost by 20% and assembling time by 30%.  Wiring Diagrams Project - Assisted electrical engineer to update hundreds of wire diagrams. - Revise and updated diagrams to PLM system.  Joint Trim Check Sheet Project - Designed new joint trims for existing case models. - Created exploded views of 30 case models in Solid Edge ST6. - Created In and Out lists of 30 case models to configuration team for BoM. - Revised, redesigned and updated 30 check sheets to PLM system.  Shelf Project, researched to minimize all shelfs’ cost.  Team Center Super user, Designer and Change Specialist.
  • 5. 2 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Engineering Intern June 2016 - August 2016  Accelerated engineering processes as being a role of Change Specialist on PLM system.  Delivered tasks and created Engineering Change Notices to designers.  Drafted Method of Assembly for the display cases.  Revised drawings and made changes on designed products in Solid Edge ST6. California Baptist University, Riverside, CA Mechanical Engineering Undergraduate Assistant May 2014 – June 2014 ● Supported operations at manufacturing research center. ● Increased the utilization of laboratory resources by 40%. AutoCAD Undergraduate Grader Oct 2013 – Dec 2013 ● Delivered weekly class reports in a timely manner. Sun Fat Electric Products (Intl.) Co., Ltd, Hong Kong Summer Engineer July 2012 – Aug 2012 ● FEA and structure calculation for an evaporative mini-air cooler fan. ● CAD design on evaporative mini-air cooler fan. 2.4 ACHIEVEMENTS Project, Underground Water Source Detector, California Baptist University 2016 ● Developed a water source detector with Geophones, using off-center mass technique. ● Designed mechanical components in Auto Desk. Project, Free-Fall Water Alternator, California Baptist University 2013 ● Designed all necessary mechanical and electrical components in SolidWorks. ● Assembled and tested prototype system. ● Integrated a rechargeable battery and demonstrated capability by powering a light bulb. 2.5 SKILLS Engineering Software: Auto CAD, Auto Desk, Lab view, SolidWorks, Solid Edge, Team Center Computer Language/ Operating System: C++, MATLAB, Microsoft Office Languages: native in Cantonese, professional in English and Mandarin
  • 6. 3 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 3 MECHANICAL DESIGN COMPONENTS 3.1 Q3-SERVICE CASES WEDGE MASTER SHELF Problem Statement The dimension from the original shelf design was fixed. The shelf was unable to slide and adjust on a wedge key rail attached on the case. Engineering, manufacturing and marketing Leads requested an engineering solution to design a high performance shelf. Shelf was unable to adjust. It was causing a huge labor cost and time for assembling.
  • 7. 4 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Solution Provided  Delivered and presented a new concept design to engineering leads.  Designed and built two prototypes with clearance for adjustment.  New design was able to slide on wedge key rail.  Reduced to 3 total parts from original 7 parts for shelf. Prototypes were built and applied on Q3-DV 22.5 Case. New design brought out flexibility and high performance to slide and adjust after attaching on the key rails of the display case. New design also contained high strength for supporting 230 lb. force load. It also provided high visibility for customers to see through products under the shelf. Result Engineering solution fulfilled and approved by Engineering, manufacturing and marketing departments. Design concept can be applied on all wedge-series cases for future improvement.
  • 8. 5 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 3.2 Q3 SERIES CASE ALIGNMENT ISSUE Problem Statement The Brackets for case-to-case alignment did not align properly due to whole case sheet metal bending factors and assembly errors on manufacturing factory. Manufacturing building line required extra time putting two cases together. Request was received to deliver an engineering mechanism solution. No constrains were mentioned. Solution Provided Note: The size of original design was 1.1’ x 1.03’ 2.166’ and new design should maintain inside the front cover.
  • 9. 6 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Four concept designs were created after model cases investigation: Design 1: Reduced holes on right side to. 187ø. Created ‘X’ slot on left bracket Design 2: Reduced holes on right side to. 187ø. Created total of 7 holes on left bracket, with .252 inch few from center and 60 degree angle each Design 3: Reduced lower holes on both side to .375ø. Created .187ø X.3 horizontal slot on right bracket and .187ø X.3 vertical slot on left bracket Design 4: Created new bracket with 2 round slots. Connecting 2 brackets with a beam. Add washer to increase up down distance.
  • 10. 7 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Results Design 3& 4 got approved from engineering leads and were submitted to fabricate prototypes. Testing and review was pending. 3.3 R3 SERVICE MASTER SHELF AND FINITE ELEMENT ANALYSIS (FEA) Problem Statement Original shelf contained 7 sub-parts. Engineering department requested an engineering solution that to reduce total sub-parts, cost and assembly time. Solution Provided Designed a new master shelf with reducing total sub-parts from 7 to 1 piece, materials in galvanize and stainless steel.
  • 11. 8 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Old-New Shelf Comparison: Finite Element Analysis (FEA): Shelf Material: 2750008, .071 MIN G60 GL. Simulating as the shelf was fixed on two brackets at the back and received a 230lbf evenly down on the surface. Yield Stress was at 38 ksi and it passed the FEA Results Master shelf got approved from engineering and manufacturing lead. 4’, 5’ and 6’width with 10” and 12” length solid and glass see-through R3 case shelfs were created base on the master shelf. Concept was also applied on other model cases’ master shelf projects. New design built in one piece of sheet metal and provided same strength as the old design. Assemble time and labor cost was greatly reduced.
  • 12. 9 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 3.4 BAKERY CASE SERVICE MASTER SHELF Problem Statement Original shelf contained 7 sub-parts. Engineering department requested an engineering solution that to reduce total sub-parts, cost and assembly time. Solution Provided Applied the same design concept as R3 case master shelf but followed all constrains as of the original BC shelf. Old-New Shelf assembled on Bakery Case: Results Master shelf got approved from engineering and manufacturing lead. 14 child shelves were created base on the master shelf. Concept was also applied on other model cases’ master shelf projects.
  • 13. 10 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 4 PROJECT MANAGEMENT 4.1 WIRE RACK PROJECT Problem Statement Wire Racks were fabricated by other companies. Engineering department found a new supplier and would like to compare the cost. However, most wire rack engineering drawings was out of dated and did not have 3D model. It made confusion for new supplier to follow direction. Engineering department required to complete a detail package for all wire racks included engineering drawing, DXF and IGS files. Only wire rack part numbers were listed in corresponding case type, 3D models, PDF, DXF and IGS were missing. Solution Provided Checked with PLM system Team Center and located existing wire racks. Prepared an excel sheet and created a checklist for each wire racks. Created all missing 3D models, DXF, IGS and PDF with updated information on each individual wire rack.
  • 14. 11 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Completed excel sheet and zip files for each cases. Results New Supplier was able to follow the package and offered their price to engineering department. Engineering department compared the cost difference between two suppliers and pended for further decision.
  • 15. 12 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 4.2 MISSED WIRE DIAGRAMS ON PLM SYSTEM Problem Statement Company swiped to different PLM system at 2013 and majority of the engineering data were missing or not up-to-date. Wire Diagrams of many display cases did not exist on the new PLM system. Manufacturing factory was not able to receive updated wire diagrams, which created a huge amount of building errors. Whole production process was delayed and it caused extra labor cost and time as scheduled. Solution Provided Assisted electrical engineer to locate corresponding wire diagrams in company’s in-network storage driver. Created excel sheet to identify which wire diagrams were missing on PLM system. Created PRs and assigned ECNs on PLM system. Updated over 100 wire diagrams with new engineering template. Uploaded all updated wire diagrams in .pdf formats on PLM system.
  • 16. 13 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798 Results Successfully delivered all first priority wires diagrams to PLM system. Manufacturing production lines were able to get updated drawings on their system. 4.3 JOINT TRIM CHECK SHEET PROJECT Problem Statement Manufacturing factory required to follow joint trim check sheet when putting display cases together. Joint trim check sheet gave details information for all essential parts such as trims’ part numbers, quantities, and direction where the corresponding joint trims located. Engineering department and BoM specialists reported many check sheets were outdated. Trim part numbers, quantities were incorrect and misleading. It made new employees hard to follow. Solution Provided Worked with engineering configuration team and manufacturing engineer and located outdated check sheets.  Updated over 30 engineering drawings for Joint Trim Checklist
  • 17. 14 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798  Created joint trim explored view for 30 cases  Created new joint trims as required from manufacturing engineers and released parts on PLM system
  • 18. 15 | P a g e Ngai Chung Lau- Mechanical Engineering Portfolio- mrchunglau@gmail.com- +1 (951)756-2019 / +852 6113 2798  Corrected and Confirmed the Item description, part numbers and quantities in each check sheets  Created IN and Out List for each check sheets and submitted to BOM Specialists Results Fulfilled Engineering and Manufacturing department needed. Responsible to update check sheet when new parts are designed and provide in and out list for engineering configuration team.