Naresh Kumar Saini is currently the Chief Engineer at The Gateway Resort Damdama Lake Gurgaon. He has over 9 years of experience in the hospitality industry, working at various levels and positions. He is seeking a challenging position that offers growth and stability. His qualifications include a Diploma in Electrical Engineering and experience at organizations such as The Gateway Resort Damdama Lake Gurgaon, Double Tree by Hilton Raipur, Elite Grande Bahrain, and Hotel Ista Amritsar in roles like Assistant Chief Engineer and Shift Engineer.
1. Naresh Kumar Saini
Naresh85_saini@rediffmail.com
30 yrs.
Una, Himachal Pradesh
+91 8396902672
Synopsis
______________________________________________________________________________________________________________________________
In span of last 9 years, with the hospitality industry, I have leaned, developed and performed at various levels
starting from root. My strengths in my career are Loyalty, creativity, sincerity, and my attitude, which are
proven by my testimonials and feedback.
I always aim to work professionally with a challenging position in an organization, which offers growth and
stability.
Professional Qualification
Diploma (Electrical) 2005 1st
division, Punjab State Board of Technical Education
Present Employment
____________________________________________________________________________________________________________________________
Currently working with THE GATEWAY Resort Damdama Lake Gurgaon (A unit of TAJ) as Chief Engineer.
Joined the Organization in August 2013 as Pre Opening Chief Engineer in The Gateway Hotel Raipur
and after successfully open the hotel got transferred to THE GATEWAY RESORT DAMDAMA RESORT
GURGAON.
Job Profile
• Ensures that regular, ongoing communication is happening in all areas of engineering. Continually
communicates a clear and consistent message regarding departmental goals to produce desired
results.
• Is perceptive of hotel environment. Reviews public space walk-through results and ensures building
is well maintained and operational areas have an atmosphere that meets or exceeds guest
expectations.
• Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and
electrical systems in accordance with brands Standard Operating Procedures.
• Prepares and submits reports required by state agencies for water consumption, wastewater
discharge and boiler emissions.
2. • Ensures building and equipment licenses, permits and certifications
• Builds positive relationships with external customers such as city building/zoning department, fire
prevention bureau and vendors.
• Ensures new hires participate in the department orientation program and receive the appropriate
new hire training to successfully perform their job. Ensures team members are cross-trained to
support successful daily operations.
• Reviews financial reports and statements to determine how Engineering is performing against
budget. Works with engineering leadership team to determine areas of concern and develops
strategies to improve the department financial performance.
• Ensures all technology relative to procurement is implemented
• Budget
Previous organizations
04th
Jan 2012 to July 2013
______________________________________________________________________________________________________________________________
Worked with Double Tree by Hilton (A unit of Hilton Worldwide) as Assistant Chief Engineer as a pre-
opening team member and successfully Open 184 rooms with three restaurants, Spa, Gym, swimming pool,
Splash pool & Three Banquet Halls
Job Profile
• Ensures that regular, ongoing communication is happening in all areas of engineering. Continually
communicates a clear and consistent message regarding departmental goals to produce desired
results.
• Is perceptive of hotel environment. Reviews public space walk-through results and ensures building
is well maintained and operational areas have an atmosphere that meets or exceeds guest
expectations.
• Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and
electrical systems in accordance with brands Standard Operating Procedures.
• Prepares and submits reports required by state agencies for water consumption, wastewater
discharge and boiler emissions.
• Ensures building and equipment licenses, permits and certifications
• Builds positive relationships with external customers such as city building/zoning department, fire
prevention bureau and vendors.
• Ensures new hires participate in the department orientation program and receive the appropriate
new hire training to successfully perform their job. Ensures team members are cross-trained to
support successful daily operations.
• Reviews financial reports and statements to determine how Engineering is performing against
budget. Works with engineering leadership team to determine areas of concern and develops
strategies to improve the department financial performance.
• Ensures all technology relative to procurement is implemented.
• Budget
28th
Jan 2011 to 1st Jan 2012
______________________________________________________________________________________________________________________________
3. Worked with Elite Grande as Assistant Chief Engineer in Bahrain Joined as a HOD of Engineering and
successfully Run 130 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool
10th
Jan 2009 to 12th
Jan 2011
______________________________________________________________________________________________________________________________
Worked With Hotel Ista Amritsar (a unit of IHHR) as Shift Engineer Joined as pre-opening team member
& successfully open 248 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool etc. Also took
handover of plant & machinery from project with minimum deficiency by putting extra efforts on snagging.
Job Profile
Reporting Chief Engineer
• Maintaining & up keeping hotel/resort to guest satisfaction.
• Monitoring & Control all mechanical, electrical, electronics, civil works, etc.
• Execution of preventive and schedule maintenance.
• Execution of environmental safety techniques.
• Supervision & training of subordinates and staff members.
• Supervision of gardening and landscaping work.
• Organizing safety & fire drills for staff members.
• Introduction & application of new techniques and skills.
• Procurement of engineering spares and maintaining engineering stores.
• Responsible for the AMF control of D.G (1500 KVA x2)
10th
Jan 2007 to 8th
Jan 2009
______________________________________________________________________________________________________________________________
Worked as a Team Member with hotel The Oberoi Cecil, (a unit of Oberoi)
Hands on experience of operation, repair and maintenance of followings
Captive power plant (Gen sets), Central air condition plant & Unit air conditioners, Space heating & swimming
pool heating, Hot water boilers, Steam boilers, Plate heat exchangers, Water softening & filtration plant, Cold
Storage, Sewerage treatment plant, Kitchen & Laundry equipment, EPABX and software configuration,
Electrical panels, Transformers, Fuel filling station, Fire fighting system, Vehicles, Building works like
carpentry, plumbing, masonry, painting, etc.
Notable accomplishments
• Successfully taken over from project team and smoothly switched over to engineering operations.
• Cut engineering operation cost by 30%.
• Managing project deficiencies with ease & comfort.
• Leading and motivating a team of 30 unskilled, semi and skilled people.