SlideShare a Scribd company logo
1 of 4
Naresh Kumar Saini
Naresh85_saini@rediffmail.com
30 yrs.
Una, Himachal Pradesh
+91 8396902672
Synopsis
______________________________________________________________________________________________________________________________
In span of last 9 years, with the hospitality industry, I have leaned, developed and performed at various levels
starting from root. My strengths in my career are Loyalty, creativity, sincerity, and my attitude, which are
proven by my testimonials and feedback.
I always aim to work professionally with a challenging position in an organization, which offers growth and
stability.
Professional Qualification
Diploma (Electrical) 2005 1st
division, Punjab State Board of Technical Education
Present Employment
____________________________________________________________________________________________________________________________
Currently working with THE GATEWAY Resort Damdama Lake Gurgaon (A unit of TAJ) as Chief Engineer.
Joined the Organization in August 2013 as Pre Opening Chief Engineer in The Gateway Hotel Raipur
and after successfully open the hotel got transferred to THE GATEWAY RESORT DAMDAMA RESORT
GURGAON.
Job Profile
• Ensures that regular, ongoing communication is happening in all areas of engineering. Continually
communicates a clear and consistent message regarding departmental goals to produce desired
results.
• Is perceptive of hotel environment. Reviews public space walk-through results and ensures building
is well maintained and operational areas have an atmosphere that meets or exceeds guest
expectations.
• Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and
electrical systems in accordance with brands Standard Operating Procedures.
• Prepares and submits reports required by state agencies for water consumption, wastewater
discharge and boiler emissions.
• Ensures building and equipment licenses, permits and certifications
• Builds positive relationships with external customers such as city building/zoning department, fire
prevention bureau and vendors.
• Ensures new hires participate in the department orientation program and receive the appropriate
new hire training to successfully perform their job. Ensures team members are cross-trained to
support successful daily operations.
• Reviews financial reports and statements to determine how Engineering is performing against
budget. Works with engineering leadership team to determine areas of concern and develops
strategies to improve the department financial performance.
• Ensures all technology relative to procurement is implemented
• Budget
Previous organizations
04th
Jan 2012 to July 2013
______________________________________________________________________________________________________________________________
Worked with Double Tree by Hilton (A unit of Hilton Worldwide) as Assistant Chief Engineer as a pre-
opening team member and successfully Open 184 rooms with three restaurants, Spa, Gym, swimming pool,
Splash pool & Three Banquet Halls
Job Profile
• Ensures that regular, ongoing communication is happening in all areas of engineering. Continually
communicates a clear and consistent message regarding departmental goals to produce desired
results.
• Is perceptive of hotel environment. Reviews public space walk-through results and ensures building
is well maintained and operational areas have an atmosphere that meets or exceeds guest
expectations.
• Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and
electrical systems in accordance with brands Standard Operating Procedures.
• Prepares and submits reports required by state agencies for water consumption, wastewater
discharge and boiler emissions.
• Ensures building and equipment licenses, permits and certifications
• Builds positive relationships with external customers such as city building/zoning department, fire
prevention bureau and vendors.
• Ensures new hires participate in the department orientation program and receive the appropriate
new hire training to successfully perform their job. Ensures team members are cross-trained to
support successful daily operations.
• Reviews financial reports and statements to determine how Engineering is performing against
budget. Works with engineering leadership team to determine areas of concern and develops
strategies to improve the department financial performance.
• Ensures all technology relative to procurement is implemented.
• Budget
28th
Jan 2011 to 1st Jan 2012
______________________________________________________________________________________________________________________________
Worked with Elite Grande as Assistant Chief Engineer in Bahrain Joined as a HOD of Engineering and
successfully Run 130 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool
10th
Jan 2009 to 12th
Jan 2011
______________________________________________________________________________________________________________________________
Worked With Hotel Ista Amritsar (a unit of IHHR) as Shift Engineer Joined as pre-opening team member
& successfully open 248 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool etc. Also took
handover of plant & machinery from project with minimum deficiency by putting extra efforts on snagging.
Job Profile
Reporting Chief Engineer
• Maintaining & up keeping hotel/resort to guest satisfaction.
• Monitoring & Control all mechanical, electrical, electronics, civil works, etc.
• Execution of preventive and schedule maintenance.
• Execution of environmental safety techniques.
• Supervision & training of subordinates and staff members.
• Supervision of gardening and landscaping work.
• Organizing safety & fire drills for staff members.
• Introduction & application of new techniques and skills.
• Procurement of engineering spares and maintaining engineering stores.
• Responsible for the AMF control of D.G (1500 KVA x2)
10th
Jan 2007 to 8th
Jan 2009
______________________________________________________________________________________________________________________________
Worked as a Team Member with hotel The Oberoi Cecil, (a unit of Oberoi)
Hands on experience of operation, repair and maintenance of followings
Captive power plant (Gen sets), Central air condition plant & Unit air conditioners, Space heating & swimming
pool heating, Hot water boilers, Steam boilers, Plate heat exchangers, Water softening & filtration plant, Cold
Storage, Sewerage treatment plant, Kitchen & Laundry equipment, EPABX and software configuration,
Electrical panels, Transformers, Fuel filling station, Fire fighting system, Vehicles, Building works like
carpentry, plumbing, masonry, painting, etc.
Notable accomplishments
• Successfully taken over from project team and smoothly switched over to engineering operations.
• Cut engineering operation cost by 30%.
• Managing project deficiencies with ease & comfort.
• Leading and motivating a team of 30 unskilled, semi and skilled people.
Personal details
______________________________________________________________________________________________________________________________
Father’s Name : Shri Tirath Ram Saini
Date of birth : August 23th
1985
Marital Status : Married
Nationality : Indian
Passport No. : H0390532
Languages known : English Hindi & Punjabi

More Related Content

What's hot

What's hot (20)

honey suryavanshi (3)
honey suryavanshi (3)honey suryavanshi (3)
honey suryavanshi (3)
 
Bhavin Ashar_Resume_201504
Bhavin Ashar_Resume_201504Bhavin Ashar_Resume_201504
Bhavin Ashar_Resume_201504
 
Mallikarjuna Reddy.G CV.
Mallikarjuna Reddy.G CV.Mallikarjuna Reddy.G CV.
Mallikarjuna Reddy.G CV.
 
CV-Ali Sutanto
CV-Ali SutantoCV-Ali Sutanto
CV-Ali Sutanto
 
CA Satish Singh Resume
CA Satish Singh ResumeCA Satish Singh Resume
CA Satish Singh Resume
 
Tyler Hartigan Resume
Tyler Hartigan ResumeTyler Hartigan Resume
Tyler Hartigan Resume
 
Kalpesh resume....
Kalpesh resume....Kalpesh resume....
Kalpesh resume....
 
Resume2[2]
Resume2[2]Resume2[2]
Resume2[2]
 
Ali anwar cv
Ali anwar cvAli anwar cv
Ali anwar cv
 
CA Satish Singh Resume
CA Satish Singh ResumeCA Satish Singh Resume
CA Satish Singh Resume
 
Omer CV Updated Nov 2015
Omer CV Updated Nov 2015Omer CV Updated Nov 2015
Omer CV Updated Nov 2015
 
Bhupendra Resume
Bhupendra ResumeBhupendra Resume
Bhupendra Resume
 
Cv of Essa Hameed
Cv of Essa HameedCv of Essa Hameed
Cv of Essa Hameed
 
resume_arun
resume_arunresume_arun
resume_arun
 
Vivek
VivekVivek
Vivek
 
MBA Finance With 9.5 Yrs Experience in Finance and Accounts
MBA Finance With 9.5 Yrs Experience in Finance and AccountsMBA Finance With 9.5 Yrs Experience in Finance and Accounts
MBA Finance With 9.5 Yrs Experience in Finance and Accounts
 
CV Fera Marlina
CV Fera MarlinaCV Fera Marlina
CV Fera Marlina
 
Zaffar Iqbal new CV
Zaffar Iqbal new CVZaffar Iqbal new CV
Zaffar Iqbal new CV
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
EOI
EOIEOI
EOI
 

Viewers also liked

Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016
Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016
Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016Business for Breakfast Ostrava
 
De Comate Company Profile (L)
De Comate Company Profile (L)De Comate Company Profile (L)
De Comate Company Profile (L)Lee Ching Yeo
 
DELITOS COMPUTACIONALES
DELITOS COMPUTACIONALESDELITOS COMPUTACIONALES
DELITOS COMPUTACIONALESZuly_28
 
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,AGPAOC- PMAWCA
 
DIL HAI HINDUSTANI
DIL HAI HINDUSTANIDIL HAI HINDUSTANI
DIL HAI HINDUSTANIAmAn Dhillon
 
2014 execsummary gilliganjin
2014 execsummary gilliganjin2014 execsummary gilliganjin
2014 execsummary gilliganjinAkash Ghosh
 
Ch03 supplement 1
Ch03 supplement 1Ch03 supplement 1
Ch03 supplement 1Akash Ghosh
 
Maruti Suzuki Ertiga Features - DD Motors
Maruti Suzuki Ertiga Features - DD MotorsMaruti Suzuki Ertiga Features - DD Motors
Maruti Suzuki Ertiga Features - DD MotorsDD Motors
 
How to improve website performance with real user data
How to improve website performance with real user dataHow to improve website performance with real user data
How to improve website performance with real user dataAudienceProject
 
PORT TRANSIT COST Session 1
PORT TRANSIT COST  Session 1PORT TRANSIT COST  Session 1
PORT TRANSIT COST Session 1AGPAOC- PMAWCA
 
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,AGPAOC- PMAWCA
 
CV - Anne Nash v1.1
CV - Anne Nash v1.1CV - Anne Nash v1.1
CV - Anne Nash v1.1Anne Nash
 
46042 analisis-templo del agua
46042 analisis-templo del agua46042 analisis-templo del agua
46042 analisis-templo del aguayerson676
 

Viewers also liked (17)

Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016
Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016
Jan Beneš z Petit atelier - Veletrh Milano, Trendy v řešení kuchyní 2016
 
De Comate Company Profile (L)
De Comate Company Profile (L)De Comate Company Profile (L)
De Comate Company Profile (L)
 
Simce leng 6basico guia 1
Simce leng 6basico guia 1Simce leng 6basico guia 1
Simce leng 6basico guia 1
 
DELITOS COMPUTACIONALES
DELITOS COMPUTACIONALESDELITOS COMPUTACIONALES
DELITOS COMPUTACIONALES
 
Question 2
Question 2Question 2
Question 2
 
final
finalfinal
final
 
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,
REPORT OF THE 3RD MEETING OF PMAWCA HARBOUR MASTERS’ NETWORK,
 
DIL HAI HINDUSTANI
DIL HAI HINDUSTANIDIL HAI HINDUSTANI
DIL HAI HINDUSTANI
 
2014 execsummary gilliganjin
2014 execsummary gilliganjin2014 execsummary gilliganjin
2014 execsummary gilliganjin
 
Ch03 supplement 1
Ch03 supplement 1Ch03 supplement 1
Ch03 supplement 1
 
Maruti Suzuki Ertiga Features - DD Motors
Maruti Suzuki Ertiga Features - DD MotorsMaruti Suzuki Ertiga Features - DD Motors
Maruti Suzuki Ertiga Features - DD Motors
 
How to improve website performance with real user data
How to improve website performance with real user dataHow to improve website performance with real user data
How to improve website performance with real user data
 
PORT TRANSIT COST Session 1
PORT TRANSIT COST  Session 1PORT TRANSIT COST  Session 1
PORT TRANSIT COST Session 1
 
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,
RAPPORT DE LA 3ème REUNION DU RESEAU DES COMMANDANTS DES PORTS DE L’AGPAOC,
 
CV - Anne Nash v1.1
CV - Anne Nash v1.1CV - Anne Nash v1.1
CV - Anne Nash v1.1
 
Turismo de-roboré
Turismo de-roboréTurismo de-roboré
Turismo de-roboré
 
46042 analisis-templo del agua
46042 analisis-templo del agua46042 analisis-templo del agua
46042 analisis-templo del agua
 

Similar to Chief Engineer resume for hospitality industry

Similar to Chief Engineer resume for hospitality industry (20)

Sanjay Patil 23
Sanjay Patil 23Sanjay Patil 23
Sanjay Patil 23
 
SAMPLE (3)
SAMPLE (3)SAMPLE (3)
SAMPLE (3)
 
Nabeel+Azmat
Nabeel+AzmatNabeel+Azmat
Nabeel+Azmat
 
Jai Balaji resume new
Jai Balaji resume newJai Balaji resume new
Jai Balaji resume new
 
Talal Kddoura C.V
Talal Kddoura C.VTalal Kddoura C.V
Talal Kddoura C.V
 
Alastair_Brett_CV_external_final
Alastair_Brett_CV_external_finalAlastair_Brett_CV_external_final
Alastair_Brett_CV_external_final
 
Resume Ramdas P
Resume Ramdas PResume Ramdas P
Resume Ramdas P
 
Betianmilikong
BetianmilikongBetianmilikong
Betianmilikong
 
Jackie Smith CV 2014 - V3
Jackie Smith CV 2014 - V3Jackie Smith CV 2014 - V3
Jackie Smith CV 2014 - V3
 
Tirthankar basu modified1_cv
Tirthankar basu modified1_cvTirthankar basu modified1_cv
Tirthankar basu modified1_cv
 
Tirthankar_Basu_modified1_cv
Tirthankar_Basu_modified1_cvTirthankar_Basu_modified1_cv
Tirthankar_Basu_modified1_cv
 
CV SG
CV SGCV SG
CV SG
 
John odo cv
John odo cvJohn odo cv
John odo cv
 
KOYEL BISWAS
KOYEL BISWASKOYEL BISWAS
KOYEL BISWAS
 
FacilitiesManager
FacilitiesManagerFacilitiesManager
FacilitiesManager
 
T.Charran Resume M
T.Charran Resume MT.Charran Resume M
T.Charran Resume M
 
KAUSHIK_Details
KAUSHIK_DetailsKAUSHIK_Details
KAUSHIK_Details
 
Neddie J Resume
Neddie J ResumeNeddie J Resume
Neddie J Resume
 
CHIRAG C V
CHIRAG C VCHIRAG C V
CHIRAG C V
 
Resume230615
Resume230615Resume230615
Resume230615
 

Chief Engineer resume for hospitality industry

  • 1. Naresh Kumar Saini Naresh85_saini@rediffmail.com 30 yrs. Una, Himachal Pradesh +91 8396902672 Synopsis ______________________________________________________________________________________________________________________________ In span of last 9 years, with the hospitality industry, I have leaned, developed and performed at various levels starting from root. My strengths in my career are Loyalty, creativity, sincerity, and my attitude, which are proven by my testimonials and feedback. I always aim to work professionally with a challenging position in an organization, which offers growth and stability. Professional Qualification Diploma (Electrical) 2005 1st division, Punjab State Board of Technical Education Present Employment ____________________________________________________________________________________________________________________________ Currently working with THE GATEWAY Resort Damdama Lake Gurgaon (A unit of TAJ) as Chief Engineer. Joined the Organization in August 2013 as Pre Opening Chief Engineer in The Gateway Hotel Raipur and after successfully open the hotel got transferred to THE GATEWAY RESORT DAMDAMA RESORT GURGAON. Job Profile • Ensures that regular, ongoing communication is happening in all areas of engineering. Continually communicates a clear and consistent message regarding departmental goals to produce desired results. • Is perceptive of hotel environment. Reviews public space walk-through results and ensures building is well maintained and operational areas have an atmosphere that meets or exceeds guest expectations. • Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and electrical systems in accordance with brands Standard Operating Procedures. • Prepares and submits reports required by state agencies for water consumption, wastewater discharge and boiler emissions.
  • 2. • Ensures building and equipment licenses, permits and certifications • Builds positive relationships with external customers such as city building/zoning department, fire prevention bureau and vendors. • Ensures new hires participate in the department orientation program and receive the appropriate new hire training to successfully perform their job. Ensures team members are cross-trained to support successful daily operations. • Reviews financial reports and statements to determine how Engineering is performing against budget. Works with engineering leadership team to determine areas of concern and develops strategies to improve the department financial performance. • Ensures all technology relative to procurement is implemented • Budget Previous organizations 04th Jan 2012 to July 2013 ______________________________________________________________________________________________________________________________ Worked with Double Tree by Hilton (A unit of Hilton Worldwide) as Assistant Chief Engineer as a pre- opening team member and successfully Open 184 rooms with three restaurants, Spa, Gym, swimming pool, Splash pool & Three Banquet Halls Job Profile • Ensures that regular, ongoing communication is happening in all areas of engineering. Continually communicates a clear and consistent message regarding departmental goals to produce desired results. • Is perceptive of hotel environment. Reviews public space walk-through results and ensures building is well maintained and operational areas have an atmosphere that meets or exceeds guest expectations. • Manages the physical plant including equipment, refrigeration, HVAC, plumbing, water treatment and electrical systems in accordance with brands Standard Operating Procedures. • Prepares and submits reports required by state agencies for water consumption, wastewater discharge and boiler emissions. • Ensures building and equipment licenses, permits and certifications • Builds positive relationships with external customers such as city building/zoning department, fire prevention bureau and vendors. • Ensures new hires participate in the department orientation program and receive the appropriate new hire training to successfully perform their job. Ensures team members are cross-trained to support successful daily operations. • Reviews financial reports and statements to determine how Engineering is performing against budget. Works with engineering leadership team to determine areas of concern and develops strategies to improve the department financial performance. • Ensures all technology relative to procurement is implemented. • Budget 28th Jan 2011 to 1st Jan 2012 ______________________________________________________________________________________________________________________________
  • 3. Worked with Elite Grande as Assistant Chief Engineer in Bahrain Joined as a HOD of Engineering and successfully Run 130 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool 10th Jan 2009 to 12th Jan 2011 ______________________________________________________________________________________________________________________________ Worked With Hotel Ista Amritsar (a unit of IHHR) as Shift Engineer Joined as pre-opening team member & successfully open 248 rooms with two restaurants, Spa, Gym, swimming pool, Splash pool etc. Also took handover of plant & machinery from project with minimum deficiency by putting extra efforts on snagging. Job Profile Reporting Chief Engineer • Maintaining & up keeping hotel/resort to guest satisfaction. • Monitoring & Control all mechanical, electrical, electronics, civil works, etc. • Execution of preventive and schedule maintenance. • Execution of environmental safety techniques. • Supervision & training of subordinates and staff members. • Supervision of gardening and landscaping work. • Organizing safety & fire drills for staff members. • Introduction & application of new techniques and skills. • Procurement of engineering spares and maintaining engineering stores. • Responsible for the AMF control of D.G (1500 KVA x2) 10th Jan 2007 to 8th Jan 2009 ______________________________________________________________________________________________________________________________ Worked as a Team Member with hotel The Oberoi Cecil, (a unit of Oberoi) Hands on experience of operation, repair and maintenance of followings Captive power plant (Gen sets), Central air condition plant & Unit air conditioners, Space heating & swimming pool heating, Hot water boilers, Steam boilers, Plate heat exchangers, Water softening & filtration plant, Cold Storage, Sewerage treatment plant, Kitchen & Laundry equipment, EPABX and software configuration, Electrical panels, Transformers, Fuel filling station, Fire fighting system, Vehicles, Building works like carpentry, plumbing, masonry, painting, etc. Notable accomplishments • Successfully taken over from project team and smoothly switched over to engineering operations. • Cut engineering operation cost by 30%. • Managing project deficiencies with ease & comfort. • Leading and motivating a team of 30 unskilled, semi and skilled people.
  • 4. Personal details ______________________________________________________________________________________________________________________________ Father’s Name : Shri Tirath Ram Saini Date of birth : August 23th 1985 Marital Status : Married Nationality : Indian Passport No. : H0390532 Languages known : English Hindi & Punjabi