SlideShare a Scribd company logo
1 of 2
Vivek Pandey
Contact Number: 08511272050
Email: vivek_mech99@rediffmail.com
A qualified BE (Mechanical Engineering) with 5+ years of experience in Procurement, Vendor Development &
Inventory Management,Planning ofMaterials,Material Sourcing,Production & Quality and Customer satisfaction.
 Worked with Crompton Greaves Ltd., Mandideep, Bhopal as Executive Procurement& contracts (June 2010 –
September 2012).
 Currently working with Schneider Electric Infrastructure Limited (MV Switchgear Division) as Engineer-
Quality & Customer Satisfaction (September 2012 – Till Date).
Professional Exposure
Crompton Greaves Ltd., Mandideep, Bhopal (Purchase/Materials Dept - June 2010 – September 2012)
 Worked with Crompton Greaves Ltd. (HT/LT Motor division) Bhopal an Avanata Group Companyleading in the
electrical and electronics Products.
 Exposure in material management activities involving material planning, scheduling & procurement of materials
& tooling from sources.
 In-depth knowledge of the consumables, spares & project planning and procurement
 Skilled at ensuring timely availability of materials for completion of project activities.
 Possess strong analytical, problem solving & organisational abilities.
 Knowledge of costing of fabrication and maching materials.
 Identifying gaps of vendors and improving by conducting audits .obtaining and evaluation of techno -commercial
offers. Negotiating techno-commercial offers before placement of order, preparation quotation evaluation
sheets for better control over material prices. Preparation of purchase order and obtaining approvals for the
same. Follow-up for timely delivery of material.
 Development of alternative sources for cost competitiveness, Cost reduction enchantment of credit terms
proper control over inventory.
 Observing the purchase order placement as per customer’s needs, handling inventory planning for raw material,
spares & vendor payment.
 Working in close coordination with vendors for detailing them on quality requirements.
 Evaluating & assessing vendors on parameters relating to cost, quality & delivery.
 Procurement cycle – E-Procurement & Purchase requisition, RFQ, Maintenance of quotations, vendor selection,
purchase orders, goods receipt and invoice verification.
 Evaluating & assessing vendors on parameters relating to cost, quality & deliver.
Schneider Electric Infrastructure Limited (MV Switchgear Division), Vadodara (Production/Indoor
Operation- Sep’2012 – Dec’2012)
 Handling material procurement, purchase planning, ensuring continuous supply at optimum costs and
outsourced the MV Panels/Switchgear.
 Overseeing production related tasks including planning, ordering, scheduling, identifying bottlenecks in
manufacturing and initiating actions for smooth manufacturing.
 Preparing 3 months forecasting plan for switchgear component and to ensure and fulfil customer requirement.
 Managing overall operations with a view to ensure timely accomplishment of production targets within the
time.
 Control month ends inventory flow with site supply specialist and sourcing team to ensure minimum inventory
is brought in to sustain the production line.
 Planning production, scheduling and controlling at assembly level.
 Handling the delivery of products and spares as per confirmation dates.
 Work with sourcing and operation directly to expedite the material, plan Master Schedule Plan(MPS) according
to material availability and capacity, maximize OTTR and OTTS with minimum past due.
Schneider Electric Infrastructure Limited (MV Switchgear Division), Vadodara (Customer
Satisfaction & Quality-Jan’2013-Till date)
 Managing in process manufacturing qualityinspection ofAIS product.
 FMEA analysis for all manufacturing productline.
 PCP for all manufacturing productoperation ofeach AIS product range.
 Product and Part validation.
 Prepare the QAP for Customer inspection ofSwitchgear.
 Customer ComplaintAnalysis & Improvement.
 Continuous Improvementactivities – 8D,Kaizen, Quality Alert, Pokayoke & Jidoka, Idea System and Lean
manufacturing.
 CapabilityAnalysis-Gauge R&R.
 Identifying and developing potential vendors through SAM Audit.
 Sub Contractor / Supplier Improvement& Training.
 Manufacturing Process Line Audit & Improvement.
 Training provides on productto Customers,Service Engineers & Marketing/Tendering Engineers.
IT Skills
 Knowledge ofSAP MM,PP & QA Module of SAP R/3 4.6c and 6.1
 Knowledge ofPLM (Team Centre 2005SR1 Admin).
 Outlook Express Mail System for inter/intra departmental communication.
 LOTUS NOTES Mail System for communication.
 Knowledge ofMinitab.
 Knowledge ofMS Word, MS Excel & Power point.
Academia
BE in Mechanical Engineering from BITS, Bhopal under RGPV University with 71.88% in the year 2010.
12th: CGBSE BOARD (2006)
10th: CBSE BOARD (2004)
Personal Information
Date of Birth: 30 Jan 1988
Languages Proficiency:English,Hindi.

More Related Content

What's hot (20)

CV
CVCV
CV
 
Resume-PPC
Resume-PPCResume-PPC
Resume-PPC
 
Eucharist Resume.doc
Eucharist Resume.docEucharist Resume.doc
Eucharist Resume.doc
 
Usha_Rani__G_CV (1)
Usha_Rani__G_CV (1)Usha_Rani__G_CV (1)
Usha_Rani__G_CV (1)
 
Resume ( Sachin Kumar)
Resume ( Sachin Kumar)Resume ( Sachin Kumar)
Resume ( Sachin Kumar)
 
Dipanwita_7 yrs_Logistics& Procurment-2016
Dipanwita_7 yrs_Logistics& Procurment-2016Dipanwita_7 yrs_Logistics& Procurment-2016
Dipanwita_7 yrs_Logistics& Procurment-2016
 
Ram resume
Ram resumeRam resume
Ram resume
 
Sowmi Resume
Sowmi ResumeSowmi Resume
Sowmi Resume
 
cv.....
cv.....cv.....
cv.....
 
Karthik_Resume
Karthik_ResumeKarthik_Resume
Karthik_Resume
 
MM_Ashwin Gawande
MM_Ashwin GawandeMM_Ashwin Gawande
MM_Ashwin Gawande
 
dhaval resume
dhaval resume dhaval resume
dhaval resume
 
Parts Sourcing Buyer
Parts Sourcing BuyerParts Sourcing Buyer
Parts Sourcing Buyer
 
Chi V. Duong - Resume
Chi V. Duong - ResumeChi V. Duong - Resume
Chi V. Duong - Resume
 
Resume - Atul NaikDesai
Resume - Atul NaikDesaiResume - Atul NaikDesai
Resume - Atul NaikDesai
 
My_CV
My_CVMy_CV
My_CV
 
RESUME (2)
RESUME (2)RESUME (2)
RESUME (2)
 
Resume - Nilesh
Resume - NileshResume - Nilesh
Resume - Nilesh
 
revised 5-27-2014 resume
revised 5-27-2014 resumerevised 5-27-2014 resume
revised 5-27-2014 resume
 
CV-Vipin Verma.doc
CV-Vipin Verma.docCV-Vipin Verma.doc
CV-Vipin Verma.doc
 

Viewers also liked

Leadership Awards Release2008
Leadership Awards Release2008Leadership Awards Release2008
Leadership Awards Release2008Patrick J. Lally
 
Myapnea slide
Myapnea slideMyapnea slide
Myapnea slidepmanko
 
Copy of Japanese Certificate
Copy of Japanese CertificateCopy of Japanese Certificate
Copy of Japanese CertificateLuyen Bui
 
Webquest exámen final
Webquest exámen finalWebquest exámen final
Webquest exámen finalanahianderson
 
Формирование патриотических чувств старших дошкольников через создание развив...
Формирование патриотических чувств старших дошкольников через создание развив...Формирование патриотических чувств старших дошкольников через создание развив...
Формирование патриотических чувств старших дошкольников через создание развив...irinka1012
 

Viewers also liked (13)

VIGNESH s
VIGNESH sVIGNESH s
VIGNESH s
 
Ciclo celular y cariotipo
Ciclo celular y cariotipoCiclo celular y cariotipo
Ciclo celular y cariotipo
 
Leadership Awards Release2008
Leadership Awards Release2008Leadership Awards Release2008
Leadership Awards Release2008
 
Tarea 9
Tarea 9Tarea 9
Tarea 9
 
Myapnea slide
Myapnea slideMyapnea slide
Myapnea slide
 
Copy of Japanese Certificate
Copy of Japanese CertificateCopy of Japanese Certificate
Copy of Japanese Certificate
 
Webquest exámen final
Webquest exámen finalWebquest exámen final
Webquest exámen final
 
Формирование патриотических чувств старших дошкольников через создание развив...
Формирование патриотических чувств старших дошкольников через создание развив...Формирование патриотических чувств старших дошкольников через создание развив...
Формирование патриотических чувств старших дошкольников через создание развив...
 
Dismenorrea e1
Dismenorrea e1Dismenorrea e1
Dismenorrea e1
 
Tarea de mecánica
Tarea de mecánicaTarea de mecánica
Tarea de mecánica
 
Heramientas para doblar
Heramientas para doblarHeramientas para doblar
Heramientas para doblar
 
Eca completo
Eca completoEca completo
Eca completo
 
Artritis reumatoide
Artritis reumatoideArtritis reumatoide
Artritis reumatoide
 

Similar to Experienced mechanical engineer resume

Avijit Roy Resume
Avijit  Roy ResumeAvijit  Roy Resume
Avijit Roy ResumeAvijit Roy
 
Avijit Roy_Resume
Avijit Roy_ResumeAvijit Roy_Resume
Avijit Roy_ResumeAvijit Roy
 
RAJA PRAKASH BALASUBRAMANIAN
RAJA PRAKASH  BALASUBRAMANIANRAJA PRAKASH  BALASUBRAMANIAN
RAJA PRAKASH BALASUBRAMANIANraja Prakash
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )S. Ravi Shankar
 
ravikiran sajja Resume
ravikiran sajja Resumeravikiran sajja Resume
ravikiran sajja ResumeRavi Kiran S
 
CV Pragati Mane-00
CV Pragati Mane-00CV Pragati Mane-00
CV Pragati Mane-00Pragati Mane
 
Ganesh Bangar c v (Purchase Plannning Procurement)
Ganesh Bangar c v (Purchase Plannning  Procurement) Ganesh Bangar c v (Purchase Plannning  Procurement)
Ganesh Bangar c v (Purchase Plannning Procurement) ganesh bangar
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTvishalskan
 
Ravi Kiran Resume
Ravi Kiran ResumeRavi Kiran Resume
Ravi Kiran ResumeRavi Kiran
 

Similar to Experienced mechanical engineer resume (20)

Avijit Roy Resume
Avijit  Roy ResumeAvijit  Roy Resume
Avijit Roy Resume
 
Avijit Roy_Resume
Avijit Roy_ResumeAvijit Roy_Resume
Avijit Roy_Resume
 
SUNAND KAPILA
SUNAND KAPILASUNAND KAPILA
SUNAND KAPILA
 
Resume.doc__1_
Resume.doc__1_Resume.doc__1_
Resume.doc__1_
 
RAJA PRAKASH BALASUBRAMANIAN
RAJA PRAKASH  BALASUBRAMANIANRAJA PRAKASH  BALASUBRAMANIAN
RAJA PRAKASH BALASUBRAMANIAN
 
Resume
ResumeResume
Resume
 
PPC-Resume.DOCX
PPC-Resume.DOCXPPC-Resume.DOCX
PPC-Resume.DOCX
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )
 
ravikiran sajja Resume
ravikiran sajja Resumeravikiran sajja Resume
ravikiran sajja Resume
 
CV Pragati Mane-00
CV Pragati Mane-00CV Pragati Mane-00
CV Pragati Mane-00
 
Ganesh Bangar c v (Purchase Plannning Procurement)
Ganesh Bangar c v (Purchase Plannning  Procurement) Ganesh Bangar c v (Purchase Plannning  Procurement)
Ganesh Bangar c v (Purchase Plannning Procurement)
 
Pankaj_CV
Pankaj_CVPankaj_CV
Pankaj_CV
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
NARINDER SINGH_CV
NARINDER SINGH_CVNARINDER SINGH_CV
NARINDER SINGH_CV
 
ankur resume
ankur resumeankur resume
ankur resume
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
 
Prashanth naik cv
Prashanth naik  cvPrashanth naik  cv
Prashanth naik cv
 
Resume Shriniwas Raichurkar
Resume Shriniwas RaichurkarResume Shriniwas Raichurkar
Resume Shriniwas Raichurkar
 
Ravi Kiran Resume
Ravi Kiran ResumeRavi Kiran Resume
Ravi Kiran Resume
 
Mohd riyazuddin
Mohd riyazuddinMohd riyazuddin
Mohd riyazuddin
 

Experienced mechanical engineer resume

  • 1. Vivek Pandey Contact Number: 08511272050 Email: vivek_mech99@rediffmail.com A qualified BE (Mechanical Engineering) with 5+ years of experience in Procurement, Vendor Development & Inventory Management,Planning ofMaterials,Material Sourcing,Production & Quality and Customer satisfaction.  Worked with Crompton Greaves Ltd., Mandideep, Bhopal as Executive Procurement& contracts (June 2010 – September 2012).  Currently working with Schneider Electric Infrastructure Limited (MV Switchgear Division) as Engineer- Quality & Customer Satisfaction (September 2012 – Till Date). Professional Exposure Crompton Greaves Ltd., Mandideep, Bhopal (Purchase/Materials Dept - June 2010 – September 2012)  Worked with Crompton Greaves Ltd. (HT/LT Motor division) Bhopal an Avanata Group Companyleading in the electrical and electronics Products.  Exposure in material management activities involving material planning, scheduling & procurement of materials & tooling from sources.  In-depth knowledge of the consumables, spares & project planning and procurement  Skilled at ensuring timely availability of materials for completion of project activities.  Possess strong analytical, problem solving & organisational abilities.  Knowledge of costing of fabrication and maching materials.  Identifying gaps of vendors and improving by conducting audits .obtaining and evaluation of techno -commercial offers. Negotiating techno-commercial offers before placement of order, preparation quotation evaluation sheets for better control over material prices. Preparation of purchase order and obtaining approvals for the same. Follow-up for timely delivery of material.  Development of alternative sources for cost competitiveness, Cost reduction enchantment of credit terms proper control over inventory.  Observing the purchase order placement as per customer’s needs, handling inventory planning for raw material, spares & vendor payment.  Working in close coordination with vendors for detailing them on quality requirements.  Evaluating & assessing vendors on parameters relating to cost, quality & delivery.  Procurement cycle – E-Procurement & Purchase requisition, RFQ, Maintenance of quotations, vendor selection, purchase orders, goods receipt and invoice verification.  Evaluating & assessing vendors on parameters relating to cost, quality & deliver. Schneider Electric Infrastructure Limited (MV Switchgear Division), Vadodara (Production/Indoor Operation- Sep’2012 – Dec’2012)  Handling material procurement, purchase planning, ensuring continuous supply at optimum costs and outsourced the MV Panels/Switchgear.  Overseeing production related tasks including planning, ordering, scheduling, identifying bottlenecks in manufacturing and initiating actions for smooth manufacturing.  Preparing 3 months forecasting plan for switchgear component and to ensure and fulfil customer requirement.  Managing overall operations with a view to ensure timely accomplishment of production targets within the time.  Control month ends inventory flow with site supply specialist and sourcing team to ensure minimum inventory is brought in to sustain the production line.  Planning production, scheduling and controlling at assembly level.  Handling the delivery of products and spares as per confirmation dates.  Work with sourcing and operation directly to expedite the material, plan Master Schedule Plan(MPS) according to material availability and capacity, maximize OTTR and OTTS with minimum past due.
  • 2. Schneider Electric Infrastructure Limited (MV Switchgear Division), Vadodara (Customer Satisfaction & Quality-Jan’2013-Till date)  Managing in process manufacturing qualityinspection ofAIS product.  FMEA analysis for all manufacturing productline.  PCP for all manufacturing productoperation ofeach AIS product range.  Product and Part validation.  Prepare the QAP for Customer inspection ofSwitchgear.  Customer ComplaintAnalysis & Improvement.  Continuous Improvementactivities – 8D,Kaizen, Quality Alert, Pokayoke & Jidoka, Idea System and Lean manufacturing.  CapabilityAnalysis-Gauge R&R.  Identifying and developing potential vendors through SAM Audit.  Sub Contractor / Supplier Improvement& Training.  Manufacturing Process Line Audit & Improvement.  Training provides on productto Customers,Service Engineers & Marketing/Tendering Engineers. IT Skills  Knowledge ofSAP MM,PP & QA Module of SAP R/3 4.6c and 6.1  Knowledge ofPLM (Team Centre 2005SR1 Admin).  Outlook Express Mail System for inter/intra departmental communication.  LOTUS NOTES Mail System for communication.  Knowledge ofMinitab.  Knowledge ofMS Word, MS Excel & Power point. Academia BE in Mechanical Engineering from BITS, Bhopal under RGPV University with 71.88% in the year 2010. 12th: CGBSE BOARD (2006) 10th: CBSE BOARD (2004) Personal Information Date of Birth: 30 Jan 1988 Languages Proficiency:English,Hindi.