Project: Risk Analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 1
Risk Analysis
▪ Risk is inherent in almost every business decision
▪ Risk refers to variability
▪ Capital budgeting decision involves cost and benefits over a long period of time
▪ Financial analysis has two phases
▪ feasibility analysis
▪ Risk analysis
▪ Sources of Risk
▪ Project Specific Risk: factors specific to project like quality, production
▪ Corporate Risk: action of competitors
▪ Industry specific Risk: technological developments and regulatory charges
▪ Market risk: Changes in microeconomic factors have impact project
▪ International risk: in case of foreign projects or political risk
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 2
Techniques of Risk Analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 3
Techniques for risk
analysis
Analysis of Stand
alone Project
Analysis of
Contextual Risk
Sensitivity Analysis Scenario Analysis
Break Even Analysis Hillier Model
Simulation Analysis Decision tree analysis
Corporate Risk
Analysis
Market Risk Analysis
Measures of Risk
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 4
Range : Range of variance is difference of maximum and minimum value
Mean or average ҧ𝑥 = 𝐸 𝑥 = σ𝑖 𝑝𝑖 𝑥𝑖
Standard deviation : standard deviation (𝜎 ) is defined as 𝜎 = 𝐸 𝑥 − ҧ𝑥 2 = σ𝑖 𝑝𝑖 𝑥 − ҧ𝑥 2
Coefficient of Variation: standard deviation (𝜎 ) is not adjusted for scale. Coefficient of
variation is adjusted for scale and is defined as 𝐶𝑉 =
𝜎
𝐸𝑥𝑝𝑒𝑐𝑡𝑒𝑑 𝑀𝑒𝑎𝑛 𝑣𝑎𝑙𝑢𝑒
Semi Variance: since investors are concerned with negative variations only so computing
variance with only negative errors (outcome less than mean) gives semi variance
standard deviation (𝜎 ) is defined as
𝑠𝑒𝑚𝑖 𝑠𝑡𝑎𝑛𝑑𝑎𝑟𝑑 𝑑𝑒𝑣𝑖𝑎𝑡𝑖𝑜𝑛 = 𝐸 𝑥 − ҧ𝑥 2 𝑓𝑜𝑟 𝑜𝑛𝑙𝑦 𝑣𝑎𝑙𝑢𝑒𝑠 𝑜𝑓 𝑥 < ҧ𝑥
Measures of Risk
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 5
NPY ( thousands) x Probability p px x- ҧ𝑥 𝑥 − ҧ𝑥 2 p * sq. error
200 0.3 60 -340 115600 34680
600 0.5 300 60 3600 1800
900 0.2 180 360 129600 25920
mean NPV ( ҧ𝑥) 540 Sq. variance 62400
std deviation 249.8
For the example, Range = 900-200 = 700 K
𝑀𝑒𝑎𝑛 𝑁𝑃𝑉 = 0.3 𝑥 200 + 0.5 𝑥 600 + 0.2 𝑥900 = 540
𝜎 = 𝐸 𝑥 − ҧ𝑥 2 = 0.3 𝑥 (−340)2+0.5 𝑥 602 + 0.2 𝑥 3602 = 249.8 𝐾
Coefficient of Variation, 𝐶𝑉 =
249.8
540
= 0.46
Semi standard deviation= 0.3 𝑥 (−340)2= 186.2 𝐾
Measures of Risk
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 6
• Standard deviation is most commonly employed as measure of risk in finance.
• For computing mean and dispersion variables, probability distribution is required,
• If sufficient records for similar ventures are available, probability distribution is quite
‘objective,
• If sufficient records are not available, probability distribution is quite ‘subjective’,
Prospective on risk
There are three perspectives of the risk
• Stand alone risk: risk of the project when viewed in isolation
• Firm risk or Corporate risk: contribution of a project to the risk of the firm
• Systematic risk or market risk: risk of a project from view point of diversified investor
Sensitivity analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 7
Sensitivity analysis is ‘what if’ analysis
NPV = -20000+4000 x PVIFA
= -20000+4000 x 5.65
= 2600 K
Cash flows depends on various factors and can
vary widely.
So optimistic and pessimistic estimates for
variables defined and NPV calculated
Cash Flow of ABC LTD project
(in thousands) Year 0 year 1-10
1 Investment 20000
2 Sales 18000
3 Variable cost ( 2/3 of sales) 12000
4 Fixed cost 1000
5 Depreciation 2000
6 Pre tax profit 3000
7 Taxes (@ 33.3 %) 1000
8 PAT 2000
9
cash flow from operation
(PAT+ depreciation) 4000
10 Net cash flow 2000 4000
Cost of capital 12%
Accumulated PV indexing factor (PVIFA) @12% 5.65
Sensitivity analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 8
• NPV calculated by varying one variable at a time
• NPV is more sensitive to sales and least sensitive to fixed cost. For more sensitive
variable, it may be explored how variability of the factor can be contained.
• In real situation, many variable may change at a time so interpretation of results is
subjective
Sensitivity of NPV to variations in the value of key variables in ABC LTD project
Range (in thousands) NPV
Pessimistic Expected Optimistic Pessimistic Expected Optimistic Variation
1 Investment 24000 20000 18000 -1400 2600 4600 6000
2 Sales 15000 18000 21000 -1147 2600 6366 7513
3
Variable cost
as percentage
70 66.67 65 340 2600 3730 3390
4 Fixed cost 1300 1000 800 1470 2600 3353 1883
Scenario analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 9
• Scenario analysis is beneficial when
various scenarios are well defined. It
considers several variable at a time
• More variable are required to be
estimated
• Normally scenarios are not discretely
defined
Sensitivity of NPV to variations in the value of key
variables in ABC LTD project
Range (in thousands)
Pessimistic Expected Optimistic
1 Investment 24000 20000 18000
2 Sales 15000 18000 21000
3
Variable cost
as percentage
70 66.67 65
4 Fixed cost 1300 1000 800
NPV -8180 2600 10438
Break-Even analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 10
• It tells what is minimum value of key variables/
revenues so that project does not ‘lose money’
• Variable cost to sales ratio= 12/18= 0.667
• Contribution to margin ratio =0.333
• Accounting break even=
𝐹𝑖𝑥𝑒𝑑 𝑐𝑜𝑠𝑡+𝑑𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑡𝑖𝑜𝑛
𝑐𝑜𝑛𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑡𝑜 𝑚𝑎𝑟𝑔𝑖𝑛 𝑟𝑎𝑡𝑖𝑜
=
1000+2000
0.333
= 9000 𝐾
• For sales 0f 9000 K , PBT, PAT will be zero
• At accounting break even project gives zero %
return
Cash Flow of ABC LTD project
(in thousands) Year 0 year 1-10
1 Investment 20000
2 Sales 18000
3 Variable cost ( 2/3 of sales) 12000
4 Fixed cost 1000
5 Depreciation 2000
6 Pre tax profit 3000
7 Taxes (@ 33.3 %) 1000
8 PAT 2000
9
cash flow from operation
(PAT+ depreciation) 4000
10 Net cash flow 2000 4000
Cost of capital 12%
Accumulated PV indexing factor (PVIFA) @ 12 % 5.65
Financial Break-Even analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 11
• Focus is on NPV and not on accounting profit
Variable cost =0.667 x sales
Contribution = 0.333 x sales
Fixed cost = 1000
Depreciation =2000
PBT= 0.333 x sales-3000
Tax= 0.333 x (0.333 x sales-3000)=0.111 x sales-1000
PAT= 0.667 x (0.333 x sales-3000)=0.222 x sales-2000
Cash flows= PAT+ depreciation= 0.222 x sales
PV of cash flows= Cash flows x PVIFA= 1.255 x sales
Breakeven NPV = 20000- 1.255 x sales= 0
so Breakeven sales= 15936 K
Cash Flow of ABC LTD project
(in thousands) Year 0 year 1-10
1 Investment 20000
2 Sales 18000
3 Variable cost (2/3 of sales) 12000
4 Fixed cost 1000
5 Depreciation 2000
6 Pre tax profit 3000
7 Taxes (@ 33.3 %) 1000
8 PAT 2000
9
cash flow from operation
(PAT+ depreciation) 4000
10 Net cash flow 2000 4000
Cost of capital 12%
Accumulated PV indexing factor (PVIFA) @ 12% 5.65
Hiller Model : Un correlated cash flows
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 12
interest rate = 12 %
Expected NPV, 𝑁𝑃𝑉 = σ 𝑡=1
3 𝐴 𝑡
(1+𝑟) 𝑡 =
5000
1.12
+
4000
(1.12)2 +
5000
(1.12)3
= 4464.3 + 3188. 8 + 3558.9 = 11211.9
Standard deviation 𝜎 𝑁𝑃𝑉 = σ 𝑡=1
3 𝜎𝑡
2
(1+𝑟)2𝑡 =
2400000
1.122 +
1600000
1.124 +
2400000
1.126 = 2036.18
Analytical derivation to find expected NPV and standard deviation of NPV
Year 1 Year 2 Year 3
Net Cash flow (Rs) Probability Net Cash flow (Rs) Probability Net Cash flow (Rs) Probability
3000 0.3 2000 0.2 3000 0.3
5000 0.4 4000 0.6 5000 0.4
7000 0.3 6000 0.2 7000 0.3
Mean 5000 4000 5000
Standard variance 2400000 Standard variance 1600000 Standard variance 2400000
Hiller Model : Perfectly correlated cash flows
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 13
interest rate = 12 %
Expected NPV, 𝑁𝑃𝑉 = σ 𝑡=1
4 𝐴 𝑡
(1+𝑟) 𝑡 − 1 =
5000
1.12
+
3000
(1.12)2 +
4000
(1.12)3 +
3000
(1.12)3 = 11609.54
Standard deviation 𝜎 𝑁𝑃𝑉 = σ 𝑡=1
4 𝜎𝑡
(1+𝑟) 𝑡 =
1500
1.12
+
1000
1.122 +
2000
1.123 +
1200
1.124 = 4322.66
Analytical derivation to find expected NPV and standard deviation of NPV for perfectly
correlated cash flows
A investment project involves a current outlay of Rs 10000. mean and standard deviation of cash
flows , which are perfectly correlated are as follows
year 𝐴 𝑡 𝜎 𝑁𝑃𝑉
1 5000 1500
2 3000 1000
3 4000 2000
4 3000 1200
Simulation Analysis
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 14
• Sensitivity of criterion of merit (NPV IRR, ROI etc.) may not be adequate for decision making
• Likelihood of occurrence of circumstances (probability profile) can be obtained by
simulation
• The steps in simulation analysis are (criterion of merit is NPV)
1. Model the project : how criterion of merit is related to variables
• Parameter variables : input variables given by decision maker held constant in
simulation
• Exogenous variable: which are random in nature and can not be controlled
2. Specify the value of parameters and probability distribution of exogenous variables
3. Select a value randomly from probability distribution of exogenous variables.
4. Determine NPV
5. Repeat steps 2 to 4 a number of times to get large number of simulated NPV’s
6. Plot the frequency distribution of NPV
Project selection under risk
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 15
• Judgemental Evaluation: Accept or reject the project based on the risk and return
characteristics without any formal method for incorporating risk in decision making
• Payback period requirement: payback period requirement is applied to control risk.
• Risk adjusted discount method:
• If the risk of the project is equal to risk of existing investment, discount rate is
average cost of capital
• If the risk of the project is greater than risk of existing investment, discount rate is
higher than average cost of capital
Thank You
19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 16
Contact
Email: naimkidwai@gmail.com
https://nrkidwai.wordpress.com/

More Related Content

What's hot (20)

Corporate restructuring
Corporate restructuringCorporate restructuring
Corporate restructuring
 
Retrenchment
RetrenchmentRetrenchment
Retrenchment
 
Investment management
Investment managementInvestment management
Investment management
 
Venture capital ppt
Venture capital pptVenture capital ppt
Venture capital ppt
 
Market and demand analysis
Market and demand analysisMarket and demand analysis
Market and demand analysis
 
Financial management
Financial managementFinancial management
Financial management
 
Indian financial system
Indian financial systemIndian financial system
Indian financial system
 
Strategic evaluation and control
Strategic evaluation and controlStrategic evaluation and control
Strategic evaluation and control
 
Retrenchment Strategies
Retrenchment StrategiesRetrenchment Strategies
Retrenchment Strategies
 
Securitization in india
Securitization in indiaSecuritization in india
Securitization in india
 
Strategy implementation
Strategy implementationStrategy implementation
Strategy implementation
 
RISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGRISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETING
 
Role of rbi as a regulator
Role of rbi as a regulatorRole of rbi as a regulator
Role of rbi as a regulator
 
Issues in foreign investment
Issues in foreign investment Issues in foreign investment
Issues in foreign investment
 
Indian financial system ppt
Indian financial system pptIndian financial system ppt
Indian financial system ppt
 
Security Analysis And Portfolio Managment
Security Analysis And Portfolio ManagmentSecurity Analysis And Portfolio Managment
Security Analysis And Portfolio Managment
 
Portfolio markowitz model
Portfolio markowitz modelPortfolio markowitz model
Portfolio markowitz model
 
Primary and Secondary Markets
Primary and Secondary MarketsPrimary and Secondary Markets
Primary and Secondary Markets
 
Presentation on financial services
Presentation on financial servicesPresentation on financial services
Presentation on financial services
 
Behavioural implimentations
Behavioural implimentationsBehavioural implimentations
Behavioural implimentations
 

Similar to project risk analysis

Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8Tinku Kumar
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...Aquamarine Emerald
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6rajeevgupta
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6rajeevgupta
 
Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206rajeevgupta
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingpremarhea
 
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3gitaovelia
 
NPV is net present value of document.ppt
NPV is net present value of document.pptNPV is net present value of document.ppt
NPV is net present value of document.pptSanthoshK757191
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingAmeen San
 
Fin 2732 investment decisions
Fin 2732 investment decisionsFin 2732 investment decisions
Fin 2732 investment decisionsYashGupta744
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibilityDr Naim R Kidwai
 
Risk analysis in investment
Risk analysis in investmentRisk analysis in investment
Risk analysis in investmenthimanshujaiswal
 
FN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppthass6
 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Landry De Chabe
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteriaAKSHAYA0000
 
781314.ppt
781314.ppt781314.ppt
781314.pptpisal3
 
Capital Budgeting Rules 04
Capital Budgeting Rules 04Capital Budgeting Rules 04
Capital Budgeting Rules 04rajeevgupta
 

Similar to project risk analysis (20)

Business Finance Chapter 8
Business Finance Chapter 8Business Finance Chapter 8
Business Finance Chapter 8
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3
Risk Analysis and Project Evaluation/Abshor.Marantika/Gita Mutiara Ovelia/3-3
 
NPV is net present value of document.ppt
NPV is net present value of document.pptNPV is net present value of document.ppt
NPV is net present value of document.ppt
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Fin 2732 investment decisions
Fin 2732 investment decisionsFin 2732 investment decisions
Fin 2732 investment decisions
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibility
 
Risk analysis in investment
Risk analysis in investmentRisk analysis in investment
Risk analysis in investment
 
FN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppt
 
Npv n other invest cri lec 4
Npv n other invest cri lec 4Npv n other invest cri lec 4
Npv n other invest cri lec 4
 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
781314.ppt
781314.ppt781314.ppt
781314.ppt
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital Budgeting Rules 04
Capital Budgeting Rules 04Capital Budgeting Rules 04
Capital Budgeting Rules 04
 
08.pdf
08.pdf08.pdf
08.pdf
 

More from Dr Naim R Kidwai

Asynchronous sequential circuit analysis
Asynchronous sequential circuit analysisAsynchronous sequential circuit analysis
Asynchronous sequential circuit analysisDr Naim R Kidwai
 
synchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registerssynchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registersDr Naim R Kidwai
 
Clocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and designClocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and designDr Naim R Kidwai
 
Sequential circuit-flip flops
Sequential circuit-flip flopsSequential circuit-flip flops
Sequential circuit-flip flopsDr Naim R Kidwai
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projectsDr Naim R Kidwai
 
multiple projects and constraints
multiple projects and constraintsmultiple projects and constraints
multiple projects and constraintsDr Naim R Kidwai
 
Nec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random processNec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random processDr Naim R Kidwai
 
spread spectrum communication
spread spectrum communicationspread spectrum communication
spread spectrum communicationDr Naim R Kidwai
 
Rec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re modelRec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re modelDr Naim R Kidwai
 
Rec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistorRec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistorDr Naim R Kidwai
 
Rec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristicsRec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristicsDr Naim R Kidwai
 
Rec101 unit v communication engg
Rec101 unit v communication enggRec101 unit v communication engg
Rec101 unit v communication enggDr Naim R Kidwai
 
Rec101 unit iii operational amplifier
Rec101 unit iii operational amplifierRec101 unit iii operational amplifier
Rec101 unit iii operational amplifierDr Naim R Kidwai
 
Rec101 unit 1 (part iii) diode applications
Rec101 unit 1 (part iii) diode applicationsRec101 unit 1 (part iii) diode applications
Rec101 unit 1 (part iii) diode applicationsDr Naim R Kidwai
 

More from Dr Naim R Kidwai (20)

Asynchronous sequential circuit analysis
Asynchronous sequential circuit analysisAsynchronous sequential circuit analysis
Asynchronous sequential circuit analysis
 
synchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registerssynchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registers
 
Clocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and designClocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and design
 
Sequential circuit-flip flops
Sequential circuit-flip flopsSequential circuit-flip flops
Sequential circuit-flip flops
 
Sampling Theorem
Sampling TheoremSampling Theorem
Sampling Theorem
 
Moodle introduction
Moodle introductionMoodle introduction
Moodle introduction
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projects
 
financing projects
financing projectsfinancing projects
financing projects
 
multiple projects and constraints
multiple projects and constraintsmultiple projects and constraints
multiple projects and constraints
 
Nec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random processNec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random process
 
spread spectrum communication
spread spectrum communicationspread spectrum communication
spread spectrum communication
 
Error Control coding
Error Control codingError Control coding
Error Control coding
 
information theory
information theoryinformation theory
information theory
 
Rec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re modelRec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re model
 
Rec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistorRec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistor
 
Rec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristicsRec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristics
 
Rec101 unit v communication engg
Rec101 unit v communication enggRec101 unit v communication engg
Rec101 unit v communication engg
 
Rec101 unit iv emi
Rec101 unit iv emiRec101 unit iv emi
Rec101 unit iv emi
 
Rec101 unit iii operational amplifier
Rec101 unit iii operational amplifierRec101 unit iii operational amplifier
Rec101 unit iii operational amplifier
 
Rec101 unit 1 (part iii) diode applications
Rec101 unit 1 (part iii) diode applicationsRec101 unit 1 (part iii) diode applications
Rec101 unit 1 (part iii) diode applications
 

Recently uploaded

Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthShaheen Kumar
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Sonam Pathan
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 

Recently uploaded (20)

Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 

project risk analysis

  • 1. Project: Risk Analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 1
  • 2. Risk Analysis ▪ Risk is inherent in almost every business decision ▪ Risk refers to variability ▪ Capital budgeting decision involves cost and benefits over a long period of time ▪ Financial analysis has two phases ▪ feasibility analysis ▪ Risk analysis ▪ Sources of Risk ▪ Project Specific Risk: factors specific to project like quality, production ▪ Corporate Risk: action of competitors ▪ Industry specific Risk: technological developments and regulatory charges ▪ Market risk: Changes in microeconomic factors have impact project ▪ International risk: in case of foreign projects or political risk 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 2
  • 3. Techniques of Risk Analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 3 Techniques for risk analysis Analysis of Stand alone Project Analysis of Contextual Risk Sensitivity Analysis Scenario Analysis Break Even Analysis Hillier Model Simulation Analysis Decision tree analysis Corporate Risk Analysis Market Risk Analysis
  • 4. Measures of Risk 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 4 Range : Range of variance is difference of maximum and minimum value Mean or average ҧ𝑥 = 𝐸 𝑥 = σ𝑖 𝑝𝑖 𝑥𝑖 Standard deviation : standard deviation (𝜎 ) is defined as 𝜎 = 𝐸 𝑥 − ҧ𝑥 2 = σ𝑖 𝑝𝑖 𝑥 − ҧ𝑥 2 Coefficient of Variation: standard deviation (𝜎 ) is not adjusted for scale. Coefficient of variation is adjusted for scale and is defined as 𝐶𝑉 = 𝜎 𝐸𝑥𝑝𝑒𝑐𝑡𝑒𝑑 𝑀𝑒𝑎𝑛 𝑣𝑎𝑙𝑢𝑒 Semi Variance: since investors are concerned with negative variations only so computing variance with only negative errors (outcome less than mean) gives semi variance standard deviation (𝜎 ) is defined as 𝑠𝑒𝑚𝑖 𝑠𝑡𝑎𝑛𝑑𝑎𝑟𝑑 𝑑𝑒𝑣𝑖𝑎𝑡𝑖𝑜𝑛 = 𝐸 𝑥 − ҧ𝑥 2 𝑓𝑜𝑟 𝑜𝑛𝑙𝑦 𝑣𝑎𝑙𝑢𝑒𝑠 𝑜𝑓 𝑥 < ҧ𝑥
  • 5. Measures of Risk 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 5 NPY ( thousands) x Probability p px x- ҧ𝑥 𝑥 − ҧ𝑥 2 p * sq. error 200 0.3 60 -340 115600 34680 600 0.5 300 60 3600 1800 900 0.2 180 360 129600 25920 mean NPV ( ҧ𝑥) 540 Sq. variance 62400 std deviation 249.8 For the example, Range = 900-200 = 700 K 𝑀𝑒𝑎𝑛 𝑁𝑃𝑉 = 0.3 𝑥 200 + 0.5 𝑥 600 + 0.2 𝑥900 = 540 𝜎 = 𝐸 𝑥 − ҧ𝑥 2 = 0.3 𝑥 (−340)2+0.5 𝑥 602 + 0.2 𝑥 3602 = 249.8 𝐾 Coefficient of Variation, 𝐶𝑉 = 249.8 540 = 0.46 Semi standard deviation= 0.3 𝑥 (−340)2= 186.2 𝐾
  • 6. Measures of Risk 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 6 • Standard deviation is most commonly employed as measure of risk in finance. • For computing mean and dispersion variables, probability distribution is required, • If sufficient records for similar ventures are available, probability distribution is quite ‘objective, • If sufficient records are not available, probability distribution is quite ‘subjective’, Prospective on risk There are three perspectives of the risk • Stand alone risk: risk of the project when viewed in isolation • Firm risk or Corporate risk: contribution of a project to the risk of the firm • Systematic risk or market risk: risk of a project from view point of diversified investor
  • 7. Sensitivity analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 7 Sensitivity analysis is ‘what if’ analysis NPV = -20000+4000 x PVIFA = -20000+4000 x 5.65 = 2600 K Cash flows depends on various factors and can vary widely. So optimistic and pessimistic estimates for variables defined and NPV calculated Cash Flow of ABC LTD project (in thousands) Year 0 year 1-10 1 Investment 20000 2 Sales 18000 3 Variable cost ( 2/3 of sales) 12000 4 Fixed cost 1000 5 Depreciation 2000 6 Pre tax profit 3000 7 Taxes (@ 33.3 %) 1000 8 PAT 2000 9 cash flow from operation (PAT+ depreciation) 4000 10 Net cash flow 2000 4000 Cost of capital 12% Accumulated PV indexing factor (PVIFA) @12% 5.65
  • 8. Sensitivity analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 8 • NPV calculated by varying one variable at a time • NPV is more sensitive to sales and least sensitive to fixed cost. For more sensitive variable, it may be explored how variability of the factor can be contained. • In real situation, many variable may change at a time so interpretation of results is subjective Sensitivity of NPV to variations in the value of key variables in ABC LTD project Range (in thousands) NPV Pessimistic Expected Optimistic Pessimistic Expected Optimistic Variation 1 Investment 24000 20000 18000 -1400 2600 4600 6000 2 Sales 15000 18000 21000 -1147 2600 6366 7513 3 Variable cost as percentage 70 66.67 65 340 2600 3730 3390 4 Fixed cost 1300 1000 800 1470 2600 3353 1883
  • 9. Scenario analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 9 • Scenario analysis is beneficial when various scenarios are well defined. It considers several variable at a time • More variable are required to be estimated • Normally scenarios are not discretely defined Sensitivity of NPV to variations in the value of key variables in ABC LTD project Range (in thousands) Pessimistic Expected Optimistic 1 Investment 24000 20000 18000 2 Sales 15000 18000 21000 3 Variable cost as percentage 70 66.67 65 4 Fixed cost 1300 1000 800 NPV -8180 2600 10438
  • 10. Break-Even analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 10 • It tells what is minimum value of key variables/ revenues so that project does not ‘lose money’ • Variable cost to sales ratio= 12/18= 0.667 • Contribution to margin ratio =0.333 • Accounting break even= 𝐹𝑖𝑥𝑒𝑑 𝑐𝑜𝑠𝑡+𝑑𝑒𝑝𝑟𝑒𝑐𝑖𝑎𝑡𝑖𝑜𝑛 𝑐𝑜𝑛𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑡𝑜 𝑚𝑎𝑟𝑔𝑖𝑛 𝑟𝑎𝑡𝑖𝑜 = 1000+2000 0.333 = 9000 𝐾 • For sales 0f 9000 K , PBT, PAT will be zero • At accounting break even project gives zero % return Cash Flow of ABC LTD project (in thousands) Year 0 year 1-10 1 Investment 20000 2 Sales 18000 3 Variable cost ( 2/3 of sales) 12000 4 Fixed cost 1000 5 Depreciation 2000 6 Pre tax profit 3000 7 Taxes (@ 33.3 %) 1000 8 PAT 2000 9 cash flow from operation (PAT+ depreciation) 4000 10 Net cash flow 2000 4000 Cost of capital 12% Accumulated PV indexing factor (PVIFA) @ 12 % 5.65
  • 11. Financial Break-Even analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 11 • Focus is on NPV and not on accounting profit Variable cost =0.667 x sales Contribution = 0.333 x sales Fixed cost = 1000 Depreciation =2000 PBT= 0.333 x sales-3000 Tax= 0.333 x (0.333 x sales-3000)=0.111 x sales-1000 PAT= 0.667 x (0.333 x sales-3000)=0.222 x sales-2000 Cash flows= PAT+ depreciation= 0.222 x sales PV of cash flows= Cash flows x PVIFA= 1.255 x sales Breakeven NPV = 20000- 1.255 x sales= 0 so Breakeven sales= 15936 K Cash Flow of ABC LTD project (in thousands) Year 0 year 1-10 1 Investment 20000 2 Sales 18000 3 Variable cost (2/3 of sales) 12000 4 Fixed cost 1000 5 Depreciation 2000 6 Pre tax profit 3000 7 Taxes (@ 33.3 %) 1000 8 PAT 2000 9 cash flow from operation (PAT+ depreciation) 4000 10 Net cash flow 2000 4000 Cost of capital 12% Accumulated PV indexing factor (PVIFA) @ 12% 5.65
  • 12. Hiller Model : Un correlated cash flows 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 12 interest rate = 12 % Expected NPV, 𝑁𝑃𝑉 = σ 𝑡=1 3 𝐴 𝑡 (1+𝑟) 𝑡 = 5000 1.12 + 4000 (1.12)2 + 5000 (1.12)3 = 4464.3 + 3188. 8 + 3558.9 = 11211.9 Standard deviation 𝜎 𝑁𝑃𝑉 = σ 𝑡=1 3 𝜎𝑡 2 (1+𝑟)2𝑡 = 2400000 1.122 + 1600000 1.124 + 2400000 1.126 = 2036.18 Analytical derivation to find expected NPV and standard deviation of NPV Year 1 Year 2 Year 3 Net Cash flow (Rs) Probability Net Cash flow (Rs) Probability Net Cash flow (Rs) Probability 3000 0.3 2000 0.2 3000 0.3 5000 0.4 4000 0.6 5000 0.4 7000 0.3 6000 0.2 7000 0.3 Mean 5000 4000 5000 Standard variance 2400000 Standard variance 1600000 Standard variance 2400000
  • 13. Hiller Model : Perfectly correlated cash flows 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 13 interest rate = 12 % Expected NPV, 𝑁𝑃𝑉 = σ 𝑡=1 4 𝐴 𝑡 (1+𝑟) 𝑡 − 1 = 5000 1.12 + 3000 (1.12)2 + 4000 (1.12)3 + 3000 (1.12)3 = 11609.54 Standard deviation 𝜎 𝑁𝑃𝑉 = σ 𝑡=1 4 𝜎𝑡 (1+𝑟) 𝑡 = 1500 1.12 + 1000 1.122 + 2000 1.123 + 1200 1.124 = 4322.66 Analytical derivation to find expected NPV and standard deviation of NPV for perfectly correlated cash flows A investment project involves a current outlay of Rs 10000. mean and standard deviation of cash flows , which are perfectly correlated are as follows year 𝐴 𝑡 𝜎 𝑁𝑃𝑉 1 5000 1500 2 3000 1000 3 4000 2000 4 3000 1200
  • 14. Simulation Analysis 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 14 • Sensitivity of criterion of merit (NPV IRR, ROI etc.) may not be adequate for decision making • Likelihood of occurrence of circumstances (probability profile) can be obtained by simulation • The steps in simulation analysis are (criterion of merit is NPV) 1. Model the project : how criterion of merit is related to variables • Parameter variables : input variables given by decision maker held constant in simulation • Exogenous variable: which are random in nature and can not be controlled 2. Specify the value of parameters and probability distribution of exogenous variables 3. Select a value randomly from probability distribution of exogenous variables. 4. Determine NPV 5. Repeat steps 2 to 4 a number of times to get large number of simulated NPV’s 6. Plot the frequency distribution of NPV
  • 15. Project selection under risk 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 15 • Judgemental Evaluation: Accept or reject the project based on the risk and return characteristics without any formal method for incorporating risk in decision making • Payback period requirement: payback period requirement is applied to control risk. • Risk adjusted discount method: • If the risk of the project is equal to risk of existing investment, discount rate is average cost of capital • If the risk of the project is greater than risk of existing investment, discount rate is higher than average cost of capital
  • 16. Thank You 19-04-2018 BCH 505 Project Finance by Dr Naim R Kidwai 16 Contact Email: naimkidwai@gmail.com https://nrkidwai.wordpress.com/