1. Date of Birth: September 1986
Nationality: Sudanese
Marital Status: Single
Religion: Muslim
Transferable Iqama and Valid Saudi Driving License
EDUCATION:
Bachelor degree (Honors) in Computer& Electronic System Engineering, University of Science and
Technology, Khartoum, Sudan
TRAINING
Ericsson ASP, Khartoum, Sudan, 2014
Installation of Radio Cabinet (IRC)
Installation of MINI-LINK products (IMP)
Basic Set-up of Microwave products (BSMP)
Test of Radio Site 2G (TRS-2)
Test of Radio Site 3G (TRS-3)
EMPLOYMENT HISTORY
Jan 2016 – Present
Systems & Communication Media CO, Saudi Arabia
Fiber Site Supervisor
Team leader
Install Fiber Optic Cables on a Computer Network
Popular Fiber Optic Installation Services
External Fiber Cable Installation
Fiber Network Cable Installation
Fiber Optic Cable splicing
Feb 2015 – Dec 2015
Black Rock for Communication Services, Sudan
Project Coordinator
Company interface between the company and other vendors
Relation coordinator with outside partners
Lead the project during the project life cycle starting from initiation phase up-to closing phase.
Team technical support for the following project
3rd carrier for & LTE for & Swap& relocation from indoor to outdoor
Installation and Swap in Gezira site from Ericsson to Huawei
Osman Isam Isa Alfadel
Address: Riyadh, Saudi Arabia
Mobile: +966 538412687
E-mail: osman.isam19@gmail.com
2. Control teams budget and executive issues
Feb 2014 – Feb 2015
Star Oil Operating Company, Sudan
ICT Engineer
Company interface between the company and other vendors.
Computing hardware &network wiring support.
Microsoft Windows (XP & Win7) operating System support.
Different software applications installation and support (MS Office, adobe Acrobat, Symantec
AV).
HP & Sharp Network printers Support & troubleshooting.
CCTV aspect &VOIP telephone extension support.
General Knowledge in the Active Directory, network switching and data security systems.
Sept 2011 0 Dec 2013
HASHAB Telecommunication and IT Company, Sudan
Field Engineer
TN (Traffic Node) installation & Microwave link alignment & CN.
Installed 6000 cabinet with (RRU & fiber).
Installed 6000 cabinet with (RRU & antenna).
RBS installation 2G, 3G (Node B) and Antennas installed Marconi (Ericsson 25th
)
Site Survey.
RBS installation 2G, 3G (Node B) and Antennas.
Site configuration.
Site Integration and troubleshooting.
TN (Traffic Node) installation & Microwave link alignment.
Installed Marconi (Ericsson, NSN).
Marconi Maintenance.
Installed 6000 cabinet with (RRU & fiber).
Installed 6000 cabinet with (RRU & antenna).
MTN Modularization survey project.
Installed 2G cabinet (2206).
Install Fiber Optic Cables on a Computer Network
REFERENCES
Will be furnished upon request