SlideShare a Scribd company logo
1 of 7
Download to read offline
NGUYEN TAN THANH
Address: No 1 - Gieng Day Ward - Ha Long City – Quang Ninh Province
PERSONAL INFORMATION
Full name: Nguyen Tan Thanh
Date of birth: July 04th
, 1976
Place of birth: Nghe An
Marital status: Married
Mobile phone: 0903.110.356
Nationally: Vietnamese
CAREER OBJECTIVE
Learn more things when working in multinational companies to accumulate much
experience for future promotion.
SYNOPSIS
More than fifteen (15) years of diversified experience in site construction planning,
supervision, Quality control, project management, procurement, project
implementation, maintenance working, coordination and consultancy for project
owner, Turn-key projects in Power Plant.
ATTRIBUTES
Excellent inter personal skills, effective communication, a team player, ability to
deliver under pressure, capable of working independently and innovative.
EDUCTION
Name of University: Ha Noi University Geology of Mining
Major of Degree: Machine and Mining Equipment
Range of Time: 1996 – 2001
EXPERIENCE RECORD
1. December, 2015 to present: Poyry Energy Ltd. Zurich / Switzerland
Project owner’s Consultant Mechanical Engineer 2(Two) X 600 MW Mong
Duong 1 Thermal Power Plant. Vietnam
Position: Mechanical Engineer
Key responsibility:
• Supervision, site inspection and site safety related inspection on EPCC
contractor’s site construction activities to ensure project targets on progress
and standard requirements.
Erection/Construction Period
• Supervise of QA/QC & Construction Department to execute of works
directly on the Site of BOP as Water and Waste Water Treatment Plant,
Welded Tank & Heavy Fuel Oil System, Fire Protection, Limestone
Handling, Coal Handling, Close Cooling Water System, Open Cooling
Water System, Electric Static Precipitator (ESP) and Feed Water System.
• Review and approval the fabrication and installation procedure relating to
mentioned above system.
• Designed document and working as a Supervisor on the Site in process the
fabrication and installation works of Sub-Contractor as per above system.
• Reviewed/approval and apply the ITP (Inspection and Test Plan) from
submission of Construction Subcontractor.
• Monitored the status of design document, material delivery schedule and
installation execution schedule on the Site of Subcontractor.
• Participation the meetings to resolve works related to above system.
• To carry out inspection and monitor site mechanical warranty and incident
investigate work prior to acceptance on contractor’s progress claim.
Warranty Period
• To review works schedules and supervise main contractor on the
implementation of warranty activities on mechanical.
• Responsible and ensure quality control and Inspection of repair period
related as:
- Mechanical Seal of Boiler Feeder Water Pump (BFP) damaged.
- HP Heater 6#, 7#, 8# tub leakage.
- Air Pre-heater Support bearing broken.
- Condenser Extraction Pump (CEP) Shaft bended.
- Loop Seal of Main Boiler leakage.
- Condenser Tube leakage.
- Bearing of Reclaimer Wheel broken.
- Bearing of vacuum pump damaged.
- HP Bypass valve leaked steam.
2. Sep, 2014 to Dec, 2015: AES-VCM Mong Duong II Power Ltd,
Position: Senior Mechanical Technician
Key responsibility:
• Supervisor the contractor/Vendor, installation of all mechanical related Coal
Mill, Boiler Fan, Boiler Feed Water Pump, Condensate Extraction Pump,
Turbine Generator.
• Commissioning activities including contractor supervision.
• Coordinate with the Maintenance Planning Engineer and other operating
sections. Preparing planned maintenance programs (Periodic Inspections &
Major Overhauls) for all plant equipments, installations, pipelines, vessels
etc…, installed within the assigned area of responsibility to ensure optimum
equipment availability and economical maintenance cost.
• Equipment condition monitoring: Assess the condition of equipment and
facilities by evaluating the results of the periodic condition surveys,
performance checks on the plant equipment. Necessary action to be taken
with reference to data and analysis results.
• Failure analysis: Assist in the failure analysis of equipment and facilities by
properly collecting evidences and recommending remedial corrective
measures. Analysis to be carried out with reference to plant DCS event,
records and history.
• Maintenance performance evaluation: Periodically prepare reports and
studies to assist in evaluating the performance of the maintenance activities
within the section, monitoring the equipment availability, performance
contract man power and maintenance cost, which requires setup of
equipment history system.
3. October, 2008 to August, 2014: Quang Ninh Thermal Power Company
Position: Senior Mechanical Technician
Key responsibility:
• Supervisor the contractor/Vendor, installation of all mechanical related Coal
Mill, Boiler Fan, Boiler Feed Water Pump, Condensate Extraction Pump,
Turbine Generator.
• Commissioning activities including contractor supervision.
• Review and approved maintenance method of statement, spare part for:
 Axial Pump, Centrifugal Pump
 Axial Fan, Centrifugal Fan
 High pressure welding
 Oil lubrication system
 Oil hydraulic jacking system
 Coupling alignment method
 Bearing replacement method
 All kind of valve
• Coordinate with operation section, planning department. Preparing planned
maintenance programs as mid overhaul and overhaul of plant.
• Carry out site inspection, man power control and site maintenance related
arrangement.
• To ensure Sub-Contractor carry out site repair activities as requirement
standard approved specification, job method and job safety analysis during
overhaul of plant.
• To ensure machinery, material abilities on site and minimize material
wastage during outage of plant.
• To updated maintenance daily site progress and submit daily report to
management.
• Supervisor and conduct maintenance inspection.
• Liaised with vendor and contractor on spare part and work schedule for main
equipment of plant.
4. January, 2004 to September, 2008: Vimaflour Mill Ltd,
Position: Senior Mechanical Technician
Key responsibility:
• Supervisor the contractor/Vendor, installation of flour mill, centrifugal fan,
pump, belt conveyor, chain conveyor and bucket elevator.
• Commissioning activities including contractor supervision.
• Coordinate with operation department to assess the condition of equipment
and facilities by evaluating the results of the periodic condition surveys,
performance checks on the plant equipment.
• Periodically prepare reports and studies to assist in evaluating the
performance of the maintenance activities within the section.
• Preparation document and organization to repair and maintenance.
5. August, 2001 to December, 2004: Liama 69-3 Company
Position: Mechanical Engineer
Key responsibility:
• Received drawings order processing from the Cement Project, Thermal
Power, Flour mill, then calculate consumption of materials, estimation,
implementation process and final installation commissioning.
Me Kong Flour Mill
• Responsible for erection/construction of all mechanical related Belt
Conveyor, Chain conveyor, Bucket elevator and Flour mill in the Me Kong
flour mill.
• Responsible for execution of work with Sub-Contractor who participate to
make a bid under Flue Gas Desulphurization (FGD) Contract Package
including engineering document and selection of equipments, vendor list and
related others.
Uong Bi No:1 Thermal Power Company
• Be a member of Material Department working in Manufacture Factory.
• Supervisor and control with fabricated materials including equipments and
piping & auxiliaries and others belongs to Material Department
responsibility.
• Organize the working schedule and doing with hand-over document relating
to all fabricated materials.
SKILLS
• Fluent written and spoken Vietnamese and English
• MS words, Excel, Power point, Outlook and Auto card
• Discipline, Responsibility, Team work, Organization and Creativity
• Working with speed
HOBBIES
• Reading Technology book
• Listening to music
• Traveling
• Shopping
REFFERENCES
• Mr.Bob Cintra – Site Manager of Poyry Consultant Mong Duong I Project
Tel: 0964.436.733
• Mr.Gopi – Maintenance Team Leader of AES-VCM Mong Duong II
Tel: 0936.001.499
• Mr. Tong Ngoc Giang – Duty Chief Humance Resource of Quang Ninh
Thermal Power Company
Tel: 01244313888
• Mr. Doan Thanh Duong – Director of Vimaflour Mill
Tel: 033-3845263
Nguyen Tan Thanh 040076000124 new

More Related Content

What's hot

Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015ARUN MANGAL
 
Resume David Young
Resume David YoungResume David Young
Resume David YoungDavid Young
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2David DiBiase
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John Reeves
 
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2David DiBiase
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementLakshminarasimman S
 
Resume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked inResume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked inRobin Li
 
Sandeep RESUME new
Sandeep RESUME newSandeep RESUME new
Sandeep RESUME newSandeep Kn
 

What's hot (20)

Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
CV-ES Enslin
CV-ES EnslinCV-ES Enslin
CV-ES Enslin
 
ASIF CV - HVAC O & M
ASIF CV - HVAC O & MASIF CV - HVAC O & M
ASIF CV - HVAC O & M
 
Houle resume
Houle resume Houle resume
Houle resume
 
Resume David Young
Resume David YoungResume David Young
Resume David Young
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
Shift E
Shift EShift E
Shift E
 
David DiBiase Resume-2
David DiBiase Resume-2David DiBiase Resume-2
David DiBiase Resume-2
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Experienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor ManagementExperienced Sourcing professional with 10years Exp- Material/vendor Management
Experienced Sourcing professional with 10years Exp- Material/vendor Management
 
Resume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked inResume - Senior Drilling Equipment Engineer - Linked in
Resume - Senior Drilling Equipment Engineer - Linked in
 
2015_Resume 2
2015_Resume 22015_Resume 2
2015_Resume 2
 
Sandeep RESUME new
Sandeep RESUME newSandeep RESUME new
Sandeep RESUME new
 

Viewers also liked

Marketing automation and lead management
Marketing automation and lead managementMarketing automation and lead management
Marketing automation and lead managementPivotal CRM
 
Edição nº 89.1 capaserrano
Edição nº 89.1 capaserranoEdição nº 89.1 capaserrano
Edição nº 89.1 capaserranoEcos Alcântaras
 
TEST2 Upload folder
TEST2 Upload folderTEST2 Upload folder
TEST2 Upload folderdmracc35
 
CPA Vic Public Practice Conference
CPA Vic Public Practice ConferenceCPA Vic Public Practice Conference
CPA Vic Public Practice ConferenceJon Manning
 
P R E T T Y B O Y: Fabulous Fifties Hollywood
P R E T T Y B O Y: Fabulous Fifties HollywoodP R E T T Y B O Y: Fabulous Fifties Hollywood
P R E T T Y B O Y: Fabulous Fifties HollywoodBen Campbell
 
NIC Partners Culture and Vision 2017
NIC Partners Culture and Vision 2017NIC Partners Culture and Vision 2017
NIC Partners Culture and Vision 2017NICPartners
 

Viewers also liked (10)

Marketing automation and lead management
Marketing automation and lead managementMarketing automation and lead management
Marketing automation and lead management
 
Edição nº 89.1 capaserrano
Edição nº 89.1 capaserranoEdição nº 89.1 capaserrano
Edição nº 89.1 capaserrano
 
TEST2 Upload folder
TEST2 Upload folderTEST2 Upload folder
TEST2 Upload folder
 
Fyp commitee
Fyp commiteeFyp commitee
Fyp commitee
 
G.o 40.907
G.o 40.907G.o 40.907
G.o 40.907
 
CPA Vic Public Practice Conference
CPA Vic Public Practice ConferenceCPA Vic Public Practice Conference
CPA Vic Public Practice Conference
 
7 0237
7 02377 0237
7 0237
 
P R E T T Y B O Y: Fabulous Fifties Hollywood
P R E T T Y B O Y: Fabulous Fifties HollywoodP R E T T Y B O Y: Fabulous Fifties Hollywood
P R E T T Y B O Y: Fabulous Fifties Hollywood
 
фруктовая мука
фруктовая мукафруктовая мука
фруктовая мука
 
NIC Partners Culture and Vision 2017
NIC Partners Culture and Vision 2017NIC Partners Culture and Vision 2017
NIC Partners Culture and Vision 2017
 

Similar to Nguyen Tan Thanh 040076000124 new

Similar to Nguyen Tan Thanh 040076000124 new (20)

Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Rupesh_Gosavi_CV_
Rupesh_Gosavi_CV_Rupesh_Gosavi_CV_
Rupesh_Gosavi_CV_
 
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
 
Giridhar
GiridharGiridhar
Giridhar
 
CV
CVCV
CV
 
LARRY CV
LARRY CVLARRY CV
LARRY CV
 
chinna terminal operator.
chinna terminal operator.chinna terminal operator.
chinna terminal operator.
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
paramaguru_Mech
paramaguru_Mechparamaguru_Mech
paramaguru_Mech
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
vijay cv
vijay cvvijay cv
vijay cv
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 
Assistant Manager - Mechanical
Assistant Manager - MechanicalAssistant Manager - Mechanical
Assistant Manager - Mechanical
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 

Nguyen Tan Thanh 040076000124 new

  • 1. NGUYEN TAN THANH Address: No 1 - Gieng Day Ward - Ha Long City – Quang Ninh Province PERSONAL INFORMATION Full name: Nguyen Tan Thanh Date of birth: July 04th , 1976 Place of birth: Nghe An Marital status: Married Mobile phone: 0903.110.356 Nationally: Vietnamese CAREER OBJECTIVE Learn more things when working in multinational companies to accumulate much experience for future promotion. SYNOPSIS More than fifteen (15) years of diversified experience in site construction planning, supervision, Quality control, project management, procurement, project implementation, maintenance working, coordination and consultancy for project owner, Turn-key projects in Power Plant. ATTRIBUTES Excellent inter personal skills, effective communication, a team player, ability to deliver under pressure, capable of working independently and innovative. EDUCTION
  • 2. Name of University: Ha Noi University Geology of Mining Major of Degree: Machine and Mining Equipment Range of Time: 1996 – 2001 EXPERIENCE RECORD 1. December, 2015 to present: Poyry Energy Ltd. Zurich / Switzerland Project owner’s Consultant Mechanical Engineer 2(Two) X 600 MW Mong Duong 1 Thermal Power Plant. Vietnam Position: Mechanical Engineer Key responsibility: • Supervision, site inspection and site safety related inspection on EPCC contractor’s site construction activities to ensure project targets on progress and standard requirements. Erection/Construction Period • Supervise of QA/QC & Construction Department to execute of works directly on the Site of BOP as Water and Waste Water Treatment Plant, Welded Tank & Heavy Fuel Oil System, Fire Protection, Limestone Handling, Coal Handling, Close Cooling Water System, Open Cooling Water System, Electric Static Precipitator (ESP) and Feed Water System. • Review and approval the fabrication and installation procedure relating to mentioned above system. • Designed document and working as a Supervisor on the Site in process the fabrication and installation works of Sub-Contractor as per above system. • Reviewed/approval and apply the ITP (Inspection and Test Plan) from submission of Construction Subcontractor. • Monitored the status of design document, material delivery schedule and installation execution schedule on the Site of Subcontractor. • Participation the meetings to resolve works related to above system. • To carry out inspection and monitor site mechanical warranty and incident investigate work prior to acceptance on contractor’s progress claim. Warranty Period
  • 3. • To review works schedules and supervise main contractor on the implementation of warranty activities on mechanical. • Responsible and ensure quality control and Inspection of repair period related as: - Mechanical Seal of Boiler Feeder Water Pump (BFP) damaged. - HP Heater 6#, 7#, 8# tub leakage. - Air Pre-heater Support bearing broken. - Condenser Extraction Pump (CEP) Shaft bended. - Loop Seal of Main Boiler leakage. - Condenser Tube leakage. - Bearing of Reclaimer Wheel broken. - Bearing of vacuum pump damaged. - HP Bypass valve leaked steam. 2. Sep, 2014 to Dec, 2015: AES-VCM Mong Duong II Power Ltd, Position: Senior Mechanical Technician Key responsibility: • Supervisor the contractor/Vendor, installation of all mechanical related Coal Mill, Boiler Fan, Boiler Feed Water Pump, Condensate Extraction Pump, Turbine Generator. • Commissioning activities including contractor supervision. • Coordinate with the Maintenance Planning Engineer and other operating sections. Preparing planned maintenance programs (Periodic Inspections & Major Overhauls) for all plant equipments, installations, pipelines, vessels etc…, installed within the assigned area of responsibility to ensure optimum equipment availability and economical maintenance cost. • Equipment condition monitoring: Assess the condition of equipment and facilities by evaluating the results of the periodic condition surveys, performance checks on the plant equipment. Necessary action to be taken with reference to data and analysis results. • Failure analysis: Assist in the failure analysis of equipment and facilities by properly collecting evidences and recommending remedial corrective
  • 4. measures. Analysis to be carried out with reference to plant DCS event, records and history. • Maintenance performance evaluation: Periodically prepare reports and studies to assist in evaluating the performance of the maintenance activities within the section, monitoring the equipment availability, performance contract man power and maintenance cost, which requires setup of equipment history system. 3. October, 2008 to August, 2014: Quang Ninh Thermal Power Company Position: Senior Mechanical Technician Key responsibility: • Supervisor the contractor/Vendor, installation of all mechanical related Coal Mill, Boiler Fan, Boiler Feed Water Pump, Condensate Extraction Pump, Turbine Generator. • Commissioning activities including contractor supervision. • Review and approved maintenance method of statement, spare part for:  Axial Pump, Centrifugal Pump  Axial Fan, Centrifugal Fan  High pressure welding  Oil lubrication system  Oil hydraulic jacking system  Coupling alignment method  Bearing replacement method  All kind of valve • Coordinate with operation section, planning department. Preparing planned maintenance programs as mid overhaul and overhaul of plant. • Carry out site inspection, man power control and site maintenance related arrangement. • To ensure Sub-Contractor carry out site repair activities as requirement standard approved specification, job method and job safety analysis during overhaul of plant. • To ensure machinery, material abilities on site and minimize material wastage during outage of plant.
  • 5. • To updated maintenance daily site progress and submit daily report to management. • Supervisor and conduct maintenance inspection. • Liaised with vendor and contractor on spare part and work schedule for main equipment of plant. 4. January, 2004 to September, 2008: Vimaflour Mill Ltd, Position: Senior Mechanical Technician Key responsibility: • Supervisor the contractor/Vendor, installation of flour mill, centrifugal fan, pump, belt conveyor, chain conveyor and bucket elevator. • Commissioning activities including contractor supervision. • Coordinate with operation department to assess the condition of equipment and facilities by evaluating the results of the periodic condition surveys, performance checks on the plant equipment. • Periodically prepare reports and studies to assist in evaluating the performance of the maintenance activities within the section. • Preparation document and organization to repair and maintenance. 5. August, 2001 to December, 2004: Liama 69-3 Company Position: Mechanical Engineer Key responsibility: • Received drawings order processing from the Cement Project, Thermal Power, Flour mill, then calculate consumption of materials, estimation, implementation process and final installation commissioning. Me Kong Flour Mill • Responsible for erection/construction of all mechanical related Belt Conveyor, Chain conveyor, Bucket elevator and Flour mill in the Me Kong flour mill. • Responsible for execution of work with Sub-Contractor who participate to make a bid under Flue Gas Desulphurization (FGD) Contract Package including engineering document and selection of equipments, vendor list and related others. Uong Bi No:1 Thermal Power Company
  • 6. • Be a member of Material Department working in Manufacture Factory. • Supervisor and control with fabricated materials including equipments and piping & auxiliaries and others belongs to Material Department responsibility. • Organize the working schedule and doing with hand-over document relating to all fabricated materials. SKILLS • Fluent written and spoken Vietnamese and English • MS words, Excel, Power point, Outlook and Auto card • Discipline, Responsibility, Team work, Organization and Creativity • Working with speed HOBBIES • Reading Technology book • Listening to music • Traveling • Shopping REFFERENCES • Mr.Bob Cintra – Site Manager of Poyry Consultant Mong Duong I Project Tel: 0964.436.733 • Mr.Gopi – Maintenance Team Leader of AES-VCM Mong Duong II Tel: 0936.001.499 • Mr. Tong Ngoc Giang – Duty Chief Humance Resource of Quang Ninh Thermal Power Company Tel: 01244313888 • Mr. Doan Thanh Duong – Director of Vimaflour Mill Tel: 033-3845263