Qualified Industrial Engineer with key skills and experience in the following fields:
Materials Management, Warehousing and Facilities Planning, including defining facilities
needed and their area requirements; preparing design layouts for the storage facilities
concerned; preparing product and performance specifications for automated materials
handling systems (Automated Guided Vehicles, Conveyors and Automated Storage and
Retrieval Systems); and review of Contractors’ designs’ and products’ submittals.
Waste Management and Waste Collection Systems, including definition of waste collection
strategy and waste segregation level; preparing design layouts for the waste storage areas
concerned and for the deployed waste systems; preparing product and performance
specifications for automated waste collection systems (especially Pneumatic Collection
Systems); and review of Contractors’ designs’ and products’ submittals.
Automated Baggage Handling Systems (BHS’s), including the determination of equipment
requirements from check-in counters and departure/transfer conveyor lines to sortation
systems, baggage make up and reclaim devices; preparing design layouts for the BHS and
the auxiliary areas; preparing product and performance specifications for the systems; review
of Contractors’ designs’ and products’ submittals; attending factory acceptance tests and
material site inspections; and attending, on a need basis, BHS Seminars for coordination with
suppliers.
Computer applications, including Arena Simulation Software, Java Programming Language,
AutoCAD, Lingo Optimization Software, and others.
SUMMARY OF
CAPABILITIES:
RAMI EL HACHEM
Industrial Engineer
PROFESSIONAL
EXPERIENCE:
Since 2010 With Dar Al-Handasah Consultants (Shair and Partners), Mechanical
Engineering & Industry Dept.
Industrial Engineer
Participated in the review of design and shop drawing submittals for all industrial systems in
the following project:
- Aircrafts Maintenance Hangars, Saudi Arabia. Data collection, master plan update, feasibility
study, preliminary design, preparation of tender documents, review of detailed design
prepared by the Contractor, and supervision of construction for a maintenance, repair and
overhaul facility, consisting of a 14-bay wide-bodied aircraft maintenance hangar
(107,100 m²), 2-bay paint hangar (13,000 m²), 4-aircraft wash dock (28,000 m²), engine
run-up area and blast fence (18,000 m²), shop core building and administration block
(90,000 m²), warehouse (45,000 m²), 14-aircraft apron (110,000 m²), and a car-parking
area for 2,000 cars (48,000 m²), including all electromechanical and infrastructure utilities
and networks.
Participated in the design and design review of industrial and mechanical systems and
installations, including coordination with other trades, equipment selection and sizing, and
preparation of specifications and other technical design documents, for the following projects:
- Centralized Customs Area at the New Port Project (NPP), Qatar. Detailed design and tender
documents for inspection sheds, offices, laboratories, scanning installations, workshop and
maintenance facility, and mosque, including all infrastructure and landscaping works. Total
site area of 695,000 m², including 165,000 m² of landscaped areas. Total built-up area:
71,500 m².
- Madinah Hajj City, Saudi Arabia. Master plan, detailed design, tender documents and
supervision of construction for a township on a 1.6 million m² site located 3 km southwest
of the Holy Prophet’s Mosque in Madinah, envisaged to accommodate 120,000 pilgrims. The
project comprises 82 hotel towers; office towers; commercial mall with a gross area of
71,000 m² and a 100,000 m² basement for 2,200 cars; 2 mosques (of which one Grand
Mosque) for 14,000 worshipers; a 360-bed hospital complex; and elevated light rail transit
and bus stations. The project is complete with all electromechanical installations; wet
infrastructure, fire water and chilled water networks; in addition to 4 chilled water plants of
50,000 TR each along with thermal energy storage tanks.
- Dubai Airports Strategic Plan 2020 (SP2020) - Cargo Facilities at Dubai International
Airport, United Arab Emirates. Detailed design, tender documents and supervision of
construction for the upgrading and expansion of the Cargo Handling Facilities (CHF’s),
including relocation of Express Courier and Mail Centre (EMC) (small courier companies from
Hall B to FG1 and large courier companies from Hall B to Dubai Flower Centre (DFC)) thus
allowing for the demolition of Hall B, upgrading the Cargo Mega Terminal (CMT) and
expanding it by one module, refurbishment and partial demolition of Hall A to serve as the
west Forward Transhipment Area (FTA), and construction of the east Forward Transhipment
Area (FTA) and a nearby east Cross Dock area. The project also comprises all MEP services
and material handling equipment with their related controls and instrumentation in addition
to all infrastructure utilities and networks (roads, chilled water, water and fire-fighting,
drainage, power supply and distribution, low-current).
- Lagos Infrastructure Development (LID) Project, Nigeria. Detailed design (under BIM
management) and supervision of construction for a mixed-use development comprising
office facilities for 2,000 employees (43,270 m²), 200 residential apartments (60,000 m²),
staff accommodation for 500 persons (12,000 m²), hotel with a capacity of 200 guestrooms
(20,000 m²), clubhouse and kindergarten (5,950 m²), restaurant, helipad, jetty, utility
buildings (power and water supply, water and sewage treatment, etc.), gatehouse, parking
lots and car-park buildings for residences and offices (76,850 m²), recreational amenities,
civic activity building, retail units, and all infrastructure utilities (roads, drainage, wet
infrastructure, pedestrian accesses, street and public lighting, landscaping,
telecommunications, IT services).
- Salahaddin University, Erbil - New Campus (Buildings), Iraq. Master plan, detailed design
and tender documents for a new university campus with a student enrolment of 40,000 at
its ultimate phase, comprising Presidency Building, 13 college buildings for various
specialisations, administration facilities, classrooms, teaching and open laboratories,
research laboratories, offices, conference spaces, central library/study, sports and athletic
facilities, assembly and exhibit spaces, University Press in addition to non-academic
buildings and facilities that include student dormitories (capacity of 6,000 at ultimate
phase), faculty and staff housing for 1,000 persons at ultimate phase, staff club, main
mosques for 2,000 worshipers, retail outlets, gates and security access points and
transportation terminals.
- Concourse C Improvements at Dubai International Airport, United Arab Emirates. Detailed
design, tender documents and supervision of construction for the full renovation and
upgrading of a 90,000 m² concourse building to be completely used by Emirates Airlines
following the opening of Concourse D that will be dedicated to other airline users. The apron
level includes most of technical areas, bussing area, transfer area and remote gate. The
departure level includes departure facilities, boarding lounges, main duty free, retail area,
and food and beverage spaces. The arrival level includes the arrival corridor, transfer area
and Business Class lounges. The Hotel 1 level includes the hotel lobby, hotel rooms, First
Class lounges, and some MEP spaces. The Hotel 2 level includes hotel rooms and First Class
lounges. Works also comprise reconfiguring the 28 existing stands into 24 stands (11 for
Code E and 13 for Code F aircrafts).
- Procurement and Operation of Equipment at Tripoli Port, Lebanon. Preparation of an
Information Memorandum and tender documents, selection of bidders, tendering,
evaluation of bids and contract award (Built/Operate/Transfer (BOT) for a period of
25 years), as part of the selection of an Operator to run the operations of a terminal for
handling containers, and bulk and general cargo at the Port of Tripoli. The terminal consists
of a 600 m long quay wall (Phase 1) extendible to 1,200 m at final construction phase.
RAMI EL HACHEM Page 2
- Road Overpass at Shidiya Rail Link and Wadi Yutum Rail Terminal, Jordan. Topographic
survey, subsoil investigation by boreholes, and hydrology, drainage, structural and road
designs for a 2 km long/100 m wide overpass with one at-grade T-intersection. Detailed
design for a new trans-shipment terminal at Wadi Yutum housing train unloading stations
with unloading hoppers, discharge screw conveyors, and dust control bag filters; phosphate
storage shed with storage conveyor and staking tripper; belt conveyors with their transfer
towers and dust control bag filters; electrical substation; workshop and spare parts storage
facility; water tanks and pumping station; compressed air station; sewage treatment plant;
fuel filling station; administration and service buildings; guardhouse; signalling, lighting and
telecommunication systems; and an approach road connecting the terminal to Aqaba Back
Road. The project also comprises the detailed design of a 6 million tons/year phosphate
train loading facility, including silos, conveyors, wagon weighing bridge, auxiliary offices and
control rooms, power supply, instrumentation and control systems, and infrastructure
works.
- Shidiya Phosphate Mine Rail Loading Terminal, Jordan. Detailed design for a 6 million
tons/year phosphate train loading facility, including train loading silos, conveyors, wagon
weigh bridge, associated instrumentation, control and power supply systems, auxiliary
offices and control rooms, and general site works.
- Five Regional Specialised Hospitals, Saudi Arabia. Detailed design (under BIM management
and according to LEED requirements-5 registrations) and tender documents for 5 new
specialised hospitals as follows (total built-up area of 637,000 m²): Maternity Hospital at
King Abdulaziz Medical City Riyadh Campus (300 beds), King Abdullah Specialised Children
Hospital at King Abdulaziz Medical City Jeddah Campus (350 beds), Neuroscience and
Trauma Care Centre at King Abdulaziz Medical City Jeddah Campus (176 beds), Taif
Specialised Hospital (300 beds in addition to support and housing facilities), Qassim
Specialised Hospital (300 beds in addition to support and housing facilities). Taif and Qassim
general hospitals, along with their relevant buildings components, are envisaged to be of
similar design, serving as a prototype to be applied by the Client in to other
locations/regions.
- Concourse C-Concourse B Baggage Handling System (BHS) Link Enclosure, United Arab
Emirates. Detailed design for the basic amenities/necessities of the BHS link, including all
architectural, structural, civil and MEP works. The project comprises slab
openings/penetration at both concourses’ apron levels to allow for the penetration of the
upgraded BHS conveyors to both concourses’ first basement levels in addition to the
structure, architectural envelope/cladding and MEP services for the BHS running outside the
concourses.
- Upgrading the Baggage Handling System (BHS) at Rafic Hariri International Airport,
Lebanon. Detailed design, tender documents and supervision of construction for the
incorporation of the baggage X-Ray machines into the BHS system at the airport’s east and
west terminals for baggage automatic search, including modifications to the existing
conveyors and addition of new ones that transport rejected or suspicious baggage to
inspection rooms. The project also comprises a Central Control Room (CCR) with a Closed
Circuit TV (CCTV) system for baggage monitoring and storage of images produced by the
baggage X-Ray machines.
- Bahrain International Airport Terminal Expansion, Bahrain. Review, validation and
development into working construction documents (under BIM management) of an initial
concept design for the expansion of the existing terminal building (for both new
constructions and renovated areas) to cater for 13.5 million passengers/year. Works
comprise the relocation of affected facilities/services to maintain operations during
expansion, including 2 new office buildings; passenger terminal building expansion by
68,000 m² with all its lounges, counters and areas; car-park deck; landside access road,
ramp and parking; rotunda buildings; passenger loading bridges and affected apron
services; central utility complex and associated substation; terminal substations and
emergency plant; medium voltage network; upgrading of the primary airport station;
replacement of the 7 existing air bridges; and the preparation of a comprehensive solid
waste management plan. Total built-up area: 88,000 m².
- Security Buildings in Shamiyah, Saudi Arabia. Design and tender documents (under BIM
management) for a residential and administrative complex that provides accommodation to
19,400 officers and soldiers of the Ministry of Interior in addition to all infrastructure
utilities, landscaping, and various support facilities and services, including kitchen, dining
area, laundry, recreational and assembly areas, 300-bed hospital with staff housing, police
and civil defence stations, etc. The complex has a direct access to Makkah Haram plazas
through pedestrian tunnels.
RAMI EL HACHEM Page 3
- Hurghada International Airport - Construction Package 1, Egypt. Supervision of construction
for a new 3-level passenger Terminal Building (TB) for international and domestic flights,
with an overall capacity of 7.5 million passengers/year with a total built-up area of
91,500 m². The TB accommodates all relevant facilities and services with direct landside
and airside interfaces. It includes 9 contact gates with passenger loading bridges, 72 check-
in counters, Out of Gauge (OOG) counter, 36 passport control booths for departure and
arrival, 9 inbound baggage claim carrousels and 6 outbound baggage conveyors with the
appropriate baggage handling system, and a 5-level security control system. The TB
incorporates the latest information technology and airport-related equipment, including
communication systems, baggage handling system, fire detection and fighting systems,
specialised air-conditioning and ventilation systems, standby power generation, passenger
and freight lifts, etc.
- Yafour Hospital Project, Syria. Detailed design and supervision of construction for a
healthcare facility with a total built-up area of 120,000 m², comprising Heart and Vascular
Institute (phase 1); Trauma, Women's Health and Paediatrics Section (phase 2); and an
education building (phase 3).
- King Abdul Aziz International Airport, Saudi Arabia. Project management, design review
(according to LEED requirements), construction management and supervision for a new
airport based on a new phased master plan up to the year 2035 (Phase 1 up to 2012),
comprising a new passenger terminal complex (670,000 m²) with a capacity of 30 million
passengers per annum to replace the existing North and South Terminals; facility design to
cater for both domestic and international operations, A380 aircrafts and full hub capability
with latest systems and equipment; integrated provision for a planned railway station and
an automated passenger mover (APM); airfield upgrading, new parallel taxiways, control
tower and related systems; state-of-the-art navigation aid and communication installations,
FIDS, departure control, life safety aspects and public address systems; Baggage Handling
System (BHS), support buildings and facilities, earthworks, complete landscaping, major
utility networks, new landside roads, tunnels and interchanges; programme coordination for
related projects, including fuel tank farm, Jet fuel supply line from Aramco to the fuel farm,
Jet fuel hydrant network, desalination plant, upgrading of existing terminals, sewage
treatment plant; and planning and infrastructure and earthworks for a major landside
commercial zone, complementing the main development.
- Duhok Airport - Buildings, Iraq. Detailed design and tender documents for a 15,000 m²
terminal building with all passenger and baggage facilities, planned to cater for one million
passengers/year and 43,300 tons/year of cargo in 2035 in addition to a 1,000 m² air traffic
control tower, 1,800 m² fire station building, 2,200 m² central utility complex (CUC), and all
other airport-related facilities.
- Academic Support Facilities at Sabah Al-Salem University City - Kuwait University, Kuwait.
Design, tender documents and supervision of construction for various support facilities with
a total net area of 242,705 m², including a community-based public model school for pre-K
and K-12 education with a capacity of 633 students (35,840 m²), community-based day-
care with a capacity of 112 children (2,846 m²), Centre for Futuristic and Strategic Studies,
Gulf Studies Centre, Academic Publication Council building, faculty housing and
neighbourhood centre, guesthouse, men’s and women’s student housing facilities and
neighbourhood centres, waste management facilities, construction and maintenance
facilities, administration and general stores and workshops, mail depot, central food
depot/commissary, vehicle repair facilities/service yard, press building, newspaper offices,
bookstore, and faculty and administration staff clubs in addition to all infrastructure and
landscaping works.
September, 2015
RAMI EL HACHEM Page 4

More Related Content

Viewers also liked

PixelMagsプレゼン資料_130612メディアフロンティアカレッジ
PixelMagsプレゼン資料_130612メディアフロンティアカレッジPixelMagsプレゼン資料_130612メディアフロンティアカレッジ
PixelMagsプレゼン資料_130612メディアフロンティアカレッジYoshi Kashima
 
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래yamoo9
 
Vergeten totdats
Vergeten totdatsVergeten totdats
Vergeten totdatsgoedbericht
 
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편yamoo9
 
일관된 컬러 매니지먼트 - Consistent Color Management
일관된 컬러 매니지먼트 - Consistent Color Management일관된 컬러 매니지먼트 - Consistent Color Management
일관된 컬러 매니지먼트 - Consistent Color Managementyamoo9
 
Seminario cambios iso 9001 2015
Seminario cambios iso 9001 2015Seminario cambios iso 9001 2015
Seminario cambios iso 9001 2015Revefer000
 

Viewers also liked (13)

Summer present
Summer presentSummer present
Summer present
 
Scamper
ScamperScamper
Scamper
 
PixelMagsプレゼン資料_130612メディアフロンティアカレッジ
PixelMagsプレゼン資料_130612メディアフロンティアカレッジPixelMagsプレゼン資料_130612メディアフロンティアカレッジ
PixelMagsプレゼン資料_130612メディアフロンティアカレッジ
 
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래
웹표준화,대한민국 의식개선프로젝트 04 웹의 탄생과 미래
 
SISTEMA RESPIRATORIO
SISTEMA RESPIRATORIOSISTEMA RESPIRATORIO
SISTEMA RESPIRATORIO
 
CARTEL PROGRAMA VIETNAM
CARTEL PROGRAMA VIETNAMCARTEL PROGRAMA VIETNAM
CARTEL PROGRAMA VIETNAM
 
Vergeten totdats
Vergeten totdatsVergeten totdats
Vergeten totdats
 
Gegeven totdat
Gegeven totdatGegeven totdat
Gegeven totdat
 
Clase de craneo
Clase de craneoClase de craneo
Clase de craneo
 
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편
웹 접근성을 고려한 UI 컴포넌트 디자인 - 캐로셀(carousel) 편
 
Hipotiroidismo
Hipotiroidismo Hipotiroidismo
Hipotiroidismo
 
일관된 컬러 매니지먼트 - Consistent Color Management
일관된 컬러 매니지먼트 - Consistent Color Management일관된 컬러 매니지먼트 - Consistent Color Management
일관된 컬러 매니지먼트 - Consistent Color Management
 
Seminario cambios iso 9001 2015
Seminario cambios iso 9001 2015Seminario cambios iso 9001 2015
Seminario cambios iso 9001 2015
 

Similar to RAMI EL HACHEM

CV DAR MARGO R. BAYDA.PDF
CV DAR MARGO R. BAYDA.PDFCV DAR MARGO R. BAYDA.PDF
CV DAR MARGO R. BAYDA.PDFMargo Baida
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultransConsultrans, S.A.
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-Harry Ramos
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamEhab Abdelmoneam
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2hamadagkhater
 
Dube agri zone call for proposals 2016
Dube agri zone   call for proposals 2016Dube agri zone   call for proposals 2016
Dube agri zone call for proposals 2016Abius Akwaake
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed Fergany
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtpmedongonu
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtpmedongonu
 
Michael labib portofolio 2017
Michael labib portofolio 2017Michael labib portofolio 2017
Michael labib portofolio 2017Michael Labib
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
Ravindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra Kauthalikar
 
Presentaciones taeca kom 영문
Presentaciones taeca kom 영문Presentaciones taeca kom 영문
Presentaciones taeca kom 영문qooji
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 

Similar to RAMI EL HACHEM (20)

CV DAR MARGO R. BAYDA.PDF
CV DAR MARGO R. BAYDA.PDFCV DAR MARGO R. BAYDA.PDF
CV DAR MARGO R. BAYDA.PDF
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2
 
Dube agri zone call for proposals 2016
Dube agri zone   call for proposals 2016Dube agri zone   call for proposals 2016
Dube agri zone call for proposals 2016
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Ahmed fergany CV 2642016
Ahmed fergany CV 2642016Ahmed fergany CV 2642016
Ahmed fergany CV 2642016
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
 
Working plan guidance_wwtp
Working plan guidance_wwtpWorking plan guidance_wwtp
Working plan guidance_wwtp
 
Michael labib portofolio 2017
Michael labib portofolio 2017Michael labib portofolio 2017
Michael labib portofolio 2017
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Ravindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_Latest
 
Presentaciones taeca kom 영문
Presentaciones taeca kom 영문Presentaciones taeca kom 영문
Presentaciones taeca kom 영문
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Handling training
Handling trainingHandling training
Handling training
 

RAMI EL HACHEM

  • 1. BORN: 1987 NATIONALITY(IES): Lebanese EDUCATION: BE, Industrial Engineering (Distinction), Lebanese American University, Lebanon, 2010 MEMBERSHIPS: - Arabic, English, FrenchLANGUAGES: Qualified Industrial Engineer with key skills and experience in the following fields: Materials Management, Warehousing and Facilities Planning, including defining facilities needed and their area requirements; preparing design layouts for the storage facilities concerned; preparing product and performance specifications for automated materials handling systems (Automated Guided Vehicles, Conveyors and Automated Storage and Retrieval Systems); and review of Contractors’ designs’ and products’ submittals. Waste Management and Waste Collection Systems, including definition of waste collection strategy and waste segregation level; preparing design layouts for the waste storage areas concerned and for the deployed waste systems; preparing product and performance specifications for automated waste collection systems (especially Pneumatic Collection Systems); and review of Contractors’ designs’ and products’ submittals. Automated Baggage Handling Systems (BHS’s), including the determination of equipment requirements from check-in counters and departure/transfer conveyor lines to sortation systems, baggage make up and reclaim devices; preparing design layouts for the BHS and the auxiliary areas; preparing product and performance specifications for the systems; review of Contractors’ designs’ and products’ submittals; attending factory acceptance tests and material site inspections; and attending, on a need basis, BHS Seminars for coordination with suppliers. Computer applications, including Arena Simulation Software, Java Programming Language, AutoCAD, Lingo Optimization Software, and others. SUMMARY OF CAPABILITIES: RAMI EL HACHEM Industrial Engineer PROFESSIONAL EXPERIENCE: Since 2010 With Dar Al-Handasah Consultants (Shair and Partners), Mechanical Engineering & Industry Dept. Industrial Engineer Participated in the review of design and shop drawing submittals for all industrial systems in the following project: - Aircrafts Maintenance Hangars, Saudi Arabia. Data collection, master plan update, feasibility study, preliminary design, preparation of tender documents, review of detailed design prepared by the Contractor, and supervision of construction for a maintenance, repair and overhaul facility, consisting of a 14-bay wide-bodied aircraft maintenance hangar (107,100 m²), 2-bay paint hangar (13,000 m²), 4-aircraft wash dock (28,000 m²), engine run-up area and blast fence (18,000 m²), shop core building and administration block (90,000 m²), warehouse (45,000 m²), 14-aircraft apron (110,000 m²), and a car-parking area for 2,000 cars (48,000 m²), including all electromechanical and infrastructure utilities and networks. Participated in the design and design review of industrial and mechanical systems and installations, including coordination with other trades, equipment selection and sizing, and preparation of specifications and other technical design documents, for the following projects: - Centralized Customs Area at the New Port Project (NPP), Qatar. Detailed design and tender documents for inspection sheds, offices, laboratories, scanning installations, workshop and maintenance facility, and mosque, including all infrastructure and landscaping works. Total site area of 695,000 m², including 165,000 m² of landscaped areas. Total built-up area: 71,500 m².
  • 2. - Madinah Hajj City, Saudi Arabia. Master plan, detailed design, tender documents and supervision of construction for a township on a 1.6 million m² site located 3 km southwest of the Holy Prophet’s Mosque in Madinah, envisaged to accommodate 120,000 pilgrims. The project comprises 82 hotel towers; office towers; commercial mall with a gross area of 71,000 m² and a 100,000 m² basement for 2,200 cars; 2 mosques (of which one Grand Mosque) for 14,000 worshipers; a 360-bed hospital complex; and elevated light rail transit and bus stations. The project is complete with all electromechanical installations; wet infrastructure, fire water and chilled water networks; in addition to 4 chilled water plants of 50,000 TR each along with thermal energy storage tanks. - Dubai Airports Strategic Plan 2020 (SP2020) - Cargo Facilities at Dubai International Airport, United Arab Emirates. Detailed design, tender documents and supervision of construction for the upgrading and expansion of the Cargo Handling Facilities (CHF’s), including relocation of Express Courier and Mail Centre (EMC) (small courier companies from Hall B to FG1 and large courier companies from Hall B to Dubai Flower Centre (DFC)) thus allowing for the demolition of Hall B, upgrading the Cargo Mega Terminal (CMT) and expanding it by one module, refurbishment and partial demolition of Hall A to serve as the west Forward Transhipment Area (FTA), and construction of the east Forward Transhipment Area (FTA) and a nearby east Cross Dock area. The project also comprises all MEP services and material handling equipment with their related controls and instrumentation in addition to all infrastructure utilities and networks (roads, chilled water, water and fire-fighting, drainage, power supply and distribution, low-current). - Lagos Infrastructure Development (LID) Project, Nigeria. Detailed design (under BIM management) and supervision of construction for a mixed-use development comprising office facilities for 2,000 employees (43,270 m²), 200 residential apartments (60,000 m²), staff accommodation for 500 persons (12,000 m²), hotel with a capacity of 200 guestrooms (20,000 m²), clubhouse and kindergarten (5,950 m²), restaurant, helipad, jetty, utility buildings (power and water supply, water and sewage treatment, etc.), gatehouse, parking lots and car-park buildings for residences and offices (76,850 m²), recreational amenities, civic activity building, retail units, and all infrastructure utilities (roads, drainage, wet infrastructure, pedestrian accesses, street and public lighting, landscaping, telecommunications, IT services). - Salahaddin University, Erbil - New Campus (Buildings), Iraq. Master plan, detailed design and tender documents for a new university campus with a student enrolment of 40,000 at its ultimate phase, comprising Presidency Building, 13 college buildings for various specialisations, administration facilities, classrooms, teaching and open laboratories, research laboratories, offices, conference spaces, central library/study, sports and athletic facilities, assembly and exhibit spaces, University Press in addition to non-academic buildings and facilities that include student dormitories (capacity of 6,000 at ultimate phase), faculty and staff housing for 1,000 persons at ultimate phase, staff club, main mosques for 2,000 worshipers, retail outlets, gates and security access points and transportation terminals. - Concourse C Improvements at Dubai International Airport, United Arab Emirates. Detailed design, tender documents and supervision of construction for the full renovation and upgrading of a 90,000 m² concourse building to be completely used by Emirates Airlines following the opening of Concourse D that will be dedicated to other airline users. The apron level includes most of technical areas, bussing area, transfer area and remote gate. The departure level includes departure facilities, boarding lounges, main duty free, retail area, and food and beverage spaces. The arrival level includes the arrival corridor, transfer area and Business Class lounges. The Hotel 1 level includes the hotel lobby, hotel rooms, First Class lounges, and some MEP spaces. The Hotel 2 level includes hotel rooms and First Class lounges. Works also comprise reconfiguring the 28 existing stands into 24 stands (11 for Code E and 13 for Code F aircrafts). - Procurement and Operation of Equipment at Tripoli Port, Lebanon. Preparation of an Information Memorandum and tender documents, selection of bidders, tendering, evaluation of bids and contract award (Built/Operate/Transfer (BOT) for a period of 25 years), as part of the selection of an Operator to run the operations of a terminal for handling containers, and bulk and general cargo at the Port of Tripoli. The terminal consists of a 600 m long quay wall (Phase 1) extendible to 1,200 m at final construction phase. RAMI EL HACHEM Page 2
  • 3. - Road Overpass at Shidiya Rail Link and Wadi Yutum Rail Terminal, Jordan. Topographic survey, subsoil investigation by boreholes, and hydrology, drainage, structural and road designs for a 2 km long/100 m wide overpass with one at-grade T-intersection. Detailed design for a new trans-shipment terminal at Wadi Yutum housing train unloading stations with unloading hoppers, discharge screw conveyors, and dust control bag filters; phosphate storage shed with storage conveyor and staking tripper; belt conveyors with their transfer towers and dust control bag filters; electrical substation; workshop and spare parts storage facility; water tanks and pumping station; compressed air station; sewage treatment plant; fuel filling station; administration and service buildings; guardhouse; signalling, lighting and telecommunication systems; and an approach road connecting the terminal to Aqaba Back Road. The project also comprises the detailed design of a 6 million tons/year phosphate train loading facility, including silos, conveyors, wagon weighing bridge, auxiliary offices and control rooms, power supply, instrumentation and control systems, and infrastructure works. - Shidiya Phosphate Mine Rail Loading Terminal, Jordan. Detailed design for a 6 million tons/year phosphate train loading facility, including train loading silos, conveyors, wagon weigh bridge, associated instrumentation, control and power supply systems, auxiliary offices and control rooms, and general site works. - Five Regional Specialised Hospitals, Saudi Arabia. Detailed design (under BIM management and according to LEED requirements-5 registrations) and tender documents for 5 new specialised hospitals as follows (total built-up area of 637,000 m²): Maternity Hospital at King Abdulaziz Medical City Riyadh Campus (300 beds), King Abdullah Specialised Children Hospital at King Abdulaziz Medical City Jeddah Campus (350 beds), Neuroscience and Trauma Care Centre at King Abdulaziz Medical City Jeddah Campus (176 beds), Taif Specialised Hospital (300 beds in addition to support and housing facilities), Qassim Specialised Hospital (300 beds in addition to support and housing facilities). Taif and Qassim general hospitals, along with their relevant buildings components, are envisaged to be of similar design, serving as a prototype to be applied by the Client in to other locations/regions. - Concourse C-Concourse B Baggage Handling System (BHS) Link Enclosure, United Arab Emirates. Detailed design for the basic amenities/necessities of the BHS link, including all architectural, structural, civil and MEP works. The project comprises slab openings/penetration at both concourses’ apron levels to allow for the penetration of the upgraded BHS conveyors to both concourses’ first basement levels in addition to the structure, architectural envelope/cladding and MEP services for the BHS running outside the concourses. - Upgrading the Baggage Handling System (BHS) at Rafic Hariri International Airport, Lebanon. Detailed design, tender documents and supervision of construction for the incorporation of the baggage X-Ray machines into the BHS system at the airport’s east and west terminals for baggage automatic search, including modifications to the existing conveyors and addition of new ones that transport rejected or suspicious baggage to inspection rooms. The project also comprises a Central Control Room (CCR) with a Closed Circuit TV (CCTV) system for baggage monitoring and storage of images produced by the baggage X-Ray machines. - Bahrain International Airport Terminal Expansion, Bahrain. Review, validation and development into working construction documents (under BIM management) of an initial concept design for the expansion of the existing terminal building (for both new constructions and renovated areas) to cater for 13.5 million passengers/year. Works comprise the relocation of affected facilities/services to maintain operations during expansion, including 2 new office buildings; passenger terminal building expansion by 68,000 m² with all its lounges, counters and areas; car-park deck; landside access road, ramp and parking; rotunda buildings; passenger loading bridges and affected apron services; central utility complex and associated substation; terminal substations and emergency plant; medium voltage network; upgrading of the primary airport station; replacement of the 7 existing air bridges; and the preparation of a comprehensive solid waste management plan. Total built-up area: 88,000 m². - Security Buildings in Shamiyah, Saudi Arabia. Design and tender documents (under BIM management) for a residential and administrative complex that provides accommodation to 19,400 officers and soldiers of the Ministry of Interior in addition to all infrastructure utilities, landscaping, and various support facilities and services, including kitchen, dining area, laundry, recreational and assembly areas, 300-bed hospital with staff housing, police and civil defence stations, etc. The complex has a direct access to Makkah Haram plazas through pedestrian tunnels. RAMI EL HACHEM Page 3
  • 4. - Hurghada International Airport - Construction Package 1, Egypt. Supervision of construction for a new 3-level passenger Terminal Building (TB) for international and domestic flights, with an overall capacity of 7.5 million passengers/year with a total built-up area of 91,500 m². The TB accommodates all relevant facilities and services with direct landside and airside interfaces. It includes 9 contact gates with passenger loading bridges, 72 check- in counters, Out of Gauge (OOG) counter, 36 passport control booths for departure and arrival, 9 inbound baggage claim carrousels and 6 outbound baggage conveyors with the appropriate baggage handling system, and a 5-level security control system. The TB incorporates the latest information technology and airport-related equipment, including communication systems, baggage handling system, fire detection and fighting systems, specialised air-conditioning and ventilation systems, standby power generation, passenger and freight lifts, etc. - Yafour Hospital Project, Syria. Detailed design and supervision of construction for a healthcare facility with a total built-up area of 120,000 m², comprising Heart and Vascular Institute (phase 1); Trauma, Women's Health and Paediatrics Section (phase 2); and an education building (phase 3). - King Abdul Aziz International Airport, Saudi Arabia. Project management, design review (according to LEED requirements), construction management and supervision for a new airport based on a new phased master plan up to the year 2035 (Phase 1 up to 2012), comprising a new passenger terminal complex (670,000 m²) with a capacity of 30 million passengers per annum to replace the existing North and South Terminals; facility design to cater for both domestic and international operations, A380 aircrafts and full hub capability with latest systems and equipment; integrated provision for a planned railway station and an automated passenger mover (APM); airfield upgrading, new parallel taxiways, control tower and related systems; state-of-the-art navigation aid and communication installations, FIDS, departure control, life safety aspects and public address systems; Baggage Handling System (BHS), support buildings and facilities, earthworks, complete landscaping, major utility networks, new landside roads, tunnels and interchanges; programme coordination for related projects, including fuel tank farm, Jet fuel supply line from Aramco to the fuel farm, Jet fuel hydrant network, desalination plant, upgrading of existing terminals, sewage treatment plant; and planning and infrastructure and earthworks for a major landside commercial zone, complementing the main development. - Duhok Airport - Buildings, Iraq. Detailed design and tender documents for a 15,000 m² terminal building with all passenger and baggage facilities, planned to cater for one million passengers/year and 43,300 tons/year of cargo in 2035 in addition to a 1,000 m² air traffic control tower, 1,800 m² fire station building, 2,200 m² central utility complex (CUC), and all other airport-related facilities. - Academic Support Facilities at Sabah Al-Salem University City - Kuwait University, Kuwait. Design, tender documents and supervision of construction for various support facilities with a total net area of 242,705 m², including a community-based public model school for pre-K and K-12 education with a capacity of 633 students (35,840 m²), community-based day- care with a capacity of 112 children (2,846 m²), Centre for Futuristic and Strategic Studies, Gulf Studies Centre, Academic Publication Council building, faculty housing and neighbourhood centre, guesthouse, men’s and women’s student housing facilities and neighbourhood centres, waste management facilities, construction and maintenance facilities, administration and general stores and workshops, mail depot, central food depot/commissary, vehicle repair facilities/service yard, press building, newspaper offices, bookstore, and faculty and administration staff clubs in addition to all infrastructure and landscaping works. September, 2015 RAMI EL HACHEM Page 4