SlideShare a Scribd company logo
1 of 6
Download to read offline
Mohamed Moheb Awaad El-Sayed
Information Technology Regional Director & Consultant
International Driving license Military Situation: Exempted
Biograph
10 years of experience in a several of Information Technology fields in both national and International
Companies. Most of my Experiences are in Communications, Telecommunications, Microsoft technologies,
Security, Programming, Development, Cisco technology and Cloud Computing.
Now I am the Head of IT at Narita Group
Before Joining Narita Group, I was worked as IT Management Consultant at Crystal Mind where I was basically
performing as IT Consultant and Project Manager.
Earlier in 2009 I was worked as IT director at First Arabian Hotels & Resorts Company the mother Company of
Four Seasons Hotels where I was managing all the Group IT departments of all subseries (Seldar, Senyar, Arabia,
First for Tourism investments)
Managed ACT Hospitality Section for Micros integrated System where I was basically responsible of managing
hotels Implementations projects.
After finalizing the B.A. of Engineering, I had joined Vodafone VIS as a Technical Support before joining
Vodafone projects management team as Project Coordinator.
PROFESSIONAL EXPERIENCE:
Narita Group www.naritagroup.com
Information Technology Regional Director & Consultant
From September 2014 till Now
Responsibilities:
1. Prepare and manage the Information Technology budget as well as the Instructional Technology
budget.
2. Supervise the Desktop Technician and Network Administrator
3. Monitor, manage, maintain and administer the server environment including; Active Directory,
Exchange, SQL database
4- Secure all servers.
5. Prepare and monitor a disaster recovery, including backups of servers.
6. Provide repair and upgrades for hardware, networks and software.
7. Install, setup, and maintain appropriate software on servers.
8. Develop bid specifications as required by NARITA policy for new and replacement hardware and
software.
9. Responsible for coordinating the selection and purchase of equipment and support materials
needed to reach goals.
10. Develop and maintain an accurate inventory of all NARITA technology equipment.
11. Coordinate and provide in-service and hands-on training for NARITA staff for hardware and
software applications as needed.
12. Maintain accuracy and quality in any and all written materials developed.
13. Maintain a limited inventory of parts and materials.
14. Remain current in the utilization of technology in the field of education by attending training
sessions, seminars and workshops
15. Perform other duties as assigned by the Vice President of Business Services.
mohamedmohebawaad@gmail.com
Mobile +202 01000021650
Date of Birth: Sep 28th
1984 Social Status: Married
Crystal Mind www.crystal-mind.com
Information Technology Consultant @ Business Management Section
From December 2013 to September 2014
Responsibilities:
1- Developing project plans, goals, and budgets; identifying resources needed
2- Developing schedules and methods for measuring results
Guiding and performing strategic analysis for the project
3- Organizing and managing all phases of the project to ensure on-time completion
4- Assembling and coordinating project team members; assigning individual responsibilities
5- Preparing requests for proposals and conducting all necessary meetings to facilitate selection of project
services and products
6- Planning and overseeing the preparation and dissemination of project communications.
7- Seeks ways to apply technology to business processes
8- Researches and provides information on technical trends
9- Consults with program/project management to develop appropriate technical solutions
10- Advise on options, risks, costs vs. benefits, impact on other business processes and system priorities
First Arabian Hotels &Resorts Company (Four Seasons Owning Company)
www.firstplace.com
Subseries (Seldar, Senyar, Arabia, First for Tourism investments)
Information Technology Manager
From December 2009 to December 2013
Responsibilities:
1- Develop requirements, outlines, budgets, and schedulers for information technology projects.
2- Oversee all phases of project from conception to completion.
3- Assist with upgrading information security.
Manage team of consultants, programmers, developers, and analysts.
4- Ensure project is completed within budget and on time.
Follow PMI standards to manage projects through the project life cycles of initiation, planning, execution and
closure.
5- Develop work-breakdown structures.
6- Develop project tracking and variance reports.
7- Assemble risk management plans and work effort documents.
8- Create project documentation.
9- Provide risk assessment.
10- Review estimates.
11-Assess new opportunities.
12- Prepare proposals.
13- Flag potential issues.
14- Manage multiple vendors.
15- Utilize in-depth technical knowledge and business requirements to design and implement secure
solutions to meet customer / client needs while protecting the corporation's assets.
16- Develop security standards, procedures, and guidelines for multiple platforms.
Managing and monitoring Servers & Services
1- Company Projects Management
2- Share Point
3- IT Trainer
4- Policy and Procedures Creator & inspector
5- Network & Infrastructure
6- ISA [ Internet Security and Acceleration ]
7- Microsoft Exchange Servers [ Mail Server ]
8- Materials Control MC [ Financial and stores Programmes ]
9- Domain Controllers
10- Symantec backup exec [ Server for backup on disk storage or backup tapes ]
11- Symantec End point [ Anti-virus Server system ]
12- Fortigate [ Hardware Firewall configuring and Monitoring ]
13- Forefront online protection [ Exchange Inbound & outbound e-mails online Protection ]
14- Cisco Switches & Routers
15- File servers
16- WSUS Servers
17- Hits [ HR attendance and payroll system ]
18- Finger prints Machines [ Attendance hardware machines ]
19- Micros POS System
20- Micro Enterprise Management EM
21- Micros I - Care System
22- My Micros Web System
Support users, configure Blackberry Services, I-phones, V-lans,VPN Connections, wireless connections,
conference calls, meeting rooms projectors
Advanced Computer Technology
Implementation Specialist @ Hospitality Section
From September 2007 to December 2009
Responsibilities:
1. Handle several implementation projects at any given time.
2. Lead all aspects of implementation at a client’s site.
3. Gather business requirements as necessary and apply detailed working knowledge of products and features to
support the client’s business.
4. Create configuration documents for setup in ACT systems and train clients
appropriately.
5. Recommend implementation of features and functions where appropriate.
6. Develop and conduct training programs for each client in all aspects ACT systems to be fully prepared on the go-
live date.
7. Work with corporate Training Specialist, where necessary, to create training materials for client.
8. Report enhancement requests and bugs on behalf of the client.
9. Act as a resource to assist project team in Product Development and/or testing process to ensure integrity of data
conversions prior to go-live.
10. Work with Project Managers to establish cost and time estimates for implementation.
11. Track tasks accomplished, time spent and milestones completed using internal tools.
12. Assist with identification of risks, and with development of mitigation or avoidance plans.
13. Communicate with client throughout the implementation project life cycle.
14. Assist clients with post-live support questions when needed.
15. Train/Coach less experienced Implementation Specialists and internal resources including support staff
Projects Experiences:
1- Jolie ville Maritime Alexandria Renovation To Hilton Cornish Alexandria 2013
http://hilton-alexandriacorniche.h-rez.com/
Responsible as an IT Project Manager and Owner Rep. IT Consultant
 Network infrastructure and Cabling extenders as per Hilton worldwide Standard
 Setup Server Room and Servers Configuration as Hilton worldwide Standard
 Micros System upgrading from 3700 to 9700 Micros Version
 Change all PC HP to Lenovo
 WIFI Guest internet
 VPN & Remote Connections
 Fire Alarm System
Reference Person: Mr.Ihab Zaki
Position: Hilton Regional IT Manager
Contact: +2012 014 1111
2- Beach Club House Emaar Company ( Marrasi – Marina alex ) 3 Restaurants – Night Life
Restaurants
http://www.marassi-egypt.com/marassi/beach-clubhouse
Responsible as an IT Project Manager
 Budget Control
 Network infrastructure
 Micros System [ WIFI New solution connection ]
 Finger Print & HR Attendance System
 VPN & Remote Connections
 WIFI Guest internet
Reference Person: Mr.Abd EL Kader
Position: Emaar Egypt General Manager
Contact: +20100 177 4631
e-mail:afarouk@emar.ae
3- First Mall ( 4 Restaurants Full Renovation + 4 Main Kitchens )
http://www.firstmallcairo.com
www.firstplace.com
Responsible as an IT Project Manager
 Budget Control
 Network infrastructure
 Micros System
 Finger Print & HR Attendance System
 VPN & Remote Connections
 WIFI Guest internet
 Fire Alarm System
Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious
Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager
Contact: 0033 683613488 (France) Contact: +2012 0000 9518
E-mail: boulouysdavid@yahoo.fr
4- La Gourmandise Chain Restaurant Arkan 6 of October
http://www.lagourmandiseegypt.com/
Responsible as an IT Project Manager
 Network infrastructure Micros System
 Finger Print & Emp. Attendance System
 VPN & Remote Connections
 Fire Alarm System
 WIFI Guest internet
Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious
Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager
Contact: 0033 683613488 (France) Contact: +2012 0000 9518
E-mail: boulouysdavid@yahoo.fr
5- La Gourmandise Chain Restaurant Jolie ville Maritime Alexandria Hotel
http://www.lagourmandiseegypt.com/
Responsible as an IT Project Manager
 Network infrastructure
 Micros System
Reference Person: Mr. David Boulouys Reference Person: Mr. Clement Gargour
Position: Chief Operation Officer [COO] Position: Owning Company General Manager
Contact: 0033 683613488 (France) Contact: +20122 999 999 1
E-mail: boulouysdavid@yahoo.fr
6- La Gourmandise Chain Restaurant Maadi
http://www.lagourmandiseegypt.com/
Responsible as an IT Project Manager
 Network infrastructure
 Micros System
 Finger Print & Emp. Attendance System
 VPN & Remote Connections
 Fire Alarm System
 WIFI Guest internet
Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious
Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager
Contact: 0033 683613488 (France) Contact: +2012 0000 9518
E-mail: boulouysdavid@yahoo.fr
EDUCATION:
Bachelor's degree Electric Engineering (Communications & Electronics)
At Faculty of Engineering
Project: Smart Vehicle
PLC & Smart Electronics
Excellent (98 %)
Location: Cairo, Egypt
Completion Date: May 2007
Communication systems have not only changed the world but are also advancing at an exceptional rate. Future
communication systems will form the foundation for a sustainable and intelligent society where people and equipment
can be connected anywhere, any time - with anything. A high degree of connectivity will be a key enabler for new
innovative technologies and applications that can benefit from information sharing.
Evolving technologies are e.g. 5G mobile communications, machine communications, fibre optical links and networks,
and sensor network communication, with emerging new applications such as remote and assisted medical diagnosis
and treatment, traffic and vehicle safety, environmental monitoring, maximising efficiency and reliability in smart grid
infrastructure, and tele-presence systems that reduce the need for energy consuming transportation of people.
In order to gain insight into communication systems of the future, and to develop such systems, solid analytical skills
and an understanding of the fundamental principles of digital information transmissions are essential.
Besides the fundamentals in communication engineering we focus on e.g. random signal analysis, stochastic
methods for digital modulation and coding, applications of digital signal processing, optical fibres and lasers and
information theory and coding.
The combination of theoretical and applied knowledge in systems that apply on a global scale gives you a toolbox
and a degree in Communication Engineering for a lifelong learning process in communication technologies
Skills
1- Professionalism
2- Adaptability
3- Goal setting
4- Motivation
References
Amr Bahi El-Din
Job Title: IT Director
Company Name: ITS KSA
Phone Number: +966.593333605
Tarek Yassin
Job Title: Vice Residence
Company Name: Crystal Mind
Phone Number: +2.01222103859
Email Address:
Hossam Ads
Job Title: Ceo
Company Name: Crystal Mind
Phone Number: +2.01223102768
Email Address: hads@crystal-mind.com
Training and Certifications
PMP (Training)
Training Institute: Amideast
Date Attended: April 2012
MCITP (Training)
Training Institute: Synergy
Date Attended: January 2008
MCSE (Training)
Training Institute: Synergy
Date Attended: June 2007
REFERENCES: Available upon request.

More Related Content

What's hot

What's hot (8)

Francis Erwin Roxas_CV
Francis Erwin Roxas_CVFrancis Erwin Roxas_CV
Francis Erwin Roxas_CV
 
loaiCV2014
loaiCV2014loaiCV2014
loaiCV2014
 
Melony Myers, IT CV, Resume, & Testimonials
Melony Myers, IT CV, Resume, & TestimonialsMelony Myers, IT CV, Resume, & Testimonials
Melony Myers, IT CV, Resume, & Testimonials
 
Ahmed Said CV
Ahmed Said CVAhmed Said CV
Ahmed Said CV
 
Karthik P.doc
Karthik P.docKarthik P.doc
Karthik P.doc
 
Ahmed Saber CV
Ahmed Saber CVAhmed Saber CV
Ahmed Saber CV
 
Curriculum Vitae in English
Curriculum Vitae in EnglishCurriculum Vitae in English
Curriculum Vitae in English
 
Ahmedsaber
AhmedsaberAhmedsaber
Ahmedsaber
 

Viewers also liked

You need rules? You need PBM!
You need rules? You need PBM!You need rules? You need PBM!
You need rules? You need PBM!Boris Hristov
 
рак на черен дроб
рак на черен дробрак на черен дроб
рак на черен дробEster Hristoskova
 
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...EnfermeríaHRUM Atención Especializada
 
El legado artiguista
El legado artiguistaEl legado artiguista
El legado artiguistaANA CODINA
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...San Diego County Water Authority
 
Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015San Diego County Water Authority
 
Salesforce - Nathan Price EECS 441
Salesforce - Nathan Price EECS 441Salesforce - Nathan Price EECS 441
Salesforce - Nathan Price EECS 441Nathaniel Price
 
Gênero textual - Hibritização
Gênero textual - HibritizaçãoGênero textual - Hibritização
Gênero textual - HibritizaçãoUNIPLETRAS
 

Viewers also liked (11)

Manejo inefectivo del régimen terapéutico. Un problema de seguridad
Manejo inefectivo del régimen terapéutico. Un problema de seguridadManejo inefectivo del régimen terapéutico. Un problema de seguridad
Manejo inefectivo del régimen terapéutico. Un problema de seguridad
 
You need rules? You need PBM!
You need rules? You need PBM!You need rules? You need PBM!
You need rules? You need PBM!
 
The kraken
The krakenThe kraken
The kraken
 
рак на черен дроб
рак на черен дробрак на черен дроб
рак на черен дроб
 
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...
IMPLEMENTACIÓN DEL PLAN INTEGRAL DE CUIDADOS DE ANDALUCÍA: UNIDAD DE GESTION ...
 
Apnea Neonatal
Apnea Neonatal Apnea Neonatal
Apnea Neonatal
 
El legado artiguista
El legado artiguistaEl legado artiguista
El legado artiguista
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
 
Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015
 
Salesforce - Nathan Price EECS 441
Salesforce - Nathan Price EECS 441Salesforce - Nathan Price EECS 441
Salesforce - Nathan Price EECS 441
 
Gênero textual - Hibritização
Gênero textual - HibritizaçãoGênero textual - Hibritização
Gênero textual - Hibritização
 

Similar to Mohamed Moheb Awaad

Similar to Mohamed Moheb Awaad (20)

cv updated 20150115
cv updated 20150115cv updated 20150115
cv updated 20150115
 
Ahmed Sami Ahmed CV v8.0 Decision Support & Technology Director
Ahmed Sami Ahmed CV v8.0 Decision Support & Technology DirectorAhmed Sami Ahmed CV v8.0 Decision Support & Technology Director
Ahmed Sami Ahmed CV v8.0 Decision Support & Technology Director
 
Heba Samir (1)
Heba Samir (1)Heba Samir (1)
Heba Samir (1)
 
Osama El Gamal's Resume
Osama El Gamal's ResumeOsama El Gamal's Resume
Osama El Gamal's Resume
 
Mohamed Mohamed Imam Ali CV
Mohamed Mohamed Imam Ali CVMohamed Mohamed Imam Ali CV
Mohamed Mohamed Imam Ali CV
 
Tk amk new
Tk amk newTk amk new
Tk amk new
 
Tk amk new
Tk amk newTk amk new
Tk amk new
 
Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)
 
Ahmed Sami C.V. V.9 E-Learning Co-ordinator
Ahmed Sami C.V. V.9 E-Learning Co-ordinatorAhmed Sami C.V. V.9 E-Learning Co-ordinator
Ahmed Sami C.V. V.9 E-Learning Co-ordinator
 
Mina Mounir (updated)
Mina Mounir (updated)Mina Mounir (updated)
Mina Mounir (updated)
 
Resume
ResumeResume
Resume
 
Resume - Mohamed Aman Mohamed Elhelw-Jun 2016
Resume - Mohamed Aman Mohamed Elhelw-Jun 2016Resume - Mohamed Aman Mohamed Elhelw-Jun 2016
Resume - Mohamed Aman Mohamed Elhelw-Jun 2016
 
Adel eid ali resume
Adel eid ali resumeAdel eid ali resume
Adel eid ali resume
 
Resume-Jasim Ali
Resume-Jasim AliResume-Jasim Ali
Resume-Jasim Ali
 
ASG
ASGASG
ASG
 
Ahmed_tohamy_CV
Ahmed_tohamy_CVAhmed_tohamy_CV
Ahmed_tohamy_CV
 
Timothy CV
Timothy CVTimothy CV
Timothy CV
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume of Dhesigan Reddy_Hyperv2012
Resume of Dhesigan Reddy_Hyperv2012Resume of Dhesigan Reddy_Hyperv2012
Resume of Dhesigan Reddy_Hyperv2012
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
 

Mohamed Moheb Awaad

  • 1. Mohamed Moheb Awaad El-Sayed Information Technology Regional Director & Consultant International Driving license Military Situation: Exempted Biograph 10 years of experience in a several of Information Technology fields in both national and International Companies. Most of my Experiences are in Communications, Telecommunications, Microsoft technologies, Security, Programming, Development, Cisco technology and Cloud Computing. Now I am the Head of IT at Narita Group Before Joining Narita Group, I was worked as IT Management Consultant at Crystal Mind where I was basically performing as IT Consultant and Project Manager. Earlier in 2009 I was worked as IT director at First Arabian Hotels & Resorts Company the mother Company of Four Seasons Hotels where I was managing all the Group IT departments of all subseries (Seldar, Senyar, Arabia, First for Tourism investments) Managed ACT Hospitality Section for Micros integrated System where I was basically responsible of managing hotels Implementations projects. After finalizing the B.A. of Engineering, I had joined Vodafone VIS as a Technical Support before joining Vodafone projects management team as Project Coordinator. PROFESSIONAL EXPERIENCE: Narita Group www.naritagroup.com Information Technology Regional Director & Consultant From September 2014 till Now Responsibilities: 1. Prepare and manage the Information Technology budget as well as the Instructional Technology budget. 2. Supervise the Desktop Technician and Network Administrator 3. Monitor, manage, maintain and administer the server environment including; Active Directory, Exchange, SQL database 4- Secure all servers. 5. Prepare and monitor a disaster recovery, including backups of servers. 6. Provide repair and upgrades for hardware, networks and software. 7. Install, setup, and maintain appropriate software on servers. 8. Develop bid specifications as required by NARITA policy for new and replacement hardware and software. 9. Responsible for coordinating the selection and purchase of equipment and support materials needed to reach goals. 10. Develop and maintain an accurate inventory of all NARITA technology equipment. 11. Coordinate and provide in-service and hands-on training for NARITA staff for hardware and software applications as needed. 12. Maintain accuracy and quality in any and all written materials developed. 13. Maintain a limited inventory of parts and materials. 14. Remain current in the utilization of technology in the field of education by attending training sessions, seminars and workshops 15. Perform other duties as assigned by the Vice President of Business Services. mohamedmohebawaad@gmail.com Mobile +202 01000021650 Date of Birth: Sep 28th 1984 Social Status: Married
  • 2. Crystal Mind www.crystal-mind.com Information Technology Consultant @ Business Management Section From December 2013 to September 2014 Responsibilities: 1- Developing project plans, goals, and budgets; identifying resources needed 2- Developing schedules and methods for measuring results Guiding and performing strategic analysis for the project 3- Organizing and managing all phases of the project to ensure on-time completion 4- Assembling and coordinating project team members; assigning individual responsibilities 5- Preparing requests for proposals and conducting all necessary meetings to facilitate selection of project services and products 6- Planning and overseeing the preparation and dissemination of project communications. 7- Seeks ways to apply technology to business processes 8- Researches and provides information on technical trends 9- Consults with program/project management to develop appropriate technical solutions 10- Advise on options, risks, costs vs. benefits, impact on other business processes and system priorities First Arabian Hotels &Resorts Company (Four Seasons Owning Company) www.firstplace.com Subseries (Seldar, Senyar, Arabia, First for Tourism investments) Information Technology Manager From December 2009 to December 2013 Responsibilities: 1- Develop requirements, outlines, budgets, and schedulers for information technology projects. 2- Oversee all phases of project from conception to completion. 3- Assist with upgrading information security. Manage team of consultants, programmers, developers, and analysts. 4- Ensure project is completed within budget and on time. Follow PMI standards to manage projects through the project life cycles of initiation, planning, execution and closure. 5- Develop work-breakdown structures. 6- Develop project tracking and variance reports. 7- Assemble risk management plans and work effort documents. 8- Create project documentation. 9- Provide risk assessment. 10- Review estimates. 11-Assess new opportunities. 12- Prepare proposals. 13- Flag potential issues. 14- Manage multiple vendors. 15- Utilize in-depth technical knowledge and business requirements to design and implement secure solutions to meet customer / client needs while protecting the corporation's assets. 16- Develop security standards, procedures, and guidelines for multiple platforms. Managing and monitoring Servers & Services 1- Company Projects Management 2- Share Point 3- IT Trainer 4- Policy and Procedures Creator & inspector 5- Network & Infrastructure 6- ISA [ Internet Security and Acceleration ] 7- Microsoft Exchange Servers [ Mail Server ] 8- Materials Control MC [ Financial and stores Programmes ] 9- Domain Controllers 10- Symantec backup exec [ Server for backup on disk storage or backup tapes ] 11- Symantec End point [ Anti-virus Server system ] 12- Fortigate [ Hardware Firewall configuring and Monitoring ]
  • 3. 13- Forefront online protection [ Exchange Inbound & outbound e-mails online Protection ] 14- Cisco Switches & Routers 15- File servers 16- WSUS Servers 17- Hits [ HR attendance and payroll system ] 18- Finger prints Machines [ Attendance hardware machines ] 19- Micros POS System 20- Micro Enterprise Management EM 21- Micros I - Care System 22- My Micros Web System Support users, configure Blackberry Services, I-phones, V-lans,VPN Connections, wireless connections, conference calls, meeting rooms projectors Advanced Computer Technology Implementation Specialist @ Hospitality Section From September 2007 to December 2009 Responsibilities: 1. Handle several implementation projects at any given time. 2. Lead all aspects of implementation at a client’s site. 3. Gather business requirements as necessary and apply detailed working knowledge of products and features to support the client’s business. 4. Create configuration documents for setup in ACT systems and train clients appropriately. 5. Recommend implementation of features and functions where appropriate. 6. Develop and conduct training programs for each client in all aspects ACT systems to be fully prepared on the go- live date. 7. Work with corporate Training Specialist, where necessary, to create training materials for client. 8. Report enhancement requests and bugs on behalf of the client. 9. Act as a resource to assist project team in Product Development and/or testing process to ensure integrity of data conversions prior to go-live. 10. Work with Project Managers to establish cost and time estimates for implementation. 11. Track tasks accomplished, time spent and milestones completed using internal tools. 12. Assist with identification of risks, and with development of mitigation or avoidance plans. 13. Communicate with client throughout the implementation project life cycle. 14. Assist clients with post-live support questions when needed. 15. Train/Coach less experienced Implementation Specialists and internal resources including support staff Projects Experiences: 1- Jolie ville Maritime Alexandria Renovation To Hilton Cornish Alexandria 2013 http://hilton-alexandriacorniche.h-rez.com/ Responsible as an IT Project Manager and Owner Rep. IT Consultant  Network infrastructure and Cabling extenders as per Hilton worldwide Standard  Setup Server Room and Servers Configuration as Hilton worldwide Standard  Micros System upgrading from 3700 to 9700 Micros Version  Change all PC HP to Lenovo  WIFI Guest internet  VPN & Remote Connections  Fire Alarm System Reference Person: Mr.Ihab Zaki Position: Hilton Regional IT Manager Contact: +2012 014 1111
  • 4. 2- Beach Club House Emaar Company ( Marrasi – Marina alex ) 3 Restaurants – Night Life Restaurants http://www.marassi-egypt.com/marassi/beach-clubhouse Responsible as an IT Project Manager  Budget Control  Network infrastructure  Micros System [ WIFI New solution connection ]  Finger Print & HR Attendance System  VPN & Remote Connections  WIFI Guest internet Reference Person: Mr.Abd EL Kader Position: Emaar Egypt General Manager Contact: +20100 177 4631 e-mail:afarouk@emar.ae 3- First Mall ( 4 Restaurants Full Renovation + 4 Main Kitchens ) http://www.firstmallcairo.com www.firstplace.com Responsible as an IT Project Manager  Budget Control  Network infrastructure  Micros System  Finger Print & HR Attendance System  VPN & Remote Connections  WIFI Guest internet  Fire Alarm System Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager Contact: 0033 683613488 (France) Contact: +2012 0000 9518 E-mail: boulouysdavid@yahoo.fr 4- La Gourmandise Chain Restaurant Arkan 6 of October http://www.lagourmandiseegypt.com/ Responsible as an IT Project Manager  Network infrastructure Micros System  Finger Print & Emp. Attendance System  VPN & Remote Connections  Fire Alarm System  WIFI Guest internet Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager Contact: 0033 683613488 (France) Contact: +2012 0000 9518 E-mail: boulouysdavid@yahoo.fr
  • 5. 5- La Gourmandise Chain Restaurant Jolie ville Maritime Alexandria Hotel http://www.lagourmandiseegypt.com/ Responsible as an IT Project Manager  Network infrastructure  Micros System Reference Person: Mr. David Boulouys Reference Person: Mr. Clement Gargour Position: Chief Operation Officer [COO] Position: Owning Company General Manager Contact: 0033 683613488 (France) Contact: +20122 999 999 1 E-mail: boulouysdavid@yahoo.fr 6- La Gourmandise Chain Restaurant Maadi http://www.lagourmandiseegypt.com/ Responsible as an IT Project Manager  Network infrastructure  Micros System  Finger Print & Emp. Attendance System  VPN & Remote Connections  Fire Alarm System  WIFI Guest internet Reference Person: Mr. David Boulouys Reference Person: Mr. Henry Armanious Position: Chief Operation Officer [COO] Position: Food & Beverage and LG Chain Manager Contact: 0033 683613488 (France) Contact: +2012 0000 9518 E-mail: boulouysdavid@yahoo.fr EDUCATION: Bachelor's degree Electric Engineering (Communications & Electronics) At Faculty of Engineering Project: Smart Vehicle PLC & Smart Electronics Excellent (98 %) Location: Cairo, Egypt Completion Date: May 2007 Communication systems have not only changed the world but are also advancing at an exceptional rate. Future communication systems will form the foundation for a sustainable and intelligent society where people and equipment can be connected anywhere, any time - with anything. A high degree of connectivity will be a key enabler for new innovative technologies and applications that can benefit from information sharing. Evolving technologies are e.g. 5G mobile communications, machine communications, fibre optical links and networks, and sensor network communication, with emerging new applications such as remote and assisted medical diagnosis and treatment, traffic and vehicle safety, environmental monitoring, maximising efficiency and reliability in smart grid infrastructure, and tele-presence systems that reduce the need for energy consuming transportation of people. In order to gain insight into communication systems of the future, and to develop such systems, solid analytical skills and an understanding of the fundamental principles of digital information transmissions are essential. Besides the fundamentals in communication engineering we focus on e.g. random signal analysis, stochastic methods for digital modulation and coding, applications of digital signal processing, optical fibres and lasers and information theory and coding. The combination of theoretical and applied knowledge in systems that apply on a global scale gives you a toolbox and a degree in Communication Engineering for a lifelong learning process in communication technologies
  • 6. Skills 1- Professionalism 2- Adaptability 3- Goal setting 4- Motivation References Amr Bahi El-Din Job Title: IT Director Company Name: ITS KSA Phone Number: +966.593333605 Tarek Yassin Job Title: Vice Residence Company Name: Crystal Mind Phone Number: +2.01222103859 Email Address: Hossam Ads Job Title: Ceo Company Name: Crystal Mind Phone Number: +2.01223102768 Email Address: hads@crystal-mind.com Training and Certifications PMP (Training) Training Institute: Amideast Date Attended: April 2012 MCITP (Training) Training Institute: Synergy Date Attended: January 2008 MCSE (Training) Training Institute: Synergy Date Attended: June 2007 REFERENCES: Available upon request.