SlideShare a Scribd company logo
1 of 16
Download to read offline
Prepared by: Mohamed kamal
Mob: 00966532863494 / 00919567783559
e-mail: abdulkamalmohamed@gmail.com
ae.linkedin.com/in/abdulkamalmohamed/
Recommendations for efficient IBS DAS
Networks
Contents
1. Planned Sites Traffic estimation.
2. DAS solution selection (active /passive).
3. Design competence to Future technologies and needed precautions.
4. Reliability of soft tool Prediction and possible substitutions.
5. Indoor and Outdoor pre-optimization with soft tools and coverage
assurance.
6. Multi operator sharing site’s acceptance and upgrade possibilities.
7. VVIP site design requirements.
8. Upgrade requirement of old IBS with respect advanced technologies.
9. Planning –designing-optimizaion mutual coordination for new sites.
10. Standardizing design folders for acceptance among the suppliers.
1. Planned Sites Traffic estimation.
• The acceptance of IBS site design should based on two main design concerns,
which are Site capacity design and Site coverage design.
• Normally the coverage design is perfectly checked by relating with the submitted
soft tool generated Prediction plots for all technology. (Challenges, see slide 8)
• Most of the current capacity designs are relayed on 2G calculations only since
the 3G and 4G calculations seems to be difficult.
• This creates bad KPIs performance in Mega IBS projects eg:- big malls, stadiums
and universities.
• The site’s capacity requirement should be determined for all technology
according to the expected number of users.
• This need high level planning by expert designers and preferred solution need to
be delivered to the DAS design supplier in advance.
2. DAS solution selection (active /passive).
• The best basic solution should be Passive as it is Coverage and
Capacity balanced solution.
• High traffic prone sites will be with high calls and data usage;
coverage area must be defined to accommodate only planned
number of users otherwise Kpi will degrade because of
loading(Small cells/ hotspots/ wifi-offloading techniques are also
preferred to manage the high traffic).
• Coverage expansion in high traffic sites( with out considering the
number of users) by active sites creates bad KPIs performance in
Mega IBS projects- including big malls, stadiums and universities.
• Selection DAS in-building solution should need high care as it is
controlling CAPEX and OPEX.
2. DAS solution selection (active /passive).
• Active sites are not advisable in terms of CAPEX and OPEX(Special
monitoring systems are required to know the working status and
parts gets easily damaged) Unless coverage duplication(expansion)
needed like in airport(Limited users but vast area) or small
buildings(with limited users inside) in a campus, where individual
passive sites will result in high CAPEX investments.
• Operators need to avoid promoting of the unscientific acceptance
of ACIVE sites designs. Even in towers and small buildings, the
active solution is selected with out looking different possibilities in
Passive solutions which are available with vendors and are able to
substitute the active systems.
• The selection of IBS type should be according to building type and
traffic capacity requirements of site.
2. DAS solution selection (active /passive).
• Both Active and Passive sites need a source for all technologies. But only Passive
site efficiently utilize the 100% of RF source power. The Active unit utilize a small
fraction of RF source power(Remaining wastage) but it could repeat and serve at
remote location; it never duplicate or increase the capacity of system(helps to
grab higher order modulation by delivering extended/good coverage).
• So any addition of Capacity by means of additional sectors or telecom site, will
contribute wastage of RF source power. Where in Passive sites, addition of
capacity will allow expansion of coverage.
• Since Active solution could serve large area it could accommodate more users
and could create loading in all technologies if the designed capacity is less and
creates bad KPI performance and customer dissatisfaction.
Site with s/m Power output
X (Normally DAS Input),
available traffic capacity Y
and area of serving Z units.
Passive IBS Site dimensioning
“X+Y+Z”
Active/Hybrid IBS Site dimensioning
“X+Y+nZ”
Site with s/m Power output X (Active Master unit
requires only 3 or less percentage of X as input), available
traffic capacity Y and area of serving can be multiplied
(nZ) units when compare with passive.
3. Design competence to Future technologies and needed
precautions.
• The below points must be considered while approving a
design.
 For Active and Passive solution
1. Compatibility of components to upcoming technology and frequency band
(eg:-2600MHz).
2. Quality of used components(Untested Cheap Chinese components can
introduce PIM while we use higher order modulations- PIM testing advisable
after implementation).
3. Design should consider current latest technology as a base reference; The
current designs should consider LTE reference signal as the power reference,
so the designs could accommodate previous technologies and future
technologies.
4. Active system’s supporting bands and technologies must be verified.
4. Reliability of soft tool Prediction and possible substitutions.
• Blindly believing the soft tool prediction could create bad KPI performance after
Implementation.
• Soft tool prediction could be fake in below cases.
• The auto cad line(Walls) will be having multiple superimposed lines while
importing to tools like iBwave, this could cause wrong wall loses resulting wrong
prediction.
• Even the wall height could be lover than prediction level and will give wrong
result.
In such cases, since the
prediction level is not meeting
the walls and will not consider
the wall losses while
calculation. Additionally,
iBwave defined wall loss also
need to be checked while
acceptance.
4. Reliability of soft tool Prediction and possible substitutions.
• To avoid this we could use cw transmitter for coverage propagation
testing at individual sites.
• The coverage gaps after implementation is because, we are only
considering the coverage predictions from iBwave or other
simulation tools only
5. Indoor and Outdoor pre-optimization with soft tools and
coverage assurance.
• iBwave is a strong tool with which we can input the pre-walktest
logs of a site and could identify issues with respect to the designed
site’s planned Rf conditions.
• This will help us to deliver an optimum design.
6. Multi operator sharing site’s acceptance and upgrade
possibilities.
• Sharing site acceptance should make sure the future carrier
upgrade and technology upgrade possibilities in active sites for all
operator.
• All new designs, where currently other operators are not
approached the Building management for new DAS, should be
designed as multi operator Sharing DAS as an advanced step for
sharing (Normally, Site acquisition team do special contract with
building management in such cases).
• Site sharing with other operator should meet all operators’s design
criteria.
7. VVIP site design requirements..
• VVIP sites Designs must be prioritized for passive solution.
• This will reduce the maintenance and optimization requirements
and could reduce frequent access to site.
• All kind of monitoring for passive sites are easy when compare with
Active solution.
8. Upgrade requirement of old IBS with respect advanced
technologies.
• The existing IBS sites need to be reviewed with respect to the
advancement in technology; to enhance customer satisfaction and
business development.
• Bandwidth compatibility of DAS components, low EIRP at antenna
end, Base station upgrade requirements will be the challenges and
this could be overcome by proper review of designs from operator
end.
9. Planning –designing-optimizaion mutual coordination for new
sites.
• All new Site’s frequency and capacity Planning should be done care
fully.
• Unscientifically planned sites need to be planned well for better
performance.
• For big campus’, even we could see the planned site sectorization
are implemented wrongly, proper verification of as built should be
conducted by operator.
10. Standardizing design folders for acceptance among the suppliers.
• It is mandatory for an organization to have a standardized criteria
for accepting the suppliers outcomes
• There should be a standardized design folder format for design
acceptance for all suppliers.
• Which will unify the task and ease the acceptance from operator
end, and will reduce the malpractices in design by the supplier.
Thank You.

More Related Content

What's hot

Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
Bruno Teixeira
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
Serik123
 

What's hot (20)

RF Antenna Planning
RF Antenna PlanningRF Antenna Planning
RF Antenna Planning
 
Ibs Rajeesh
Ibs RajeeshIbs Rajeesh
Ibs Rajeesh
 
In Building Solution
In Building SolutionIn Building Solution
In Building Solution
 
Huawei gsm grfu introduction
Huawei gsm grfu introductionHuawei gsm grfu introduction
Huawei gsm grfu introduction
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-ref
 
Handling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN MicrowavesHandling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN Microwaves
 
Base Transceiver Station (BTS)
Base Transceiver Station (BTS)Base Transceiver Station (BTS)
Base Transceiver Station (BTS)
 
Ubbp
UbbpUbbp
Ubbp
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Distributed Antenna System
Distributed Antenna SystemDistributed Antenna System
Distributed Antenna System
 
Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structure
 
Fttx
FttxFttx
Fttx
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
 
Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
Passive Optical Networks - PON: Customer Case Study, Design, Implementation a...
 
83092299 rru3804-overview
83092299 rru3804-overview83092299 rru3804-overview
83092299 rru3804-overview
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
 
LTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxLTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptx
 
55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems
 
TRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-AlamiTRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-Alami
 

Similar to IBS Design recommendation for Efficient DAS

Enable business continuity and high availability through active active techno...
Enable business continuity and high availability through active active techno...Enable business continuity and high availability through active active techno...
Enable business continuity and high availability through active active techno...
Qian Li Jin
 
Infrastructure Strategy
Infrastructure StrategyInfrastructure Strategy
Infrastructure Strategy
Robert Jones
 
das-level-2-training-resource-pdf1
das-level-2-training-resource-pdf1das-level-2-training-resource-pdf1
das-level-2-training-resource-pdf1
Ryan Tyson, MBA
 
Wifi Documentation Presentation
Wifi Documentation PresentationWifi Documentation Presentation
Wifi Documentation Presentation
SwitchPitch
 

Similar to IBS Design recommendation for Efficient DAS (20)

Evolution of Telecommunication
Evolution of Telecommunication Evolution of Telecommunication
Evolution of Telecommunication
 
Abhimanyu_Resume[1][1]
Abhimanyu_Resume[1][1]Abhimanyu_Resume[1][1]
Abhimanyu_Resume[1][1]
 
Enable business continuity and high availability through active active techno...
Enable business continuity and high availability through active active techno...Enable business continuity and high availability through active active techno...
Enable business continuity and high availability through active active techno...
 
The Enterprise Unlocked webinar
The Enterprise Unlocked webinarThe Enterprise Unlocked webinar
The Enterprise Unlocked webinar
 
Dubbo and Weidian's practice on micro-service architecture
Dubbo and Weidian's practice on micro-service architectureDubbo and Weidian's practice on micro-service architecture
Dubbo and Weidian's practice on micro-service architecture
 
Technology insights: Decision Science Platform
Technology insights: Decision Science PlatformTechnology insights: Decision Science Platform
Technology insights: Decision Science Platform
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Infrastructure Strategy
Infrastructure StrategyInfrastructure Strategy
Infrastructure Strategy
 
das-level-2-training-resource-pdf1
das-level-2-training-resource-pdf1das-level-2-training-resource-pdf1
das-level-2-training-resource-pdf1
 
Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1
 
Cloud Computing
Cloud ComputingCloud Computing
Cloud Computing
 
AppViewX|Case study - Largest US telecommunication company builds agile adc i...
AppViewX|Case study - Largest US telecommunication company builds agile adc i...AppViewX|Case study - Largest US telecommunication company builds agile adc i...
AppViewX|Case study - Largest US telecommunication company builds agile adc i...
 
Data Center for Cloud Computing - DC3X
Data Center for Cloud Computing - DC3XData Center for Cloud Computing - DC3X
Data Center for Cloud Computing - DC3X
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Implementing Service Oriented Architecture
Implementing Service Oriented ArchitectureImplementing Service Oriented Architecture
Implementing Service Oriented Architecture
 
Wifi Documentation Presentation
Wifi Documentation PresentationWifi Documentation Presentation
Wifi Documentation Presentation
 
Implementing Service Oriented Architecture
Implementing Service Oriented Architecture Implementing Service Oriented Architecture
Implementing Service Oriented Architecture
 
Implementing Service Oriented Architecture
Implementing Service Oriented ArchitectureImplementing Service Oriented Architecture
Implementing Service Oriented Architecture
 
How Small Cells Resolve the Design Challenges in a Dense Venue: iBwave
How Small Cells Resolve the Design Challenges in a Dense Venue: iBwave How Small Cells Resolve the Design Challenges in a Dense Venue: iBwave
How Small Cells Resolve the Design Challenges in a Dense Venue: iBwave
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Recently uploaded (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
API Governance and Monetization - The evolution of API governance
API Governance and Monetization -  The evolution of API governanceAPI Governance and Monetization -  The evolution of API governance
API Governance and Monetization - The evolution of API governance
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 

IBS Design recommendation for Efficient DAS

  • 1. Prepared by: Mohamed kamal Mob: 00966532863494 / 00919567783559 e-mail: abdulkamalmohamed@gmail.com ae.linkedin.com/in/abdulkamalmohamed/ Recommendations for efficient IBS DAS Networks
  • 2. Contents 1. Planned Sites Traffic estimation. 2. DAS solution selection (active /passive). 3. Design competence to Future technologies and needed precautions. 4. Reliability of soft tool Prediction and possible substitutions. 5. Indoor and Outdoor pre-optimization with soft tools and coverage assurance. 6. Multi operator sharing site’s acceptance and upgrade possibilities. 7. VVIP site design requirements. 8. Upgrade requirement of old IBS with respect advanced technologies. 9. Planning –designing-optimizaion mutual coordination for new sites. 10. Standardizing design folders for acceptance among the suppliers.
  • 3. 1. Planned Sites Traffic estimation. • The acceptance of IBS site design should based on two main design concerns, which are Site capacity design and Site coverage design. • Normally the coverage design is perfectly checked by relating with the submitted soft tool generated Prediction plots for all technology. (Challenges, see slide 8) • Most of the current capacity designs are relayed on 2G calculations only since the 3G and 4G calculations seems to be difficult. • This creates bad KPIs performance in Mega IBS projects eg:- big malls, stadiums and universities. • The site’s capacity requirement should be determined for all technology according to the expected number of users. • This need high level planning by expert designers and preferred solution need to be delivered to the DAS design supplier in advance.
  • 4. 2. DAS solution selection (active /passive). • The best basic solution should be Passive as it is Coverage and Capacity balanced solution. • High traffic prone sites will be with high calls and data usage; coverage area must be defined to accommodate only planned number of users otherwise Kpi will degrade because of loading(Small cells/ hotspots/ wifi-offloading techniques are also preferred to manage the high traffic). • Coverage expansion in high traffic sites( with out considering the number of users) by active sites creates bad KPIs performance in Mega IBS projects- including big malls, stadiums and universities. • Selection DAS in-building solution should need high care as it is controlling CAPEX and OPEX.
  • 5. 2. DAS solution selection (active /passive). • Active sites are not advisable in terms of CAPEX and OPEX(Special monitoring systems are required to know the working status and parts gets easily damaged) Unless coverage duplication(expansion) needed like in airport(Limited users but vast area) or small buildings(with limited users inside) in a campus, where individual passive sites will result in high CAPEX investments. • Operators need to avoid promoting of the unscientific acceptance of ACIVE sites designs. Even in towers and small buildings, the active solution is selected with out looking different possibilities in Passive solutions which are available with vendors and are able to substitute the active systems. • The selection of IBS type should be according to building type and traffic capacity requirements of site.
  • 6. 2. DAS solution selection (active /passive). • Both Active and Passive sites need a source for all technologies. But only Passive site efficiently utilize the 100% of RF source power. The Active unit utilize a small fraction of RF source power(Remaining wastage) but it could repeat and serve at remote location; it never duplicate or increase the capacity of system(helps to grab higher order modulation by delivering extended/good coverage). • So any addition of Capacity by means of additional sectors or telecom site, will contribute wastage of RF source power. Where in Passive sites, addition of capacity will allow expansion of coverage. • Since Active solution could serve large area it could accommodate more users and could create loading in all technologies if the designed capacity is less and creates bad KPI performance and customer dissatisfaction. Site with s/m Power output X (Normally DAS Input), available traffic capacity Y and area of serving Z units. Passive IBS Site dimensioning “X+Y+Z” Active/Hybrid IBS Site dimensioning “X+Y+nZ” Site with s/m Power output X (Active Master unit requires only 3 or less percentage of X as input), available traffic capacity Y and area of serving can be multiplied (nZ) units when compare with passive.
  • 7. 3. Design competence to Future technologies and needed precautions. • The below points must be considered while approving a design.  For Active and Passive solution 1. Compatibility of components to upcoming technology and frequency band (eg:-2600MHz). 2. Quality of used components(Untested Cheap Chinese components can introduce PIM while we use higher order modulations- PIM testing advisable after implementation). 3. Design should consider current latest technology as a base reference; The current designs should consider LTE reference signal as the power reference, so the designs could accommodate previous technologies and future technologies. 4. Active system’s supporting bands and technologies must be verified.
  • 8. 4. Reliability of soft tool Prediction and possible substitutions. • Blindly believing the soft tool prediction could create bad KPI performance after Implementation. • Soft tool prediction could be fake in below cases. • The auto cad line(Walls) will be having multiple superimposed lines while importing to tools like iBwave, this could cause wrong wall loses resulting wrong prediction. • Even the wall height could be lover than prediction level and will give wrong result. In such cases, since the prediction level is not meeting the walls and will not consider the wall losses while calculation. Additionally, iBwave defined wall loss also need to be checked while acceptance.
  • 9. 4. Reliability of soft tool Prediction and possible substitutions. • To avoid this we could use cw transmitter for coverage propagation testing at individual sites. • The coverage gaps after implementation is because, we are only considering the coverage predictions from iBwave or other simulation tools only
  • 10. 5. Indoor and Outdoor pre-optimization with soft tools and coverage assurance. • iBwave is a strong tool with which we can input the pre-walktest logs of a site and could identify issues with respect to the designed site’s planned Rf conditions. • This will help us to deliver an optimum design.
  • 11. 6. Multi operator sharing site’s acceptance and upgrade possibilities. • Sharing site acceptance should make sure the future carrier upgrade and technology upgrade possibilities in active sites for all operator. • All new designs, where currently other operators are not approached the Building management for new DAS, should be designed as multi operator Sharing DAS as an advanced step for sharing (Normally, Site acquisition team do special contract with building management in such cases). • Site sharing with other operator should meet all operators’s design criteria.
  • 12. 7. VVIP site design requirements.. • VVIP sites Designs must be prioritized for passive solution. • This will reduce the maintenance and optimization requirements and could reduce frequent access to site. • All kind of monitoring for passive sites are easy when compare with Active solution.
  • 13. 8. Upgrade requirement of old IBS with respect advanced technologies. • The existing IBS sites need to be reviewed with respect to the advancement in technology; to enhance customer satisfaction and business development. • Bandwidth compatibility of DAS components, low EIRP at antenna end, Base station upgrade requirements will be the challenges and this could be overcome by proper review of designs from operator end.
  • 14. 9. Planning –designing-optimizaion mutual coordination for new sites. • All new Site’s frequency and capacity Planning should be done care fully. • Unscientifically planned sites need to be planned well for better performance. • For big campus’, even we could see the planned site sectorization are implemented wrongly, proper verification of as built should be conducted by operator.
  • 15. 10. Standardizing design folders for acceptance among the suppliers. • It is mandatory for an organization to have a standardized criteria for accepting the suppliers outcomes • There should be a standardized design folder format for design acceptance for all suppliers. • Which will unify the task and ease the acceptance from operator end, and will reduce the malpractices in design by the supplier.