Electricity Network Connectivity
Between the GCC Countries
Presented By:
Adnan I. Al-Mohaisen
May 17, 2005
2
BIRTH OF THE GCC POWER GRID
• Originated in the early 1980’s by a local GCC committee from the electricity
sector.
• In 1986 the first project study was conducted by a committee from the GCC in
coordination with the Kuwait Research Institute and King Fahad University of
Petroleum and Minerals.
• The study was updated in 1990 by Gulf Investment Bank and SNC-Lavalin to
confirm the interconnection was economical and financially viable.
• In 2003 another study update was undertaken as a final preparation for the
project financing and tendering, in which the following topics were covered:
•Techno-Economic Analysis
•Market Study
•Financial Analysis
•Interconnection Agreement
•Implementation Strategy
GCC INTERCONNECTION AUTHORITY
• Established in July 2001 by a Royal Decree No. M/21.
• Owned by the six GCC Countries the authorized share capital is
($US 1,100,000,000) divided into (1,100,00) shares of ($US 1,000) each share.
• The Authority is managed by a (twelve member) Board of Directors; each
member country is represented by two members. The Chairmanship is rotated
among the member states every three years.
• The official domicile of the Authority is Dammam, with the Control Center to be
located in Ghunan, Saudi Arabia.
• The primary objective of the Authority is to:
• link up the power grids of the six GCC countries
• operate and maintain the interconnection
INTERCONNECTION SHARE CAPITAL
Founders No. of Shares Nominal Value Percent
United Arab Emirates 169 ,400 $169 ,400 ,000 15 .40 %
Kingdom of Bahrain 99 ,000 99 ,000 ,000 9.00 %
Kingdom of Saudi Arabia 347 ,600 347 ,600 ,000 31 .60 %
Sultanate of Oman 61 ,600 61 ,600 ,000 5.60 %
State of Qatar 128 ,700 128 ,700 ,000 11 .70 %
State of Kuwait 293 ,700 293 ,700 ,000 26 .70 %
1,100 ,000 $1,100 ,000 ,000 100 .00 %
Total
Based on the 1990 Project Study it was determined that the share of the cost of
the interconnection will be the present worth of the capacity savings.
INTERCONNECTION LINK
• The interconnection is to be constructed in 3 phase, namely:
Phase
II
• Phase I will interconnect Al-Zour (Kuwait), Al-Fadhili, Ghunan, Salwa (KSA) and
Doha South (Qatar) with a 400 kV OHL, and a 400 kV Land & Submarine cable
with Al-Jasra (Bahrain).
• Phase III will interconnect Salwa and Shuwaihat with 400 kV OHL and Al-
Ouhah and Al-Waseet in Oman with a 220 kV OHL.
• Phase II will integrate the UAE system with a 400 kV OHL from Shuwaihat to Al-
Ouhah.
INTERCONNECTION CRITERIA
BAHRAIN
U.A.E.
EMIRATES NATIONAL
GRID
AL OUHAH
220kV
220kV
AL FADHILI 400kV
JASRA 400kV
GHUNAN
400 kV
600MW
SALWA
400kV
SALWA
400kV
QATAR
750MW
90km
90km
DOHA SOUTH SUPER 400kV
DOHA SOUTH SUPER 400kV
290km
290km
150km
150km
SHUWAIHAT
400kV
400kV
900
MW
OMAN
OMAN NORTHERN
GRID
AL WASEET
220 kV
400MW
52km
112km
100km
100km
KUWAIT
AL ZOUR
400kV
AL ZOUR
400kV
310km
1200
MW
SAUDI ARABIA
SEC - ERB
HVDC
BACK -
TO -
BACK
1200MW
SINGLE-LINE DIAGRAM
Upon the completion of Phase-I and the reduction of generation capacity the total
cost savings rate of return after 4 years from operations is 2.5 billion US Dollars.
•PHASE I
•:•CUMULATIVE PW OF BENEFITS AND COSTS IN
•$ MILLION•(
•Jan
•.•2008
• @•6%
•)
•0
•500
•1000
•1500
•2000
•2500
•3000
•Year
•Cumulative
PW
of
•Benefits
and
Costs
•Phase I Benefits •Phase I Costs
BENEFITS & COSTS
Upon the completion of Phase-III the total cost savings rate of return after 3 years
from operations is 3.35 billion US Dollars.
•PHASE I&III •:•CUMULATIVE PW OF BENEFITS AND COSTS IN
•$ MILLIONS •(
•Jan•.•2008• @ •6%•)
•0
•500
•1000
•1500
•2000
•2500
•3000
•3500
•Year
•Cumulative
PW
of
Benefits
and
Costs
•Phase I & III Benefits •Phase I&III Costs
BENEFITS & COSTS
PROJECT ECONOMICS
•The capital cost of constructing Phase I estimated at US$ 1,189 million is
depicted below:
•It is further estimated that it will cost approximately $ 30 million annually to
operate and maintain the Grid:
Total O&M Cost
14
6
4
6
30
1
Lot
Transmission Lines
Cable System
Substations
Converter Station
Control Station
Total 1,189
392
293
172
302
30
Capital Cost
•The estimated cost for constructing Phase III is $US 137 million.
•Although the construction of Phase II is not under GCCIA task it is estimated
that its construction to be approximately $US 300 million.
PROJECT ECONOMICS
•The GCC Grid is expected to reduce the amount of new generation capacity
required by the GCC member states by sharing the reserve capacity that needs
to be maintained by each system to ensure reliability and provide protection
against outages. The capacity benefits to Year 2028 are shown below:
Load (MW) Total Installed Capacity Reserve (MW)
93 781 105 781 MW 12 085
Isolated System
Interconnected System
Load (MW) Total Installed Capacity Reserve (MW)
93 781 100 726 MW 6 945
•The cumulative benefit in MW of the interconnected system as opposed to
isolated systems will be 5,113 MW.
INTERCONNECTION BENEFITS
• Reduce generation reserves;
• Provide power exchange and strengthens supply reliability;
• Improve the economic efficiency of the electricity power systems;
• Strengthens operational efficiency;
• Promoting utilities to construct larger generation units to share extra
generated power;
• Provide opportunities for industrial customers and utilities to shop around for
more attractive supply of power;
• Adopt technological development and use the best modern technologies;
• Providing long-term environmental advantages by reducing waste
emissions from increasing generation plants.
GLOBAL INTEGRATION
• The technical and economical feasibility study for the GCC Interconnection has
been proven.
• The GCC Interconnection will enhance the Power Systems of the GCC
Countries.
• The GCC Countries will be a significant part of the Pan-Arab Grid.
• The GCC Interconnection is the main gateway towards a Regional and Pan-
Arab Power Pools.
• The Power Grid is a fundamental step leading to the liberalization of regional
power market.
PROJECT STATUS
• September 2004 SNC-Lavalin of Canada was hired to perform the Tendering
and Adjudication for the Phase I Project.
• Thirty three (33) out of the sixty five (65) companies were pre-qualified; where
some companies qualified for only one lot and some qualified for all five lots.
Substations
HVDC
OHL
Cable
Control
4
22
6 7
4
• Pre-qualified companies were from
local GCC and international countries.
• GCCIA will engage an international
consulting firm affiliated with a local
GCC firm for the Supervision of the
Construction of the Phase-I Project.
PROJECT SCHEDULE
TASKS DATE
Pre-Qualification Exercise August 2004
Pre-Tender Meetings March 2005
Tender Submittals June 2005
Technical Bid Opening June 2005
Commercial Bid Opening TBA
Evaluations August 2005
Contract Awarding October 2005
Operations Commencement 1st Qtr 2008
For further information you can
access our website at:
www.gccia.com.sa
THANK YOU

More Related Content

Similar to 6559163.ppt

KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016sfact
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
GCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational StudiesGCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational StudiesPower System Operation
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOECD Environment
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...Fairfax County
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsSABC News
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in IndiaAshish Rajendran
 
Mingrid consultation paper3
Mingrid consultation paper3Mingrid consultation paper3
Mingrid consultation paper3Abdussalam Yusuf
 
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...iQHub
 
Irp presentation 1
Irp presentation 1Irp presentation 1
Irp presentation 1Athar Riaz
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...Power System Operation
 
OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OECD Environment
 
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...OECD Environment
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 

Similar to 6559163.ppt (20)

KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
GCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational StudiesGCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational Studies
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
Dulles Corridor Metrorail Project: Silver Line Phase 2 Implementation - BTC U...
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEs
 
Sgcp12 beel-ofgem
Sgcp12 beel-ofgemSgcp12 beel-ofgem
Sgcp12 beel-ofgem
 
Solar Rooftop Business in India
Solar Rooftop Business in IndiaSolar Rooftop Business in India
Solar Rooftop Business in India
 
Mingrid consultation paper3
Mingrid consultation paper3Mingrid consultation paper3
Mingrid consultation paper3
 
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...
UNLOCKING NETWORK CAPACITY FOR INCREASING NUMBERS OF EVS ON DISTRIBUTION NETW...
 
Irp presentation 1
Irp presentation 1Irp presentation 1
Irp presentation 1
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...OSW ambitions in the Philippines and what it will take to build the first few...
OSW ambitions in the Philippines and what it will take to build the first few...
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
Renewable Energy Project Development in Off-Grid Areas - Rene Fajigalutan, RO...
 
Thermal power sector
Thermal power sectorThermal power sector
Thermal power sector
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
Australia – Japan Cable
Australia – Japan CableAustralia – Japan Cable
Australia – Japan Cable
 

More from MoHsinKh2

A1800 Technical Manual_rev.02.pdf
A1800 Technical Manual_rev.02.pdfA1800 Technical Manual_rev.02.pdf
A1800 Technical Manual_rev.02.pdfMoHsinKh2
 
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...MoHsinKh2
 
Pensionrules.pdf
Pensionrules.pdfPensionrules.pdf
Pensionrules.pdfMoHsinKh2
 
TSU Grade 19-20 & Grade 17-18.pdf
TSU Grade 19-20 & Grade 17-18.pdfTSU Grade 19-20 & Grade 17-18.pdf
TSU Grade 19-20 & Grade 17-18.pdfMoHsinKh2
 

More from MoHsinKh2 (7)

5973334.ppt
5973334.ppt5973334.ppt
5973334.ppt
 
3736253.ppt
3736253.ppt3736253.ppt
3736253.ppt
 
A1800 Technical Manual_rev.02.pdf
A1800 Technical Manual_rev.02.pdfA1800 Technical Manual_rev.02.pdf
A1800 Technical Manual_rev.02.pdf
 
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...
Forex Trading Secrets_ Trading Strategies for the Forex Market ( PDFDrive.com...
 
Pensionrules.pdf
Pensionrules.pdfPensionrules.pdf
Pensionrules.pdf
 
TSU Grade 19-20 & Grade 17-18.pdf
TSU Grade 19-20 & Grade 17-18.pdfTSU Grade 19-20 & Grade 17-18.pdf
TSU Grade 19-20 & Grade 17-18.pdf
 
TPO-12.pdf
TPO-12.pdfTPO-12.pdf
TPO-12.pdf
 

Recently uploaded

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Recently uploaded (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

6559163.ppt

  • 1. Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005
  • 2. 2 BIRTH OF THE GCC POWER GRID • Originated in the early 1980’s by a local GCC committee from the electricity sector. • In 1986 the first project study was conducted by a committee from the GCC in coordination with the Kuwait Research Institute and King Fahad University of Petroleum and Minerals. • The study was updated in 1990 by Gulf Investment Bank and SNC-Lavalin to confirm the interconnection was economical and financially viable. • In 2003 another study update was undertaken as a final preparation for the project financing and tendering, in which the following topics were covered: •Techno-Economic Analysis •Market Study •Financial Analysis •Interconnection Agreement •Implementation Strategy
  • 3. GCC INTERCONNECTION AUTHORITY • Established in July 2001 by a Royal Decree No. M/21. • Owned by the six GCC Countries the authorized share capital is ($US 1,100,000,000) divided into (1,100,00) shares of ($US 1,000) each share. • The Authority is managed by a (twelve member) Board of Directors; each member country is represented by two members. The Chairmanship is rotated among the member states every three years. • The official domicile of the Authority is Dammam, with the Control Center to be located in Ghunan, Saudi Arabia. • The primary objective of the Authority is to: • link up the power grids of the six GCC countries • operate and maintain the interconnection
  • 4. INTERCONNECTION SHARE CAPITAL Founders No. of Shares Nominal Value Percent United Arab Emirates 169 ,400 $169 ,400 ,000 15 .40 % Kingdom of Bahrain 99 ,000 99 ,000 ,000 9.00 % Kingdom of Saudi Arabia 347 ,600 347 ,600 ,000 31 .60 % Sultanate of Oman 61 ,600 61 ,600 ,000 5.60 % State of Qatar 128 ,700 128 ,700 ,000 11 .70 % State of Kuwait 293 ,700 293 ,700 ,000 26 .70 % 1,100 ,000 $1,100 ,000 ,000 100 .00 % Total Based on the 1990 Project Study it was determined that the share of the cost of the interconnection will be the present worth of the capacity savings.
  • 5. INTERCONNECTION LINK • The interconnection is to be constructed in 3 phase, namely: Phase II • Phase I will interconnect Al-Zour (Kuwait), Al-Fadhili, Ghunan, Salwa (KSA) and Doha South (Qatar) with a 400 kV OHL, and a 400 kV Land & Submarine cable with Al-Jasra (Bahrain). • Phase III will interconnect Salwa and Shuwaihat with 400 kV OHL and Al- Ouhah and Al-Waseet in Oman with a 220 kV OHL. • Phase II will integrate the UAE system with a 400 kV OHL from Shuwaihat to Al- Ouhah.
  • 6. INTERCONNECTION CRITERIA BAHRAIN U.A.E. EMIRATES NATIONAL GRID AL OUHAH 220kV 220kV AL FADHILI 400kV JASRA 400kV GHUNAN 400 kV 600MW SALWA 400kV SALWA 400kV QATAR 750MW 90km 90km DOHA SOUTH SUPER 400kV DOHA SOUTH SUPER 400kV 290km 290km 150km 150km SHUWAIHAT 400kV 400kV 900 MW OMAN OMAN NORTHERN GRID AL WASEET 220 kV 400MW 52km 112km 100km 100km KUWAIT AL ZOUR 400kV AL ZOUR 400kV 310km 1200 MW SAUDI ARABIA SEC - ERB HVDC BACK - TO - BACK 1200MW
  • 8. Upon the completion of Phase-I and the reduction of generation capacity the total cost savings rate of return after 4 years from operations is 2.5 billion US Dollars. •PHASE I •:•CUMULATIVE PW OF BENEFITS AND COSTS IN •$ MILLION•( •Jan •.•2008 • @•6% •) •0 •500 •1000 •1500 •2000 •2500 •3000 •Year •Cumulative PW of •Benefits and Costs •Phase I Benefits •Phase I Costs BENEFITS & COSTS
  • 9. Upon the completion of Phase-III the total cost savings rate of return after 3 years from operations is 3.35 billion US Dollars. •PHASE I&III •:•CUMULATIVE PW OF BENEFITS AND COSTS IN •$ MILLIONS •( •Jan•.•2008• @ •6%•) •0 •500 •1000 •1500 •2000 •2500 •3000 •3500 •Year •Cumulative PW of Benefits and Costs •Phase I & III Benefits •Phase I&III Costs BENEFITS & COSTS
  • 10. PROJECT ECONOMICS •The capital cost of constructing Phase I estimated at US$ 1,189 million is depicted below: •It is further estimated that it will cost approximately $ 30 million annually to operate and maintain the Grid: Total O&M Cost 14 6 4 6 30 1 Lot Transmission Lines Cable System Substations Converter Station Control Station Total 1,189 392 293 172 302 30 Capital Cost •The estimated cost for constructing Phase III is $US 137 million. •Although the construction of Phase II is not under GCCIA task it is estimated that its construction to be approximately $US 300 million.
  • 11. PROJECT ECONOMICS •The GCC Grid is expected to reduce the amount of new generation capacity required by the GCC member states by sharing the reserve capacity that needs to be maintained by each system to ensure reliability and provide protection against outages. The capacity benefits to Year 2028 are shown below: Load (MW) Total Installed Capacity Reserve (MW) 93 781 105 781 MW 12 085 Isolated System Interconnected System Load (MW) Total Installed Capacity Reserve (MW) 93 781 100 726 MW 6 945 •The cumulative benefit in MW of the interconnected system as opposed to isolated systems will be 5,113 MW.
  • 12. INTERCONNECTION BENEFITS • Reduce generation reserves; • Provide power exchange and strengthens supply reliability; • Improve the economic efficiency of the electricity power systems; • Strengthens operational efficiency; • Promoting utilities to construct larger generation units to share extra generated power; • Provide opportunities for industrial customers and utilities to shop around for more attractive supply of power; • Adopt technological development and use the best modern technologies; • Providing long-term environmental advantages by reducing waste emissions from increasing generation plants.
  • 13. GLOBAL INTEGRATION • The technical and economical feasibility study for the GCC Interconnection has been proven. • The GCC Interconnection will enhance the Power Systems of the GCC Countries. • The GCC Countries will be a significant part of the Pan-Arab Grid. • The GCC Interconnection is the main gateway towards a Regional and Pan- Arab Power Pools. • The Power Grid is a fundamental step leading to the liberalization of regional power market.
  • 14. PROJECT STATUS • September 2004 SNC-Lavalin of Canada was hired to perform the Tendering and Adjudication for the Phase I Project. • Thirty three (33) out of the sixty five (65) companies were pre-qualified; where some companies qualified for only one lot and some qualified for all five lots. Substations HVDC OHL Cable Control 4 22 6 7 4 • Pre-qualified companies were from local GCC and international countries. • GCCIA will engage an international consulting firm affiliated with a local GCC firm for the Supervision of the Construction of the Phase-I Project.
  • 15. PROJECT SCHEDULE TASKS DATE Pre-Qualification Exercise August 2004 Pre-Tender Meetings March 2005 Tender Submittals June 2005 Technical Bid Opening June 2005 Commercial Bid Opening TBA Evaluations August 2005 Contract Awarding October 2005 Operations Commencement 1st Qtr 2008
  • 16. For further information you can access our website at: www.gccia.com.sa THANK YOU