SMU MBA FALL 2015 -2016
Dear Students,
SMU MBA FALL 2015-2016 Assignments are available. For Booking ,Kindly mail us on kvsude@gmail.com OR call us to +91 9995105420 or S M S your “ Email ID ” us in the following Format “ On +91 9995105420 we will reach back you with in 24H ”
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Pm 0015 – quantitative methods in project management
1. SMU MBA FALL 2015 -2016
Dear Students,
SMU MBA FALL 2015-2016 Assignments are available. For Booking
,Kindly mail us on kvsude@gmail.comOR call us to +91 9995105420 or S M
S your “ Email ID ” us in the following Format “ On +91 9995105420 we will
reach back you with in 24H ”
ASSIGNM
ENT
DRIVE Fall 2015
PROGRAM MBADS (SEM 4/SEM 6)
MBAFLEX/ MBA(SEM 4)
PGDPMN (SEM 2)
SUBJECT CODE&NAME PM 0015 – QUANTITATIVE METHODSINPROJECT
MANAGEMENT
BK ID B2011
CREDIT AND MARKS 4 CREDITS AND 60 MARKS
Q.No Criteria Marks Total Marks
1 Write short notes on:
Kano model
Differences between a sponsor’s view and project’s view in a project balance
sheet
Triangular distribution
Organisational break down structure
2. A Kano model
Differences between a sponsor’s view
and project’s view in a project balance
sheet
Triangular distribution
Organisational break down structure
10 (2.5 marks each) 10
2 Discuss capitalbudgeting in project management.
A describe use of capital budgeting to an
organisation in terms of undertaking multiple
projects
Explain the importance of capital budgeting in
project selection
Discuss theaspects of capital budgeting that
an organisation should consider while selecting
a project.
2
2
6 (1.5 marks each)
10
3 Write short notes on:
Rolling wave planning
Time centric earned value
A Rolling wave planning
Time centric earned value
10 (5 marks each) 10
4 Describe the various cost incurred in a project. Describe the applications of three - point
estimates.
A Discuss the THREE types of costs incurred in a
project
Discuss the applications of three - point
estimates.
7.5 (2.5 marks each)
2.5
10
5 Explain the six sigma methodologies.
A Discuss the2 six sigma project methodologies
Compare the 2 six sigma project
methodologies
8
2
10
3. 6 Discuss the time and materials contract.
Solve the following problem
Consider a the time and materials contract as follows:
Labour is billed according to the following schedule
1 software engineer : $45/hr
1 tester: $ 45/hr
1 senior software engineer: $65/hr
Material is billed according to the following schedule:
Cost of materials + 30 % profit/overhead
Actual cost of the material is $2140
Calculate the material cost,calculate the contract payable
A Describethe time and materials contract
Calculation of material cost
Calculation of contractpayable
7
1
2
10
*A-Answer
Note –Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
SMU MBA FALL 2015 -2016
Dear Students,
SMU MBA FALL 2015-2016 Assignments are available. For Booking
,Kindly mail us on kvsude@gmail.comOR call us to +91 9995105420 or S M
S your “ Email ID ” us in the following Format “ On +91 9995105420 we will
reach back you with in 24H ”