PROJECT INFO:
Owner:
General Services
Administration
Contact:
Carly Thompson
312-353-1796
Location:
85 Marconi Blvd
Columbus, OH
Construction:
2010 – 2013
Budget:
$24.8 Million
Area:
270,900 SF
FWAS’ Role:
Construction
Management
PROJECT DETAILS
New direct digital controlled (DDC) HVAC building
automation system, air handling loads, etc.
Water Reduction: Public Restrooms, replace water
closets, urinals, & lavatory faucets w/ low flow..
Replace lighting fixtures: in office areas with high
efficiency fluorescent “T -8” lights.
Daylight harvesting, lighting controls, and
occupancy sensors in all office areas.
Façade Restoration: Stone repair, stone
replacement, flashing repair, and tuck-pointing,
Relevant Experience
• LEED Green Building
• “Silver” certification
• Public Restroom s Total
Renovations
• Façade Replacement
and Restorations
• Asbestos and Lead
Abatements
• Multi-Phased Project
• Replacement of 17 AHU
w/ BAS Controls
• Lighting System
Automated
• Continuous Work on
Fully Occupied Bldg.
• Roof rainwater
collection for site
irrigation
Entry Lobby/Connector
Physical Therapy Area
ARRA: JP Kinneary US Courthouse
US Army Corps of EngineersPROJECT INFO:
Owner:
US Department of
Defense
Contact:
Tammie Woods,
USACE
(Little Rock District)
501-324-5842
Project Location:
El Paso, TX
Project Design:
2009
Construction:
2009-2010
Project Estimate:
$9,500,000
Building Area:
26,500 SF
FWAS’ Role:
Project
Architect/Manager
PROJECT DETAILS
LEED Silver Qualification
Base Hardware Facility Standards
Blast Resistant Doors and Windows -
meets Antiterrorism Standard
UFC 4-010-01
Architectural and Engineering (Structural,
Mechanical, Electrical, Plumbing, and Fire
Protection Systems)
Kitchen Exhaust Systems
Communications/Cable TY/Telephone
Force protection
Prototype Design Format
Energy Efficient Exterior Envelope
Entry Lobby/Connector
Physical Therapy Area Model of Addition
Ft. Bliss IBCT 1: Dining Hall Facility
Advance Technology and Learning Center
PROJECT INFO:
Owner:
Cincinnati State
Technical &
Community College
Contact:
Dr. Ronald Wright,
Former President /
CEO
Construction :
2004
Project Costs:
$54,200,000
Building Area:
196,500 SF; 20,000 SF,
5-Level Garage
FWAS’ Role:
Assistant Project
Architect & Lead
Program Manager
PROJECT DETAILS
Wellness Center & Related Support Spaces
Community Meeting Room
Student Technology Lounges
Student Meeting Rooms
New Bookstore & Ancillary Support Spaces
ADA Compliant throughout
90 seat Café & 300 capacity dining hall style Restaurant
2 Large Auditorium spaces (250 & 350 seats)
Energy Conservative Features throughout (sunshades, special glazing, sensors)
New Parking Garage – 700 car capacity with elevator & security systems
Entry Lobby/Connector
Physical Therapy Area Model of Addition
New K-12 : Riverview East Academy
PROJECT INFO:
Owner:
Cincinnati Public
Schools (CPS)
Contact:
Michael Burson
Director of Facilities
513-363-0777
Project Design:
2002-2005
Construction:
2005-06
Cost:
$17,000,000
Building Area:
105,000 SF
FWAS’ Role:
Asst Project Architect,
Lead Designer &
Construction
Documents Manager
PROJECT DETAILS
* First World Architects Studio teamed with
SFA Architects, serving as design architects
and construction documents lead, to design
this prototype K-12 new school for Cincinnati
Public Schools.
* The facility consolidated two existing school
programs, which were converted into one
program after opening. The educational
program then accommodated a student
population of 650.
* Local partners integrated program spaces
such as the public library, police, health
clinic, museum center, and a YMCA after-
school program.
* The site provided was in a flood plain, so the
facility was creatively designed to be
supported on foundation piles which are
elevated above the 100-year flood mark. This
provided for parking and play areas
underneath the building for most of the
school year.
* AIA Chapter Award
Entry Lobby/Connector
Physical Therapy Area
National Underground Railroad Freedom Center
PROJECT INFO:
Owner:
NURFC
US Department of
Interiors
Contact:
Edwin Riguad
Former President /
CEO
513-470-1571
Project Development
1997-2002
Construction Duration:
2002 – 2004
Project Bldg. Budget:
$46,200,000
Building Area:
158,000 SF
FWAS’ Role:
Special Project
Architect &
Quality Control
Manager for Facility
PROJECT DESCRIPTION
New Construction for cultural arts center situated
on the banks of the Ohio River. This unique center
focuses on slavery and the journeys to freedom;
pays tribute to all efforts to “abolish human
enslavement and to secure freedom for all people.
Entry Lobby/Connector
Physical Therapy Area

More Related Content

What's hot

ITC_Renovation article
ITC_Renovation articleITC_Renovation article
ITC_Renovation articleKarel Forman
 
STI Real Estate Article
STI Real Estate ArticleSTI Real Estate Article
STI Real Estate ArticleTony Miller
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowMark Oberschmidt
 
Engel Projects
Engel ProjectsEngel Projects
Engel ProjectsEngeladpe
 
Senior Capstone Presentation
Senior Capstone PresentationSenior Capstone Presentation
Senior Capstone Presentationarsimmons
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Fairfax County
 
Facilities committee presentation to school board 28 feb 2011
Facilities committee presentation to school board   28 feb 2011Facilities committee presentation to school board   28 feb 2011
Facilities committee presentation to school board 28 feb 2011cw5rocky
 
Philip Ives, Marcel Hendricks & David Tasker
Philip Ives, Marcel Hendricks & David TaskerPhilip Ives, Marcel Hendricks & David Tasker
Philip Ives, Marcel Hendricks & David TaskerVikki Jacobs
 
Presentation & Building Tour of University Hall (APPA 2009)
Presentation & Building Tour of University Hall (APPA 2009)Presentation & Building Tour of University Hall (APPA 2009)
Presentation & Building Tour of University Hall (APPA 2009)Frank Cunha
 
WNY LEED Projects June2010
WNY LEED Projects June2010WNY LEED Projects June2010
WNY LEED Projects June2010Roxanne Kujawa
 
Restoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioRestoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioHeritage Ohio
 
Leed & Historic Tax Credit Certification
Leed & Historic Tax Credit CertificationLeed & Historic Tax Credit Certification
Leed & Historic Tax Credit CertificationHeritage Ohio
 
Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Buildingahcitycouncil
 

What's hot (18)

ITC_Renovation article
ITC_Renovation articleITC_Renovation article
ITC_Renovation article
 
STI Real Estate Article
STI Real Estate ArticleSTI Real Estate Article
STI Real Estate Article
 
Canal City - Poster-
Canal City - Poster-Canal City - Poster-
Canal City - Poster-
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 
ULX Sept 09
ULX Sept 09ULX Sept 09
ULX Sept 09
 
Engel Projects
Engel ProjectsEngel Projects
Engel Projects
 
Senior Capstone Presentation
Senior Capstone PresentationSenior Capstone Presentation
Senior Capstone Presentation
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
Facilities committee presentation to school board 28 feb 2011
Facilities committee presentation to school board   28 feb 2011Facilities committee presentation to school board   28 feb 2011
Facilities committee presentation to school board 28 feb 2011
 
Philip Ives, Marcel Hendricks & David Tasker
Philip Ives, Marcel Hendricks & David TaskerPhilip Ives, Marcel Hendricks & David Tasker
Philip Ives, Marcel Hendricks & David Tasker
 
Presentation & Building Tour of University Hall (APPA 2009)
Presentation & Building Tour of University Hall (APPA 2009)Presentation & Building Tour of University Hall (APPA 2009)
Presentation & Building Tour of University Hall (APPA 2009)
 
WNY LEED Projects June2010
WNY LEED Projects June2010WNY LEED Projects June2010
WNY LEED Projects June2010
 
Restoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville OhioRestoration of Clarendon Hotel St Clairsville Ohio
Restoration of Clarendon Hotel St Clairsville Ohio
 
Leed & Historic Tax Credit Certification
Leed & Historic Tax Credit CertificationLeed & Historic Tax Credit Certification
Leed & Historic Tax Credit Certification
 
Feasability Study
Feasability StudyFeasability Study
Feasability Study
 
C.V 17-S
C.V 17-SC.V 17-S
C.V 17-S
 
Item #12 ppt Judson Nature Trail Building
Item #12   ppt Judson Nature Trail BuildingItem #12   ppt Judson Nature Trail Building
Item #12 ppt Judson Nature Trail Building
 
Resume_CPM
Resume_CPMResume_CPM
Resume_CPM
 

Viewers also liked

Otd ch-5- int-orgs-relationship
Otd ch-5- int-orgs-relationshipOtd ch-5- int-orgs-relationship
Otd ch-5- int-orgs-relationshipEngr Razaque
 
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...Antonio Capone
 
KSI for IoT Security - Turning Defence Into Offence - Guardtime Whitepaper
KSI for IoT Security - Turning Defence Into Offence - Guardtime WhitepaperKSI for IoT Security - Turning Defence Into Offence - Guardtime Whitepaper
KSI for IoT Security - Turning Defence Into Offence - Guardtime WhitepaperMartin Ruubel
 
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel Maksim Izmaylov
 
Internship evaluation form for supervisors
Internship evaluation form for supervisorsInternship evaluation form for supervisors
Internship evaluation form for supervisorsKari-Anne Kooy
 
楽天テクノロジーカンファレンス2016 の見どころ 日本語版
楽天テクノロジーカンファレンス2016 の見どころ 日本語版楽天テクノロジーカンファレンス2016 の見どころ 日本語版
楽天テクノロジーカンファレンス2016 の見どころ 日本語版Rakuten Group, Inc.
 
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal Symbol
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal SymbolDiscrete Equal-Simiar-Symbols To Enhance the Existing Equal Symbol
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal SymbolToshiyuki Shimono
 
IoT時代を支えるプロトコルMQTT技術詳解
IoT時代を支えるプロトコルMQTT技術詳解IoT時代を支えるプロトコルMQTT技術詳解
IoT時代を支えるプロトコルMQTT技術詳解Naoto MATSUMOTO
 
【講演資料】アテにされる / どういうこと?どすればいいの?
【講演資料】アテにされる / どういうこと?どすればいいの?【講演資料】アテにされる / どういうこと?どすればいいの?
【講演資料】アテにされる / どういうこと?どすればいいの?Masanori Saito
 
夏サミ2013【A1】基礎からわかるDevOps
夏サミ2013【A1】基礎からわかるDevOps夏サミ2013【A1】基礎からわかるDevOps
夏サミ2013【A1】基礎からわかるDevOpsDevelopers Summit
 

Viewers also liked (15)

C.V
C.VC.V
C.V
 
Otd ch-5- int-orgs-relationship
Otd ch-5- int-orgs-relationshipOtd ch-5- int-orgs-relationship
Otd ch-5- int-orgs-relationship
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit 2 a
Unit 2 aUnit 2 a
Unit 2 a
 
cisco: connecting people
cisco: connecting people cisco: connecting people
cisco: connecting people
 
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...
Linkra: Mobile backhauling: i collegamenti radio a larga banda per le reti ra...
 
KSI for IoT Security - Turning Defence Into Offence - Guardtime Whitepaper
KSI for IoT Security - Turning Defence Into Offence - Guardtime WhitepaperKSI for IoT Security - Turning Defence Into Offence - Guardtime Whitepaper
KSI for IoT Security - Turning Defence Into Offence - Guardtime Whitepaper
 
Dhanraj_resume _2016
Dhanraj_resume _2016Dhanraj_resume _2016
Dhanraj_resume _2016
 
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel
TTC16: Ravir Gurjal and Jody Farrar - AI: The Future of Travel
 
Internship evaluation form for supervisors
Internship evaluation form for supervisorsInternship evaluation form for supervisors
Internship evaluation form for supervisors
 
楽天テクノロジーカンファレンス2016 の見どころ 日本語版
楽天テクノロジーカンファレンス2016 の見どころ 日本語版楽天テクノロジーカンファレンス2016 の見どころ 日本語版
楽天テクノロジーカンファレンス2016 の見どころ 日本語版
 
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal Symbol
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal SymbolDiscrete Equal-Simiar-Symbols To Enhance the Existing Equal Symbol
Discrete Equal-Simiar-Symbols To Enhance the Existing Equal Symbol
 
IoT時代を支えるプロトコルMQTT技術詳解
IoT時代を支えるプロトコルMQTT技術詳解IoT時代を支えるプロトコルMQTT技術詳解
IoT時代を支えるプロトコルMQTT技術詳解
 
【講演資料】アテにされる / どういうこと?どすればいいの?
【講演資料】アテにされる / どういうこと?どすればいいの?【講演資料】アテにされる / どういうこと?どすればいいの?
【講演資料】アテにされる / どういうこと?どすればいいの?
 
夏サミ2013【A1】基礎からわかるDevOps
夏サミ2013【A1】基礎からわかるDevOps夏サミ2013【A1】基礎からわかるDevOps
夏サミ2013【A1】基礎からわかるDevOps
 

Similar to 02 Chicago Teaming Presentation Part 2

Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14Douglas Rogge
 
Rob Mothershed Architect 310-972-0973.pdf
Rob Mothershed Architect 310-972-0973.pdfRob Mothershed Architect 310-972-0973.pdf
Rob Mothershed Architect 310-972-0973.pdfrobmothershed1
 
a-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nominationa-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards NominationRay Pini
 
Public Safety Headquarters
Public Safety HeadquartersPublic Safety Headquarters
Public Safety HeadquartersFairfax County
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACECSDES
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Mark Shaw
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramCordoba Corp
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionMiron Construction
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpointwdemshar
 
Brian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAlfred Socias
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009jelser4228
 

Similar to 02 Chicago Teaming Presentation Part 2 (20)

Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14
 
E. Kochaeva - projects (1)
E. Kochaeva - projects (1)E. Kochaeva - projects (1)
E. Kochaeva - projects (1)
 
Rob Mothershed Architect 310-972-0973.pdf
Rob Mothershed Architect 310-972-0973.pdfRob Mothershed Architect 310-972-0973.pdf
Rob Mothershed Architect 310-972-0973.pdf
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
a-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nominationa-Corso NL-MBRC-IPWEA Project Awards Nomination
a-Corso NL-MBRC-IPWEA Project Awards Nomination
 
Public Safety Headquarters
Public Safety HeadquartersPublic Safety Headquarters
Public Safety Headquarters
 
Portfolio
PortfolioPortfolio
Portfolio
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence Awards
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
Facilities 101 2018 / 2019
Facilities 101 2018 / 2019Facilities 101 2018 / 2019
Facilities 101 2018 / 2019
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron Construction
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
Brian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich's Resume & Portfolio
Brian Rich's Resume & Portfolio
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - Commercial
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 

02 Chicago Teaming Presentation Part 2

  • 1. U.S. General Services Administration PROJECT INFO: Owner: General Services Administration Contact: Carly Thompson 312-353-1796 Location: 85 Marconi Blvd Columbus, OH Construction: 2010 – 2013 Budget: $24.8 Million Area: 270,900 SF FWAS’ Role: Construction Management PROJECT DETAILS New direct digital controlled (DDC) HVAC building automation system, air handling loads, etc. Water Reduction: Public Restrooms, replace water closets, urinals, & lavatory faucets w/ low flow.. Replace lighting fixtures: in office areas with high efficiency fluorescent “T -8” lights. Daylight harvesting, lighting controls, and occupancy sensors in all office areas. Façade Restoration: Stone repair, stone replacement, flashing repair, and tuck-pointing, Relevant Experience • LEED Green Building • “Silver” certification • Public Restroom s Total Renovations • Façade Replacement and Restorations • Asbestos and Lead Abatements • Multi-Phased Project • Replacement of 17 AHU w/ BAS Controls • Lighting System Automated • Continuous Work on Fully Occupied Bldg. • Roof rainwater collection for site irrigation Entry Lobby/Connector Physical Therapy Area ARRA: JP Kinneary US Courthouse
  • 2. US Army Corps of EngineersPROJECT INFO: Owner: US Department of Defense Contact: Tammie Woods, USACE (Little Rock District) 501-324-5842 Project Location: El Paso, TX Project Design: 2009 Construction: 2009-2010 Project Estimate: $9,500,000 Building Area: 26,500 SF FWAS’ Role: Project Architect/Manager PROJECT DETAILS LEED Silver Qualification Base Hardware Facility Standards Blast Resistant Doors and Windows - meets Antiterrorism Standard UFC 4-010-01 Architectural and Engineering (Structural, Mechanical, Electrical, Plumbing, and Fire Protection Systems) Kitchen Exhaust Systems Communications/Cable TY/Telephone Force protection Prototype Design Format Energy Efficient Exterior Envelope Entry Lobby/Connector Physical Therapy Area Model of Addition Ft. Bliss IBCT 1: Dining Hall Facility
  • 3. Advance Technology and Learning Center PROJECT INFO: Owner: Cincinnati State Technical & Community College Contact: Dr. Ronald Wright, Former President / CEO Construction : 2004 Project Costs: $54,200,000 Building Area: 196,500 SF; 20,000 SF, 5-Level Garage FWAS’ Role: Assistant Project Architect & Lead Program Manager PROJECT DETAILS Wellness Center & Related Support Spaces Community Meeting Room Student Technology Lounges Student Meeting Rooms New Bookstore & Ancillary Support Spaces ADA Compliant throughout 90 seat Café & 300 capacity dining hall style Restaurant 2 Large Auditorium spaces (250 & 350 seats) Energy Conservative Features throughout (sunshades, special glazing, sensors) New Parking Garage – 700 car capacity with elevator & security systems Entry Lobby/Connector Physical Therapy Area Model of Addition
  • 4. New K-12 : Riverview East Academy PROJECT INFO: Owner: Cincinnati Public Schools (CPS) Contact: Michael Burson Director of Facilities 513-363-0777 Project Design: 2002-2005 Construction: 2005-06 Cost: $17,000,000 Building Area: 105,000 SF FWAS’ Role: Asst Project Architect, Lead Designer & Construction Documents Manager PROJECT DETAILS * First World Architects Studio teamed with SFA Architects, serving as design architects and construction documents lead, to design this prototype K-12 new school for Cincinnati Public Schools. * The facility consolidated two existing school programs, which were converted into one program after opening. The educational program then accommodated a student population of 650. * Local partners integrated program spaces such as the public library, police, health clinic, museum center, and a YMCA after- school program. * The site provided was in a flood plain, so the facility was creatively designed to be supported on foundation piles which are elevated above the 100-year flood mark. This provided for parking and play areas underneath the building for most of the school year. * AIA Chapter Award Entry Lobby/Connector Physical Therapy Area
  • 5. National Underground Railroad Freedom Center PROJECT INFO: Owner: NURFC US Department of Interiors Contact: Edwin Riguad Former President / CEO 513-470-1571 Project Development 1997-2002 Construction Duration: 2002 – 2004 Project Bldg. Budget: $46,200,000 Building Area: 158,000 SF FWAS’ Role: Special Project Architect & Quality Control Manager for Facility PROJECT DESCRIPTION New Construction for cultural arts center situated on the banks of the Ohio River. This unique center focuses on slavery and the journeys to freedom; pays tribute to all efforts to “abolish human enslavement and to secure freedom for all people. Entry Lobby/Connector Physical Therapy Area