GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014PAGE 01
CYCLETIMES FORTRACKMOTION™
ROBOTIC CELLS
Placing a robot on a track greatly expands its reach
envelope, potentially allowing it to tend many more
machines or to transfer materials across a much
greater distance. For example, instead of three ro-
bots each tending a machine at separate locations,
a single robot on a track could potentially tend all
three, saving money and increasing efficiency. Or, a
single material handling robot on a rail could replace
multiple robots with intermediate handoff locations.
MINIMIZING CYCLETIME:
GENERAL PRINCIPLES
The overall cycle time of a cell is defined as the time
it takes to produce a single unit. There are many
factors that affect the cycle time of a robotic cell.
1) Cell Layout. The layout of the workcell will
have a major effect on the overall cycle time. The
placement of the robot and other equipment, such
as machine tools, conveyors, and pallet racks, should
be done with the sequence of operations in mind.
For a work cell utilizing aTrackmotion™ LinearAxis,
first try to minimize the distance that the robot must
move along the track between one step and the next.
For a work cell with multiple operations, place each
operation as close to the previous operation
as possible.
2) Robot Motions. Reducing or removing robot mo-
tions that are unnecessary or excessive is the next
step. Examine intermediate points in the robot path
to determine if movements and rotations can be re-
duced or eliminated.
Some robot controllers allow for easy optimization
of robot motions. For example, changing the path ac-
curacy settings to coarse instead of fine for motions
which do not require precision allows for increased
speed.
Where allowable, increase the acceleration/deceler-
ation and velocity settings to their maximum levels,
except where this might be detrimental to the payload
(such as for fragile, long, or large parts).This includes
both robot movements and the 7th axis movements.
(Ensure that 7th axis acceleration and velocity settings
are within design parameters, as will be described be-
low.)
Finally, attempt to perform more than one robot op-
eration in parallel instead of in sequence. For example,
opening an end effector during an approach motion
instead of waiting until the motion has stopped.
GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014 PAGE 02
TRACKMOTION CYCLETIME: MOVING
FROM POINT ATO POINT B
For a robot on a track, minimizing the distance be-
tween operations is the first step to reduce overall
cycle time. Once this has been done, there are a
number of factors which will determine how quickly
the robot is able to move through its sequence of
operations.
The carriage motion profile1
describes the speed
and acceleration of the robot carriage over time.
To move from point A to point B, the carriage ac-
celerates to a certain velocity, maintains that travel
velocity for some amount of time (greater than or
equal to zero), and then decelerates to a stop. On
the speed-time graph this looks like a trapezoid, so
this is known as a“trapezoidal” motion profile. If the
travel distance is sufficiently long, greater than the
“critical distance,” the carriage will reach its maxi-
mum velocity (or rated speed). This maximum ve-
locity is a function of several factors, including the
rated speed of the servo motor, the rated speed of
the gearbox, and the pinion size. For longer tracks,
increasing the maximum velocity of the 7th axis can
significantly decrease the cycle time of your cell.
Determining Maximum Velocity. For a Trackmo-
tion™ linear axis driven by a Güdel rack & pinion
system, the maximum velocity is determined simply
by the effective pitch radius of the pinion gear and
the maximum angular velocity at which it is able to
turn.
1 See Appendix A
Vrack = wpinion ∙rpinion
The pinion pitch radii are 25.47mm for the Güdel
TMF-1 and TMF-2, 33.96mm for the TMF-3, and
42.44mm for the TMF-4.
Gearbox rating & ratio: Each gearbox will have a max-
imum allowable input speed. For the Güdel AE060
gearbox (used for TMF-1 and TMF-2) this is 6000
RPM (628.3 rad/s). For the AE090 (TMF-3) and
AE120 (TMF-4) gearboxes it is 4500 RPM (471.2
rad/s). Also, each gearbox is available in ratios from
2:1 to 24:1. Dividing the maximum input speed by
the gear ratio i will provide the maximum output
speed at which the pinion gear will turn.
woutput =
winput
i
Therefore, in order to increase the maximum ve-
locity of a given system, choose a smaller gearbox
ratio. (However, this will have an inverse effect on
maximum acceleration, as described below.)
Based on the information above, the maximum
possible velocity (using a gearbox ratio 2:1 and
the maximum gearbox input RPM) is 8.0 m/s for the
TMF-1, TMF-2, and TMF-3, and 10.0 m/s for TMF-
4. However, it is not advisable that the gearbox be
operated at maximum input speed. Also, finding a
servo motor which can provide the required torque
at such high speeds may be problematic, if not im-
possible.
GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014PAGE 03
Therefore it is safe to assume that the actual max-
imum velocity will be no more than about 60-70%
of those theoretical values. Finally, keep in mind that
choosing a small gearbox ratio (such as 2:1) will have
a negative effect on the maximum possible accelera-
tion, as described below.
Determining Maximum Acceleration. Deter-
mining the maximum possible acceleration of the
carriage requires quite a bit more information. Ac-
cording to Newton’s famous equation, acceleration
equals force divided by mass. The forces acting upon
the carriage include both the force between the pin-
ion and the rack as well as various frictional forces:
the rolling resistance of the rollers, friction from the
guideway scrapers and lubrication system, etc. The
mass of the system includes the carriage itself, the
robot on the carriage, as well as everything else that
is connected to it (cables, connectors, etc.) Also,
because the carriage involves rotational elements
(rollers, motor shaft, couplings, gearbox elements,
pinion),there is also rotational momentum and rota-
tional friction which must be factored into the equa-
tions of acceleration.
For the sake of simplicity, let us focus on the three
main variables affecting maximum carriage accelera-
tion: robot mass, servo motor torque, and gearbox
ratio.
Robot Mass: For most Trackmotion™ systems, the
most significant contribution to mass will be the ro-
bot. Therefore, choosing the smallest robot which
can perform the required tasks is essential for max-
imizing the acceleration of the system. This also ap-
plies to any robot riser or payload attached to the
carriage. The lighter the overall system, the more
quickly it can accelerate with a given applied force.
Servo Motor Torque: There are a wide range of servo
motors which are compatible with Güdel gearboxes.
Each motor will have its own speed-torque charac-
teristics, usually illustrated by a speed/torque graph.
For electric motors, maximum torque will decrease
as the speed of the output shaft increases.
Servo motors typically have a “peak” or intermittent
torque capacity, as well as a rated torque capacity,
for continuous operation, for a given speed.The mo-
tor can operate for an indefinite period within the
“continuous” zone without overheating. Therefore
the motor’s RMS speed and torque must lie within
the continuous region.
To increase the acceleration of the carriage sys-
tem, choose a servo motor with a high intermittent
torque rating. (Keep in mind that the maximum ser-
vo motor torque must not exceed the maximum
torque rating of the gearbox coupling, or slipping
will occur.)
GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014 PAGE 04
Gearbox Ratio: Because the gearbox reduces the
rotational velocity going from the motor to the pin-
ion, it has the effect of increasing the output torque
by a corresponding amount.
toutput = tinput ∙ i
Therefore, choosing a higher gearbox ratio allows
for a higher output torque for a given motor speed.
However, as we saw above, increasing the gearbox
ratio has the effect of reducing the maximum veloc-
ity! There is a trade-off between maximum velocity
and maximum acceleration for a given servo motor.
Balancing Speed and Acceleration. What is the
ideal tradeoff between speed and acceleration for
a particular application? As mentioned above, at
travel distances greater than the critical distance,
the robot carriage will peak at its maximum veloc-
ity Vmax . The critical distance is a function of the
maximum velocity and acceleration of the system:
dcr = V
2
max
			 a
Short DistanceTravel: For travel distances less than
this critical distance, where the robot carriage nev-
er achieves its maximum velocity before decelerat-
ing, the travel time is simply a function of distance
and the rate of acceleration:
t = 2
√
For short distances (below the critical distance), in-
creasing the maximum velocity has no effect on the
travel time! Therefore, when travel distances are
short enough such that the robot does not reach
its maximum speed, the strategy to reduce travel
time is to increase acceleration by choosing a servo
motor with higher torque, and/or by choosing a
higher gearbox ratio. (Keep in mind that maximum
acceleration can also be improved by lightening the
payload on the carriage, so look for ways to reduce
mass wherever possible).
Long Distance Travel: For distances above the critical
distance, the travel time is a function of distance,
maximum velocity and acceleration.
t = d + Vmax
Vmax a
For travel distances above the critical distance, the
first component of this equation will be the larger
factor in the travel time. Therefore, once the criti-
cal distance has been exceeded, the first strategy to
reduce cycle time is to increase maximum velocity
by choosing a servo motor with a greater maximum
rated speed, and/or by choosing a lower gearbox ra-
tio. Once an attempt has been made to increase the
maximum velocity, further cycle time improvements
may be achieved by increasing acceleration (as de-
scribed above).
WORKFLOW SCHEDULING
For robotic cells in which there is more than one
operation being performed on each part, there are
several decisions which can be made affecting cy-
cle time. First, there is a decision as to whether
a forward or a reverse cycle will be implemented.
Secondly, implementing a dual gripper instead of a
single gripper can greatly reduce cycle time. Last-
ly, the number of parallel machines simultaneously
performing each operation must be determined for
optimum efficiency.
Forward or Reverse Cycle. In a “forward cycle”,
the cycle begins with all machines empty.The robot
picks up a part from the input buffer,carries it to the
first machine, waits for the first machine to finish,
then carries the part to the next machine (and so
on until all processes are completed and the part is
dropped off at the output buffer).
d
a
GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014PAGE 05
In a“reverse cycle”,the cycle begins with all machines
except the first one full (the first machine must be
empty in order to receive an incoming part). The
robot picks up a raw part from the input buffer and
carries it to the first machine. Then the robot trav-
els to the last machine, picks up a finished part, and
transfers it to the output buffer. Then the robot goes
to the second-to-the-last machine,picks up a finished
part,and transfers it to the last machine. This process
continues until the robot returns to the beginning.
The reverse cycle allows for more machines to be
occupied by parts simultaneously, which increases
efficiency. However, it increases the overall move
distance required by the robot per part.
So, for single-gripper robots, where the processing
time for each machine is always less than the time
required for the robot to travel from that machine
to the next, the forward cycle is preferable. In all
other situations,the reverse cycle is more efficient.2
Dual-Gripper EOAT. Implementing a dual-gripper
EOAT can greatly reduce the overall cycle time for
most systems in which machine processing time is
greater than the robot travel time. A dual-gripper
EOAT allows for all machines to be occupied at the
beginning of each cycle, and it reduces the overall
travel distance per part. The cycle begins with all
machines occupied and both grippers empty. The
robot picks up a part from the input device with the
first gripper and then travels to the first machine.
2
Dawande, M., Geismar, H. N., Sethi, S. P., & Sriskandarajah, C. S. (2005).
Sequencing and Scheduling in Robotic Cells: Recent Developments. Journal of
Scheduling, 8, 387-426.
The EOAT rotates and picks up the completed part
at machine #1 with the empty gripper, the EOAT
rotates and drops off the new part from the first
gripper. Then the robot travels to machine #2, the
EOAT rotates and picks up the finished part with
the empty gripper, the EOAT rotates and then
drops off the part from the first machine. This se-
quence continues until the robot drops off a fin-
ished part to the output device. It then returns
to the beginning and starts the sequence over.
Parallel Machines. In situations where one oper-
ation has a longer duration than another, the over-
all efficiency of the cell can be increased by running
more than one of the slower operation in parallel,
but having multiple machines. For example, if oper-
ation #1 takes 10 seconds per part, but operation
#2 takes 30 seconds per part, there will always be
wasted time as the robot waits for operation #2 to
complete, limiting the overall capacity of the system.
However, this wasted time can be reduced by adding
additional machines performing the slower operation.
CONCLUSION
There are a number of factors affecting the over-
all cycle time of a robotic cell, from the layout to
the selection of components. Making the work cell
as compact as possible, so that robot and track
movements are minimized, is the first step. Choos-
ing the lightest robot available which can perform
the necessary tasks will allow for more rapid car-
riage acceleration.A Güdel application engineer can
assist in the selection of a servo motor and gear-
box ratio combination which will provide the cor-
rect tradeoff of velocity and acceleration. Finally,
where parts are being moved through multiple op-
erations, a dual-gripper EOAT should be considered.
GÜDEL, INC. 	 TECHNOLOGY WHITEPAPER
GUDEL, INC. ©2014 PAGE 06
APPENDIX A:TRAPEZOIDAL AND
S-CURVE MOTION PROFILES
Trapezoidal Motion Profile. The trapezoidal mo-
tion profile is based on the assumption of constant
acceleration and deceleration.
Looking at a graph of both velocity and acceleration
versus time,you can see that there are three distinct
travel phases: a first phase of constant acceleration,
a second phase of constant velocity (zero acceler-
ation), and a third phase of constant deceleration.
Looking at the acceleration graph, you can see that
the transition between these phases is instanta-
neous—the change in acceleration occurs instantly
between each phase. The “jerk” is the rate change
of acceleration. For trapezoidal motion, the jerk is
infinite.
There are drawbacks to designing a system with ex-
tremely high jerk, namely the introduction of vibra-
tions or oscillations. For a given load, the higher the
jerk (or change in acceleration), the more power-
ful the vibrations will be, and the larger the number
of vibrational modes that will be excited. This may
result in increased settling time or reduced accura-
cy if the vibration frequency matches resonances in
the mechanical system. Vibrations will also lead to
greater stresses on the system and reduced life due
to material fatigue. Therefore another motion pro-
file, known as the S-curve Profile, is often preferred.
S-Curve Profile. The S-curve consists of 7 distinct
phases of motion (as opposed the 3 phases of the
trapezoidal profile). Phase 1 starts the load from rest
at a linearly increasing acceleration until it reaches
the maximum acceleration. In phase 2, the profile
accelerates at this maximum acceleration rate until
it must start decreasing as it approaches maximum
velocity. In phase 3 the acceleration linearly decreas-
es until it reaches zero. In phase 4 the velocity is
constant, at which point the profile decelerates in a
matter symmetric to phases 1-3.
Since trapezoidal profiles spend all their time at full
acceleration or full deceleration, they are faster than
the S-curve profile. But if the “all on / all off” ap-
proach causes an increase in settling time, the ad-
vantage is lost. Many times, even a small amount of
smoothing between full acceleration and zero accel-
eration can substantially reduce induced vibration.
The specific choice of the form of the S-curve will
depend on the mechanical nature of the system and
the desired performance specifications.
Credit for the written content of this document is Don
Bromley, Applications Engineer, Güdel, Inc.
4881 RUNWAY BOULEVARD
ANN ARBOR, MICHIGAN
48108 USA
PH: 734.214.0000
EMAIL: info@us.gudel.com
WEB: www.gudel.com
Copyright ©2014. All rights reserved. No portion of this whitepaper can be reproduced
without approval from the management at Güdel Inc.

More Related Content

What's hot

Supervariator preliminary test result report
Supervariator preliminary test result reportSupervariator preliminary test result report
Supervariator preliminary test result reportvlas_strigunenko
 
Analysis, Design and Application of Continuously Variable Transmission (CVT)
Analysis, Design and Application of Continuously Variable Transmission (CVT)Analysis, Design and Application of Continuously Variable Transmission (CVT)
Analysis, Design and Application of Continuously Variable Transmission (CVT)IJERA Editor
 
Continuously Variable Transmission ( CVT )
Continuously Variable Transmission ( CVT )Continuously Variable Transmission ( CVT )
Continuously Variable Transmission ( CVT )Vinay Prajapati
 
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLER
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLERPNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLER
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLERTushar Tambe
 
controlling the vibration of automobile suspension system using pid controller
controlling the vibration of automobile suspension system using pid controllercontrolling the vibration of automobile suspension system using pid controller
controlling the vibration of automobile suspension system using pid controllersiva kumar
 
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLE
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLESELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLE
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLEJournal For Research
 
CVT- case study of all terrain vehicle
CVT- case study of all terrain vehicleCVT- case study of all terrain vehicle
CVT- case study of all terrain vehiclemechmitaoe
 
Continuously variable transmissions (CVT)
Continuously variable transmissions (CVT)Continuously variable transmissions (CVT)
Continuously variable transmissions (CVT)Crystal Lopes
 
Modelling simulation and control of an active suspension system
Modelling  simulation and control of an active suspension systemModelling  simulation and control of an active suspension system
Modelling simulation and control of an active suspension systemIAEME Publication
 
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Model
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car ModelMathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Model
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Modelijsrd.com
 
Continuously Variable transmission
Continuously Variable transmissionContinuously Variable transmission
Continuously Variable transmissionSharique Ahssan
 
Cone Ring Traction Drive
Cone Ring Traction DriveCone Ring Traction Drive
Cone Ring Traction DriveIRJET Journal
 
Simulation of an Active Suspension Using PID Control
Simulation of an Active Suspension Using PID ControlSimulation of an Active Suspension Using PID Control
Simulation of an Active Suspension Using PID ControlSuzana Avila
 

What's hot (18)

Supervariator preliminary test result report
Supervariator preliminary test result reportSupervariator preliminary test result report
Supervariator preliminary test result report
 
Analysis, Design and Application of Continuously Variable Transmission (CVT)
Analysis, Design and Application of Continuously Variable Transmission (CVT)Analysis, Design and Application of Continuously Variable Transmission (CVT)
Analysis, Design and Application of Continuously Variable Transmission (CVT)
 
Continuously Variable Transmission ( CVT )
Continuously Variable Transmission ( CVT )Continuously Variable Transmission ( CVT )
Continuously Variable Transmission ( CVT )
 
Suspension system
Suspension systemSuspension system
Suspension system
 
SUSPENSION
SUSPENSION SUSPENSION
SUSPENSION
 
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLER
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLERPNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLER
PNEUMATIC VEHICLE ACTIVE SUSPENSION SYSTEM USING PID CONTROLLER
 
controlling the vibration of automobile suspension system using pid controller
controlling the vibration of automobile suspension system using pid controllercontrolling the vibration of automobile suspension system using pid controller
controlling the vibration of automobile suspension system using pid controller
 
solar car
solar carsolar car
solar car
 
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLE
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLESELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLE
SELECTION OF POWERTRAIN TO ACHIEVE PERFORMANCE OF VEHICLE
 
CVT- case study of all terrain vehicle
CVT- case study of all terrain vehicleCVT- case study of all terrain vehicle
CVT- case study of all terrain vehicle
 
Cvt report
Cvt reportCvt report
Cvt report
 
Continuously variable transmissions (CVT)
Continuously variable transmissions (CVT)Continuously variable transmissions (CVT)
Continuously variable transmissions (CVT)
 
Modelling simulation and control of an active suspension system
Modelling  simulation and control of an active suspension systemModelling  simulation and control of an active suspension system
Modelling simulation and control of an active suspension system
 
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Model
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car ModelMathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Model
Mathematical Modeling and Simulation of Two Degree of Freedom Quarter Car Model
 
Permanent magnet flux switching motor technology as a solution for high torqu...
Permanent magnet flux switching motor technology as a solution for high torqu...Permanent magnet flux switching motor technology as a solution for high torqu...
Permanent magnet flux switching motor technology as a solution for high torqu...
 
Continuously Variable transmission
Continuously Variable transmissionContinuously Variable transmission
Continuously Variable transmission
 
Cone Ring Traction Drive
Cone Ring Traction DriveCone Ring Traction Drive
Cone Ring Traction Drive
 
Simulation of an Active Suspension Using PID Control
Simulation of an Active Suspension Using PID ControlSimulation of an Active Suspension Using PID Control
Simulation of an Active Suspension Using PID Control
 

Viewers also liked

Cultura, Clima y Cambio Organizacional
Cultura, Clima y Cambio OrganizacionalCultura, Clima y Cambio Organizacional
Cultura, Clima y Cambio OrganizacionalMariangelica Rodriguez
 
Lagaceta portada 20111120
Lagaceta portada 20111120Lagaceta portada 20111120
Lagaceta portada 20111120faralami
 
Plantilla futbol
Plantilla  futbolPlantilla  futbol
Plantilla futbolcdstadium
 
Venez passer vos vacances au vietnam(1)
Venez passer vos vacances au vietnam(1)Venez passer vos vacances au vietnam(1)
Venez passer vos vacances au vietnam(1)vietnamtravels
 
United Nations COP - Paul Greening & Associates
United Nations COP - Paul Greening & AssociatesUnited Nations COP - Paul Greening & Associates
United Nations COP - Paul Greening & AssociatesPaul Greening
 
CaptureIt! Cards Introduction
CaptureIt! Cards IntroductionCaptureIt! Cards Introduction
CaptureIt! Cards IntroductionCaptureIt
 
"Antenna diversity to combat the effects of reader-to-reader interference in ...
"Antenna diversity to combat the effects of reader-to-reader interference in ..."Antenna diversity to combat the effects of reader-to-reader interference in ...
"Antenna diversity to combat the effects of reader-to-reader interference in ...3JornadasRFID
 
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,..."Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...3JornadasRFID
 
Prueba redes sociales
Prueba redes socialesPrueba redes sociales
Prueba redes socialesnelsonrueda1
 
ST Presentation- RAKIB
ST Presentation- RAKIBST Presentation- RAKIB
ST Presentation- RAKIBRakib Bappy
 
2.4 agenda notițelor paralele
2.4 agenda notițelor paralele2.4 agenda notițelor paralele
2.4 agenda notițelor paraleleEugen Tabac
 
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p..."Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...3JornadasRFID
 
3.2 tehnica de prelevare a materialului biologic
3.2 tehnica de prelevare a materialului biologic3.2 tehnica de prelevare a materialului biologic
3.2 tehnica de prelevare a materialului biologicEugen Tabac
 
1. ppt natura și importanța microorganismelor
1. ppt natura și importanța microorganismelor1. ppt natura și importanța microorganismelor
1. ppt natura și importanța microorganismelorEugen Tabac
 

Viewers also liked (20)

Cultura, Clima y Cambio Organizacional
Cultura, Clima y Cambio OrganizacionalCultura, Clima y Cambio Organizacional
Cultura, Clima y Cambio Organizacional
 
References
ReferencesReferences
References
 
Actividad 6
Actividad 6Actividad 6
Actividad 6
 
Legenda anotimpului
Legenda anotimpuluiLegenda anotimpului
Legenda anotimpului
 
Lagaceta portada 20111120
Lagaceta portada 20111120Lagaceta portada 20111120
Lagaceta portada 20111120
 
Plantilla futbol
Plantilla  futbolPlantilla  futbol
Plantilla futbol
 
Venez passer vos vacances au vietnam(1)
Venez passer vos vacances au vietnam(1)Venez passer vos vacances au vietnam(1)
Venez passer vos vacances au vietnam(1)
 
Amilcar cruz guias de observacion
Amilcar cruz guias de observacionAmilcar cruz guias de observacion
Amilcar cruz guias de observacion
 
MODEL RESUME
MODEL RESUMEMODEL RESUME
MODEL RESUME
 
Plante medicinale
Plante medicinalePlante medicinale
Plante medicinale
 
United Nations COP - Paul Greening & Associates
United Nations COP - Paul Greening & AssociatesUnited Nations COP - Paul Greening & Associates
United Nations COP - Paul Greening & Associates
 
CaptureIt! Cards Introduction
CaptureIt! Cards IntroductionCaptureIt! Cards Introduction
CaptureIt! Cards Introduction
 
"Antenna diversity to combat the effects of reader-to-reader interference in ...
"Antenna diversity to combat the effects of reader-to-reader interference in ..."Antenna diversity to combat the effects of reader-to-reader interference in ...
"Antenna diversity to combat the effects of reader-to-reader interference in ...
 
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,..."Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...
"Estudio sobre la viabilidad de un sistema de etiquetado de RFID activo en 2,...
 
Prueba redes sociales
Prueba redes socialesPrueba redes sociales
Prueba redes sociales
 
ST Presentation- RAKIB
ST Presentation- RAKIBST Presentation- RAKIB
ST Presentation- RAKIB
 
2.4 agenda notițelor paralele
2.4 agenda notițelor paralele2.4 agenda notițelor paralele
2.4 agenda notițelor paralele
 
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p..."Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...
"Estudio de mecanismos de convivencia de lectores en sistemas RFID pasivos" p...
 
3.2 tehnica de prelevare a materialului biologic
3.2 tehnica de prelevare a materialului biologic3.2 tehnica de prelevare a materialului biologic
3.2 tehnica de prelevare a materialului biologic
 
1. ppt natura și importanța microorganismelor
1. ppt natura și importanța microorganismelor1. ppt natura și importanța microorganismelor
1. ppt natura și importanța microorganismelor
 

Similar to Optimize cycle times for robotic cells on track systems

CD1606-How-to-Size-a-Motor (002)
CD1606-How-to-Size-a-Motor (002)CD1606-How-to-Size-a-Motor (002)
CD1606-How-to-Size-a-Motor (002)Paul Plavicheanu
 
Bygen transmission motor
Bygen transmission motorBygen transmission motor
Bygen transmission motorMusclezzang
 
IRJET- Speed Variation using Cone Ring Traction Drive
IRJET- Speed Variation using Cone Ring Traction DriveIRJET- Speed Variation using Cone Ring Traction Drive
IRJET- Speed Variation using Cone Ring Traction DriveIRJET Journal
 
IRJET- Design, Development and Manufacturing of CVT for ATV through Real ...
IRJET-  	  Design, Development and Manufacturing of CVT for ATV through Real ...IRJET-  	  Design, Development and Manufacturing of CVT for ATV through Real ...
IRJET- Design, Development and Manufacturing of CVT for ATV through Real ...IRJET Journal
 
Principle of self aligning
Principle of self aligningPrinciple of self aligning
Principle of self aligningSiya Agarwal
 
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC Engines
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC EnginesRack And Pinion Mechanism for Continuous Variable Valve Timing of IC Engines
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC EnginesIJERA Editor
 
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...ijsrd.com
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric driveVijay Krishna
 
Fuel efficiency in construction equipment – optimize the machine as one system
Fuel efficiency in construction equipment – optimize the machine as one systemFuel efficiency in construction equipment – optimize the machine as one system
Fuel efficiency in construction equipment – optimize the machine as one systemReno Filla
 
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...Experimental Investigation on Performance of Turbo-matching of Turbocharger A...
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...IRJET Journal
 
Hydrostatic transmission as an alternative to conventional gearbox
Hydrostatic transmission as an alternative to conventional gearboxHydrostatic transmission as an alternative to conventional gearbox
Hydrostatic transmission as an alternative to conventional gearboxeSAT Publishing House
 
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...IRJET Journal
 
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...ijiert bestjournal
 
Motor Selection.pptx
Motor Selection.pptxMotor Selection.pptx
Motor Selection.pptxAsad Khan
 
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docx
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docxSheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docx
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docxbagotjesusa
 
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...IRJET Journal
 
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel Loader
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel LoaderOn Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel Loader
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel LoaderReno Filla
 
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION IAEME Publication
 
Mechatronic system based manual transmission
Mechatronic system based manual transmissionMechatronic system based manual transmission
Mechatronic system based manual transmissionIAEME Publication
 

Similar to Optimize cycle times for robotic cells on track systems (20)

CD1606-How-to-Size-a-Motor (002)
CD1606-How-to-Size-a-Motor (002)CD1606-How-to-Size-a-Motor (002)
CD1606-How-to-Size-a-Motor (002)
 
Bygen transmission motor
Bygen transmission motorBygen transmission motor
Bygen transmission motor
 
IRJET- Speed Variation using Cone Ring Traction Drive
IRJET- Speed Variation using Cone Ring Traction DriveIRJET- Speed Variation using Cone Ring Traction Drive
IRJET- Speed Variation using Cone Ring Traction Drive
 
IRJET- Design, Development and Manufacturing of CVT for ATV through Real ...
IRJET-  	  Design, Development and Manufacturing of CVT for ATV through Real ...IRJET-  	  Design, Development and Manufacturing of CVT for ATV through Real ...
IRJET- Design, Development and Manufacturing of CVT for ATV through Real ...
 
Principle of self aligning
Principle of self aligningPrinciple of self aligning
Principle of self aligning
 
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC Engines
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC EnginesRack And Pinion Mechanism for Continuous Variable Valve Timing of IC Engines
Rack And Pinion Mechanism for Continuous Variable Valve Timing of IC Engines
 
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric drive
 
Fuel efficiency in construction equipment – optimize the machine as one system
Fuel efficiency in construction equipment – optimize the machine as one systemFuel efficiency in construction equipment – optimize the machine as one system
Fuel efficiency in construction equipment – optimize the machine as one system
 
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...Experimental Investigation on Performance of Turbo-matching of Turbocharger A...
Experimental Investigation on Performance of Turbo-matching of Turbocharger A...
 
Hydrostatic transmission as an alternative to conventional gearbox
Hydrostatic transmission as an alternative to conventional gearboxHydrostatic transmission as an alternative to conventional gearbox
Hydrostatic transmission as an alternative to conventional gearbox
 
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...
IRJET- Design Simulation and Production of 2-Stage Reduction Gearbox for all ...
 
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...
PERFORMANCE INVESTIGATION OF A CONTROLLED DIFFERENTIAL CONTINUOUSLY VARIABLE ...
 
Motor Selection.pptx
Motor Selection.pptxMotor Selection.pptx
Motor Selection.pptx
 
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docx
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docxSheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docx
Sheet1ASU - CON 243NameRoss DodenhoffHomework Chapter 2Student IDP.docx
 
Ae04606189197
Ae04606189197Ae04606189197
Ae04606189197
 
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
 
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel Loader
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel LoaderOn Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel Loader
On Increasing Fuel Efficiency by Operator Assistance Systems in a Wheel Loader
 
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION
MECHATRONIC SYSTEM BASED MANUAL TRANSMISSION
 
Mechatronic system based manual transmission
Mechatronic system based manual transmissionMechatronic system based manual transmission
Mechatronic system based manual transmission
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Optimize cycle times for robotic cells on track systems

  • 1. TECHNOLOGY WHITEPAPER March 2014 CYCLETIMES FORTRACKMOTION ROBOTIC CELLS 4881 RUNWAY BOULEVARD ANN ARBOR, MICHIGAN 48108 USA PH: 734.214.0000 EMAIL: info@us.gudel.com WEB: www.gudel.com GUDEL, INC. ©2014
  • 2. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014PAGE 01 CYCLETIMES FORTRACKMOTION™ ROBOTIC CELLS Placing a robot on a track greatly expands its reach envelope, potentially allowing it to tend many more machines or to transfer materials across a much greater distance. For example, instead of three ro- bots each tending a machine at separate locations, a single robot on a track could potentially tend all three, saving money and increasing efficiency. Or, a single material handling robot on a rail could replace multiple robots with intermediate handoff locations. MINIMIZING CYCLETIME: GENERAL PRINCIPLES The overall cycle time of a cell is defined as the time it takes to produce a single unit. There are many factors that affect the cycle time of a robotic cell. 1) Cell Layout. The layout of the workcell will have a major effect on the overall cycle time. The placement of the robot and other equipment, such as machine tools, conveyors, and pallet racks, should be done with the sequence of operations in mind. For a work cell utilizing aTrackmotion™ LinearAxis, first try to minimize the distance that the robot must move along the track between one step and the next. For a work cell with multiple operations, place each operation as close to the previous operation as possible. 2) Robot Motions. Reducing or removing robot mo- tions that are unnecessary or excessive is the next step. Examine intermediate points in the robot path to determine if movements and rotations can be re- duced or eliminated. Some robot controllers allow for easy optimization of robot motions. For example, changing the path ac- curacy settings to coarse instead of fine for motions which do not require precision allows for increased speed. Where allowable, increase the acceleration/deceler- ation and velocity settings to their maximum levels, except where this might be detrimental to the payload (such as for fragile, long, or large parts).This includes both robot movements and the 7th axis movements. (Ensure that 7th axis acceleration and velocity settings are within design parameters, as will be described be- low.) Finally, attempt to perform more than one robot op- eration in parallel instead of in sequence. For example, opening an end effector during an approach motion instead of waiting until the motion has stopped.
  • 3. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014 PAGE 02 TRACKMOTION CYCLETIME: MOVING FROM POINT ATO POINT B For a robot on a track, minimizing the distance be- tween operations is the first step to reduce overall cycle time. Once this has been done, there are a number of factors which will determine how quickly the robot is able to move through its sequence of operations. The carriage motion profile1 describes the speed and acceleration of the robot carriage over time. To move from point A to point B, the carriage ac- celerates to a certain velocity, maintains that travel velocity for some amount of time (greater than or equal to zero), and then decelerates to a stop. On the speed-time graph this looks like a trapezoid, so this is known as a“trapezoidal” motion profile. If the travel distance is sufficiently long, greater than the “critical distance,” the carriage will reach its maxi- mum velocity (or rated speed). This maximum ve- locity is a function of several factors, including the rated speed of the servo motor, the rated speed of the gearbox, and the pinion size. For longer tracks, increasing the maximum velocity of the 7th axis can significantly decrease the cycle time of your cell. Determining Maximum Velocity. For a Trackmo- tion™ linear axis driven by a Güdel rack & pinion system, the maximum velocity is determined simply by the effective pitch radius of the pinion gear and the maximum angular velocity at which it is able to turn. 1 See Appendix A Vrack = wpinion ∙rpinion The pinion pitch radii are 25.47mm for the Güdel TMF-1 and TMF-2, 33.96mm for the TMF-3, and 42.44mm for the TMF-4. Gearbox rating & ratio: Each gearbox will have a max- imum allowable input speed. For the Güdel AE060 gearbox (used for TMF-1 and TMF-2) this is 6000 RPM (628.3 rad/s). For the AE090 (TMF-3) and AE120 (TMF-4) gearboxes it is 4500 RPM (471.2 rad/s). Also, each gearbox is available in ratios from 2:1 to 24:1. Dividing the maximum input speed by the gear ratio i will provide the maximum output speed at which the pinion gear will turn. woutput = winput i Therefore, in order to increase the maximum ve- locity of a given system, choose a smaller gearbox ratio. (However, this will have an inverse effect on maximum acceleration, as described below.) Based on the information above, the maximum possible velocity (using a gearbox ratio 2:1 and the maximum gearbox input RPM) is 8.0 m/s for the TMF-1, TMF-2, and TMF-3, and 10.0 m/s for TMF- 4. However, it is not advisable that the gearbox be operated at maximum input speed. Also, finding a servo motor which can provide the required torque at such high speeds may be problematic, if not im- possible.
  • 4. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014PAGE 03 Therefore it is safe to assume that the actual max- imum velocity will be no more than about 60-70% of those theoretical values. Finally, keep in mind that choosing a small gearbox ratio (such as 2:1) will have a negative effect on the maximum possible accelera- tion, as described below. Determining Maximum Acceleration. Deter- mining the maximum possible acceleration of the carriage requires quite a bit more information. Ac- cording to Newton’s famous equation, acceleration equals force divided by mass. The forces acting upon the carriage include both the force between the pin- ion and the rack as well as various frictional forces: the rolling resistance of the rollers, friction from the guideway scrapers and lubrication system, etc. The mass of the system includes the carriage itself, the robot on the carriage, as well as everything else that is connected to it (cables, connectors, etc.) Also, because the carriage involves rotational elements (rollers, motor shaft, couplings, gearbox elements, pinion),there is also rotational momentum and rota- tional friction which must be factored into the equa- tions of acceleration. For the sake of simplicity, let us focus on the three main variables affecting maximum carriage accelera- tion: robot mass, servo motor torque, and gearbox ratio. Robot Mass: For most Trackmotion™ systems, the most significant contribution to mass will be the ro- bot. Therefore, choosing the smallest robot which can perform the required tasks is essential for max- imizing the acceleration of the system. This also ap- plies to any robot riser or payload attached to the carriage. The lighter the overall system, the more quickly it can accelerate with a given applied force. Servo Motor Torque: There are a wide range of servo motors which are compatible with Güdel gearboxes. Each motor will have its own speed-torque charac- teristics, usually illustrated by a speed/torque graph. For electric motors, maximum torque will decrease as the speed of the output shaft increases. Servo motors typically have a “peak” or intermittent torque capacity, as well as a rated torque capacity, for continuous operation, for a given speed.The mo- tor can operate for an indefinite period within the “continuous” zone without overheating. Therefore the motor’s RMS speed and torque must lie within the continuous region. To increase the acceleration of the carriage sys- tem, choose a servo motor with a high intermittent torque rating. (Keep in mind that the maximum ser- vo motor torque must not exceed the maximum torque rating of the gearbox coupling, or slipping will occur.)
  • 5. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014 PAGE 04 Gearbox Ratio: Because the gearbox reduces the rotational velocity going from the motor to the pin- ion, it has the effect of increasing the output torque by a corresponding amount. toutput = tinput ∙ i Therefore, choosing a higher gearbox ratio allows for a higher output torque for a given motor speed. However, as we saw above, increasing the gearbox ratio has the effect of reducing the maximum veloc- ity! There is a trade-off between maximum velocity and maximum acceleration for a given servo motor. Balancing Speed and Acceleration. What is the ideal tradeoff between speed and acceleration for a particular application? As mentioned above, at travel distances greater than the critical distance, the robot carriage will peak at its maximum veloc- ity Vmax . The critical distance is a function of the maximum velocity and acceleration of the system: dcr = V 2 max a Short DistanceTravel: For travel distances less than this critical distance, where the robot carriage nev- er achieves its maximum velocity before decelerat- ing, the travel time is simply a function of distance and the rate of acceleration: t = 2 √ For short distances (below the critical distance), in- creasing the maximum velocity has no effect on the travel time! Therefore, when travel distances are short enough such that the robot does not reach its maximum speed, the strategy to reduce travel time is to increase acceleration by choosing a servo motor with higher torque, and/or by choosing a higher gearbox ratio. (Keep in mind that maximum acceleration can also be improved by lightening the payload on the carriage, so look for ways to reduce mass wherever possible). Long Distance Travel: For distances above the critical distance, the travel time is a function of distance, maximum velocity and acceleration. t = d + Vmax Vmax a For travel distances above the critical distance, the first component of this equation will be the larger factor in the travel time. Therefore, once the criti- cal distance has been exceeded, the first strategy to reduce cycle time is to increase maximum velocity by choosing a servo motor with a greater maximum rated speed, and/or by choosing a lower gearbox ra- tio. Once an attempt has been made to increase the maximum velocity, further cycle time improvements may be achieved by increasing acceleration (as de- scribed above). WORKFLOW SCHEDULING For robotic cells in which there is more than one operation being performed on each part, there are several decisions which can be made affecting cy- cle time. First, there is a decision as to whether a forward or a reverse cycle will be implemented. Secondly, implementing a dual gripper instead of a single gripper can greatly reduce cycle time. Last- ly, the number of parallel machines simultaneously performing each operation must be determined for optimum efficiency. Forward or Reverse Cycle. In a “forward cycle”, the cycle begins with all machines empty.The robot picks up a part from the input buffer,carries it to the first machine, waits for the first machine to finish, then carries the part to the next machine (and so on until all processes are completed and the part is dropped off at the output buffer). d a
  • 6. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014PAGE 05 In a“reverse cycle”,the cycle begins with all machines except the first one full (the first machine must be empty in order to receive an incoming part). The robot picks up a raw part from the input buffer and carries it to the first machine. Then the robot trav- els to the last machine, picks up a finished part, and transfers it to the output buffer. Then the robot goes to the second-to-the-last machine,picks up a finished part,and transfers it to the last machine. This process continues until the robot returns to the beginning. The reverse cycle allows for more machines to be occupied by parts simultaneously, which increases efficiency. However, it increases the overall move distance required by the robot per part. So, for single-gripper robots, where the processing time for each machine is always less than the time required for the robot to travel from that machine to the next, the forward cycle is preferable. In all other situations,the reverse cycle is more efficient.2 Dual-Gripper EOAT. Implementing a dual-gripper EOAT can greatly reduce the overall cycle time for most systems in which machine processing time is greater than the robot travel time. A dual-gripper EOAT allows for all machines to be occupied at the beginning of each cycle, and it reduces the overall travel distance per part. The cycle begins with all machines occupied and both grippers empty. The robot picks up a part from the input device with the first gripper and then travels to the first machine. 2 Dawande, M., Geismar, H. N., Sethi, S. P., & Sriskandarajah, C. S. (2005). Sequencing and Scheduling in Robotic Cells: Recent Developments. Journal of Scheduling, 8, 387-426. The EOAT rotates and picks up the completed part at machine #1 with the empty gripper, the EOAT rotates and drops off the new part from the first gripper. Then the robot travels to machine #2, the EOAT rotates and picks up the finished part with the empty gripper, the EOAT rotates and then drops off the part from the first machine. This se- quence continues until the robot drops off a fin- ished part to the output device. It then returns to the beginning and starts the sequence over. Parallel Machines. In situations where one oper- ation has a longer duration than another, the over- all efficiency of the cell can be increased by running more than one of the slower operation in parallel, but having multiple machines. For example, if oper- ation #1 takes 10 seconds per part, but operation #2 takes 30 seconds per part, there will always be wasted time as the robot waits for operation #2 to complete, limiting the overall capacity of the system. However, this wasted time can be reduced by adding additional machines performing the slower operation. CONCLUSION There are a number of factors affecting the over- all cycle time of a robotic cell, from the layout to the selection of components. Making the work cell as compact as possible, so that robot and track movements are minimized, is the first step. Choos- ing the lightest robot available which can perform the necessary tasks will allow for more rapid car- riage acceleration.A Güdel application engineer can assist in the selection of a servo motor and gear- box ratio combination which will provide the cor- rect tradeoff of velocity and acceleration. Finally, where parts are being moved through multiple op- erations, a dual-gripper EOAT should be considered.
  • 7. GÜDEL, INC. TECHNOLOGY WHITEPAPER GUDEL, INC. ©2014 PAGE 06 APPENDIX A:TRAPEZOIDAL AND S-CURVE MOTION PROFILES Trapezoidal Motion Profile. The trapezoidal mo- tion profile is based on the assumption of constant acceleration and deceleration. Looking at a graph of both velocity and acceleration versus time,you can see that there are three distinct travel phases: a first phase of constant acceleration, a second phase of constant velocity (zero acceler- ation), and a third phase of constant deceleration. Looking at the acceleration graph, you can see that the transition between these phases is instanta- neous—the change in acceleration occurs instantly between each phase. The “jerk” is the rate change of acceleration. For trapezoidal motion, the jerk is infinite. There are drawbacks to designing a system with ex- tremely high jerk, namely the introduction of vibra- tions or oscillations. For a given load, the higher the jerk (or change in acceleration), the more power- ful the vibrations will be, and the larger the number of vibrational modes that will be excited. This may result in increased settling time or reduced accura- cy if the vibration frequency matches resonances in the mechanical system. Vibrations will also lead to greater stresses on the system and reduced life due to material fatigue. Therefore another motion pro- file, known as the S-curve Profile, is often preferred. S-Curve Profile. The S-curve consists of 7 distinct phases of motion (as opposed the 3 phases of the trapezoidal profile). Phase 1 starts the load from rest at a linearly increasing acceleration until it reaches the maximum acceleration. In phase 2, the profile accelerates at this maximum acceleration rate until it must start decreasing as it approaches maximum velocity. In phase 3 the acceleration linearly decreas- es until it reaches zero. In phase 4 the velocity is constant, at which point the profile decelerates in a matter symmetric to phases 1-3. Since trapezoidal profiles spend all their time at full acceleration or full deceleration, they are faster than the S-curve profile. But if the “all on / all off” ap- proach causes an increase in settling time, the ad- vantage is lost. Many times, even a small amount of smoothing between full acceleration and zero accel- eration can substantially reduce induced vibration. The specific choice of the form of the S-curve will depend on the mechanical nature of the system and the desired performance specifications. Credit for the written content of this document is Don Bromley, Applications Engineer, Güdel, Inc.
  • 8. 4881 RUNWAY BOULEVARD ANN ARBOR, MICHIGAN 48108 USA PH: 734.214.0000 EMAIL: info@us.gudel.com WEB: www.gudel.com Copyright ©2014. All rights reserved. No portion of this whitepaper can be reproduced without approval from the management at Güdel Inc.