Monitoring Coal Mill
Performance
Manohar Tatwawadi
Director TOPS
Load Swings
• Today’s demands on PC-fired unit flexibility are
tremendous. Even very large units are now
expected to park overnight at low loads before
rapidly ramping up in the morning for another
day of load swings.
• This combined with new requirements for NOx
reduction and a market-driven push for fuel
flexibility has taxed coal pulverizing equipment to
the limit.
• The utility staff can, however, hold its own against
such odds if it takes the time to understand the
pulverizers and properly set them up.
5/10/2019 2Manohar Tatwawadi
Pulveriser Designs
One of the most popular pulverizer designs in
use today is the medium speed roll and race
design, such as B&W’s MPS, Foster Wheeler’s
MB or MBF, and ABB-CE’s new HP. This type of
design will be generically addressed here. All
curves and examples presented are consistent
with a theoretical, but practical example of an
operating roll and race design.
5/10/2019 3Manohar Tatwawadi
Raymond Bowl Mill
5/10/2019 Manohar Tatwawadi 4
Pulveriser Setup & Tuning
• Pulverizer set up and tuning will be addressed
in three parts:
• Part I - Pulverizer Capacity
• Part II - Primary Air/Fuel Ratio
Characterization
• Part III - Pulverizer Controls
5/10/2019 5Manohar Tatwawadi
Pulveriser Capacity
• When a pulverizer manufacturer rates
capacity at 100,000 pph, (45 TPH) there are
strings attached. Associated with that rating
are limits on coal grindability, moisture, feed
size and output fineness, along with some
reasonable PA/fuel ratio.
• Each of the parameters will affect the effective
size of the machine.
5/10/2019 6Manohar Tatwawadi
Grindability Index and Capacity
Mill Capacity – 125ooo Lb/hr
Case -1
HGI Index – 55%
Capacity to grind 70% thro 200
mesh – 133000 Lb/hr
Case – 2
HGI Index – 50%
Capacity to grind 70% thro 200
mesh – 122000 Lb/hr
Case – 3
HGI Index – 40%
Capacity to grind 80% thro 200
mesh – 85000 Lb/hr.
5/10/2019 Manohar Tatwawadi 7
5/10/2019 8Manohar Tatwawadi
5/10/2019 9Manohar Tatwawadi
5/10/2019 10Manohar Tatwawadi
5/10/2019 11Manohar Tatwawadi
Capacity…
• For example, consider a 100 KPPH (45360 kg/hr)
pulverizer which was designed for a Hardgrove
Grindability Index (HGI) of 60, a surface moisture of
less than 10%, and a feed size of 2.5".
• The 100 KPPH (45.36 T/hr) rating means that
operating at those stated conditions the pulverizer
product will have a fineness of 70% through a 200
mesh at a throughput of 45.36 TPH.
• Figures No. 1 through 4 shows how the capacity of
the pulverizer actually changes as each of the
operating parameters change.
• Figures No. 1, 3 and 4 assume that rated fineness is
being maintained, which in this case is 70% through
200 mesh.
5/10/2019 12Manohar Tatwawadi
Pulveriser Capacity
• Suppose a plant’s fuels department has found a
bargain on a local coal which has an HGI of 54, a
surface moisture of 14% and a feed size of 2.75".
Using the capacity correction curves, the
pulverizers new effective capacity for delivering a
70% through 200 mesh product is:
• (RATED CAPACITY) (HGI CORRECTION) (MOISTURE
CORRECTION) (SIZE CORRECTION) = (100 KPPH)
(.935) (.97) = 82.5 KPPH
5/10/2019 13Manohar Tatwawadi
Capacity Curves & Relations
• If the operators simply must push 100 KPPH of
this new fuel through the pulverizer, then
Figure No. 2 indicates that the pulverizer will
be running at 121% of the new rated capacity
and the 200 mesh fineness will drop to about
52%. There goes LOI and boiler efficiency, not
to mention an increase in equipment erosion
and possible adverse effects on NOX.
5/10/2019 14Manohar Tatwawadi
Inside the mill
The profile of
the roll should
be parallel with
the grinding ring
profile.
5/10/2019 Manohar Tatwawadi 15
Classifires
A classifier
recirculates
coarse coal in
the grinding
zone and
balances the
flow of coal to
each burner
line to the
furnace.
5/10/2019 Manohar Tatwawadi 16
Classifiers
• The flow of coal particles through a classifier is
several times the amount of coal flowing to the
burners because of the large amount of coal
recirculated within a pulverizer. For example, if a
pulverizer is operating at 100,000 lb/hr coal feed to
the burners, as much as 300,000 lb/hr or more may
be flowing through the classifier for regrinding. For
this reason the surface smoothness and inverted
cone clearances or discharge doors of the MPS
original design mills are extremely important for
acceptable pulverizer performance and of course,
optimum furnace performance.
5/10/2019 Manohar Tatwawadi 17
Effects / Results
• Pulverizer performance will deteriorate any time the
machine is operated above its effective rating. The
above example of switching fuels is one illustration, but
a similar effect may result from switching to a fuel with
lower heating value or trying to sustain higher loads with
fewer pulverizers operating. Both increase the required
fuel throughput. It is a certainty that LOI goes up as
fineness goes down.
• The message then, is to thoroughly consider the rating
and operating conditions of the pulverizer before firming
up new fuel purchases or buying new pulverizers. Other
fuels impacts such as fouling and slagging tendencies,
fuel bound nitrogen, sulfur and ash should be considered
as well.5/10/2019 18Manohar Tatwawadi
PRIMARY AIR/FUEL RATIO
CHARACTERIZATION
The primary air/fuel ratio characterization is a
very critical but seldom understood curve. Even
the manufacturer’s start-up or service engineer
sometimes fails to grasp the significance of the
relationship as a whole, or the effect of each part
of the curve. How the air/fuel ratio is
characterized will have profound effects on flame
stability, pulverizer load stability, turndown,
response rate, burner eyebrows, NOx generation,
LOI, erosion and auxiliary power use.
5/10/2019 19Manohar Tatwawadi
MINIMUM ALLOWABLE CURVE
The exact values of PA Flow for a given pulverizer are a function of coal
conduit size, fuel moisture and throat ring flow area. In any case the
actual curve must be above a minimum allowable curve.
5/10/2019 20Manohar Tatwawadi
Components of Minimum Air Flow
• The minimum curve has four components which must be
calculated and coordinated: Minimum line velocity,
minimum A/F ratio, minimum slope, and the resulting
inflection point.
• The minimum line velocity is the velocity required through
the coal conduits to keep the fuel in suspension. At lower
PA flows the pulverized coal is in danger of falling out of
suspension and laying out in the coal conduits, possibly
resulting in fire or explosion. Minimum line velocity is thus
affected by conduit size, number of conduits, altitude and
temperature. Minimum line velocity is usually targeted at
about 3000 fpm (15.24 m/sec) at sea level. The quantity of
air required to maintain minimum line velocity is calculated
as follows:
5/10/2019 21Manohar Tatwawadi
The minimum line velocity
Carrying of Particles by Fluid Drag
In view of the age of the technique it would be presumed that the
subject of concurrent fluid-solid flow would be quite well defined
and understood.
Investigation of the published literature indicates, however, that
such conveying is still an extremely empirical art.
5/10/2019 Manohar Tatwawadi 22
Pneumatic Carrying of Particles
• The major goal of pneumatic conveying of solids is to maximize the
carrying capacity of the installation and carry flows with high-solids
concentration ("dense-phase flow").
• In pulverized coal combustion, the ratio of coal to carrying gas is
usually in the range of y = 0.5-0.6 kg/kg.
• Assuming a coal density rc = 1.5 x 103 kg/m3, and the density of the
carrying gas as rg = 0.9 kg/m 3, the volume fraction of the coal can be
shown to be very small, 0.036 % .
• Dilute Phase Transport
• The inter particle effects can therefore be neglected for steady state
operation.
• An important aerodynamic characteristic of the particles is their
terminal velocity (the free-fall velocity in stagnant air) which for a
spherical particle of d = 0.1 mm has an approximate value of
0.3m/sec.
• Experience shows that due to non-uniformities of flow behind bends,
and to avoid settling of solids in horizontal sections of the transport
line, a gas velocity of ~ V = 16 -- 20 m/sec has to be chosen.
5/10/2019 Manohar Tatwawadi 23
Qty of Air for Minimum Velocity
• Minimum line velocity is usually targeted at about 3000
fpm (15.24 m/sec) at sea level. The quantity of air required
to maintain minimum line velocity is calculated as follows:
• Air Flow = (3000fpm) (60 min/hr) (A) (N) (p) Po/Pb
Where:
• A = Flow Area of one conduit, ft2
• N = No. Of conduits/pulverizer
• Po= Standard barometric pressure, psiu
• Pb= Barometric pressure at plant altitude, psiu
• p = Density of air at standard pressure, 150°F. (65.50C)
• Note: Western fuels are often controlled to 135°F, which
would also require a density correction for temperature.
5/10/2019 24Manohar Tatwawadi
Min PA Flow Required
• Thus, for user example pulverizer, the PA flow required to
support minimum line velocity is calculated at 150°F,
elevation of 400 ft., and four 17" I.D. coal conduits per
pulverizer:
(3000fpm) (60 min/hr) π (17 in)2 (4) (0.00651 lb/ft3) (14.7 psia)
(4) (144 in2/ft2) (14.44 psia)
• = 75,212 pph
5/10/2019 25Manohar Tatwawadi
Min. Allowable PA/Fuel Ratio
• Function of Moisture in Fuel
• Note also that minimum air/fuel ratio is achieved at maximum fuel flow.
• Thus, multiplying the maximum fuel flow by the minimum air/fuel ratio
results in the PA flow at maximum fuel flow. Continuing our example:
• Max PA Flow = (100,000 pph fuel flow) (1.25 lb air/lb fuel) = 125,000 pph
5/10/2019 26Manohar Tatwawadi
Operating Range of PA Flow
Typical turndown ratio for this type of pulverizer is between 2-1/2 and 3 to 1,
which would put minimum operating load at 33.3 to 40 kpph in the example.
Thus, an inflection point of 33.3 kpph would seem in order.
5/10/2019 27Manohar Tatwawadi
Lower PA FLOW
· Improved fineness
· Less component erosion
· More complete pyrite rejection
· Fewer or smaller burner eyebrows (via better pyrite rejection)
· Less PA fan capacity requirements
· Less PA system resistance (not including the pulverizer)
· More reserve fines available
· Greater opportunity for steeper characterization curve
· Easier to keep inflection point out of the operating range
· Aids in NOX reduction
· Higher pulveriser d/p via increased bed depth
· Excessive pyrites & fuel rejection via low throat ring velocity
· Increased fire risk due to operating closer to minimum line velocity & minimum
throat ring velocity
· Greater tendency to plug with wet coal
· Hotter inlet air temperature (i.e. constant BTU input) for the same fuel moisture5/10/2019 28Manohar Tatwawadi
Operational Makeovers
• The higher d/p may be handled through additional PA fan head, if
available.
• The increased fire risk is really not a factor if operated as described above.
• Wet coal pluggage with reduced PA flow can be avoided bias available
until maximum biased air flow prior to the change (assuming this previous
maximum air flow adequately avoided wet pluggage).
• Excessive pyrites rejection is a matter of insufficient throat ring velocity,
however, and may require mechanical modification of the throat ring flow
area. Minimum throat ring velocity varies with pulverizer design, and
even seems to be somewhat proprietary among manufacturers.
• Obviously, the proper minimum velocity is that which provides continued
fuel through put while rejecting the majority of legitimate pyrites but very
little fuel. Once again, field test at low pulverizer load will determine what
needs to be done.
• If PA flow has been lowered then one good approach would be to add
throat ring flow area restriction proportionally to maintain the same
velocity.
5/10/2019 29Manohar Tatwawadi
Primary Air Lead & Lags
• A load-following unit with rapid load changes
requires maximum pulverizer ramping capability.
• During a pulverizer load ramp the primary air will
always lead the increase ramps (transferring
additional fines to the burners) and lag the
decrease ramps (to withhold fines from the
burners). Once the new load is reached both fuel
and air find a new equilibrium point as
determined by the characterization curve.
• The faster the ramp, the more the primary air
leads (or lags) the fuel.
5/10/2019 30Manohar Tatwawadi
Derate Analysis and Operating Concerns
• Pulverizer capacity limitation : A derate is due to the fuel
burn rate exceeding predicted pulverizer capacity with all
pulverizers in service.
• Feeder capacity limitation : A derate is due to the fuel
burn rate is greater than the total actual feeder capacity
with all pulverizers in service.
• An exhauster mill limitation: A derate is due to the
calculated airflow required with all pulverizers in service is
greater than the actual exhauster fan flow.
• Improper pulverizer outlet temperature: A derate is due to
the heat available in the primary air for drying coal in the
pulverizers is less than that required.
5/10/2019 Manohar Tatwawadi 31
Mill Units Design A B C D E F G H
Plant load MW 500 491.67 494.33 464.67 464.17 504.33 519.33 496.80 487.70
Coal flow t/h 51.248 59.56 56.42 54.28 56.42 57.51 56.68 58.40 56.47
A/F ratio 2.03 2.09 2.12 2.08 2.15 2.13 2.16 2.15 2.12
PA temp. oC 243 247.17 244.67 245.00 246.33 247.50 241.50 245.17 248.50
Coal-air mixture
temp
oC 85 78 76 81 72 71 70 75 75
Coal fineness
below 75 micron
% 70 65 68 70 60 61 62 61 62
DP mmWC 437.9 494.00 496.83 485.50 467.83 440.33 430.50 496.50 431.90
PA pressure I/L mmWC 991.5 900.50 927.50 999.83 909.67 922.33 933.50 929.17 958.80
PA flow t/h 104 120.31 123.01 110.52 102.18 104.80 108.66 113.13 120.17
Power kW 406 393.72 404.22 458.29 379.51 382.57 365.17 445.18 428.11
Energy kWh/h - 383.52 395.76 451.92 370.62 374.22 350.94 441.48 433.12
Load factor % 84.58 82.03 84.21 95.48 79.06 79.70 76.08 92.75 89.19
Sp. Energy
Consumption
kWh/t of
coal
7.92 8.44 9.01 8.33 8.57 8.51 8.19 8.56 8.67
Performance results of mills for 500 MW plant.
5/10/2019 Manohar Tatwawadi 32
5/10/2019 33Manohar Tatwawadi

More Related Content

What's hot

Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlHossam Zein
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Clinker formation
Clinker formationClinker formation
Clinker formationmkpq pasha
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plantVVDVARAPRASAD
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationNITIN ASNANI
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube millStudy Hub
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plantsSHIVAJI CHOUDHURY
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTahoor Alam Khan
 

What's hot (20)

Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Clinker formation
Clinker formationClinker formation
Clinker formation
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plant
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Dry heat losses in boiler
Dry heat losses in boilerDry heat losses in boiler
Dry heat losses in boiler
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Air heater
Air heaterAir heater
Air heater
 
coal pulveriser
coal pulveriser coal pulveriser
coal pulveriser
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube mill
 
200 mw FSSS
200 mw FSSS200 mw FSSS
200 mw FSSS
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plants
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Heat rate- pulse rate of power plant
Heat rate-  pulse rate of power plantHeat rate-  pulse rate of power plant
Heat rate- pulse rate of power plant
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
 
boiler turbine emergency
boiler turbine emergencyboiler turbine emergency
boiler turbine emergency
 

Similar to Monitoring Coal Mill Performance and Optimizing Primary Air/Fuel Ratio

Max AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsMax AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsTom Lowes
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfBhawnaRighteous
 
Training presentation
Training presentation Training presentation
Training presentation Keyur Patel
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
To Calculate and Improvement in the Efficiency of FBC Boiler
To Calculate and Improvement in the Efficiency of FBC BoilerTo Calculate and Improvement in the Efficiency of FBC Boiler
To Calculate and Improvement in the Efficiency of FBC BoilerIRJET Journal
 
Mega Planta De Etileno - Steam Cracking
Mega Planta De Etileno  - Steam CrackingMega Planta De Etileno  - Steam Cracking
Mega Planta De Etileno - Steam Crackingeargume
 
Cement Grinding Optimization
Cement Grinding OptimizationCement Grinding Optimization
Cement Grinding OptimizationIngrid McKenzie
 
pgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKpgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKPratap Ghorpade
 
pgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKpgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKPratap Ghorpade
 
ICR OFT April
ICR OFT AprilICR OFT April
ICR OFT AprilTom Lowes
 
Ureaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsUreaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsPrem Baboo
 
BP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingBP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingJohn Downs
 
System optimization and selection of coking coal drying process for coking pr...
System optimization and selection of coking coal drying process for coking pr...System optimization and selection of coking coal drying process for coking pr...
System optimization and selection of coking coal drying process for coking pr...Alex Wong
 
SMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsSMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsDexter Vaz
 

Similar to Monitoring Coal Mill Performance and Optimizing Primary Air/Fuel Ratio (20)

mel725-40.ppt
mel725-40.pptmel725-40.ppt
mel725-40.ppt
 
Max AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsMax AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S Concerns
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdf
 
Training presentation
Training presentation Training presentation
Training presentation
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
To Calculate and Improvement in the Efficiency of FBC Boiler
To Calculate and Improvement in the Efficiency of FBC BoilerTo Calculate and Improvement in the Efficiency of FBC Boiler
To Calculate and Improvement in the Efficiency of FBC Boiler
 
Mega Planta De Etileno - Steam Cracking
Mega Planta De Etileno  - Steam CrackingMega Planta De Etileno  - Steam Cracking
Mega Planta De Etileno - Steam Cracking
 
Cement Grinding Optimization
Cement Grinding OptimizationCement Grinding Optimization
Cement Grinding Optimization
 
pgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKpgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UK
 
pgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UKpgpager_Wolfson Heat treat-UK
pgpager_Wolfson Heat treat-UK
 
pgpager
pgpagerpgpager
pgpager
 
ICR OFT April
ICR OFT AprilICR OFT April
ICR OFT April
 
Mixing systems
Mixing systemsMixing systems
Mixing systems
 
Tp cfb 13_01
Tp cfb 13_01Tp cfb 13_01
Tp cfb 13_01
 
Ureaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsUreaplantenergysavingbyselectionoflinermaterialandinernals
Ureaplantenergysavingbyselectionoflinermaterialandinernals
 
Graphite Heat Exchangers
Graphite Heat ExchangersGraphite Heat Exchangers
Graphite Heat Exchangers
 
BP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingBP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforating
 
System optimization and selection of coking coal drying process for coking pr...
System optimization and selection of coking coal drying process for coking pr...System optimization and selection of coking coal drying process for coking pr...
System optimization and selection of coking coal drying process for coking pr...
 
SMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlantsSMID_016_AeroderivativeGTsforLNGPlants
SMID_016_AeroderivativeGTsforLNGPlants
 
IMO 2020
IMO 2020IMO 2020
IMO 2020
 

More from Manohar Tatwawadi

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion EquationsManohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stationsManohar Tatwawadi
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 

More from Manohar Tatwawadi (20)

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 

Recently uploaded

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 

Recently uploaded (20)

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 

Monitoring Coal Mill Performance and Optimizing Primary Air/Fuel Ratio

  • 2. Load Swings • Today’s demands on PC-fired unit flexibility are tremendous. Even very large units are now expected to park overnight at low loads before rapidly ramping up in the morning for another day of load swings. • This combined with new requirements for NOx reduction and a market-driven push for fuel flexibility has taxed coal pulverizing equipment to the limit. • The utility staff can, however, hold its own against such odds if it takes the time to understand the pulverizers and properly set them up. 5/10/2019 2Manohar Tatwawadi
  • 3. Pulveriser Designs One of the most popular pulverizer designs in use today is the medium speed roll and race design, such as B&W’s MPS, Foster Wheeler’s MB or MBF, and ABB-CE’s new HP. This type of design will be generically addressed here. All curves and examples presented are consistent with a theoretical, but practical example of an operating roll and race design. 5/10/2019 3Manohar Tatwawadi
  • 4. Raymond Bowl Mill 5/10/2019 Manohar Tatwawadi 4
  • 5. Pulveriser Setup & Tuning • Pulverizer set up and tuning will be addressed in three parts: • Part I - Pulverizer Capacity • Part II - Primary Air/Fuel Ratio Characterization • Part III - Pulverizer Controls 5/10/2019 5Manohar Tatwawadi
  • 6. Pulveriser Capacity • When a pulverizer manufacturer rates capacity at 100,000 pph, (45 TPH) there are strings attached. Associated with that rating are limits on coal grindability, moisture, feed size and output fineness, along with some reasonable PA/fuel ratio. • Each of the parameters will affect the effective size of the machine. 5/10/2019 6Manohar Tatwawadi
  • 7. Grindability Index and Capacity Mill Capacity – 125ooo Lb/hr Case -1 HGI Index – 55% Capacity to grind 70% thro 200 mesh – 133000 Lb/hr Case – 2 HGI Index – 50% Capacity to grind 70% thro 200 mesh – 122000 Lb/hr Case – 3 HGI Index – 40% Capacity to grind 80% thro 200 mesh – 85000 Lb/hr. 5/10/2019 Manohar Tatwawadi 7
  • 12. Capacity… • For example, consider a 100 KPPH (45360 kg/hr) pulverizer which was designed for a Hardgrove Grindability Index (HGI) of 60, a surface moisture of less than 10%, and a feed size of 2.5". • The 100 KPPH (45.36 T/hr) rating means that operating at those stated conditions the pulverizer product will have a fineness of 70% through a 200 mesh at a throughput of 45.36 TPH. • Figures No. 1 through 4 shows how the capacity of the pulverizer actually changes as each of the operating parameters change. • Figures No. 1, 3 and 4 assume that rated fineness is being maintained, which in this case is 70% through 200 mesh. 5/10/2019 12Manohar Tatwawadi
  • 13. Pulveriser Capacity • Suppose a plant’s fuels department has found a bargain on a local coal which has an HGI of 54, a surface moisture of 14% and a feed size of 2.75". Using the capacity correction curves, the pulverizers new effective capacity for delivering a 70% through 200 mesh product is: • (RATED CAPACITY) (HGI CORRECTION) (MOISTURE CORRECTION) (SIZE CORRECTION) = (100 KPPH) (.935) (.97) = 82.5 KPPH 5/10/2019 13Manohar Tatwawadi
  • 14. Capacity Curves & Relations • If the operators simply must push 100 KPPH of this new fuel through the pulverizer, then Figure No. 2 indicates that the pulverizer will be running at 121% of the new rated capacity and the 200 mesh fineness will drop to about 52%. There goes LOI and boiler efficiency, not to mention an increase in equipment erosion and possible adverse effects on NOX. 5/10/2019 14Manohar Tatwawadi
  • 15. Inside the mill The profile of the roll should be parallel with the grinding ring profile. 5/10/2019 Manohar Tatwawadi 15
  • 16. Classifires A classifier recirculates coarse coal in the grinding zone and balances the flow of coal to each burner line to the furnace. 5/10/2019 Manohar Tatwawadi 16
  • 17. Classifiers • The flow of coal particles through a classifier is several times the amount of coal flowing to the burners because of the large amount of coal recirculated within a pulverizer. For example, if a pulverizer is operating at 100,000 lb/hr coal feed to the burners, as much as 300,000 lb/hr or more may be flowing through the classifier for regrinding. For this reason the surface smoothness and inverted cone clearances or discharge doors of the MPS original design mills are extremely important for acceptable pulverizer performance and of course, optimum furnace performance. 5/10/2019 Manohar Tatwawadi 17
  • 18. Effects / Results • Pulverizer performance will deteriorate any time the machine is operated above its effective rating. The above example of switching fuels is one illustration, but a similar effect may result from switching to a fuel with lower heating value or trying to sustain higher loads with fewer pulverizers operating. Both increase the required fuel throughput. It is a certainty that LOI goes up as fineness goes down. • The message then, is to thoroughly consider the rating and operating conditions of the pulverizer before firming up new fuel purchases or buying new pulverizers. Other fuels impacts such as fouling and slagging tendencies, fuel bound nitrogen, sulfur and ash should be considered as well.5/10/2019 18Manohar Tatwawadi
  • 19. PRIMARY AIR/FUEL RATIO CHARACTERIZATION The primary air/fuel ratio characterization is a very critical but seldom understood curve. Even the manufacturer’s start-up or service engineer sometimes fails to grasp the significance of the relationship as a whole, or the effect of each part of the curve. How the air/fuel ratio is characterized will have profound effects on flame stability, pulverizer load stability, turndown, response rate, burner eyebrows, NOx generation, LOI, erosion and auxiliary power use. 5/10/2019 19Manohar Tatwawadi
  • 20. MINIMUM ALLOWABLE CURVE The exact values of PA Flow for a given pulverizer are a function of coal conduit size, fuel moisture and throat ring flow area. In any case the actual curve must be above a minimum allowable curve. 5/10/2019 20Manohar Tatwawadi
  • 21. Components of Minimum Air Flow • The minimum curve has four components which must be calculated and coordinated: Minimum line velocity, minimum A/F ratio, minimum slope, and the resulting inflection point. • The minimum line velocity is the velocity required through the coal conduits to keep the fuel in suspension. At lower PA flows the pulverized coal is in danger of falling out of suspension and laying out in the coal conduits, possibly resulting in fire or explosion. Minimum line velocity is thus affected by conduit size, number of conduits, altitude and temperature. Minimum line velocity is usually targeted at about 3000 fpm (15.24 m/sec) at sea level. The quantity of air required to maintain minimum line velocity is calculated as follows: 5/10/2019 21Manohar Tatwawadi
  • 22. The minimum line velocity Carrying of Particles by Fluid Drag In view of the age of the technique it would be presumed that the subject of concurrent fluid-solid flow would be quite well defined and understood. Investigation of the published literature indicates, however, that such conveying is still an extremely empirical art. 5/10/2019 Manohar Tatwawadi 22
  • 23. Pneumatic Carrying of Particles • The major goal of pneumatic conveying of solids is to maximize the carrying capacity of the installation and carry flows with high-solids concentration ("dense-phase flow"). • In pulverized coal combustion, the ratio of coal to carrying gas is usually in the range of y = 0.5-0.6 kg/kg. • Assuming a coal density rc = 1.5 x 103 kg/m3, and the density of the carrying gas as rg = 0.9 kg/m 3, the volume fraction of the coal can be shown to be very small, 0.036 % . • Dilute Phase Transport • The inter particle effects can therefore be neglected for steady state operation. • An important aerodynamic characteristic of the particles is their terminal velocity (the free-fall velocity in stagnant air) which for a spherical particle of d = 0.1 mm has an approximate value of 0.3m/sec. • Experience shows that due to non-uniformities of flow behind bends, and to avoid settling of solids in horizontal sections of the transport line, a gas velocity of ~ V = 16 -- 20 m/sec has to be chosen. 5/10/2019 Manohar Tatwawadi 23
  • 24. Qty of Air for Minimum Velocity • Minimum line velocity is usually targeted at about 3000 fpm (15.24 m/sec) at sea level. The quantity of air required to maintain minimum line velocity is calculated as follows: • Air Flow = (3000fpm) (60 min/hr) (A) (N) (p) Po/Pb Where: • A = Flow Area of one conduit, ft2 • N = No. Of conduits/pulverizer • Po= Standard barometric pressure, psiu • Pb= Barometric pressure at plant altitude, psiu • p = Density of air at standard pressure, 150°F. (65.50C) • Note: Western fuels are often controlled to 135°F, which would also require a density correction for temperature. 5/10/2019 24Manohar Tatwawadi
  • 25. Min PA Flow Required • Thus, for user example pulverizer, the PA flow required to support minimum line velocity is calculated at 150°F, elevation of 400 ft., and four 17" I.D. coal conduits per pulverizer: (3000fpm) (60 min/hr) π (17 in)2 (4) (0.00651 lb/ft3) (14.7 psia) (4) (144 in2/ft2) (14.44 psia) • = 75,212 pph 5/10/2019 25Manohar Tatwawadi
  • 26. Min. Allowable PA/Fuel Ratio • Function of Moisture in Fuel • Note also that minimum air/fuel ratio is achieved at maximum fuel flow. • Thus, multiplying the maximum fuel flow by the minimum air/fuel ratio results in the PA flow at maximum fuel flow. Continuing our example: • Max PA Flow = (100,000 pph fuel flow) (1.25 lb air/lb fuel) = 125,000 pph 5/10/2019 26Manohar Tatwawadi
  • 27. Operating Range of PA Flow Typical turndown ratio for this type of pulverizer is between 2-1/2 and 3 to 1, which would put minimum operating load at 33.3 to 40 kpph in the example. Thus, an inflection point of 33.3 kpph would seem in order. 5/10/2019 27Manohar Tatwawadi
  • 28. Lower PA FLOW · Improved fineness · Less component erosion · More complete pyrite rejection · Fewer or smaller burner eyebrows (via better pyrite rejection) · Less PA fan capacity requirements · Less PA system resistance (not including the pulverizer) · More reserve fines available · Greater opportunity for steeper characterization curve · Easier to keep inflection point out of the operating range · Aids in NOX reduction · Higher pulveriser d/p via increased bed depth · Excessive pyrites & fuel rejection via low throat ring velocity · Increased fire risk due to operating closer to minimum line velocity & minimum throat ring velocity · Greater tendency to plug with wet coal · Hotter inlet air temperature (i.e. constant BTU input) for the same fuel moisture5/10/2019 28Manohar Tatwawadi
  • 29. Operational Makeovers • The higher d/p may be handled through additional PA fan head, if available. • The increased fire risk is really not a factor if operated as described above. • Wet coal pluggage with reduced PA flow can be avoided bias available until maximum biased air flow prior to the change (assuming this previous maximum air flow adequately avoided wet pluggage). • Excessive pyrites rejection is a matter of insufficient throat ring velocity, however, and may require mechanical modification of the throat ring flow area. Minimum throat ring velocity varies with pulverizer design, and even seems to be somewhat proprietary among manufacturers. • Obviously, the proper minimum velocity is that which provides continued fuel through put while rejecting the majority of legitimate pyrites but very little fuel. Once again, field test at low pulverizer load will determine what needs to be done. • If PA flow has been lowered then one good approach would be to add throat ring flow area restriction proportionally to maintain the same velocity. 5/10/2019 29Manohar Tatwawadi
  • 30. Primary Air Lead & Lags • A load-following unit with rapid load changes requires maximum pulverizer ramping capability. • During a pulverizer load ramp the primary air will always lead the increase ramps (transferring additional fines to the burners) and lag the decrease ramps (to withhold fines from the burners). Once the new load is reached both fuel and air find a new equilibrium point as determined by the characterization curve. • The faster the ramp, the more the primary air leads (or lags) the fuel. 5/10/2019 30Manohar Tatwawadi
  • 31. Derate Analysis and Operating Concerns • Pulverizer capacity limitation : A derate is due to the fuel burn rate exceeding predicted pulverizer capacity with all pulverizers in service. • Feeder capacity limitation : A derate is due to the fuel burn rate is greater than the total actual feeder capacity with all pulverizers in service. • An exhauster mill limitation: A derate is due to the calculated airflow required with all pulverizers in service is greater than the actual exhauster fan flow. • Improper pulverizer outlet temperature: A derate is due to the heat available in the primary air for drying coal in the pulverizers is less than that required. 5/10/2019 Manohar Tatwawadi 31
  • 32. Mill Units Design A B C D E F G H Plant load MW 500 491.67 494.33 464.67 464.17 504.33 519.33 496.80 487.70 Coal flow t/h 51.248 59.56 56.42 54.28 56.42 57.51 56.68 58.40 56.47 A/F ratio 2.03 2.09 2.12 2.08 2.15 2.13 2.16 2.15 2.12 PA temp. oC 243 247.17 244.67 245.00 246.33 247.50 241.50 245.17 248.50 Coal-air mixture temp oC 85 78 76 81 72 71 70 75 75 Coal fineness below 75 micron % 70 65 68 70 60 61 62 61 62 DP mmWC 437.9 494.00 496.83 485.50 467.83 440.33 430.50 496.50 431.90 PA pressure I/L mmWC 991.5 900.50 927.50 999.83 909.67 922.33 933.50 929.17 958.80 PA flow t/h 104 120.31 123.01 110.52 102.18 104.80 108.66 113.13 120.17 Power kW 406 393.72 404.22 458.29 379.51 382.57 365.17 445.18 428.11 Energy kWh/h - 383.52 395.76 451.92 370.62 374.22 350.94 441.48 433.12 Load factor % 84.58 82.03 84.21 95.48 79.06 79.70 76.08 92.75 89.19 Sp. Energy Consumption kWh/t of coal 7.92 8.44 9.01 8.33 8.57 8.51 8.19 8.56 8.67 Performance results of mills for 500 MW plant. 5/10/2019 Manohar Tatwawadi 32