Introduction to
Railway Engineering
MUHAMMAD TAIMUR KHAN 2K18-FT-MS-TRAN-05
TARIQ NAVEED 2K18-FT-MS-TRAN-08
Definition
• The branch of Civil Engineering which deals with the design, construction and
maintenance of the railway tracks for safe and efficient movements of trains is called
Railway Engineering .
•Rail
• The rolled steel sections laid end to end in two parallel lines over sleepers to form
a railway track are known as rails.
History
 In medieval times people mostly travelled by foot or
horseback and any form of transportation was mainly
for moving goods.
The first railways were laid down in the seventeenth
and eighteenth century for horse drawn trains of
wagons in collieries and quarries.
As the Industrial Revolution progressed, the
idea was developed further by adding cast iron or
wrought iron plates to reduce wear on the wooden
baulks.
History
This evolved further to iron edge rails enabling the use of flanged
wheels for the first time.
steam locomotives came on the scene, in the early nineteenth
century, wrought iron rails and later steel rails were developed which
were strong enough to support these heavy axle loads without
assistance from longitudinal timbers.
In essence the track itself, together with its supports, had and still has
the basic function of safely transmitting the loads and forces imposed
by passing trains to the ground beneath.
Various other civil engineering skills were also involved such as the
building of bridges, tunnels and gravity walls as well as extensive
earthworks and drainage.
History
There was a need to balance the requirements and interests of the various
engineering disciplines involved.
Example: Effect of rolling stock on the fixed infrastructure.
This may sometimes require compromise in certain disciplines for the good of
the whole .
History of railway in Subcontinent
Sir Henry David Frere, appointed as the commissioner of Sindh, ought
permission from lord Dalhousie to begin a survey for a Karachi seaport and a
railway line in 1858. On may 13th, 1861 the first railway line was opened to the
public, between Karachi and Kotri, with a total distance of 169 km.
History of Railways in Pakistan
In 1947 following independence, most of the North Western State Railway
infrastructure was in Pakistani territory and was renamed the Pakistan Western
Railway. In East Bengal, the portion of the Assam Bengal Railway in Pakistani
territory was renamed the Pakistan Eastern Railway. The country adopted 8,122
kilometers (5,047 mi) of the North Western State Railway; 6,880 kilometers
(4,280 mi) was 1,676 mm(5 ft 6 in), 506 kilometers (314 mi) was meter gauge,
and 736 kilometers (457 mi) was 762 mm(2 ft. 6 in) narrow gauge.
Development and diversification
In the early railways the Boards would appoint an Engineer
Responsible for all the engineering of the railway parts, both moving and fixed.
Often involved in the actual day-to-day operating of the railway.
 This had considerable advantage from a point of view of co-ordination.
With time roles Became more specialized.
The Customer
The needs and aspirations of the customer must always be kept in the forefront of the
mind.
The passenger’s basic needs are to travel comfortably and to arrive safely at the
destination reasonably on time.
The freight customer needs confidence that his goods will be delivered safely and on
time.
And at a reasonable cost.
All engineers and Operators need to work together to achieve this objective.
Departmental and local interests can and often do arise which can jeopardize this
simple objective .
The operator
Operator’s needs in satisfying the customer’s needs are also very important .
In satisfying the customer’s basic needs, there is often more than one
operational solution.
the operators and the engineers involved to jointly consider all the valid options
which are available.
Example: the consideration of carrying out week-end essential works either over
a number of shorter possessions of the railway or over one longer week-end.
must also be able to deal with emergencies during periods of engineering work
and contingency plans must be drawn up for this.
Overall planning
In constructing and maintaining any railway system infrastructure, there are
various engineering activities that overlap each other.
Proper co-ordination and co-operation is necessary here.
items of work where there is considerable overlap or ‘knock-on’ effect.
An example of this might be the requirement to renew a number of bridges on a
certain line.
Depending on relative costs in each area, an optimum programme could be
drawn up jointly which would keep overall costs and disruption to a minimumin
the long term.
Overall Planning
booking of long possessions to do work in one area might provide opportunities
for other engineers to carry out other works at the same time, thus reducing
expenditure overall.
This type of co-operation is not always easy and does require a flexible attitude .
Maximum benefit of the whole must be the criterion.
Choice of Route and Level
choices have to be made relating to the best route, and which parts will need to
be elevated or in tunnel.
largely dictated by traffic demands and existing physical constraints .
In some cases, cost for alternatives is compared.
In such cases, ground conditions and water levels as well as existing building
foundations and services must all be taken into consideration.
level of the railway will be determined by existing physical constraints.
However, all engineering implications are fully investigated and costed before
any decision is made to construct a railway, either underground or on elevated
structure.
Choice of Route and Level
(Underground)
For underground construction, full allowance must be made for the full life
costs of escalators, ventilation/air conditioning, lighting and other services,
additional tunneled accommodation for staff, fire protection and
emergency exits etc.
Disruption during the construction in inner city areas is considered when
deciding whether or not to go underground.
Choice of Route and Level
(Elevated)
For elevated railway, a careful considerationon environmental issues including
visual impact and noise is needed.
 Dealing with emergencies at high level must be considered.
elevated railways occupy less ground level space, the stations often cover more
relative area because of the need for stairs, ramps and escalators etc.
From an engineering point of view, alignments should also be as smooth
as possible without steep gradients or tight curves to reduce wear on both
the rolling stock and the track and to keep power consumption to a minimum.
Resources Required
For the satisfactory operation and maintenance of a railway, certain basic
resources are required:
1. human resources
2. Fixed assets
3. mobile machinery
 Inadequacy in any of this fixed triangle will mean that good operation cannot
be maintained, irrespective of the performance on the other sides
Human Resources
Careful selection and adequate training of personnel at all levels is
essential.
good relations with staff both at National and local level must have a high
priority.
This requires constant attention at all levels of engineering management.
Individuals need to feel that they are valued and that they have a positive part to
play in the running of the whole enterprise.
Thanks

More Related Content

What's hot

Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways EngineeringLatif Hyder Wadho
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistanAYAZ AHMAD
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 
Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.Md Khan
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway addavidson
 
CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering TANZEEL HABEEBULLA
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieeringMani Vel
 
Komlapur Railway
Komlapur RailwayKomlapur Railway
Komlapur RailwayA. R. Atiq
 
Introduction to transport engg (3)
Introduction to transport engg (3)Introduction to transport engg (3)
Introduction to transport engg (3)georgezac
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...Hossam Shafiq I
 
Urban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and undergroundUrban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and undergroundLydia Lyven
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gaugeGaurav Jagad
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringAditya Mistry
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering IntroductionT.Naga Anusha
 

What's hot (20)

Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways Engineering
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistan
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering CV213 (S5) Transportation Engineering
CV213 (S5) Transportation Engineering
 
1.railway engnieering
1.railway engnieering1.railway engnieering
1.railway engnieering
 
Komlapur Railway
Komlapur RailwayKomlapur Railway
Komlapur Railway
 
Introduction to transport engg (3)
Introduction to transport engg (3)Introduction to transport engg (3)
Introduction to transport engg (3)
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
 
Urban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and undergroundUrban infrastructure on mono, metro and underground
Urban infrastructure on mono, metro and underground
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gauge
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel Engineering
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering Introduction
 

Similar to Introduction to railway engineering

Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2R VIJAYAKUMAR
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Introduction, alignment & surveys
Introduction, alignment & surveysIntroduction, alignment & surveys
Introduction, alignment & surveysGARRE RAVI KUMAR
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridgesCivil Engineers
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptxSpidra1
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeJangid Devendra
 
Planning Principles Railway Engineering
Planning Principles Railway EngineeringPlanning Principles Railway Engineering
Planning Principles Railway EngineeringLatif Hyder Wadho
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...RAMPRASAD KUMAWAT
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracksGowtham G
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaSuhas Khedkar
 

Similar to Introduction to railway engineering (20)

Mumbai-Nagpur.pdf
Mumbai-Nagpur.pdfMumbai-Nagpur.pdf
Mumbai-Nagpur.pdf
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Introduction, alignment & surveys
Introduction, alignment & surveysIntroduction, alignment & surveys
Introduction, alignment & surveys
 
Tunneling
TunnelingTunneling
Tunneling
 
456.pdf
456.pdf456.pdf
456.pdf
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
 
sky bus
sky bussky bus
sky bus
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gauge
 
Planning Principles Railway Engineering
Planning Principles Railway EngineeringPlanning Principles Railway Engineering
Planning Principles Railway Engineering
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

Introduction to railway engineering

  • 1. Introduction to Railway Engineering MUHAMMAD TAIMUR KHAN 2K18-FT-MS-TRAN-05 TARIQ NAVEED 2K18-FT-MS-TRAN-08
  • 2. Definition • The branch of Civil Engineering which deals with the design, construction and maintenance of the railway tracks for safe and efficient movements of trains is called Railway Engineering . •Rail • The rolled steel sections laid end to end in two parallel lines over sleepers to form a railway track are known as rails.
  • 3. History  In medieval times people mostly travelled by foot or horseback and any form of transportation was mainly for moving goods. The first railways were laid down in the seventeenth and eighteenth century for horse drawn trains of wagons in collieries and quarries. As the Industrial Revolution progressed, the idea was developed further by adding cast iron or wrought iron plates to reduce wear on the wooden baulks.
  • 4. History This evolved further to iron edge rails enabling the use of flanged wheels for the first time. steam locomotives came on the scene, in the early nineteenth century, wrought iron rails and later steel rails were developed which were strong enough to support these heavy axle loads without assistance from longitudinal timbers. In essence the track itself, together with its supports, had and still has the basic function of safely transmitting the loads and forces imposed by passing trains to the ground beneath. Various other civil engineering skills were also involved such as the building of bridges, tunnels and gravity walls as well as extensive earthworks and drainage.
  • 5. History There was a need to balance the requirements and interests of the various engineering disciplines involved. Example: Effect of rolling stock on the fixed infrastructure. This may sometimes require compromise in certain disciplines for the good of the whole .
  • 6. History of railway in Subcontinent Sir Henry David Frere, appointed as the commissioner of Sindh, ought permission from lord Dalhousie to begin a survey for a Karachi seaport and a railway line in 1858. On may 13th, 1861 the first railway line was opened to the public, between Karachi and Kotri, with a total distance of 169 km.
  • 7. History of Railways in Pakistan In 1947 following independence, most of the North Western State Railway infrastructure was in Pakistani territory and was renamed the Pakistan Western Railway. In East Bengal, the portion of the Assam Bengal Railway in Pakistani territory was renamed the Pakistan Eastern Railway. The country adopted 8,122 kilometers (5,047 mi) of the North Western State Railway; 6,880 kilometers (4,280 mi) was 1,676 mm(5 ft 6 in), 506 kilometers (314 mi) was meter gauge, and 736 kilometers (457 mi) was 762 mm(2 ft. 6 in) narrow gauge.
  • 8.
  • 9. Development and diversification In the early railways the Boards would appoint an Engineer Responsible for all the engineering of the railway parts, both moving and fixed. Often involved in the actual day-to-day operating of the railway.  This had considerable advantage from a point of view of co-ordination. With time roles Became more specialized.
  • 10. The Customer The needs and aspirations of the customer must always be kept in the forefront of the mind. The passenger’s basic needs are to travel comfortably and to arrive safely at the destination reasonably on time. The freight customer needs confidence that his goods will be delivered safely and on time. And at a reasonable cost. All engineers and Operators need to work together to achieve this objective. Departmental and local interests can and often do arise which can jeopardize this simple objective .
  • 11. The operator Operator’s needs in satisfying the customer’s needs are also very important . In satisfying the customer’s basic needs, there is often more than one operational solution. the operators and the engineers involved to jointly consider all the valid options which are available. Example: the consideration of carrying out week-end essential works either over a number of shorter possessions of the railway or over one longer week-end. must also be able to deal with emergencies during periods of engineering work and contingency plans must be drawn up for this.
  • 12. Overall planning In constructing and maintaining any railway system infrastructure, there are various engineering activities that overlap each other. Proper co-ordination and co-operation is necessary here. items of work where there is considerable overlap or ‘knock-on’ effect. An example of this might be the requirement to renew a number of bridges on a certain line. Depending on relative costs in each area, an optimum programme could be drawn up jointly which would keep overall costs and disruption to a minimumin the long term.
  • 13. Overall Planning booking of long possessions to do work in one area might provide opportunities for other engineers to carry out other works at the same time, thus reducing expenditure overall. This type of co-operation is not always easy and does require a flexible attitude . Maximum benefit of the whole must be the criterion.
  • 14. Choice of Route and Level choices have to be made relating to the best route, and which parts will need to be elevated or in tunnel. largely dictated by traffic demands and existing physical constraints . In some cases, cost for alternatives is compared. In such cases, ground conditions and water levels as well as existing building foundations and services must all be taken into consideration. level of the railway will be determined by existing physical constraints. However, all engineering implications are fully investigated and costed before any decision is made to construct a railway, either underground or on elevated structure.
  • 15. Choice of Route and Level (Underground) For underground construction, full allowance must be made for the full life costs of escalators, ventilation/air conditioning, lighting and other services, additional tunneled accommodation for staff, fire protection and emergency exits etc. Disruption during the construction in inner city areas is considered when deciding whether or not to go underground.
  • 16. Choice of Route and Level (Elevated) For elevated railway, a careful considerationon environmental issues including visual impact and noise is needed.  Dealing with emergencies at high level must be considered. elevated railways occupy less ground level space, the stations often cover more relative area because of the need for stairs, ramps and escalators etc. From an engineering point of view, alignments should also be as smooth as possible without steep gradients or tight curves to reduce wear on both the rolling stock and the track and to keep power consumption to a minimum.
  • 17. Resources Required For the satisfactory operation and maintenance of a railway, certain basic resources are required: 1. human resources 2. Fixed assets 3. mobile machinery  Inadequacy in any of this fixed triangle will mean that good operation cannot be maintained, irrespective of the performance on the other sides
  • 18. Human Resources Careful selection and adequate training of personnel at all levels is essential. good relations with staff both at National and local level must have a high priority. This requires constant attention at all levels of engineering management. Individuals need to feel that they are valued and that they have a positive part to play in the running of the whole enterprise.