  1. 1. Achilles Milioulis Undertaken Projects Page 1 of 5 Employer Project Owner Contract Title Contract Value Description of Work Tageco JSC – Terna SA J/V, Libya O.D.A.C. (Libyan Organization for the Development of Administrative Centers) Road, sidewalk, and street lighting networks in the cities of Waddan, Hun, and Sokna $123M New urban roadwork construction, including excavation, embankment, granular subbase & base courses, bituminous binder and wearing courses, concrete curb & gutter, sidewalks, and street lighting networks. Relocation of underground utilities in conflict. AM Engineering Corp., Chicago, Illinois IDOT (Illinois Department of Transportation), ISTHA (Illinois State Toll Highway Authority), City of Joliet, several other Villages in the Greater Chicago Area Various building demolitions, tree removals, landscaping, erosion control systems, concrete curb & gutter, sidewalks, driveways removal and replacement $4.5M Demolition of low income communities in Joliet, Illinois. Removal and disposal of regular and contaminated debris. Installation of new erosion control systems, and landscaping. Removal and replacement of concrete curb & gutter, removal & replacement of sidewalks & driveways. BBA, LLC, Chicago, Illinois IDOT (Illinois Department of Transportation) Palwaukee Executive Airport taxiway construction N/A New construction of doweled concrete taxiways, excavation, PGE (porous granular embankment) erosion control systems, electrical & signage work, landscaping. BBA, LLC, Chicago, Illinois IDOT (Illinois Department of Transportation) Joliet Regional Airport taxiway construction N/A New construction of doweled concrete taxiways, excavation, PGE (porous granular embankment) erosion control systems, electrical & signage work, landscaping. Ganna Construction Inc., Chicago, Illinois CDOT (City of Chicago Department of Transportation) Bridge replacement over the North Branch of the Chicago River N/A Removal and disposal of existing bridge. Installation of new precast soil filling bridge. Pavement, and extensive utilities work. Erosion control & landscaping work.
  2. 2. Achilles Milioulis Undertaken Projects Page 2 of 5 Employer Project Owner Contract Title Contract Value Description of Work Ganna Construction Inc., Chicago, Illinois IDOT (Illinois Department of Transportation) Improvement of Route 30 $22M + $7M extensions Route 30 widening from Theodore Street to Western Avenue in Joliet. MOT (maintenance of Traffic), removal of old pavement. Installation of new storm sewers, sanitary sewers, water supply, trench protection from contaminated soils. Excavation, PGE (porous granular embankment). New doweled concrete pavement, bituminous courses, concrete curb & gutter, sidewalks, and driveways. New traffic signals, street lighting, signage, erosion control systems, and landscaping. Ganna Construction Inc., Chicago, Illinois IDOT (Illinois Department of Transportation) Stevenson Expressway 5P (I55 – Interstate 55) $30M Reconstruction of SB (Southbound) lanes from Willow Springs Road to north of Des Plaines River. MOT (maintenance of Traffic). Removal of existing 4 bridges, pavement, barrier walls, and ramps. Installation of new storm sewers, road drainage systems, variable height concrete barrier walls, 4 new bridges, consisting of abutment walls, piers, steel beams & new concrete deck. PGE (porous granular embankment), bituminous ramps, concrete shoulders, CRC (continuous reinforced concrete) pavement, concrete curb & gutter, polymerized bituminous courses, overhead signage, street lighting, erosion control, landscaping.
  3. 3. Achilles Milioulis Undertaken Projects Page 3 of 5 Employer Project Owner Contract Title Contract Value Description of Work Ganna Construction Inc., Chicago, Illinois ISTHA (Illinois State Toll Highway Authority) Army Trail Toll Plaza Extension $33M MOT (maintenance of Traffic). Removal of existing pavement, ramps, barrier walls, noise walls, plaza toll booths. Installation of new storm sewers, road drainage systems, concrete variable height barrier walls, noise walls, bridge abutment & pier extensions, steel beams, new concrete deck, new lanes, PGE (porous granular embankment), concrete ramps, bituminous shoulders, concrete curb & gutter, new doweled concrete pavement, overhead signage, new tollway plaza canopy & booths, street lighting, erosion control, landscaping Meton SA - Etep SA, Fezan, Libya Projects Office Sebha, a division of G.P.C. (General Popular Committee) of Iskan and Utilities Sanitary Sewage for 4 Areas in Sebha $16.5M Excavate and install sanitary sewer lines, precast M/H, Catch basins & house connections. Deep trench protection, and ground water pumping. Waste pumping stations. Meton SA - Etep SA, Fezan, Libya Sebha Roads & Bridges Department Sebha – Brak Road Project, 61 km $53M Design new alignment through desert. Construction of service road, new high embankment, box culverts, granular bases, and bituminous binder & wearing courses. Installation of pavement markings, signage, mile posts, cat eyes, and cleanup of sand accumulation on pavement from continuous eolic movement of massive sand dunes.
  4. 4. Achilles Milioulis Undertaken Projects Page 4 of 5 Employer Project Owner Contract Title Contract Value Description of Work Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Sanitary Sewage projects in Morzuk, Traghen, Al-Qatrun, Zwellah, Umularaneb, Tissawah, Sabitat. Water supply works in Tmissah- Mugadul $22M Excavate and install sanitary sewer lines and precast M/H, catch basins & house connections. Rock excavation, deep trench protection, and ground water pumping. Waste pumping stations. Excavate and install ductile iron pipes & accessories for water supply networks. Radial irrigation systems in Al-Qatrun. Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Building construction of 270 housing units in Al-Qatrun, Traghen, Sabitat, Tajerhi, and Zaitunah. 15 6-class schools, health dispensaries, warehouses, and distribution centers $74M Building construction including excavation, footings, concrete beams, columns, and slabs, concrete block masonry, plastering, floor tiles, wall cladding, wood doors & windows, electrical, water, and sanitary sewer installations. Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Industrial Chip board factory construction in Traghen $6M Building construction including excavation, footings, concrete beams, columns, and slabs, concrete block masonry, plastering, floor tiles, wall cladding, steel & wood doors & windows, electrical, water, and sanitary sewer installations. Procurement and installation of German origin prototype machinery for the fabrication of chipboards from palm tree branches. Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Godwah – Traghen – Morzuk Road reconstruction, 136 km $57M Removal and disposal of existing pavement, construction of service road, rehabilitation of existing road foundation, installation of granular bases, and bituminous binder & wearing courses. Cleanup and expansion of existing culverts, road signage, and mile posts.
  5. 5. Achilles Milioulis Undertaken Projects Page 5 of 5 Employer Project Owner Contract Title Contract Value Description of Work Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Construction of 5 Airstrips in Traghen, Majdul, Umularaneb, Morzuk, Al-Qatrun, $1.7M Construction of airstrips to fight locust infestation Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Majdul – Tarboo and Zaituna – Traghen Road construction, 43 km $23M New construction in compromised soils with high water table. Installation of rock foundation, high embankments, box culverts, granular base courses, bituminous binder & wearing courses, pavement markings, mile posts, cat eyes, and signage. Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Qatrun – Al Weigh Road construction, 130 km $58M New alignment, rock excavation, and embankment work.

×