Permanent Packer Failure Causes
• Factors causing failures
Permanent Packer Performance
• Hoppman and Walker, PEI, May 1995
__________________________________
• Rating envelope - regions of stress
• catastrophic failure - packer no longer able
to maintain seal integrity
• non-catastrophic - limit the ability of the
packer to function as designed
Packer Failure Causes
• Body Collapse
– ID of seal bore contacts OD of seal assembly
– Caused by differential pressure above or below
the packer, or by packer and tubing forces; or
by a combination of the two.
– Virtually all of the pressure and forces exerted
on the packer are locked in by the slip system.
The body remains collapsed even after the
forces are removed.
Packer Failure Causes
• Body Collapse (continued)
– Since pressures and forces are dependent on the cross-
sectional area of the packing element, they are
dependent on the casing ID.
– Each size packer is used in a range of casing ID’s
(weights)
– As casing ID increases, the expansion of the packing
element must
be greater - adversely
affects packer rating.
Consequences of Body Collapse
• Not a catastrophic failure (sealing not
compromised)
– often cannot remove seals from packer bore
– Safe Operating Region - 3 on envelope
Packer Failure Causes
• Packing Element System Failure
– failure of the element occurs when the element
extrudes through the back-up system
Packer Failure Causes
• Causes of packing element failure
– temperature of seal material exceeded
– excess pressure on element causes extrusion
– chemical attack (breakdown or softening)
– gas permeation and sudden decompression causing
blisters and seal ruptures
– backup system failures
– seal bore corrosion or erosion leaves sealing surface
rough
Consequences of Seal Failure
• Catastrophic failure (sealing compromised)
– seal is lost - leaks may cause other problems
– often cannot remove seals from packer bore
(baked, hardened, fused, etc.)
– Safe Operating Region - 4 on envelope
Packer Failure Causes
• Pin collapse at the body/guide connection
– like a body collapse, collapse of the pin connection at
the lower connection with maximum deflection at the
middel of the lower thread.
– Differential pressure can occur when the seals are in a
seal bore extension below packer or if a wireline plug is
set in a nipple in the tailpipe.
– Consequences - non-catastrophic
– Region - 5 on envelope
Packer Failure Causes
• Body to Guide Failure
– fails at thread relief or in thread itself.
– Thread relief failure occurs when the yield
strength of the body is exceeded.
– Thread failure occurs when the tensile loads
exceed the shear or bearing strength of the
threads.
Packer Failure Causes
• Body to Guide Failure (continued)
– Sources of the loads are pressure differential below the
packer, packer-to-tubing tensile forces or a combination
of the two.
– If both forces are present, their effects are additive.
• Failure is catastrophic - body becomes free to moveupward
through the packer and the guide is free to fall downhole.
• Safe Operating Region - 2
Packer Failure Causes
• Anchor Attachment Failure (failure of left
hand square thread)
– can occur only when a tubing anchor seal
assembly is used. Tread can fail in the tread
relief, in the tread, or due to swelling of box.
– Thread relief fails when body tensile exceeded
– Threads fail when bearing strength exceeded
– Swelling occurs when elastic burst limit of the
wall is exceeded
Packer Failure Causes
• Anchor Attachment Failure (continued)
– Consequences -
Failure in thread relief or threads is catastrophic -
anchor seal pulls out of the packer - pressure integrity is
lost.
Most likely effect of a box swelling failure is loss of
contact area between anchor and packer. If box swells
to the point where anchor can pull out - the failure will
be catastrophic.
– Safe Operating Region - 1
Packer Failure Causes
• Body Lock Ring System Failure
– The body lock ring fails when the stresses in the threads
exceed the material shear or bearing strength in the ring
or its supporting elements.
– Consequences - body is free to float, even though slips
continue to trap the packoff force. When pressure
cycles - leads to reciprocation and wear on packing
element - produces a leak.
– No pressure cycle - no serious consequences.
– Safe operating Limit - region 6.
Packer Failure Causes
• Bearing Failure
– occurs with locator and anchor seal assemblies.
– Bearing failure at contact of anchor/locator and
packer occurs when compressive stress exceeds
bearing strength of the material.
– An added force may be stress in body and seal
sub generated by radial component of the
contact forces (this is caused strictly by
compressive packer-to-tubing forces).
Bearing Failure
• Consequences
– Generally, only result is deformation of the
contact surface of each part.
– In cases of extreme, high set-down loads, the
seal assembly can be swaged into the bore or
body of the packer.
• Bearing failure is represented in the
envelope as region 6
Using The Packer Envelope in
Well Design
• Plot data from tubing movement and stress
programs on a packer envelope to determine
if the loads fall in the safe area during initial
setting, production, stimulation and kill
operations.
Using The Packer Envelope in
Well Design
• The envelope can be used to determine optimum
material for packer construction.
• Check outer limits of the packer for it’s casing
weight range.
• All future operations must be accounted for in a
permanent packer design.
• Failure rate for permanent packers is less than 1%.
Packer failure

More Related Content

What's hot

SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.womgroup
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operationsAbdulkadir Tekin
 
Wpce reference guide for common quick union type connections
Wpce reference guide for common quick union type connectionsWpce reference guide for common quick union type connections
Wpce reference guide for common quick union type connectionspacho916
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdfDrilling Manual
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
Wireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas IndustryWireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas IndustryGamal Eldien Tarek
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipplesElsayed Amer
 

What's hot (20)

Well intervention
Well  interventionWell  intervention
Well intervention
 
Wellhead
WellheadWellhead
Wellhead
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
 
Liner hanger systems
Liner hanger systemsLiner hanger systems
Liner hanger systems
 
Well head replacement
Well head replacementWell head replacement
Well head replacement
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
02 wireline
02 wireline02 wireline
02 wireline
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
 
Wpce reference guide for common quick union type connections
Wpce reference guide for common quick union type connectionsWpce reference guide for common quick union type connections
Wpce reference guide for common quick union type connections
 
Well intervention
Well interventionWell intervention
Well intervention
 
Production packer
Production packerProduction packer
Production packer
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Wireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas IndustryWireline Operation 2018 - Oil and Gas Industry
Wireline Operation 2018 - Oil and Gas Industry
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 

Viewers also liked

Masters in petroleum engg degree
Masters in petroleum engg  degreeMasters in petroleum engg  degree
Masters in petroleum engg degreeAmit Kumar Singh
 
Fagan, a. an introduction to the petroleum industry
Fagan, a.   an introduction to the petroleum industryFagan, a.   an introduction to the petroleum industry
Fagan, a. an introduction to the petroleum industryCesar Bardales Alvarado
 
2. Failure Mechanics
2. Failure Mechanics2. Failure Mechanics
2. Failure MechanicsJames Craig
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary CementingHtet Naing Htoo
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic FracturingJames Craig
 
Drilling Engineering - Drilling Economics
Drilling Engineering - Drilling EconomicsDrilling Engineering - Drilling Economics
Drilling Engineering - Drilling EconomicsJames Craig
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingJames Craig
 
Endangered and Threatened Plants and Animals
Endangered and Threatened Plants and AnimalsEndangered and Threatened Plants and Animals
Endangered and Threatened Plants and AnimalsSadia Zareen
 
Goal setting & self motivation
Goal setting & self motivationGoal setting & self motivation
Goal setting & self motivationGanesh Murugan
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)James Craig
 

Viewers also liked (20)

Body packers
Body packersBody packers
Body packers
 
Masters in petroleum engg degree
Masters in petroleum engg  degreeMasters in petroleum engg  degree
Masters in petroleum engg degree
 
Spe 80945-ms
Spe 80945-msSpe 80945-ms
Spe 80945-ms
 
Fagan, a. an introduction to the petroleum industry
Fagan, a.   an introduction to the petroleum industryFagan, a.   an introduction to the petroleum industry
Fagan, a. an introduction to the petroleum industry
 
Introduction to locomotor
Introduction to locomotorIntroduction to locomotor
Introduction to locomotor
 
Brain & thinking
Brain & thinkingBrain & thinking
Brain & thinking
 
2. Failure Mechanics
2. Failure Mechanics2. Failure Mechanics
2. Failure Mechanics
 
Squeeze cementing
Squeeze cementingSqueeze cementing
Squeeze cementing
 
Cementation
CementationCementation
Cementation
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
Cementation
CementationCementation
Cementation
 
Cementation
CementationCementation
Cementation
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic Fracturing
 
Drilling Engineering - Drilling Economics
Drilling Engineering - Drilling EconomicsDrilling Engineering - Drilling Economics
Drilling Engineering - Drilling Economics
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary Cementing
 
Endangered and Threatened Plants and Animals
Endangered and Threatened Plants and AnimalsEndangered and Threatened Plants and Animals
Endangered and Threatened Plants and Animals
 
Degrees of freedom
Degrees of freedomDegrees of freedom
Degrees of freedom
 
Goal setting & self motivation
Goal setting & self motivationGoal setting & self motivation
Goal setting & self motivation
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 

Similar to Packer failure

Organizing an Effective Maintenance Program for Plasticating Components
Organizing an Effective Maintenance Program for Plasticating ComponentsOrganizing an Effective Maintenance Program for Plasticating Components
Organizing an Effective Maintenance Program for Plasticating ComponentsGlycon Corp.
 
Fishbone Article Pumps and Systems
Fishbone Article Pumps and SystemsFishbone Article Pumps and Systems
Fishbone Article Pumps and SystemsDwight Bertozzi
 
RCA - Mechanical component failure analysis - Part 1
RCA - Mechanical component failure analysis - Part 1RCA - Mechanical component failure analysis - Part 1
RCA - Mechanical component failure analysis - Part 1Sandeep Gupta
 
ASSQC on snap fasteners and buttons
ASSQC on snap fasteners and buttonsASSQC on snap fasteners and buttons
ASSQC on snap fasteners and buttonsShreeti Mishra
 
Dover ALS Safety Moment of the Week 21-Nov-2016
Dover ALS Safety Moment of the Week 21-Nov-2016Dover ALS Safety Moment of the Week 21-Nov-2016
Dover ALS Safety Moment of the Week 21-Nov-2016albertaoiltool
 
Peabody_Rigging_Program.ppt
Peabody_Rigging_Program.pptPeabody_Rigging_Program.ppt
Peabody_Rigging_Program.pptAdnanZafar88
 
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptx
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptxCHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptx
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptxLEAK-PACK
 
Cpnstruction Joints.pptx
Cpnstruction Joints.pptxCpnstruction Joints.pptx
Cpnstruction Joints.pptxTejasRathi8
 
How to unlock productivity savings in mining operations part 3 final_11.06.2017
How to unlock productivity savings in mining operations part 3 final_11.06.2017How to unlock productivity savings in mining operations part 3 final_11.06.2017
How to unlock productivity savings in mining operations part 3 final_11.06.2017David Mallinson MAICD
 
Practical aspects of PSC.ppt
Practical aspects of PSC.pptPractical aspects of PSC.ppt
Practical aspects of PSC.pptAdityaJoshi320204
 
Relief Systems.pdf
Relief Systems.pdfRelief Systems.pdf
Relief Systems.pdfKAhmedRehman
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012Mouli Edla
 

Similar to Packer failure (19)

Organizing an Effective Maintenance Program for Plasticating Components
Organizing an Effective Maintenance Program for Plasticating ComponentsOrganizing an Effective Maintenance Program for Plasticating Components
Organizing an Effective Maintenance Program for Plasticating Components
 
Test Vm Training 1
Test Vm Training 1Test Vm Training 1
Test Vm Training 1
 
training_JOB2
training_JOB2training_JOB2
training_JOB2
 
training_JOB1
training_JOB1training_JOB1
training_JOB1
 
Elastic springback in plates - Theo Kahl
Elastic springback in plates - Theo KahlElastic springback in plates - Theo Kahl
Elastic springback in plates - Theo Kahl
 
Fishbone Article Pumps and Systems
Fishbone Article Pumps and SystemsFishbone Article Pumps and Systems
Fishbone Article Pumps and Systems
 
Basic Rigging
Basic RiggingBasic Rigging
Basic Rigging
 
RCA - Mechanical component failure analysis - Part 1
RCA - Mechanical component failure analysis - Part 1RCA - Mechanical component failure analysis - Part 1
RCA - Mechanical component failure analysis - Part 1
 
ASSQC on snap fasteners and buttons
ASSQC on snap fasteners and buttonsASSQC on snap fasteners and buttons
ASSQC on snap fasteners and buttons
 
Dover ALS Safety Moment of the Week 21-Nov-2016
Dover ALS Safety Moment of the Week 21-Nov-2016Dover ALS Safety Moment of the Week 21-Nov-2016
Dover ALS Safety Moment of the Week 21-Nov-2016
 
Peabody_Rigging_Program.ppt
Peabody_Rigging_Program.pptPeabody_Rigging_Program.ppt
Peabody_Rigging_Program.ppt
 
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptx
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptxCHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptx
CHALLENGES AND CORRECTION OF MECHANICAL SEAL LEAK FULL CONTACT RING.pptx
 
Cpnstruction Joints.pptx
Cpnstruction Joints.pptxCpnstruction Joints.pptx
Cpnstruction Joints.pptx
 
How to unlock productivity savings in mining operations part 3 final_11.06.2017
How to unlock productivity savings in mining operations part 3 final_11.06.2017How to unlock productivity savings in mining operations part 3 final_11.06.2017
How to unlock productivity savings in mining operations part 3 final_11.06.2017
 
Practical aspects of PSC.ppt
Practical aspects of PSC.pptPractical aspects of PSC.ppt
Practical aspects of PSC.ppt
 
Relief Systems.pdf
Relief Systems.pdfRelief Systems.pdf
Relief Systems.pdf
 
Relief systems
Relief systemsRelief systems
Relief systems
 
Bolted joint design
Bolted joint designBolted joint design
Bolted joint design
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Packer failure

  • 1. Permanent Packer Failure Causes • Factors causing failures
  • 2. Permanent Packer Performance • Hoppman and Walker, PEI, May 1995 __________________________________ • Rating envelope - regions of stress • catastrophic failure - packer no longer able to maintain seal integrity • non-catastrophic - limit the ability of the packer to function as designed
  • 3.
  • 4. Packer Failure Causes • Body Collapse – ID of seal bore contacts OD of seal assembly – Caused by differential pressure above or below the packer, or by packer and tubing forces; or by a combination of the two. – Virtually all of the pressure and forces exerted on the packer are locked in by the slip system. The body remains collapsed even after the forces are removed.
  • 5. Packer Failure Causes • Body Collapse (continued) – Since pressures and forces are dependent on the cross- sectional area of the packing element, they are dependent on the casing ID. – Each size packer is used in a range of casing ID’s (weights) – As casing ID increases, the expansion of the packing element must be greater - adversely affects packer rating.
  • 6. Consequences of Body Collapse • Not a catastrophic failure (sealing not compromised) – often cannot remove seals from packer bore – Safe Operating Region - 3 on envelope
  • 7. Packer Failure Causes • Packing Element System Failure – failure of the element occurs when the element extrudes through the back-up system
  • 8. Packer Failure Causes • Causes of packing element failure – temperature of seal material exceeded – excess pressure on element causes extrusion – chemical attack (breakdown or softening) – gas permeation and sudden decompression causing blisters and seal ruptures – backup system failures – seal bore corrosion or erosion leaves sealing surface rough
  • 9.
  • 10. Consequences of Seal Failure • Catastrophic failure (sealing compromised) – seal is lost - leaks may cause other problems – often cannot remove seals from packer bore (baked, hardened, fused, etc.) – Safe Operating Region - 4 on envelope
  • 11. Packer Failure Causes • Pin collapse at the body/guide connection – like a body collapse, collapse of the pin connection at the lower connection with maximum deflection at the middel of the lower thread. – Differential pressure can occur when the seals are in a seal bore extension below packer or if a wireline plug is set in a nipple in the tailpipe. – Consequences - non-catastrophic – Region - 5 on envelope
  • 12.
  • 13. Packer Failure Causes • Body to Guide Failure – fails at thread relief or in thread itself. – Thread relief failure occurs when the yield strength of the body is exceeded. – Thread failure occurs when the tensile loads exceed the shear or bearing strength of the threads.
  • 14. Packer Failure Causes • Body to Guide Failure (continued) – Sources of the loads are pressure differential below the packer, packer-to-tubing tensile forces or a combination of the two. – If both forces are present, their effects are additive. • Failure is catastrophic - body becomes free to moveupward through the packer and the guide is free to fall downhole. • Safe Operating Region - 2
  • 15. Packer Failure Causes • Anchor Attachment Failure (failure of left hand square thread) – can occur only when a tubing anchor seal assembly is used. Tread can fail in the tread relief, in the tread, or due to swelling of box. – Thread relief fails when body tensile exceeded – Threads fail when bearing strength exceeded – Swelling occurs when elastic burst limit of the wall is exceeded
  • 16. Packer Failure Causes • Anchor Attachment Failure (continued) – Consequences - Failure in thread relief or threads is catastrophic - anchor seal pulls out of the packer - pressure integrity is lost. Most likely effect of a box swelling failure is loss of contact area between anchor and packer. If box swells to the point where anchor can pull out - the failure will be catastrophic. – Safe Operating Region - 1
  • 17. Packer Failure Causes • Body Lock Ring System Failure – The body lock ring fails when the stresses in the threads exceed the material shear or bearing strength in the ring or its supporting elements. – Consequences - body is free to float, even though slips continue to trap the packoff force. When pressure cycles - leads to reciprocation and wear on packing element - produces a leak. – No pressure cycle - no serious consequences. – Safe operating Limit - region 6.
  • 18. Packer Failure Causes • Bearing Failure – occurs with locator and anchor seal assemblies. – Bearing failure at contact of anchor/locator and packer occurs when compressive stress exceeds bearing strength of the material. – An added force may be stress in body and seal sub generated by radial component of the contact forces (this is caused strictly by compressive packer-to-tubing forces).
  • 19. Bearing Failure • Consequences – Generally, only result is deformation of the contact surface of each part. – In cases of extreme, high set-down loads, the seal assembly can be swaged into the bore or body of the packer. • Bearing failure is represented in the envelope as region 6
  • 20. Using The Packer Envelope in Well Design • Plot data from tubing movement and stress programs on a packer envelope to determine if the loads fall in the safe area during initial setting, production, stimulation and kill operations.
  • 21.
  • 22. Using The Packer Envelope in Well Design • The envelope can be used to determine optimum material for packer construction. • Check outer limits of the packer for it’s casing weight range. • All future operations must be accounted for in a permanent packer design. • Failure rate for permanent packers is less than 1%.