SlideShare a Scribd company logo
1 of 4
G H U L A M F A R E E D
G u l _ f a r i d @ h o t m a i l . c o m
A d d a M a c h h i a n W a l a ,
D i s t r i c t V e h a r i , P a k i s t a n
C e l l : + 9 2 3 0 8 4 9 4 7 2 6 0 , 0 3 3 6 7 2 0 2 5 0 2
Personal Detail
S/O Manzoor Ahmad
D.O.B 12th
Dec 1978
Passport # AV8972532
N.I.C # 36603-6929253-3
Nationality Pakistani
Marital Status Married
Religion Islam
Education
Intermediate
Govt. Degree College Vehari Multan Board Punjab
Matriculation
Govt. High School Machhian Wala Multan Board Punjab
Apprenticeship 3-Year Certificate
3-Year Certificate Program in Machinist from Govt. ATC, College road Town Ship Lahore through DDFC Pvt
Ltd. (2001~2004)
COMPUTER LITERACY
MS Office, Auto Cad (Object Layout & editing), MS Project, Primavera (P6-WBS, Activities & Resources)
Personal Statement
I would like to perform under challenging situations and in an utmost professional atmosphere and set standards
of Quality for my work that results from committed and control work strategies and teamwork.
Working Experience
15 Years’ experience in Mechanical manufacturing & construction Fields.
Professional Summary
POWER PLANT (QATAR)
OIL & GAS PLANT (QATAR)
Gas Plant (GTL) (QATAR)
Cement Plant (QATAR)
Oil & Gas Plant (Pakistan)
Gas Plant (Pakistan)
Cement Plant (Pakistan)
Industrial Projects (Pakistan)
Building projects (Pakistan)
Manufacturing jobs (Pakistan)
MAJOR RESPONSIBILITIES
• Prepares the bill of quantities and costs related to mechanical works from IFC & tender drawings,
specifications. (Piping, Equipment, tanks, structure, painting & insulation)
• Preparation of bill of quantity and Entry in project monitoring systems.
• To prepare cutting plans as per drawing & available material for procurement & production
departments
• Preparation of all types of mechanical FBOQ for invoice purpose.
• Preparation of Test Package.
• Spool Marking.
• Preparation of Extra Work all the discipline wise.
• Co-ordination all the matter of invoicing of discipline.
• Preparation invoices discipline wise.
• Co-ordination for technical issues with client, construction & design department.
• Co-ordination arrangement of material as per construction plans and site requirement.
• Coordinates with planning, purchasing, store & production departments regarding all material
related issues.
• Visit to the site for take actual dimensions & make as built of job
• Evaluates quotations obtained from different suppliers & subcontractors, ensures quantities and
specifications are in line with tender and projects specifications
• Performs material takeoff prior to the purchase requisitions for the projects and reports any
irregularities or discrepancies to the project management.
• Verified the sub-contractors final bill of quantities & invoices as per contract
• To prepare material check list for dispatch material.
• Record keeping as per ISO standards for audit proposes.
• Updating the filing system according to ISO-9000/90001 Procedures.
• Assists Planning and FEDC Manager in preparation of MRP.
• Prepares comprehensive work packages for field execution staff/ work front availability.
• Preparation the overall material consolidation through the system and provide the information to
discipline wise.
Working History
Projects
Azam Javed corpotation Pvt Ltd (From March - 2015 ~ todate)
Working as Sr. Mechanical Quantity Surveyor (Proposal & Planning).
ENGINEERING KINETICS Ltd (From May - 2013 ~Feb-2015)
1. ATTOCK REFNERY LIMITED (Rawalpindi - PAKISTAN)
Working as Mechanical Quantity Surveyor
2. MOL WELLHEAD PROJECT (KOHAT - PAKISTAN)
Working as Planning Engineer + Q.S (Piping, Equipments & Structure)
3. Working as Mech. Q.S + Planning Engineer (PROJECT SUPPORT GROUP IN HEAD
OFFICE)
JDW SUGER MILLS (SADIQABAD - PAKISTAN)
PHILIP MORRIS PAKISTAN (SAHIWAL - PAKISTAN)
UEPL, PRL & POL REFINERIES PAKISTAN
HI-TECH STORAGE TANKS LAHORE
ITTEHAD CHEMICALS LAHORE PAKISTAN
LAFARGE PAKISTAN CEMENT- PAKISTAN
Descon Qatar L.L.c (From Oct- 2009 to April-2013)
1- C IWPP Project (Desalination & Power Plant) - Ras Laffan Qatar.
Worked as Quantity Surveyor
2- Descon Head office (Doha Qatar).
Worked as Quantity Surveyor in Proposal Department
3- PLATEAU MAINTENANCE PROJECT (Ras Laffan Qatar)
Worked as Senior Quantity Surveyor
DDFC (PVT) LTD LAHORE PAKISTAN (From 1999 – Aug 2009)
Working with DDFC (Pvt) Ltd. (ASME “S” & “U” & “R” and “C” stamps certified & ISO 9001:2000
certified) at their Engineering Works Lahore, Pakistan.
DDFC PRODUCT: Fuel Gas Discharge Receiver, Universal Mixer, Oil Phase & Water Phase Vessels Gas
Buffer Vessels, Heat Exchanger, Storage Vessel, Instrument Gas Scrubber, 50 M Ton LPG Storage Tank,
Instrument Gas Scrubber, Waste Water Treatment Plants, Filter Separator & Boiler Jobs.
10 Years working experience in DDFC as a Trainee Technician to Project Coordinator. During this
period Fabrication of Structure, Boiler, Pressure Vessel, Tanks, & prepared BOQ, BOM. Estimation of Piping,
Pipe Supports, Structure and Tanks and also Estimate the project Consumables. Evaluate the site instructions
as per client requirement and Invoicing To client with back up Data base on monthly reporting.
RESPONSIBILITIES AS A PROJECT COORDINATOR
 To study Job Order regarding Scope of Work & other measures.
 To prepare cutting plans as per drawing and available material.
 To prepare activity plan & weakly progress containing all Projects.
 To prepare bill of material as per drawing.
 To Make Progress Curves.
 To prepare Material Hold-up report for monitoring of Job flow at its full.
 To prepare different planning report, i.e. summary of PPC reports.
 To prepare project schedule / plans at start of project, as per requirement & resources availability.
 To prepare activity plans, update the weakly progress.
 To prepare different planning report i.e. summary of PPC reports.
 To prepare material check list / material requirement & resources planning.
 To prepare job closing summery reports.
 To monitor the progress of running jobs and identify required material for smooth flow of product
manufacturing.
Mech Q.S.

More Related Content

What's hot (20)

RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Mechanical engineer
Mechanical engineerMechanical engineer
Mechanical engineer
 
JD CV 08022015_R
JD CV 08022015_RJD CV 08022015_R
JD CV 08022015_R
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
CV (2)
CV (2)CV (2)
CV (2)
 
CV Shahzad Ahmed
CV Shahzad AhmedCV Shahzad Ahmed
CV Shahzad Ahmed
 
TONEY GASCO CV updated
TONEY GASCO CV updatedTONEY GASCO CV updated
TONEY GASCO CV updated
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 

Viewers also liked

Viewers also liked (16)

PJ Gives Back Best Practices - Chicago
PJ Gives Back Best Practices - ChicagoPJ Gives Back Best Practices - Chicago
PJ Gives Back Best Practices - Chicago
 
Онищенко Павла
Онищенко ПавлаОнищенко Павла
Онищенко Павла
 
File45420
File45420File45420
File45420
 
презентація
презентаціяпрезентація
презентація
 
balance turistico comunitat valencciana 2015
balance turistico comunitat valencciana 2015balance turistico comunitat valencciana 2015
balance turistico comunitat valencciana 2015
 
лялька
лялькалялька
лялька
 
Hebreo para principiantes
Hebreo para principiantesHebreo para principiantes
Hebreo para principiantes
 
Español 2
Español  2Español  2
Español 2
 
Sigue a Jesús, honrando al Padre, a la manera de Jesús
Sigue a Jesús, honrando al Padre, a la manera de JesúsSigue a Jesús, honrando al Padre, a la manera de Jesús
Sigue a Jesús, honrando al Padre, a la manera de Jesús
 
practical geometry
practical geometrypractical geometry
practical geometry
 
Respuestas a mis amigos católicos
Respuestas a mis amigos católicosRespuestas a mis amigos católicos
Respuestas a mis amigos católicos
 
Clarificación y clasificación de los valores
Clarificación y clasificación de los valoresClarificación y clasificación de los valores
Clarificación y clasificación de los valores
 
Data communication
Data communicationData communication
Data communication
 
Normas Internacionales de Contabilidad en Colombia
Normas Internacionales de Contabilidad en ColombiaNormas Internacionales de Contabilidad en Colombia
Normas Internacionales de Contabilidad en Colombia
 
Huesos del cráneo
Huesos del cráneoHuesos del cráneo
Huesos del cráneo
 
Discurso de xv
Discurso de xvDiscurso de xv
Discurso de xv
 

Similar to Mech Q.S.

Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
PROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGHPROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGHManpreet Singh
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineerKaran Vinayak
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDFsaddam abas
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghushashi tr
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubairZubair Noor
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. ZubairZubair Noor
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 

Similar to Mech Q.S. (20)

BASEEM
BASEEMBASEEM
BASEEM
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Resume
ResumeResume
Resume
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Project Controller
Project ControllerProject Controller
Project Controller
 
PROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGHPROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGH
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
khawar Resume
khawar Resumekhawar Resume
khawar Resume
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
MUHAMMAD JAVED
MUHAMMAD JAVEDMUHAMMAD JAVED
MUHAMMAD JAVED
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Resume
ResumeResume
Resume
 
RESUME_31-Oct-16
RESUME_31-Oct-16RESUME_31-Oct-16
RESUME_31-Oct-16
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 

Mech Q.S.

  • 1. G H U L A M F A R E E D G u l _ f a r i d @ h o t m a i l . c o m A d d a M a c h h i a n W a l a , D i s t r i c t V e h a r i , P a k i s t a n C e l l : + 9 2 3 0 8 4 9 4 7 2 6 0 , 0 3 3 6 7 2 0 2 5 0 2 Personal Detail S/O Manzoor Ahmad D.O.B 12th Dec 1978 Passport # AV8972532 N.I.C # 36603-6929253-3 Nationality Pakistani Marital Status Married Religion Islam Education Intermediate Govt. Degree College Vehari Multan Board Punjab Matriculation Govt. High School Machhian Wala Multan Board Punjab Apprenticeship 3-Year Certificate 3-Year Certificate Program in Machinist from Govt. ATC, College road Town Ship Lahore through DDFC Pvt Ltd. (2001~2004) COMPUTER LITERACY MS Office, Auto Cad (Object Layout & editing), MS Project, Primavera (P6-WBS, Activities & Resources) Personal Statement I would like to perform under challenging situations and in an utmost professional atmosphere and set standards of Quality for my work that results from committed and control work strategies and teamwork. Working Experience 15 Years’ experience in Mechanical manufacturing & construction Fields. Professional Summary POWER PLANT (QATAR) OIL & GAS PLANT (QATAR) Gas Plant (GTL) (QATAR) Cement Plant (QATAR) Oil & Gas Plant (Pakistan) Gas Plant (Pakistan) Cement Plant (Pakistan) Industrial Projects (Pakistan) Building projects (Pakistan) Manufacturing jobs (Pakistan) MAJOR RESPONSIBILITIES • Prepares the bill of quantities and costs related to mechanical works from IFC & tender drawings, specifications. (Piping, Equipment, tanks, structure, painting & insulation) • Preparation of bill of quantity and Entry in project monitoring systems. • To prepare cutting plans as per drawing & available material for procurement & production departments
  • 2. • Preparation of all types of mechanical FBOQ for invoice purpose. • Preparation of Test Package. • Spool Marking. • Preparation of Extra Work all the discipline wise. • Co-ordination all the matter of invoicing of discipline. • Preparation invoices discipline wise. • Co-ordination for technical issues with client, construction & design department. • Co-ordination arrangement of material as per construction plans and site requirement. • Coordinates with planning, purchasing, store & production departments regarding all material related issues. • Visit to the site for take actual dimensions & make as built of job • Evaluates quotations obtained from different suppliers & subcontractors, ensures quantities and specifications are in line with tender and projects specifications • Performs material takeoff prior to the purchase requisitions for the projects and reports any irregularities or discrepancies to the project management. • Verified the sub-contractors final bill of quantities & invoices as per contract • To prepare material check list for dispatch material. • Record keeping as per ISO standards for audit proposes. • Updating the filing system according to ISO-9000/90001 Procedures. • Assists Planning and FEDC Manager in preparation of MRP. • Prepares comprehensive work packages for field execution staff/ work front availability. • Preparation the overall material consolidation through the system and provide the information to discipline wise. Working History Projects Azam Javed corpotation Pvt Ltd (From March - 2015 ~ todate) Working as Sr. Mechanical Quantity Surveyor (Proposal & Planning). ENGINEERING KINETICS Ltd (From May - 2013 ~Feb-2015) 1. ATTOCK REFNERY LIMITED (Rawalpindi - PAKISTAN) Working as Mechanical Quantity Surveyor 2. MOL WELLHEAD PROJECT (KOHAT - PAKISTAN) Working as Planning Engineer + Q.S (Piping, Equipments & Structure) 3. Working as Mech. Q.S + Planning Engineer (PROJECT SUPPORT GROUP IN HEAD OFFICE) JDW SUGER MILLS (SADIQABAD - PAKISTAN) PHILIP MORRIS PAKISTAN (SAHIWAL - PAKISTAN) UEPL, PRL & POL REFINERIES PAKISTAN HI-TECH STORAGE TANKS LAHORE ITTEHAD CHEMICALS LAHORE PAKISTAN LAFARGE PAKISTAN CEMENT- PAKISTAN Descon Qatar L.L.c (From Oct- 2009 to April-2013) 1- C IWPP Project (Desalination & Power Plant) - Ras Laffan Qatar. Worked as Quantity Surveyor
  • 3. 2- Descon Head office (Doha Qatar). Worked as Quantity Surveyor in Proposal Department 3- PLATEAU MAINTENANCE PROJECT (Ras Laffan Qatar) Worked as Senior Quantity Surveyor DDFC (PVT) LTD LAHORE PAKISTAN (From 1999 – Aug 2009) Working with DDFC (Pvt) Ltd. (ASME “S” & “U” & “R” and “C” stamps certified & ISO 9001:2000 certified) at their Engineering Works Lahore, Pakistan. DDFC PRODUCT: Fuel Gas Discharge Receiver, Universal Mixer, Oil Phase & Water Phase Vessels Gas Buffer Vessels, Heat Exchanger, Storage Vessel, Instrument Gas Scrubber, 50 M Ton LPG Storage Tank, Instrument Gas Scrubber, Waste Water Treatment Plants, Filter Separator & Boiler Jobs. 10 Years working experience in DDFC as a Trainee Technician to Project Coordinator. During this period Fabrication of Structure, Boiler, Pressure Vessel, Tanks, & prepared BOQ, BOM. Estimation of Piping, Pipe Supports, Structure and Tanks and also Estimate the project Consumables. Evaluate the site instructions as per client requirement and Invoicing To client with back up Data base on monthly reporting. RESPONSIBILITIES AS A PROJECT COORDINATOR  To study Job Order regarding Scope of Work & other measures.  To prepare cutting plans as per drawing and available material.  To prepare activity plan & weakly progress containing all Projects.  To prepare bill of material as per drawing.  To Make Progress Curves.  To prepare Material Hold-up report for monitoring of Job flow at its full.  To prepare different planning report, i.e. summary of PPC reports.  To prepare project schedule / plans at start of project, as per requirement & resources availability.  To prepare activity plans, update the weakly progress.  To prepare different planning report i.e. summary of PPC reports.  To prepare material check list / material requirement & resources planning.  To prepare job closing summery reports.  To monitor the progress of running jobs and identify required material for smooth flow of product manufacturing.