This document provides a summary of Gulam Farid's personal and professional details. It includes his contact information, education history, computer skills, work experience, and responsibilities. Some key points:
- Gulam Farid is from Pakistan and has over 15 years of experience in mechanical manufacturing and construction fields.
- He has a 3-year certificate in machinist work and education includes intermediate and matriculation degrees.
- Work experience includes projects in Qatar and Pakistan in various industries like oil/gas, cement, and more.
- Responsibilities have involved preparing bills of quantities, coordinating materials, planning, and project coordination.
1. G H U L A M F A R E E D
G u l _ f a r i d @ h o t m a i l . c o m
A d d a M a c h h i a n W a l a ,
D i s t r i c t V e h a r i , P a k i s t a n
C e l l : + 9 2 3 0 8 4 9 4 7 2 6 0 , 0 3 3 6 7 2 0 2 5 0 2
Personal Detail
S/O Manzoor Ahmad
D.O.B 12th
Dec 1978
Passport # AV8972532
N.I.C # 36603-6929253-3
Nationality Pakistani
Marital Status Married
Religion Islam
Education
Intermediate
Govt. Degree College Vehari Multan Board Punjab
Matriculation
Govt. High School Machhian Wala Multan Board Punjab
Apprenticeship 3-Year Certificate
3-Year Certificate Program in Machinist from Govt. ATC, College road Town Ship Lahore through DDFC Pvt
Ltd. (2001~2004)
COMPUTER LITERACY
MS Office, Auto Cad (Object Layout & editing), MS Project, Primavera (P6-WBS, Activities & Resources)
Personal Statement
I would like to perform under challenging situations and in an utmost professional atmosphere and set standards
of Quality for my work that results from committed and control work strategies and teamwork.
Working Experience
15 Years’ experience in Mechanical manufacturing & construction Fields.
Professional Summary
POWER PLANT (QATAR)
OIL & GAS PLANT (QATAR)
Gas Plant (GTL) (QATAR)
Cement Plant (QATAR)
Oil & Gas Plant (Pakistan)
Gas Plant (Pakistan)
Cement Plant (Pakistan)
Industrial Projects (Pakistan)
Building projects (Pakistan)
Manufacturing jobs (Pakistan)
MAJOR RESPONSIBILITIES
• Prepares the bill of quantities and costs related to mechanical works from IFC & tender drawings,
specifications. (Piping, Equipment, tanks, structure, painting & insulation)
• Preparation of bill of quantity and Entry in project monitoring systems.
• To prepare cutting plans as per drawing & available material for procurement & production
departments
2. • Preparation of all types of mechanical FBOQ for invoice purpose.
• Preparation of Test Package.
• Spool Marking.
• Preparation of Extra Work all the discipline wise.
• Co-ordination all the matter of invoicing of discipline.
• Preparation invoices discipline wise.
• Co-ordination for technical issues with client, construction & design department.
• Co-ordination arrangement of material as per construction plans and site requirement.
• Coordinates with planning, purchasing, store & production departments regarding all material
related issues.
• Visit to the site for take actual dimensions & make as built of job
• Evaluates quotations obtained from different suppliers & subcontractors, ensures quantities and
specifications are in line with tender and projects specifications
• Performs material takeoff prior to the purchase requisitions for the projects and reports any
irregularities or discrepancies to the project management.
• Verified the sub-contractors final bill of quantities & invoices as per contract
• To prepare material check list for dispatch material.
• Record keeping as per ISO standards for audit proposes.
• Updating the filing system according to ISO-9000/90001 Procedures.
• Assists Planning and FEDC Manager in preparation of MRP.
• Prepares comprehensive work packages for field execution staff/ work front availability.
• Preparation the overall material consolidation through the system and provide the information to
discipline wise.
Working History
Projects
Azam Javed corpotation Pvt Ltd (From March - 2015 ~ todate)
Working as Sr. Mechanical Quantity Surveyor (Proposal & Planning).
ENGINEERING KINETICS Ltd (From May - 2013 ~Feb-2015)
1. ATTOCK REFNERY LIMITED (Rawalpindi - PAKISTAN)
Working as Mechanical Quantity Surveyor
2. MOL WELLHEAD PROJECT (KOHAT - PAKISTAN)
Working as Planning Engineer + Q.S (Piping, Equipments & Structure)
3. Working as Mech. Q.S + Planning Engineer (PROJECT SUPPORT GROUP IN HEAD
OFFICE)
JDW SUGER MILLS (SADIQABAD - PAKISTAN)
PHILIP MORRIS PAKISTAN (SAHIWAL - PAKISTAN)
UEPL, PRL & POL REFINERIES PAKISTAN
HI-TECH STORAGE TANKS LAHORE
ITTEHAD CHEMICALS LAHORE PAKISTAN
LAFARGE PAKISTAN CEMENT- PAKISTAN
Descon Qatar L.L.c (From Oct- 2009 to April-2013)
1- C IWPP Project (Desalination & Power Plant) - Ras Laffan Qatar.
Worked as Quantity Surveyor
3. 2- Descon Head office (Doha Qatar).
Worked as Quantity Surveyor in Proposal Department
3- PLATEAU MAINTENANCE PROJECT (Ras Laffan Qatar)
Worked as Senior Quantity Surveyor
DDFC (PVT) LTD LAHORE PAKISTAN (From 1999 – Aug 2009)
Working with DDFC (Pvt) Ltd. (ASME “S” & “U” & “R” and “C” stamps certified & ISO 9001:2000
certified) at their Engineering Works Lahore, Pakistan.
DDFC PRODUCT: Fuel Gas Discharge Receiver, Universal Mixer, Oil Phase & Water Phase Vessels Gas
Buffer Vessels, Heat Exchanger, Storage Vessel, Instrument Gas Scrubber, 50 M Ton LPG Storage Tank,
Instrument Gas Scrubber, Waste Water Treatment Plants, Filter Separator & Boiler Jobs.
10 Years working experience in DDFC as a Trainee Technician to Project Coordinator. During this
period Fabrication of Structure, Boiler, Pressure Vessel, Tanks, & prepared BOQ, BOM. Estimation of Piping,
Pipe Supports, Structure and Tanks and also Estimate the project Consumables. Evaluate the site instructions
as per client requirement and Invoicing To client with back up Data base on monthly reporting.
RESPONSIBILITIES AS A PROJECT COORDINATOR
To study Job Order regarding Scope of Work & other measures.
To prepare cutting plans as per drawing and available material.
To prepare activity plan & weakly progress containing all Projects.
To prepare bill of material as per drawing.
To Make Progress Curves.
To prepare Material Hold-up report for monitoring of Job flow at its full.
To prepare different planning report, i.e. summary of PPC reports.
To prepare project schedule / plans at start of project, as per requirement & resources availability.
To prepare activity plans, update the weakly progress.
To prepare different planning report i.e. summary of PPC reports.
To prepare material check list / material requirement & resources planning.
To prepare job closing summery reports.
To monitor the progress of running jobs and identify required material for smooth flow of product
manufacturing.