Arctic power grid development 
– issues and opportunities 
Auke Lont, CEO Statnett 
Northern Lights Corridor Seminar, 26th...
The role of Statnett 
The future is electric 
2 
Owner of high voltage grid 
• Operator 
• Maintenance 
• Construction 
Sy...
Responsible for a stable and 
secure power supply 
• Statnett operating about 
11.000 km of high-voltage 
power lines, 150...
Statnett has been through huge 
changes 
Increased utilisation 
The future is electric 
Elhub, AMS (advanced meter- and 
s...
Our strategy 2014-2018 
The future is electric 
Safe and efficient operations 
We will help developing next 
generation po...
Massive investments in the power 
sector 2010-2025 
Statnett's ongoing projects Historic and expected investments in gener...
More than tripled investment level 
since 2010 
The future is electric 
7 
p 
mill.kr 
p 
Employees Investments
We are active in the Northern area 
• Ofoten-Balsfjord 
• Ongoing constructions 
• Cost estimate 3200-3700 MNOK 
• Balsfjo...
The future is electric 
Bardufoss 
Kvandal 
Ofoten 
Construction starts 
when the industry 
sees need for new 
capacity an...
Grid layout after Ofoten-Skaidi 
The future is electric 
10 
Red = 420 kV 
Green = 220 kV 
Black = 132 kV 
Blue = 110 kV.
Extensive plans and large potential for 
increased consumption and production 
The future is electric 
11 
Eastern Finnmar...
Scenarios for consumption 
development in Finnmark 
800 
700 
600 
500 
400 
300 
200 
100 
The future is electric 
12 
0 ...
Concept selection study in the 
North 
The future is electric 
Red = 420 kV 
Green = 220 kV 
Black = 132 kV 
Blue = 110 kV...
A process involving both internal 
analysis and external interested parties 
• To ensure that we find the right concept to...
The concept selection 
study (KVU north) will be 
our compass for further 
development 
Identify 
demand 
The future is el...
Strategic supplier development 
Line 
2007 2016 
field/y 
Station 
field/y C 
2007 2016 
The future is electric 
EPC 
Incr...
Statnett arranges for local creation 
of value 
• We normally use 15-25 % of total costs on local 
deliverances and servic...
Contractor arrangement August 
2015 
• Related to our Balsfjord-Skaidi project, we will have a 
contractor arrangement in ...
uncertain, but 
The future is electric 
The future is electric 
19 
Statnett's power gird development in 
the artic area: ...
You’ve finished this document.
Download and read it offline.
Upcoming SlideShare
Brandscapes Youth Connect_A Global Study
Next
Upcoming SlideShare
Brandscapes Youth Connect_A Global Study
Next
Download to read offline and view in fullscreen.

1

Share

Presentation by Mr Auke Lont Statnett Norge at #NLC Olos 26.11.2014

Download to read offline

Norjan valtion verkkoyhtiön pääjohtaja Auke Lontin puheenvuoro #NLC3 -seminaarissa Olos Polar Centerissä 26.11.2014.

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all

Presentation by Mr Auke Lont Statnett Norge at #NLC Olos 26.11.2014

  1. 1. Arctic power grid development – issues and opportunities Auke Lont, CEO Statnett Northern Lights Corridor Seminar, 26th November 2014
  2. 2. The role of Statnett The future is electric 2 Owner of high voltage grid • Operator • Maintenance • Construction System operator • Maintain balance between generation and consumption • Security of supply
  3. 3. Responsible for a stable and secure power supply • Statnett operating about 11.000 km of high-voltage power lines, 150 stations and 4 HVDC interconnections • Responsible for maintaining balance between supply and demand at any time • Security of supply reliability: 99,96 % • Max production: 26.167 MW • ≈ 100 % renewable The future is electric A service provider with duty to connect 3
  4. 4. Statnett has been through huge changes Increased utilisation The future is electric Elhub, AMS (advanced meter- and steering system) and fast changes in technology Increased efficiency 2009 2012 2013 2014 2015 2016 2017 2018 4 Increased capacity Third energy package – Statnett have to acquire the last parts of the central grid in Norway 1990 2005 2025 Increased costs. Increased external requests on focus on cost efficiency. Safe and efficient operation
  5. 5. Our strategy 2014-2018 The future is electric Safe and efficient operations We will help developing next generation power system In 2018, Statnett will be a safe, efficient and attractive company, which owns and operate all central grid in Norway
  6. 6. Massive investments in the power sector 2010-2025 Statnett's ongoing projects Historic and expected investments in generation, The future is electric transmission, distribution 30 25 20 15 10 5 Our annual investments: 5.000-7.000 MNOK 160 150 140 130 120 110 100 90 80 70 60 0 TWh x 1000 MNOK Generation Distribution Transmission Consumption(TWh) 6
  7. 7. More than tripled investment level since 2010 The future is electric 7 p mill.kr p Employees Investments
  8. 8. We are active in the Northern area • Ofoten-Balsfjord • Ongoing constructions • Cost estimate 3200-3700 MNOK • Balsfjord-Skaidi • Investment decided September 2014 • Cost estimate 4000-6000 MNOK • Concession expected in 2015 • Skaidi-Hammerfest • Awaiting concession from the Government • Realization depended on petroleum industry • Other reinvestments and stations works The future is electric 8
  9. 9. The future is electric Bardufoss Kvandal Ofoten Construction starts when the industry sees need for new capacity and increased Balsfjord Hammerfest Alta Skaidi Step 1: Started construction in 2014 Step 3: security of supply Step 2: Development adapted to the development of the demand Ofoten-Balsfjord- Skaidi-(Hammerfest) 420 kV 9
  10. 10. Grid layout after Ofoten-Skaidi The future is electric 10 Red = 420 kV Green = 220 kV Black = 132 kV Blue = 110 kV.
  11. 11. Extensive plans and large potential for increased consumption and production The future is electric 11 Eastern Finnmark Oil- and mining industry. Wind power Further demand growth depends on new oil field discoveries Specific plans for new wind power, large potential for further development Grid operates close to capacity limit both summer and winter. Satisfactory security of supply when Finland line is operational Western Finnmark Oil- and mining industry. Wind power Expect strained operating conditions after 2014 due to demand growth and weak existing grid
  12. 12. Scenarios for consumption development in Finnmark 800 700 600 500 400 300 200 100 The future is electric 12 0 2014 2019 2024 2029 2034 2039 2044 2049 MW Change in consumption in Finnmark Electrification of all new oil fields, all mines and ports Gas pipe line to Hammerfest Likely projects N-1 with Balsfjord- Skaidi Certain (Goliat) Current max consumption: 300-350 MW
  13. 13. Concept selection study in the North The future is electric Red = 420 kV Green = 220 kV Black = 132 kV Blue = 110 kV 13 • Unsure demand side development • A broad involvement and political anchoring is necessary • Analysis completes in 2015
  14. 14. A process involving both internal analysis and external interested parties • To ensure that we find the right concept to meet future demand and obtain acceptance, we will, in addition to our own analysis, discuss the analysis externally Technical Knowledge base assessments The future is electric Concept selection study • Assessment of the needs • Objectives & framework • Feasibility study • Analysis of alternatives • Establish guidelines for the project phase • Condition of existing stations and lines • Feasibility of upgrading and rebuilding • Assessment of new corridors • Knowledge based on internal and external analyses • Datasets for several models for current system and expected development • Experience from operations and markets
  15. 15. The concept selection study (KVU north) will be our compass for further development Identify demand The future is electric Choice of concept Application for concession Kick off 16th December KVU finished in 2015 Political process 15
  16. 16. Strategic supplier development Line 2007 2016 field/y Station field/y C 2007 2016 The future is electric EPC Increased outsourcing 300 km/y 20 km/y Several contractors Sima-Samnanger
  17. 17. Statnett arranges for local creation of value • We normally use 15-25 % of total costs on local deliverances and services for our line and station projects. • We give local business opportunities through our projects: • SHA-training • Information meetings • Facilitating cooperation between suppliers The future is electric 17 Ground works and concrete Office, storage, accommodation and food Transport Forest cleaning and road
  18. 18. Contractor arrangement August 2015 • Related to our Balsfjord-Skaidi project, we will have a contractor arrangement in August next year • Both large and local contractors and supplier can participate The future is electric From speed dating with large international and local suppliers in Tromsø 18th June 2013 18
  19. 19. uncertain, but The future is electric The future is electric 19 Statnett's power gird development in the artic area: • Ongoing project: Ofoten-Balsfjord, 3200-3700 MNOK • Planned start 2015: Balsfjord-Skaidi, 4000-6000 MNOK, with local suppliers • Concept selection study for further development in the North in 2015
  • PinkiDebnath1

    Apr. 29, 2019

Norjan valtion verkkoyhtiön pääjohtaja Auke Lontin puheenvuoro #NLC3 -seminaarissa Olos Polar Centerissä 26.11.2014.

Views

Total views

415

On Slideshare

0

From embeds

0

Number of embeds

30

Actions

Downloads

7

Shares

0

Comments

0

Likes

1

×