EMVT 12 september - Han van Asten - TenneT

  1. 1. Connect Offshore Wind 12 September 2013 ir. Han van Asten, Programma manager TenneT Rotterdam / Arnhem, 12 September 2013 Connect Offshore Wind 'Met EMVT op Zee'
  2. 2. Connect Offshore Wind 12 September 2013 Met EMVT op Zee: Connect Offshore Wind 2 • Introduction TenneT • Video Installation DolWin Alpha • TenneT Offshore Germany • Regulatory Framework & Licensing • Technology & Industry • Comparison Germany - Netherlands
  3. 3. Connect Offshore Wind 12 September 2013 3 About TenneT • TenneT is responsible for connecting electricity producers to the high-voltage grid • TenneT does not distinguish between different producers and is obligated by law to connect all parties to the grid Additional tasks • Maintaining the balance between electricity supply and demand (50 Hz) • Ensuring the security of supply • Importing and exporting electricity and maintaining the programme responsibility system
  4. 4. Connect Offshore Wind 12 September 2013 4 4 From • Stable, predictable (price-driven) energy generation • Maintenance and (limited) replacement • Focus on technology • Local markets, separate price zones • National focus and regulation To • Fluctuating (nature-driven) energy generation • Large-scale new construction • Technology and market • North-Western European market, price convergence • Grid planning and regulation at European level Radically changing role and tasks of TSOs New roles and tasks of TSOs
  5. 5. Connect Offshore Wind 12 September 2013 5 Two grid operators – One company As Europe’s first cross-border grid operator, TenneT has been safeguarding the security of supply in the Netherlands and large parts of Germany since 2009: • Management, maintenance and expansion of the transmission grid • Promoting integration of the European electricity market • Linking up offshore wind parks to the German grid 1) 220/380 kV grid 1998 2008 2009 2010 Electricity Act: TenneT acquires Dutch national electricity grid (220/380 kV) TenneT acquires Dutch national electricity grid (110/150 kV) E.ON Netz1) changes its name to transpower. TenneT acquires transpower and becomes first cross-border grid operator transpower becomes TenneT TSO 2000 E.ON Netz established
  6. 6. Connect Offshore Wind 12 September 2013 6 TenneT strategy 2002-2020 • Ensuring a continuous supply of electricity, any time and anywhere, 24 hours a day and seven days a week • Offering an excellent price/quality ratio • Responding to energy-related developments in society and contributing to the achievement of energy-related objectives • Actively promoting European market integration through targeted investments • Creating value for our shareholders ‘Strengthen & Build’ 2002- 2010 ‘Distribute & Store’ 2011-2020
  7. 7. Connect Offshore Wind 12 September 2013 TenneT key figures • Total grid length 20.392 km • Transformer substations 443 • No. of customers 36 million • Installed capacity 67,000 MW • No. of staff 2,293 • Customer satisfaction 7.9 • Interconnections 14 • Revenues 2012 EUR 1,8 billion
  8. 8. Connect Offshore Wind 12 September 2013 Installing DolWin Alpha 2,5 minute film 8
  9. 9. Connect Offshore Wind 12 September 2013 Developments Germany Energiewende ̵ Geopolitical arguments ̵ Renewable Energy Sources Atomausstieg Industry Policy Actuals: ̵ 32000 MW Solar ̵ 33000 MW Onshore Wind ̵ 400 MW Offshore Wind 9
  10. 10. Connect Offshore Wind 12 September 2013 13.000 MW Offshore Wind in 2022 Offshore goals of federal government until 2022: 13.000 MW in total, 11.000 MW to be connected by TenneT. 3 Offshore wind farms in operation, 28 licensed and more than 60 in the licensing process. With a fixed investment volume of approx. 6 billion Euro TenneT is largest Investor in the „Energiewende“ and provides connection capacity of 6.200 MW. 10
  11. 11. Connect Offshore Wind 12 September 2013 Connecting Offshore Wind -> 2022: 11000 MW -> 2030: 25000 MW 11
  12. 12. Connect Offshore Wind 12 September 2013 Comparison AC and DC Cost for transmission of energy 12 Cost [€] Distance [km] 50-100 km for cables 600-800 km for lines DC AC
  13. 13. Connect Offshore Wind 12 September 2013 A typical grid connection in German North Sea 13 Leistung: 800 Megawatt Kabellänge:165 km • an Land: 90 km • auf See: 75 km
  14. 14. Connect Offshore Wind 12 September 2013 Status Offshore Grid Connections in North Sea 14 Project Capacity (MW) 1) Expected PAC Contractor AC/DC Built / in Operation alpha ventus 60 2009 AC BorWin1 (West) 400 Q1/2014 ABB DC Under Construction / Awarded BorWin2 (West) 800 Q1/2015 Siemens Prysmian DC AC Dt. Bucht to BorWin2 xx Q4/2015 Prysmian AC DolWin1 (West) 800 Q1/2014 ABB DC DolWin2 (East) 900 Q1/2015 ABB DC DolWin3 900 Q3/2017 Alstom DC HelWin1 576 Q4/2014 Siemens/Prysmian DC HelWin2 690 Q1/2015 Siemens/Prysmian DC SylWin1 2) 864 Q3/2014 Siemens/Prysmian DC Riffgat 108 Q3/2013 NKT AC Nordergründe 111 Q3/2015 ABB AC ∑ Built / Awarded 6.209 PAC=Preliminary Acceptance Certificate (after trial operation) 1) Total grid connection capacity 2) According to the new legislation the remaining capacity of 288 MW was allocated by BNetzA to OWF Sandbank
  15. 15. Connect Offshore Wind 12 September 2013 TSO has obligation to connect OWF offshore 15 Offshore Wind Farm Grid connection (TSO) Investment trigger criteria by OWF for grid connection: 1. Permits awarded 2. Construction schedule 3. Soil investigation 4. Major contracts awarded & obliging financing of wind turbines Approx. 36 months Feed in by OWF t
  16. 16. Connect Offshore Wind 12 September 2013 Regulatory Framework: The business context is improving 16 Political-/Business context: Uncapped liabilities -> capped liabilities; ̵ enabling investors (ao Mitsubishi Corporation) Windfarm driven connections -> plan driven connections, ̵ A 10 year Offshore Netz Entwickelungs Plan) ONEP‘: September 22: elections ̵ 6200 MW connection, 2700 MW OWP FID ̵ Restructure Energiewende & EEG
  17. 17. Connect Offshore Wind 12 September 2013 Licensing is complex and takes time OWF: License by BSH (Bundesamt für Schifffahrt & Hydrographie TSO: BSH, PFV (Plan Feststellung Verfahren), BimSchG, private agreements All parties are learning 17
  18. 18. Connect Offshore Wind 12 September 2013 Technology & Industry, Cables and cable installation 18
  19. 19. Connect Offshore Wind 12 September 2013 Single core cable Double core cable Developments Cable MI cables up to 550 kV XLPE cables up to 320 kV (500 kV?) Depth of Burial 3 meter Cable production capacity 19
  20. 20. Connect Offshore Wind 12 September 2013 High Voltage Direct Current Converters 20
  21. 21. Connect Offshore Wind 12 September 2013 Grid Connection Options for OWF =~ =~ =~ =~ OWF Filter, compensation, etc. Filter, compensation, etc. Filter, compensation, etc. Filter, compensation, etc. OWFOWF Offshore Offshore Onshore Onshore AC-technology DC-technology 21
  22. 22. Connect Offshore Wind 12 September 2013 Developments HVDC VSC systems up to 600 kV Cables up to 500 kV 1500 MW in one connection DC switch / Transformer DC grids ̵ Offshore ̵ Super grid 22 North Sea Country Y North Sea country X Offshore Windfarm 1000 MW Cable 500 MW or 1500 MW Cable 500 MW or 1500 MW North Sea Country Y North Sea country X Offshore Windfarm 1000 MW Interconnector 1500 MW Business cases to be compared Maximise OEE
  23. 23. Connect Offshore Wind 12 September 2013 Offshore Platforms 23
  24. 24. Connect Offshore Wind 12 September 2013 24 BorWin alpha 400 MW: BorWin beta 800 MW: HelWin alpha 576 MW: HelWin beta 690 MW: DolWin alpha 800 MW: DolWin beta 900 MW: DolWin gamma 900 MW:SylWin alpha 864 MW:
  25. 25. Connect Offshore Wind 12 September 2013 Developments: standard platform 25 (LxBxH): 82,7 x 56 x 26 m
  26. 26. Connect Offshore Wind 12 September 2013 Offshore Platforms 26
  27. 27. Connect Offshore Wind 12 September 2013 NL well positioned for offshore grid connections NL based industries active in German offshore grid connections: • Cable production (land) • Cable installation • Platform manufacturing • Platform installation • Consultancy And many others for OWF 27
  28. 28. Connect Offshore Wind 12 September 2013 Comparison Offshore Wind in NL vs D 28 NL D Ambition 2022 4450 MW 11000 MW Ambition 2030 10000 (?) MW 25000 MW Operational 228 MW 460 MW Awarded (expressed in connection capacity) 958 MW 6200 MW Connection TSO Onshore (??) Offshore
  29. 29. Connect Offshore Wind 12 September 2013 Grids connect production with consumption 29 Grid = offshore and onshore D: onshore grid to be reinforced NL: offshore wind can be close to load
  30. 30. Connect Offshore Wind 12 September 2013 Experiences to be taken into account: Regulatory framework & Licenses • Balanced regulatory framework (liabilities, financing) • Focus offshore and onshore • Long lead times for licenses onshore • Planned development Technology & Industry • New technologies in HV grids • New combinations of technologies/suppliers • Planned development, Standardisation • Supply chains to be built up 30
  31. 31. Connect Offshore Wind 12 September 2013 Energie akkoord promising for Offshore Wind TenneT experience available for Dutch Offshore wind connections 31
  32. 32. TenneT is Europe’s first cross-border grid operator for electricity. With approximately 20,000 kilometres of (Extra) High Voltage lines and 36 million end users in the Netherlands and Germany we rank among the top five grid operators in Europe. Our focus is to develop a north-west European energy market and to integrate renewable energy. www.tennet.eu Taking power further Dank voor uw aandacht

×