IMPLEMENTATION AND
MAINTENANCE OF BSS SYSTEM FOR
GSM CDMA AND 3G
Presented By:
K Mathew Shilling Jose
TM1514311(BITM)
Company Information
 An Indian broadband and telecommunication service provider based in Mumbai, Maharashtra, India.
 Tata DOCOMO arises out of the Tata Group’s strategic alliance with Japanese telecom major NTT
DOCOMO in November 2008.
 The company has been rated as the no. 1 wireless operator in terms of overall customer satisfaction
across Maharashtra (including Mumbai) and Goa, in surveys commissioned by the Telecom
Regulatory Authority of India (TRAI).
PRODUCT AND SERVICES OFFERED:-
 Tata DoCoMo CDMA
 Tata DoCoMo GSM
 Tata DoCoMo Walky
 Tata DoCoMo Photon
 Tata DoCoMo Internet
OBJECTIVE OF THE PROJECT
 The objective of the project is to Implement the BSS(Base station
subsystem) site and to maintain the same with Operation and
Transmission team.
 The Maintenance part is done using the Network Management Center
and Operation and maintenance center.
Project Overview
1. BASIC CONCEPTS OF BASE STATION SUBSYSTEM (BSS)
MS, Mobile Station
The mobile station is the device that is used by a subscriber in order to send and receive
traffic. The MS contains of the Mobile Equipment (ME), which can be a cellular phone or a
laptop equipped with a GSM card, and a Subscriber Identity Module (SIM) containing among
other things subscriber information.
BTS, Base Transceiver Station
The base transceiver station is the network node sending and receiving messages via the air
and contains therefore only functions that are related to radio and which must be located
closest to the radio interface, as channel coding and decryption for circuit switched traffic.
BSC, Base Station Controller
The base station controller is controlling one or more base transceiver stations. It also handles
functions related to the radio equipment, as channel allocation and administration to the
mobile station, handover procedures, paging, and sometimes also voice transcoding. (Some
vendors implement the transcoder in the base transceiver station instead.)
2. CONCEPT OF MAINTENANCE
NMC, Network Management Centre
The network management centre is controlling the GSM network and reporting transmission
problems.
OMC, Operation and Maintenance Centre
One operation and maintenance centre can control hundreds of network nodes within the
GSM network. It is sending alarming reports for different kinds of faults, as incorrect input.
After the understanding of the architectures theoretically, its practical application is
understood through the different computers used to control as well as monitor the various
sites to which the connectivity is provided by the company. The practical application
involve:
Working with the OMCR (Operation and Maintenance Centre Radio) to monitor the
BSS system by checking the alarms and investigating the different faults that have come up
at a particular site.
With the NMS (Network Management System) team to monitor transmission media and
transmission mux (multiplexers) and the troubleshooting of the faults.
With PNMS team to help monitor microwave media and the equipment failure (IDU and
ODU).
A clear understanding is achieved on visiting the cell sites or the service sites and
observing the troubleshooting techniques involved to solve the different issues that had
come to pass.
voltage, corrupt data signals etc.
IMPLEMENTATION OF BSS FLOW DIAGRAM
Process Flow Chart for Project Roll Out
AOP Site list Approved By Business team
Sites RF Survey and SAM Planning
Sites Loaded to
Different IPs for
Feasibility
NO
Yes
Not Feasible sites loaded to Build
As Anchor with BU approval
Service Order (SO ) Issued to IPs for
Feasible sites
Sites Declared Ready for Installation
(RFI ) by IPs
Sites Loaded in SMP portal for
Location ID creation
FAR ID and WBS is created in
SAP
Material Requisition (MR ) given
to WH Team
Material Dispatched
from WH to Site
EMFSite Installation and Integration
EMF Submission and SCFT
Site Declared RFS to Business
team
1. AOP Site list Approved By Business team
Analyzing the need for new sites
Business planning and decision making
Allocating fund
2. Sites RF Survey and SAM Planning
Survey for suitable place
SAM PLANNING-giving unique ID
3.Sites Loaded to Different IPs for Feasibility
Approaching different infra providers such as
GTL
Indus tower
American tower
Unitech
Idea
4.Service Order (SO ) Issued to IPs for Feasible Sites
Selecting one of the infra provider based on the feasibility
Ordering and giving money for Ips
5. Tower or Pole
6. Sites Declared Ready for Installation (RFI ) by IPs
Indoor Site
Outdoor Site
Now a days 90% are outdoor sites (cost saving)
7. Sites Loaded in SMP portal for Location ID creation
Check whether Power Equipments is installed or not
ID creation
8. Tray and Duct
9. Line of sight survey-check nearest visible cell site
10. Material Requisition (MR ) given to WH Team
11. Material Dispatched from WH to Site
12. Site Installation and Integration
Installing as per specification , three sector antenna 0,120,240 to cover
entire 360 degree space. It may vary according to requirements.
Microwave antenna is checked and installed as per link budget.
Cell site Integration and commissioning(I&C).
13. EMF Submission and SCFT
Handover site for Sector Carrier and Functional Test (SCFT)
Drive test is done for SCFT.
For CDMA drive test done by checking all the parameters through software
agilent.
14.Site Declared RFS to Business team
Acceptance test to operation team.
Finally site is declared to business and marketing unit (sales team).
LINK BUDGET OF MICROWAVE HOP USING PATH LOSS
TOOL
MAINTENANCE OF BSS SYSTEM
Alarms Detected in Login Server
1. Network Management System
In this only ECI MUX will be visible others are unmanaged unit.
It is down mostly due to the fiber cut and if one fiber is degraded i.e. Only on the single fiber loss
is occured.
2. Passolink Network Management System
AIS –Alarm Indication Signal
At particular node issue occurs in the ring then you get a AIS alarm.
RDI-Radio Dual Interference
Optical fiber break, Optical interface to the OTR line is down, then the team goes and replace the fiber or
OTR. Finally they reset the IDU and check the service.
Line of Sight
Login the metering and check if the RX level is increased then align the microwave antenna in a proper
direction. So RX level will come to original.
Creation of building-occurence of interference
Interference
It occurs due to same frequency in this case the field engineers will go to area and
change the frequency in radio settings or put dummy frequency.
If it is not resolved yet then exchange the ODU with new ODU.
3. Operaton and Maintenance Center
VSWR-Voltage Standing Wave Ratio
It occurs due to loose connection between cable and BTS connectors
Sector High Temperature
This alarm occurs due to Fan module faulty
Sites visited by me: Alarm sign:
1. Pun_Moshi shanti Trade_iPASO 1.Green-stable,active or live
2. TalegaonMor_1472-Lake Parad_2405 2.Green slow blinking-live
3. Bhosari GBT—Parekh Engg 3.Green fast blinking-Communicating or
4. Parekh Engg—Bhosari GBT Downloading data
5. HDFC Colony 4.Amber-Warning alarm
6. Shahu Nagar 5.Red-Issue
7. Thermax—HDFC Colony 6.No LED-Equipment Faulty
LIMITATIONS
 The company was very supportive and helped me learn about everything
that they had to offer. Language was one of the main drawback for me to
understand few things in depth. And few things I missed out due to time
constraint are listed as follows.
 Call Scenario
 Call Establishment
 Call Setup
 Quality of Service
FINDINGS
 TATA’S CDMA- 2 BSC and 550 BTS
 TATA’S GSM- 7 BSC and 1200 BTS
 TATA’S 3G- 3 RNC and 1150 BTS
 Based on the TRx capaacity of BTS you can connect it to BSC.
 For Example,
If 7 BTS having 1100 TRx you can connect all 7 BTS to a single BSC of 1100 TRx capacity.
COMPARITIVE ANALYSIS
Advantage of New technology
 1. Number of E1 can be increased.
 2. Helps in improving the number of calls.
 3. Data connection can be given to many user from single device of 2mbps speed for each user.
 4. By combining 3 to 4 E1 we can give speed of 8mbps to a single user.
Disadvantage of New technology
 1. Replacing with New technology in all site will gives many unused E1 connection.
 2. High cost and manpower is needed.
RECOMMENDATION
 Complete visual inspection of the equipment and connections.
 Cleaning of filters, fans.
 Pre-monsoon checks.
 In the future while deploying the fiber cable make sure that it is not near or close to
the HT&LT electric cable MSEB, because when the optical cable contact with high
tension electric cable during lightening and thundering and the reverse voltage
produced in the cable will destroy the BTS.
 Few times fiber cable’s are installed through private area ,person from that area have
the rights to cut the fiber which is passing through his area. So it should be avoided.
 The labour’s working in the field should be properly trained in some case they cut
the wrong fiber unintentionally.
 New techonolgy should be installed only if it is needed.
Key Learnings
 How to build up a BSS site
 Clear knowledge about existing device and new devices
 Process of implementation of BSS
 Maintenance of BSS system
 How to overcome the issue created by Line of Sight
THANK YOU

More Related Content

What's hot

bsnl presentation on gsm
bsnl presentation on  gsm bsnl presentation on  gsm
bsnl presentation on gsm Kapil Masatker
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiataHasitha Neelaka
 
Bsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptBsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptAswinkumar R
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report fileAman singh
 
Report on Telecommunication
Report on TelecommunicationReport on Telecommunication
Report on TelecommunicationSonal Bansal
 
Bharat Sanchar Nigam Limited
Bharat Sanchar Nigam LimitedBharat Sanchar Nigam Limited
Bharat Sanchar Nigam LimitedSaurabh Kumar
 
Gsm & ewsd technology BY SATYENDRA SINGH RATHORE
Gsm & ewsd technology BY SATYENDRA SINGH RATHOREGsm & ewsd technology BY SATYENDRA SINGH RATHORE
Gsm & ewsd technology BY SATYENDRA SINGH RATHORESatyendra Singh Rathore
 
2 g modernization cluster acceptance report cluster 8
2 g modernization cluster acceptance report cluster 82 g modernization cluster acceptance report cluster 8
2 g modernization cluster acceptance report cluster 8Arwan Priatna
 
DESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORTDESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORTDeshbandhu Kumar
 
BSNL training report
BSNL training reportBSNL training report
BSNL training reportShubham Singh
 
Bsnl electronics training report
Bsnl electronics training reportBsnl electronics training report
Bsnl electronics training reportDeepak Bhati
 

What's hot (19)

3G basic good
3G basic good3G basic good
3G basic good
 
bsnl presentation on gsm
bsnl presentation on  gsm bsnl presentation on  gsm
bsnl presentation on gsm
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata
 
Bsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.pptBsnl ppt-by aswin.ppt
Bsnl ppt-by aswin.ppt
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report file
 
Report on Telecommunication
Report on TelecommunicationReport on Telecommunication
Report on Telecommunication
 
OCB 283
OCB 283OCB 283
OCB 283
 
Bsnl
BsnlBsnl
Bsnl
 
Bharat Sanchar Nigam Limited
Bharat Sanchar Nigam LimitedBharat Sanchar Nigam Limited
Bharat Sanchar Nigam Limited
 
Call_Drop
Call_DropCall_Drop
Call_Drop
 
Gsm & ewsd technology BY SATYENDRA SINGH RATHORE
Gsm & ewsd technology BY SATYENDRA SINGH RATHOREGsm & ewsd technology BY SATYENDRA SINGH RATHORE
Gsm & ewsd technology BY SATYENDRA SINGH RATHORE
 
2 g modernization cluster acceptance report cluster 8
2 g modernization cluster acceptance report cluster 82 g modernization cluster acceptance report cluster 8
2 g modernization cluster acceptance report cluster 8
 
DESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORTDESHBANDHU BSNL SUMMER TRAINING REPORT
DESHBANDHU BSNL SUMMER TRAINING REPORT
 
BSNL training report
BSNL training reportBSNL training report
BSNL training report
 
Telecommunication
TelecommunicationTelecommunication
Telecommunication
 
Bsnl electronics training report
Bsnl electronics training reportBsnl electronics training report
Bsnl electronics training report
 
Railnet
RailnetRailnet
Railnet
 
li-fi Bsnl final report
li-fi Bsnl final reportli-fi Bsnl final report
li-fi Bsnl final report
 

Similar to PROJECT 2016-2017

Similar to PROJECT 2016-2017 (20)

Final Presentation Divyansh Gupta
Final Presentation Divyansh GuptaFinal Presentation Divyansh Gupta
Final Presentation Divyansh Gupta
 
MSIP report
MSIP reportMSIP report
MSIP report
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Vaijanath resume Updated
Vaijanath resume UpdatedVaijanath resume Updated
Vaijanath resume Updated
 
VIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CVVIJAY GODERA_Technical _CV
VIJAY GODERA_Technical _CV
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
CV Hamed Sabbah
CV Hamed SabbahCV Hamed Sabbah
CV Hamed Sabbah
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
Bsnl best ppt
Bsnl best pptBsnl best ppt
Bsnl best ppt
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
BSNL training seminar ppt
BSNL training seminar pptBSNL training seminar ppt
BSNL training seminar ppt
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Abdul Rafay CV
Abdul Rafay CVAbdul Rafay CV
Abdul Rafay CV
 
Bsnl
BsnlBsnl
Bsnl
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Talha Ali
Talha AliTalha Ali
Talha Ali
 

PROJECT 2016-2017

  • 1. IMPLEMENTATION AND MAINTENANCE OF BSS SYSTEM FOR GSM CDMA AND 3G Presented By: K Mathew Shilling Jose TM1514311(BITM)
  • 2. Company Information  An Indian broadband and telecommunication service provider based in Mumbai, Maharashtra, India.  Tata DOCOMO arises out of the Tata Group’s strategic alliance with Japanese telecom major NTT DOCOMO in November 2008.  The company has been rated as the no. 1 wireless operator in terms of overall customer satisfaction across Maharashtra (including Mumbai) and Goa, in surveys commissioned by the Telecom Regulatory Authority of India (TRAI). PRODUCT AND SERVICES OFFERED:-  Tata DoCoMo CDMA  Tata DoCoMo GSM  Tata DoCoMo Walky  Tata DoCoMo Photon  Tata DoCoMo Internet
  • 3. OBJECTIVE OF THE PROJECT  The objective of the project is to Implement the BSS(Base station subsystem) site and to maintain the same with Operation and Transmission team.  The Maintenance part is done using the Network Management Center and Operation and maintenance center.
  • 4. Project Overview 1. BASIC CONCEPTS OF BASE STATION SUBSYSTEM (BSS) MS, Mobile Station The mobile station is the device that is used by a subscriber in order to send and receive traffic. The MS contains of the Mobile Equipment (ME), which can be a cellular phone or a laptop equipped with a GSM card, and a Subscriber Identity Module (SIM) containing among other things subscriber information. BTS, Base Transceiver Station The base transceiver station is the network node sending and receiving messages via the air and contains therefore only functions that are related to radio and which must be located closest to the radio interface, as channel coding and decryption for circuit switched traffic. BSC, Base Station Controller The base station controller is controlling one or more base transceiver stations. It also handles functions related to the radio equipment, as channel allocation and administration to the mobile station, handover procedures, paging, and sometimes also voice transcoding. (Some vendors implement the transcoder in the base transceiver station instead.)
  • 5. 2. CONCEPT OF MAINTENANCE NMC, Network Management Centre The network management centre is controlling the GSM network and reporting transmission problems. OMC, Operation and Maintenance Centre One operation and maintenance centre can control hundreds of network nodes within the GSM network. It is sending alarming reports for different kinds of faults, as incorrect input. After the understanding of the architectures theoretically, its practical application is understood through the different computers used to control as well as monitor the various sites to which the connectivity is provided by the company. The practical application involve: Working with the OMCR (Operation and Maintenance Centre Radio) to monitor the BSS system by checking the alarms and investigating the different faults that have come up at a particular site.
  • 6. With the NMS (Network Management System) team to monitor transmission media and transmission mux (multiplexers) and the troubleshooting of the faults. With PNMS team to help monitor microwave media and the equipment failure (IDU and ODU). A clear understanding is achieved on visiting the cell sites or the service sites and observing the troubleshooting techniques involved to solve the different issues that had come to pass. voltage, corrupt data signals etc.
  • 7. IMPLEMENTATION OF BSS FLOW DIAGRAM Process Flow Chart for Project Roll Out AOP Site list Approved By Business team Sites RF Survey and SAM Planning Sites Loaded to Different IPs for Feasibility NO Yes Not Feasible sites loaded to Build As Anchor with BU approval Service Order (SO ) Issued to IPs for Feasible sites Sites Declared Ready for Installation (RFI ) by IPs Sites Loaded in SMP portal for Location ID creation FAR ID and WBS is created in SAP Material Requisition (MR ) given to WH Team Material Dispatched from WH to Site EMFSite Installation and Integration EMF Submission and SCFT Site Declared RFS to Business team
  • 8. 1. AOP Site list Approved By Business team Analyzing the need for new sites Business planning and decision making Allocating fund 2. Sites RF Survey and SAM Planning Survey for suitable place SAM PLANNING-giving unique ID 3.Sites Loaded to Different IPs for Feasibility Approaching different infra providers such as GTL Indus tower American tower Unitech Idea
  • 9. 4.Service Order (SO ) Issued to IPs for Feasible Sites Selecting one of the infra provider based on the feasibility Ordering and giving money for Ips 5. Tower or Pole 6. Sites Declared Ready for Installation (RFI ) by IPs Indoor Site Outdoor Site Now a days 90% are outdoor sites (cost saving) 7. Sites Loaded in SMP portal for Location ID creation Check whether Power Equipments is installed or not ID creation
  • 10. 8. Tray and Duct 9. Line of sight survey-check nearest visible cell site 10. Material Requisition (MR ) given to WH Team 11. Material Dispatched from WH to Site 12. Site Installation and Integration Installing as per specification , three sector antenna 0,120,240 to cover entire 360 degree space. It may vary according to requirements. Microwave antenna is checked and installed as per link budget. Cell site Integration and commissioning(I&C).
  • 11. 13. EMF Submission and SCFT Handover site for Sector Carrier and Functional Test (SCFT) Drive test is done for SCFT. For CDMA drive test done by checking all the parameters through software agilent. 14.Site Declared RFS to Business team Acceptance test to operation team. Finally site is declared to business and marketing unit (sales team).
  • 12. LINK BUDGET OF MICROWAVE HOP USING PATH LOSS TOOL
  • 13. MAINTENANCE OF BSS SYSTEM Alarms Detected in Login Server 1. Network Management System In this only ECI MUX will be visible others are unmanaged unit. It is down mostly due to the fiber cut and if one fiber is degraded i.e. Only on the single fiber loss is occured.
  • 14. 2. Passolink Network Management System AIS –Alarm Indication Signal At particular node issue occurs in the ring then you get a AIS alarm. RDI-Radio Dual Interference Optical fiber break, Optical interface to the OTR line is down, then the team goes and replace the fiber or OTR. Finally they reset the IDU and check the service.
  • 15. Line of Sight Login the metering and check if the RX level is increased then align the microwave antenna in a proper direction. So RX level will come to original. Creation of building-occurence of interference
  • 16. Interference It occurs due to same frequency in this case the field engineers will go to area and change the frequency in radio settings or put dummy frequency. If it is not resolved yet then exchange the ODU with new ODU.
  • 17. 3. Operaton and Maintenance Center VSWR-Voltage Standing Wave Ratio It occurs due to loose connection between cable and BTS connectors Sector High Temperature This alarm occurs due to Fan module faulty Sites visited by me: Alarm sign: 1. Pun_Moshi shanti Trade_iPASO 1.Green-stable,active or live 2. TalegaonMor_1472-Lake Parad_2405 2.Green slow blinking-live 3. Bhosari GBT—Parekh Engg 3.Green fast blinking-Communicating or 4. Parekh Engg—Bhosari GBT Downloading data 5. HDFC Colony 4.Amber-Warning alarm 6. Shahu Nagar 5.Red-Issue 7. Thermax—HDFC Colony 6.No LED-Equipment Faulty
  • 18. LIMITATIONS  The company was very supportive and helped me learn about everything that they had to offer. Language was one of the main drawback for me to understand few things in depth. And few things I missed out due to time constraint are listed as follows.  Call Scenario  Call Establishment  Call Setup  Quality of Service
  • 19. FINDINGS  TATA’S CDMA- 2 BSC and 550 BTS  TATA’S GSM- 7 BSC and 1200 BTS  TATA’S 3G- 3 RNC and 1150 BTS  Based on the TRx capaacity of BTS you can connect it to BSC.  For Example, If 7 BTS having 1100 TRx you can connect all 7 BTS to a single BSC of 1100 TRx capacity. COMPARITIVE ANALYSIS Advantage of New technology  1. Number of E1 can be increased.  2. Helps in improving the number of calls.  3. Data connection can be given to many user from single device of 2mbps speed for each user.  4. By combining 3 to 4 E1 we can give speed of 8mbps to a single user. Disadvantage of New technology  1. Replacing with New technology in all site will gives many unused E1 connection.  2. High cost and manpower is needed.
  • 20. RECOMMENDATION  Complete visual inspection of the equipment and connections.  Cleaning of filters, fans.  Pre-monsoon checks.  In the future while deploying the fiber cable make sure that it is not near or close to the HT&LT electric cable MSEB, because when the optical cable contact with high tension electric cable during lightening and thundering and the reverse voltage produced in the cable will destroy the BTS.  Few times fiber cable’s are installed through private area ,person from that area have the rights to cut the fiber which is passing through his area. So it should be avoided.  The labour’s working in the field should be properly trained in some case they cut the wrong fiber unintentionally.  New techonolgy should be installed only if it is needed.
  • 21. Key Learnings  How to build up a BSS site  Clear knowledge about existing device and new devices  Process of implementation of BSS  Maintenance of BSS system  How to overcome the issue created by Line of Sight