Request for Expression of Interest
Africa Renewable Energy Fund
EPC assignments for Kikagati Hydro Power Project, Uganda
1. Berkeley Energy (http://www.berkeley-energy.com) is a renewable energy investment manager that invests in
Asian and African emerging markets. Berkeley Energy currently manages the Africa Renewable Energy Fund
(“AREF”). AREF is a USD $200m fund (final close in Q32015) corner stoned by the African Development Bank
(“AfDB”) to invest into development stage renewable energy projects in Sub-Saharan African markets, excluding
South Africa. A General Procurement Notice for AREF was published on 30th
September 2014.
2. AREF in partnership with Norfund are developing the Kikagati Hydro Power project (the “Project”) in Kikagati,
Insingiro District, and Western Uganda. The Project is estimated to have a size of between 14-18 MW.
3. This request for an Expression of Interest (“EOI”) is in relation to Engineering, Procurement and Construction
(‘EPC’) for the entire project, which includes the provision of the, design, manufacture, supply, transportation,
construction, installation and commissioning of turbines and all other associated works (civils, substation and
electro-mechanical), including spare parts, which will be detailed in the Tender Documents, Specifications,
Drawings and Employers Requirements.
4. EOI’s are requested from the interested single or Joint Venture firms that have proven experience in EPC
assignments for Hydro Power Projects.
5. The firms submitting the EOI as Joint Ventures if shortlisted must submit their proposals in the same Joint
Venture name at the time of the request of the proposal.
6. The project has a design discharge of180-240m3/s which is based on extensive hydrological data including long
term rainfall measurements, satellite data and hydrology assessments carried out by the project engineering
consultant. The project is expected to have a gross hydraulic head of about 9.25 M.
7. The proposed ‘low head’ ‘run of the river’ Hydroelectric Project will be constructed on the site of an earlier 2
x 2MW hydroelectric power plant. The proposed new plant will comprise:
 A river weir approximately 170 m total length and of maximum height 11.5 m incorporating a gated
spillway and flushing sluice,
 Power canal intake structure including coarse intake screens and stop logs,
 Power canal,
 Fine trash racks and gates at intake for turbine generator units,
 Powerhouse,
 Two –Three bulb, Pit Type or Vertical Kaplan turbines generator units and associated auxiliary plant,
and
 Two main transformers, switchyard and connection to the two REA 33 kV transmission lines.
8. The proposed site is located about 328 KM from Kampala via Masaka, Mbarara and Isingiro and shares a
boundary with Tanzania. Some of the works will need to be undertaken in Tanzania.
9. AREF invites suitably experienced Companies to indicate their interest in providing the above services and being
invited to tender, and to be included on the electronic issue of the Tender Documents when they are made
EOI-Kikagati
Page 2 of 2
available. The tender is intended to be run as a restricted tender and, where reasonably practicable, in
accordance with the African Development Bank’s “Rules and Procedures for the use of Consultants” (May 2008
edition, revised in July 2012), which is available on the Bank’s website at http://www.afdb.org.
10. Interested eligible Companies are requested to provide tender specific information outlining their qualifications
and experience demonstrating their ability to provide the above services (information to be provided should
include; references for similar projects delivered, summary experience in delivering comparable sized
hydropower projects, summary of qualified staff, a list of projects completed in the last 3 years and general
company financial information, and most importantly, their experience of delivering similar projects in East
Africa, principally Uganda). This should be submitted by email in pdf form to the address below.
11. Please note that interest expressed by a Company does not imply any obligation on the part of AREF to include it
in the shortlist or to continue with the tender as outlined within this EOI.A non-response indicates that your
Expression of Interest has not been successful.
12. The tender stage of procurement is expected to commence during Q1 2016, with a 6 week tender period. The
successful bidder will be notified in around 4 weeks after then and the expected date of contract award at the
end of Q2, 2016, subject to final arrangements for project approvals, financing and off take agreement.
13. Interested Companies may submit queries and request further information to the email address below, however
it is pointed out that limited information will be available for disclosure until the tender launch date or until Non-
Disclosure Agreements are entered into.
14. Expressions of interest must be received at the email address below no later than Friday 17th
December 2015,
15:00 East Africa Time and specifically referencing “Kikagati EPC”.
Mr.Saidi Bukenya
sbukenya@majipower.com
+256 77 2625757
Maji Power Ltd,
1st
Floor Unicalo House, Archer Road, Kololo
Kampala, Uganda

More Related Content

What's hot

London Electric Vehicles Plan
London  Electric Vehicles PlanLondon  Electric Vehicles Plan
London Electric Vehicles PlanNick Craig
 
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottZero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottForth
 
Clark PUD Transportation Electrification Plan by Matt Babbitts
Clark PUD Transportation Electrification Plan by Matt BabbittsClark PUD Transportation Electrification Plan by Matt Babbitts
Clark PUD Transportation Electrification Plan by Matt BabbittsForth
 
The Chevrolet Volt Extended Range Electric Vehicle
The Chevrolet Volt  Extended Range Electric VehicleThe Chevrolet Volt  Extended Range Electric Vehicle
The Chevrolet Volt Extended Range Electric VehicleAlliance To Save Energy
 
The Development of a 48-Volt Power Supply
The Development of a 48-Volt Power SupplyThe Development of a 48-Volt Power Supply
The Development of a 48-Volt Power SupplyTorben Haagh
 
Engage with...Cummins
Engage with...CumminsEngage with...Cummins
Engage with...CumminsKTN
 
Driving Transportation Electrification Forward - The TEINA Study byMary Brazell
Driving Transportation Electrification Forward - The TEINA Study byMary BrazellDriving Transportation Electrification Forward - The TEINA Study byMary Brazell
Driving Transportation Electrification Forward - The TEINA Study byMary BrazellForth
 
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIFlinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIjames hamilton
 
Plenary - Pedro Martin
Plenary - Pedro MartinPlenary - Pedro Martin
Plenary - Pedro MartinReenergize
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for differenceGeoff White
 
The Charging Infrastructure Ecosystem by Matteo Muratori
The Charging Infrastructure Ecosystem by Matteo MuratoriThe Charging Infrastructure Ecosystem by Matteo Muratori
The Charging Infrastructure Ecosystem by Matteo MuratoriForth
 
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...Forth
 
eceee position on EPBD recast
eceee position on EPBD recasteceee position on EPBD recast
eceee position on EPBD recastrodjanssen
 
RCREEE-enerMENA_energy in yemen
RCREEE-enerMENA_energy in yemenRCREEE-enerMENA_energy in yemen
RCREEE-enerMENA_energy in yemenRCREEE
 
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain Forum
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain ForumMicrogeneration Support Scheme (MSS) Non- Domestic Supply Chain Forum
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain ForumSustainableEnergyAut
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...CALSTART
 
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy ModelAnirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy ModelANUECI
 

What's hot (19)

London Electric Vehicles Plan
London  Electric Vehicles PlanLondon  Electric Vehicles Plan
London Electric Vehicles Plan
 
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottZero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
 
Clark PUD Transportation Electrification Plan by Matt Babbitts
Clark PUD Transportation Electrification Plan by Matt BabbittsClark PUD Transportation Electrification Plan by Matt Babbitts
Clark PUD Transportation Electrification Plan by Matt Babbitts
 
Solar industry in iran
Solar industry in iranSolar industry in iran
Solar industry in iran
 
The Chevrolet Volt Extended Range Electric Vehicle
The Chevrolet Volt  Extended Range Electric VehicleThe Chevrolet Volt  Extended Range Electric Vehicle
The Chevrolet Volt Extended Range Electric Vehicle
 
The Development of a 48-Volt Power Supply
The Development of a 48-Volt Power SupplyThe Development of a 48-Volt Power Supply
The Development of a 48-Volt Power Supply
 
Engage with...Cummins
Engage with...CumminsEngage with...Cummins
Engage with...Cummins
 
Driving Transportation Electrification Forward - The TEINA Study byMary Brazell
Driving Transportation Electrification Forward - The TEINA Study byMary BrazellDriving Transportation Electrification Forward - The TEINA Study byMary Brazell
Driving Transportation Electrification Forward - The TEINA Study byMary Brazell
 
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIFlinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
 
Plenary - Pedro Martin
Plenary - Pedro MartinPlenary - Pedro Martin
Plenary - Pedro Martin
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
The Charging Infrastructure Ecosystem by Matteo Muratori
The Charging Infrastructure Ecosystem by Matteo MuratoriThe Charging Infrastructure Ecosystem by Matteo Muratori
The Charging Infrastructure Ecosystem by Matteo Muratori
 
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...
The Electric Vehicle Infrastructure Transportation Alliance (EVITA) by Jennif...
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
eceee position on EPBD recast
eceee position on EPBD recasteceee position on EPBD recast
eceee position on EPBD recast
 
RCREEE-enerMENA_energy in yemen
RCREEE-enerMENA_energy in yemenRCREEE-enerMENA_energy in yemen
RCREEE-enerMENA_energy in yemen
 
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain Forum
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain ForumMicrogeneration Support Scheme (MSS) Non- Domestic Supply Chain Forum
Microgeneration Support Scheme (MSS) Non- Domestic Supply Chain Forum
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
 
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy ModelAnirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
 

Similar to Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 2015

NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...Khaled Al Awadi
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseLeonardo ENERGY
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWLeonardo ENERGY
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
Maximizing financing Viability Solar Initiative
Maximizing financing Viability Solar InitiativeMaximizing financing Viability Solar Initiative
Maximizing financing Viability Solar InitiativeTimi50
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordanRCREEE
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
 
ESKOM Transmission Ten-Year Development Plan 2013-2022
ESKOM Transmission Ten-Year Development Plan 2013-2022ESKOM Transmission Ten-Year Development Plan 2013-2022
ESKOM Transmission Ten-Year Development Plan 2013-2022Dr Lendy Spires
 
Priorities infrastructure retreat- web
Priorities   infrastructure retreat- webPriorities   infrastructure retreat- web
Priorities infrastructure retreat- webDr Lendy Spires
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOECD Environment
 
US-UK Offshore Wind R&D
US-UK Offshore Wind R&DUS-UK Offshore Wind R&D
US-UK Offshore Wind R&DKTN
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrixDoris Capurro
 
Cv philip schubert june 27, 2016
Cv philip schubert june 27, 2016Cv philip schubert june 27, 2016
Cv philip schubert june 27, 2016Philip Schubert
 

Similar to Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 2015 (20)

NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
Bankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa caseBankability of clean energy projects - South Africa case
Bankability of clean energy projects - South Africa case
 
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GWBankability of Clean Energy Projects: the case of South Africa - 6 GW
Bankability of Clean Energy Projects: the case of South Africa - 6 GW
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Anibal_Carias_CV(1)
Anibal_Carias_CV(1)Anibal_Carias_CV(1)
Anibal_Carias_CV(1)
 
Maximizing financing Viability Solar Initiative
Maximizing financing Viability Solar InitiativeMaximizing financing Viability Solar Initiative
Maximizing financing Viability Solar Initiative
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordan
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmers
 
ESKOM Transmission Ten-Year Development Plan 2013-2022
ESKOM Transmission Ten-Year Development Plan 2013-2022ESKOM Transmission Ten-Year Development Plan 2013-2022
ESKOM Transmission Ten-Year Development Plan 2013-2022
 
Priorities infrastructure retreat- web
Priorities   infrastructure retreat- webPriorities   infrastructure retreat- web
Priorities infrastructure retreat- web
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
US-UK Offshore Wind R&D
US-UK Offshore Wind R&DUS-UK Offshore Wind R&D
US-UK Offshore Wind R&D
 
IHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper OduorIHA Congress 2011 - Global Workshop - Jasper Oduor
IHA Congress 2011 - Global Workshop - Jasper Oduor
 
IHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshopIHA Congress 2011 - Jasper Oduor global worshop
IHA Congress 2011 - Jasper Oduor global worshop
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
 
2011 Clarington Energy Summit - MEDT Presentation by Rick Grandin
2011 Clarington Energy Summit -  MEDT Presentation by Rick Grandin2011 Clarington Energy Summit -  MEDT Presentation by Rick Grandin
2011 Clarington Energy Summit - MEDT Presentation by Rick Grandin
 
Cv philip schubert june 27, 2016
Cv philip schubert june 27, 2016Cv philip schubert june 27, 2016
Cv philip schubert june 27, 2016
 

Recently uploaded

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

Eoi – uganda epc assignments for kikagati hydro power project uganda – 12 2015

  • 1. EOI-Kikagati Page 1 of 2 Request for Expression of Interest Africa Renewable Energy Fund EPC assignments for Kikagati Hydro Power Project, Uganda 1. Berkeley Energy (http://www.berkeley-energy.com) is a renewable energy investment manager that invests in Asian and African emerging markets. Berkeley Energy currently manages the Africa Renewable Energy Fund (“AREF”). AREF is a USD $200m fund (final close in Q32015) corner stoned by the African Development Bank (“AfDB”) to invest into development stage renewable energy projects in Sub-Saharan African markets, excluding South Africa. A General Procurement Notice for AREF was published on 30th September 2014. 2. AREF in partnership with Norfund are developing the Kikagati Hydro Power project (the “Project”) in Kikagati, Insingiro District, and Western Uganda. The Project is estimated to have a size of between 14-18 MW. 3. This request for an Expression of Interest (“EOI”) is in relation to Engineering, Procurement and Construction (‘EPC’) for the entire project, which includes the provision of the, design, manufacture, supply, transportation, construction, installation and commissioning of turbines and all other associated works (civils, substation and electro-mechanical), including spare parts, which will be detailed in the Tender Documents, Specifications, Drawings and Employers Requirements. 4. EOI’s are requested from the interested single or Joint Venture firms that have proven experience in EPC assignments for Hydro Power Projects. 5. The firms submitting the EOI as Joint Ventures if shortlisted must submit their proposals in the same Joint Venture name at the time of the request of the proposal. 6. The project has a design discharge of180-240m3/s which is based on extensive hydrological data including long term rainfall measurements, satellite data and hydrology assessments carried out by the project engineering consultant. The project is expected to have a gross hydraulic head of about 9.25 M. 7. The proposed ‘low head’ ‘run of the river’ Hydroelectric Project will be constructed on the site of an earlier 2 x 2MW hydroelectric power plant. The proposed new plant will comprise:  A river weir approximately 170 m total length and of maximum height 11.5 m incorporating a gated spillway and flushing sluice,  Power canal intake structure including coarse intake screens and stop logs,  Power canal,  Fine trash racks and gates at intake for turbine generator units,  Powerhouse,  Two –Three bulb, Pit Type or Vertical Kaplan turbines generator units and associated auxiliary plant, and  Two main transformers, switchyard and connection to the two REA 33 kV transmission lines. 8. The proposed site is located about 328 KM from Kampala via Masaka, Mbarara and Isingiro and shares a boundary with Tanzania. Some of the works will need to be undertaken in Tanzania. 9. AREF invites suitably experienced Companies to indicate their interest in providing the above services and being invited to tender, and to be included on the electronic issue of the Tender Documents when they are made
  • 2. EOI-Kikagati Page 2 of 2 available. The tender is intended to be run as a restricted tender and, where reasonably practicable, in accordance with the African Development Bank’s “Rules and Procedures for the use of Consultants” (May 2008 edition, revised in July 2012), which is available on the Bank’s website at http://www.afdb.org. 10. Interested eligible Companies are requested to provide tender specific information outlining their qualifications and experience demonstrating their ability to provide the above services (information to be provided should include; references for similar projects delivered, summary experience in delivering comparable sized hydropower projects, summary of qualified staff, a list of projects completed in the last 3 years and general company financial information, and most importantly, their experience of delivering similar projects in East Africa, principally Uganda). This should be submitted by email in pdf form to the address below. 11. Please note that interest expressed by a Company does not imply any obligation on the part of AREF to include it in the shortlist or to continue with the tender as outlined within this EOI.A non-response indicates that your Expression of Interest has not been successful. 12. The tender stage of procurement is expected to commence during Q1 2016, with a 6 week tender period. The successful bidder will be notified in around 4 weeks after then and the expected date of contract award at the end of Q2, 2016, subject to final arrangements for project approvals, financing and off take agreement. 13. Interested Companies may submit queries and request further information to the email address below, however it is pointed out that limited information will be available for disclosure until the tender launch date or until Non- Disclosure Agreements are entered into. 14. Expressions of interest must be received at the email address below no later than Friday 17th December 2015, 15:00 East Africa Time and specifically referencing “Kikagati EPC”. Mr.Saidi Bukenya sbukenya@majipower.com +256 77 2625757 Maji Power Ltd, 1st Floor Unicalo House, Archer Road, Kololo Kampala, Uganda