32531 COX RD.
MENIFEE CA 92584
Phone 760-535-8599 Fax: 760-994-1368
E-MAIL: mike.z@casacontracting.com www.casacontracting.com
Project: Westin Desert Willows Villa Building C “Revised”
Date: 2/16/2011
Scope of work
Light Gauge Steel Framing Per plans and Specification Prefabricated Wall and truss system
Section 5400 “Materials price valid till May 29 2011”
A- Trusses Labor and Materials “Design Build”
B-Light Gauge Steel Framing include
C-Metal Decking and Plywood roof sheeting
Inclusion
1-Submittal package
2-Fabrication of steel truss
3-Truss to truss connection clips
4-Truss to bearing connection clips
5-Bracing materials
6-All Backing materials/Strapping/ Shear Plate
7-Truss installation ready for plywood sheeting
8-Exterior Wall Framing, Post and Headers
9-Interior Wall Framing
10-Floor Joist framing and hard lid
11-Blocking
12-Shear Transfer
13-Backing
Exclusion
1-Cost of bonds and permits
2-Lath and plaster
3-Acoustical ceilings
4-Insulation and water proofing
5-Interior Coating and Painting
6-Any Steel greater than 14 Gauge “Paco Post, HSS”
7-Access Doors
8-Door Frames
9-Any and all wood
10- Exterior Dens Glass sheeting
11-Drywall Sheeting, taping and texture
12-Scafolding
BASE BID: $1,475,757.00

More Related Content

What's hot

Brian O'Sullivan - Curriculum Vitae 123
Brian O'Sullivan - Curriculum Vitae 123Brian O'Sullivan - Curriculum Vitae 123
Brian O'Sullivan - Curriculum Vitae 123Brian O'Sullivan
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R Newneerajtri
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building ProcessTimo Kettunen
 
Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams
 
Bellerive House - progress case study
Bellerive House -  progress case studyBellerive House -  progress case study
Bellerive House - progress case studyAmanda Dunn
 
LIMS Conditional Assessment Presentation; 4-9-14
LIMS Conditional Assessment Presentation; 4-9-14LIMS Conditional Assessment Presentation; 4-9-14
LIMS Conditional Assessment Presentation; 4-9-14laurelschooldistrict
 

What's hot (8)

Brian O'Sullivan - Curriculum Vitae 123
Brian O'Sullivan - Curriculum Vitae 123Brian O'Sullivan - Curriculum Vitae 123
Brian O'Sullivan - Curriculum Vitae 123
 
Duplex Apartments in Tirupur
Duplex Apartments in TirupurDuplex Apartments in Tirupur
Duplex Apartments in Tirupur
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building Process
 
Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams Resume 2016
Ben Williams Resume 2016
 
Walk Through Wednesday (141008)
Walk Through Wednesday (141008)Walk Through Wednesday (141008)
Walk Through Wednesday (141008)
 
Bellerive House - progress case study
Bellerive House -  progress case studyBellerive House -  progress case study
Bellerive House - progress case study
 
LIMS Conditional Assessment Presentation; 4-9-14
LIMS Conditional Assessment Presentation; 4-9-14LIMS Conditional Assessment Presentation; 4-9-14
LIMS Conditional Assessment Presentation; 4-9-14
 

Similar to casa contracting

Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]w ss
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides shensin1015
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system reportshensin1015
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment shensin1015
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system reportw ss
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015john kinds
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
Portfolio_Simple
Portfolio_SimplePortfolio_Simple
Portfolio_SimpleChris Lee
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resumeEric Heikkila
 
Dry wall profile
Dry wall profileDry wall profile
Dry wall profileMulti-D
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuildingmusahossein
 
Steelinx letter of thanks J1040
Steelinx letter of thanks J1040Steelinx letter of thanks J1040
Steelinx letter of thanks J1040Ray McCaig
 

Similar to casa contracting (20)

Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides
 
PERSONAL RESUME
PERSONAL  RESUMEPERSONAL  RESUME
PERSONAL RESUME
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
kuku.pptx
kuku.pptxkuku.pptx
kuku.pptx
 
Portfolio_Simple
Portfolio_SimplePortfolio_Simple
Portfolio_Simple
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resume
 
ARLY OCAMPO2
ARLY OCAMPO2ARLY OCAMPO2
ARLY OCAMPO2
 
Dry wall profile
Dry wall profileDry wall profile
Dry wall profile
 
Structural Steel Modeling and Detailing with Tekla
Structural Steel Modeling and Detailing with TeklaStructural Steel Modeling and Detailing with Tekla
Structural Steel Modeling and Detailing with Tekla
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuilding
 
Steelinx letter of thanks J1040
Steelinx letter of thanks J1040Steelinx letter of thanks J1040
Steelinx letter of thanks J1040
 
C.V wesam -UPDATED-
C.V wesam -UPDATED-C.V wesam -UPDATED-
C.V wesam -UPDATED-
 

casa contracting

  • 1. 1 32531 COX RD. MENIFEE CA 92584 Phone 760-535-8599 Fax: 760-994-1368 E-MAIL: mike.z@casacontracting.com www.casacontracting.com Project: Westin Desert Willows Villa Building C “Revised” Date: 2/16/2011 Scope of work Light Gauge Steel Framing Per plans and Specification Prefabricated Wall and truss system Section 5400 “Materials price valid till May 29 2011” A- Trusses Labor and Materials “Design Build” B-Light Gauge Steel Framing include C-Metal Decking and Plywood roof sheeting Inclusion 1-Submittal package 2-Fabrication of steel truss 3-Truss to truss connection clips 4-Truss to bearing connection clips 5-Bracing materials 6-All Backing materials/Strapping/ Shear Plate 7-Truss installation ready for plywood sheeting 8-Exterior Wall Framing, Post and Headers 9-Interior Wall Framing 10-Floor Joist framing and hard lid 11-Blocking 12-Shear Transfer 13-Backing Exclusion 1-Cost of bonds and permits 2-Lath and plaster 3-Acoustical ceilings 4-Insulation and water proofing 5-Interior Coating and Painting 6-Any Steel greater than 14 Gauge “Paco Post, HSS” 7-Access Doors 8-Door Frames 9-Any and all wood 10- Exterior Dens Glass sheeting 11-Drywall Sheeting, taping and texture 12-Scafolding BASE BID: $1,475,757.00