Make to Order in SAP ERP
Applies to:
SAP ECC 6.0. For more information, visit the Enterprise Resource Planning homepage.
Summary
This document shall help consultants in the cross functional areas like Sales and Distribution, Production
planning and Materials Management. It is prepared to suits for Indian Make to Order Business Scenario. It
explains the various activities like Sales, Planning, External procurement, Subcontracting, Production &
Distribution.
Author: Appala Raju P
Company: Larsen & Toubro Infotech Ltd.,
Created on: 01 October 2009
Author Bio
P. AppalaRaju is now an employee of Larsen & Toubro Infotech Ltd. He has total 10 years
of experience, out of which near about 2 years experience in the area of SAP Consulting in
Procure to Pay process. He has worked various business segments like Procurement,
Design & Drawing and Plant maintenance in Engineering and Process sectors as part of
Domain experience.
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 2
Table of Contents
Introduction .........................................................................................................................................................3
Make-to-Order.................................................................................................................................................3
Make-to-Stock.................................................................................................................................................3
MTO Business Scenario - Diagrammatical Representation ...........................................................................3
Major Steps.....................................................................................................................................................4
Bill of Materials................................................................................................................................................4
Steps in SAP.......................................................................................................................................................5
Create Materials..............................................................................................................................................6
CIN Master data..............................................................................................................................................7
Create Bill of Material (BOM) ..........................................................................................................................8
Create Routing to Finished material ...............................................................................................................9
Create Sale Order.........................................................................................................................................10
Run MRP for Sale Order...............................................................................................................................10
View the Planned Orders Created ................................................................................................................11
Convert “Component” Planned Order to PR.................................................................................................12
Convert Semi Finished Planned Order to PR ...............................................................................................13
Convert “Component” PR into PO ................................................................................................................14
Goods Receipt for Components....................................................................................................................15
View the Stock (sale order stock) .................................................................................................................16
Create Subcontract PO with Reference to Semi Finished PR......................................................................17
Maintain Storage Location to the Subcontractor...........................................................................................17
Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)......................................18
Stock Overview .............................................................................................................................................19
Create Challan ..............................................................................................................................................20
Receive Goods (semi finished) from Subcontractor .....................................................................................21
View the Stock of Components after Goods Receipt....................................................................................21
View the Stock of Semi-Finished after Goods Receipt.................................................................................22
Reconciliation of Challan...............................................................................................................................23
Complete Challan..........................................................................................................................................23
Convert Finished Material Planned Order to Production Order....................................................................24
Goods Issue to the Production......................................................................................................................25
Confirmation of Production Order .................................................................................................................26
Goods Receipt Against Production Order.....................................................................................................27
Order Settlement for Production Order.........................................................................................................28
Delivery of Finished Products .......................................................................................................................29
Related Content................................................................................................................................................30
Disclaimer and Liability Notice..........................................................................................................................31
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 3
Introduction
Traditional production systems produce products and stock those as inventory until they are sold (make to
stock). In order to reduce inventory and increase the level of customization, some firms have designed their
production systems to produce a product only after it is ordered. Such systems are referred to as make-to-
order. Make-to-order systems are not appropriate for all types of products, and the make-to-order versus
make-to-stock decision must be weighted carefully.
Make-to-Order
Make-to-order production is a process in which a product is individually manufactured for a particular
customer. Stock keeping is not usually carried out for products that are made to order. The primary benefits
of this process are the ability to track the progress for the sales order and the flexibility to offer to the
customer the products to meet their specific requirements. The benefit also lies in tracking the costs incurred
in the servicing of the sales order in the manufacturing of the goods and the ability of arrive at a profitability
of the sales order.
This Business Scenario Map shows how enterprises work together to complete a make to order scenario.
The planning and manufacturing process is initiated after receiving the sales orders from the customer..
There is a constant link between the sales order and the production order. This leads to the tracking of the
progress on the customer order. The material stock is seen as customer stock.
Make-to-Stock
In make-to-stock production scenario stock is produced independently of orders because you want to provide
your customers immediately with goods from that stock later on. You might even want to produce goods
without having sales orders, if you expect that there might be customer demand in the future. This means
that make-to-stock strategies can support a very close customer-vendor relationship because your objective
here is to provide your customers with goods from your stock as quickly as possible.
MTO Business Scenario - Diagrammatical Representation
S1, S2 & S3: Storage location for Raw material, Semi finished material & final products respectively
SL: Storage Location for Subcontracting Vendor
Sale Order
Final Prod
Customer
SL
Production
Vendor
Subcontractor
PLANT PO
Components
S1
Semi Finished
S2
S3
MRP1
2
6
4
5
3
Components
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 4
Major Steps
1 - Sales activity: Sales order is created with reference to customer order (customer PO)
2 - Planning activity: Planned orders are generated as output of Material Requirement Planning (MRP)
With reference to Sales order
3 - Ext. procurement: Required components procured externally using purchase order (PO)
4 - Subcontracting: Procured components send to the subcontracting vendor & received semi finished
product
5 - Production: Semi finished product processed internally and gives output as final
product/Assembly
6 - Delivery activity: Delivers final product/Assembly to the customer against Sale order.
Bill of Materials
Sales
Subcontracting
External Proc
- Components (comp.1 & comp. 2) procured externally.
- Semi finished material received from subcontracting vendor by providing components
- Assembly will be available for sales after processing semi finished material internally in
production department.
Assembly
Semi finished
Comp. 1 Comp. 2
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 5
Steps in SAP
Create materials with required views - MM01
Maintain CIN master data - J1ID
Create Bill of Materials (BOM) - CS01
Create Routing to Finished material - CA01
Create sale order - VA01
Run MRP - MD50
View the planned orders created - MD04
Convert component planned order to PR (PR will show a/c assgn cat as M) – MD04
Convert semi finished planned order to PR (PR will show a/c assgt cat “M” & item cat. “L”) – MD04
Convert component PR into PO for external procurement - ME21N
Goods receipt with reference to sale order - MIGO
View the stock (sale order stock) - MMBE
Create subcontract PO with reference to semi finished PR - ME21N
Maintain storage location to the subcontractor - SPRO
Transfer goods to Subcontractor (movement type 311 +E) - MB1B / MIGO
Stock will be updated Subcontract storage location under Sale order stock - MMBE
Create challan - J1IFQ
Receive goods from Subcontractor with movt type 101 (543 will be taken to the component &
subcontractor storage location to be entered) - MIGO
Reconciliation of challan – J1IFQ
Complete challan – J1IF13
Convert finished material planned order to production order - MD04
Goods issue to the production with movement type 261 - MB1A / MIGO
Confirmation of Production order - CO15
Goods receipt against Production order with movement type 101 - MB31/MIGO
Order settlement for Production order - KO88
Delivery of Finished products - VL01N
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 6
Create Materials
Required views & important fields mentioned for each view
VALVE100 - Finished material, material type ZHAW (for sale order)
Views: Basic data1(div & mat gr), Sales, MRP1, MRP2 (proc type E), MRP3 (Strategy group 20), MRP4
(individual/collec _ ), Work scheduling, General Plant data/storage, Accounting , Costing
Key Point: Maintain Strategy Group as “20” in MRP3 view
Note: No purchasing view available for material type FERT/ZHAW
VALVESEMI100 - Semi finished material, material type HALB (for subcontracting)
Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (Sp. procurement as 30 & proc type X) MRP3
(consumption mode 2, availability check 02), MRP4 (individual/collec. _), Work scheduling, Plant
data/storage, Accounting, Costing & No sales views
Key Point: Maintain Special procurement as “30” in MRP2 view
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 7
VALVECOMP - Raw material/component (material type ROH)
Views: Basic dta1 (material group), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2,
availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views
VALVECOMP1 - Raw material/component (material type ROH)
Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability
check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views
CIN Master data
Use transaction code: J1ID
Maintain material chapter ID combination to the component & semi finished material.
Select Subcontract check box to the components
Maintain assessable value to the components
Components: - VALVECOMP & VALVECOMP1
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 8
Semi finished material: - VALVESEMI100
Finished material: - VALVE100
Components: VALVECOMP & VALVECOMP1
Create Bill of Material (BOM)
Use transaction code CS01
BOM1: VALVE100 – VALVESEMI100,
BOM2: VALVESEMI100 – VALVECOMP, VALVECOMP1
Key Point: Maintain item category as “L”
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 9
Create Routing to Finished material
Use transaction code CA01
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 10
Create Sale Order
Use transaction code VA01
Run MRP for Sale Order
Use transaction code MD50
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 11
View the Planned Orders Created
Use transaction code MD04
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 12
Note:
Total number of planned orders created = 4
Planned order 1 for VALVECOMP (component)
Planned order 2 for VALVECOMP1 (component)
Planned order 3 for VALVESEMI100 (semifinished/subcontacting material)
Planned order 4 for VALVE100 (assembly/final product)
Convert “Component” Planned Order to PR
Use transaction code MD04 (Created PR contains a/c assignment category as M)
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 13
Convert Semi Finished Planned Order to PR
Use transaction code MD04 (Created PR contains a/c assignment cat as M & item cat as L)
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 14
Convert “Component” PR into PO
Use transaction code ME21N for external procurement.
PO for material VALVECOMP
PO for material VALVECOMP1
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 15
Goods Receipt for Components
Use transaction code MIGO
Note the sale order number in item details in “where” tab
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 16
View the Stock (sale order stock)
Use transaction code MMBE
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 17
Create Subcontract PO with Reference to Semi Finished PR
Maintain Storage Location to the Subcontractor
Use transaction code SPRO
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 18
Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)
Use transaction code MB1B with movement type 311 +E
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 19
Stock Overview
Stock will be updated at subcontractor storage location under sale order stock.
Transaction code MMBE
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 20
Create Challan
Use transaction code J1IF01
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 21
Receive Goods (semi finished) from Subcontractor
Use transaction code MIGO, with movement type 101 (543 will be taken to components), Subcontractor
storage location to be entered.
View the Stock of Components after Goods Receipt
Stock of componets will be consumed at subcontracting storage location when semifinished goods received
from subcontracting vendor.
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 22
View the Stock of Semi-Finished after Goods Receipt
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 23
Reconciliation of Challan
Use transaction code J1IFQ
Complete Challan
Use transaction code J1IF13
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 24
Convert Finished Material Planned Order to Production Order
From planned order to Production order, transaction code MD04
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 25
Note that planned order (000011696) converted as production order (00000100591)
Goods Issue to the Production
Use Transaction code MB1A
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 26
Confirmation of Production Order
Use Transaction code CO15
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 27
Goods Receipt Against Production Order
Use Transaction code MB31 / MIGO with movement type 101
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 28
Order Settlement for Production Order
Use Transaction code KO88
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 29
Delivery of Finished Products
Use Transaction code VL01N
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 30
Related Content
For more information, visit the Enterprise Resource Planning homepage.
https://forums.sdn.sap.com/thread.jspa?messageID=7729276
https://forums.sdn.sap.com/thread.jspa?messageID=7742000
https://forums.sdn.sap.com/thread.jspa?messageID=7742915
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 31
Disclaimer and Liability Notice
This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not
supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade.
SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document,
and anyone using these methods does so at his/her own risk.
SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or
code sample, including any liability resulting from incompatibility between the content within this document and the materials and
services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this
document.

More Related Content

What's hot

Currency conversion in bi 7.0
Currency conversion in bi 7.0Currency conversion in bi 7.0
Currency conversion in bi 7.0gireesho
 
How to run v3 job
How to run v3 jobHow to run v3 job
How to run v3 jobAnil Kumar
 
Customer exit variables in sap
Customer exit variables in sapCustomer exit variables in sap
Customer exit variables in sapsaborhade
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_icswalldorf_share
 
Sap sd-srinivas-naidu
Sap sd-srinivas-naiduSap sd-srinivas-naidu
Sap sd-srinivas-naiduaawara88
 
MS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_PictMS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_PictMunir Solkar
 
Sap sd notes
Sap sd notesSap sd notes
Sap sd notesMohit2385
 
Global Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and ConfigurationGlobal Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and ConfigurationSandeep Pradhan
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_icsranganv72
 
Version 9 sales order to cash
Version 9 sales order to cashVersion 9 sales order to cash
Version 9 sales order to cashkmussel
 
Copa configuration
Copa configurationCopa configuration
Copa configurationMithun Roy
 
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...Roadmap ERP
 
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2Interview Mocha
 
Chandan Personal Profile
Chandan Personal ProfileChandan Personal Profile
Chandan Personal ProfileChandan Kumar
 

What's hot (18)

Currency conversion in bi 7.0
Currency conversion in bi 7.0Currency conversion in bi 7.0
Currency conversion in bi 7.0
 
How to run v3 job
How to run v3 jobHow to run v3 job
How to run v3 job
 
Customer exit variables in sap
Customer exit variables in sapCustomer exit variables in sap
Customer exit variables in sap
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
 
Sap sd-srinivas-naidu
Sap sd-srinivas-naiduSap sd-srinivas-naidu
Sap sd-srinivas-naidu
 
Pacmp
PacmpPacmp
Pacmp
 
MS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_PictMS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_Pict
 
Sap sd notes
Sap sd notesSap sd notes
Sap sd notes
 
Sudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print SampleSudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print Sample
 
SAP SD Training
SAP SD Training SAP SD Training
SAP SD Training
 
Global Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and ConfigurationGlobal Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and Configuration
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
 
63556309 sap
63556309 sap63556309 sap
63556309 sap
 
Version 9 sales order to cash
Version 9 sales order to cashVersion 9 sales order to cash
Version 9 sales order to cash
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
 
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
 
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
 
Chandan Personal Profile
Chandan Personal ProfileChandan Personal Profile
Chandan Personal Profile
 

Similar to Make to order process with inventory checking

SAP PR released
SAP PR releasedSAP PR released
SAP PR releasedpiwal123
 
dokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdfdokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdfharper34
 
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdfdokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdfharper34
 
Sap crm integration scenarios a high level approach
Sap crm integration scenarios   a high level approachSap crm integration scenarios   a high level approach
Sap crm integration scenarios a high level approachAbhiram Reddy Basani
 
Sdbusinessblueprint
SdbusinessblueprintSdbusinessblueprint
Sdbusinessblueprintcecileekove
 
SAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales TemplateSAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales TemplateAditya Pandey
 
Best Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and ServiceBest Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and ServiceFindWhitePapers
 
Supply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global EconomySupply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global EconomyFindWhitePapers
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webrambhao
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webVee De Pee
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configurationVikranth Ikkalaki
 
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsHicham Khallouki
 
Master guide1611
Master guide1611Master guide1611
Master guide1611ram sap
 

Similar to Make to order process with inventory checking (20)

SAP PR released
SAP PR releasedSAP PR released
SAP PR released
 
dokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdfdokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdf
 
Asset purchase
Asset purchaseAsset purchase
Asset purchase
 
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdfdokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
 
Sap crm integration scenarios a high level approach
Sap crm integration scenarios   a high level approachSap crm integration scenarios   a high level approach
Sap crm integration scenarios a high level approach
 
Sdbusinessblueprint
SdbusinessblueprintSdbusinessblueprint
Sdbusinessblueprint
 
SAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales TemplateSAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales Template
 
Sap sd bbp template
Sap sd bbp templateSap sd bbp template
Sap sd bbp template
 
Best Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and ServiceBest Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and Service
 
Supply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global EconomySupply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global Economy
 
Sd availabulity check
Sd availabulity checkSd availabulity check
Sd availabulity check
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
Sample Business Plan
Sample Business PlanSample Business Plan
Sample Business Plan
 
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflows
 
Conv op1909
Conv op1909Conv op1909
Conv op1909
 
Crystal Report
Crystal ReportCrystal Report
Crystal Report
 
Master guide1611
Master guide1611Master guide1611
Master guide1611
 
SAP BODS Designer PDF
SAP BODS Designer PDFSAP BODS Designer PDF
SAP BODS Designer PDF
 

Recently uploaded

Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 

Recently uploaded (20)

Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 

Make to order process with inventory checking

  • 1. SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 1 Make to Order in SAP ERP Applies to: SAP ECC 6.0. For more information, visit the Enterprise Resource Planning homepage. Summary This document shall help consultants in the cross functional areas like Sales and Distribution, Production planning and Materials Management. It is prepared to suits for Indian Make to Order Business Scenario. It explains the various activities like Sales, Planning, External procurement, Subcontracting, Production & Distribution. Author: Appala Raju P Company: Larsen & Toubro Infotech Ltd., Created on: 01 October 2009 Author Bio P. AppalaRaju is now an employee of Larsen & Toubro Infotech Ltd. He has total 10 years of experience, out of which near about 2 years experience in the area of SAP Consulting in Procure to Pay process. He has worked various business segments like Procurement, Design & Drawing and Plant maintenance in Engineering and Process sectors as part of Domain experience.
  • 2. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 2 Table of Contents Introduction .........................................................................................................................................................3 Make-to-Order.................................................................................................................................................3 Make-to-Stock.................................................................................................................................................3 MTO Business Scenario - Diagrammatical Representation ...........................................................................3 Major Steps.....................................................................................................................................................4 Bill of Materials................................................................................................................................................4 Steps in SAP.......................................................................................................................................................5 Create Materials..............................................................................................................................................6 CIN Master data..............................................................................................................................................7 Create Bill of Material (BOM) ..........................................................................................................................8 Create Routing to Finished material ...............................................................................................................9 Create Sale Order.........................................................................................................................................10 Run MRP for Sale Order...............................................................................................................................10 View the Planned Orders Created ................................................................................................................11 Convert “Component” Planned Order to PR.................................................................................................12 Convert Semi Finished Planned Order to PR ...............................................................................................13 Convert “Component” PR into PO ................................................................................................................14 Goods Receipt for Components....................................................................................................................15 View the Stock (sale order stock) .................................................................................................................16 Create Subcontract PO with Reference to Semi Finished PR......................................................................17 Maintain Storage Location to the Subcontractor...........................................................................................17 Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)......................................18 Stock Overview .............................................................................................................................................19 Create Challan ..............................................................................................................................................20 Receive Goods (semi finished) from Subcontractor .....................................................................................21 View the Stock of Components after Goods Receipt....................................................................................21 View the Stock of Semi-Finished after Goods Receipt.................................................................................22 Reconciliation of Challan...............................................................................................................................23 Complete Challan..........................................................................................................................................23 Convert Finished Material Planned Order to Production Order....................................................................24 Goods Issue to the Production......................................................................................................................25 Confirmation of Production Order .................................................................................................................26 Goods Receipt Against Production Order.....................................................................................................27 Order Settlement for Production Order.........................................................................................................28 Delivery of Finished Products .......................................................................................................................29 Related Content................................................................................................................................................30 Disclaimer and Liability Notice..........................................................................................................................31
  • 3. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 3 Introduction Traditional production systems produce products and stock those as inventory until they are sold (make to stock). In order to reduce inventory and increase the level of customization, some firms have designed their production systems to produce a product only after it is ordered. Such systems are referred to as make-to- order. Make-to-order systems are not appropriate for all types of products, and the make-to-order versus make-to-stock decision must be weighted carefully. Make-to-Order Make-to-order production is a process in which a product is individually manufactured for a particular customer. Stock keeping is not usually carried out for products that are made to order. The primary benefits of this process are the ability to track the progress for the sales order and the flexibility to offer to the customer the products to meet their specific requirements. The benefit also lies in tracking the costs incurred in the servicing of the sales order in the manufacturing of the goods and the ability of arrive at a profitability of the sales order. This Business Scenario Map shows how enterprises work together to complete a make to order scenario. The planning and manufacturing process is initiated after receiving the sales orders from the customer.. There is a constant link between the sales order and the production order. This leads to the tracking of the progress on the customer order. The material stock is seen as customer stock. Make-to-Stock In make-to-stock production scenario stock is produced independently of orders because you want to provide your customers immediately with goods from that stock later on. You might even want to produce goods without having sales orders, if you expect that there might be customer demand in the future. This means that make-to-stock strategies can support a very close customer-vendor relationship because your objective here is to provide your customers with goods from your stock as quickly as possible. MTO Business Scenario - Diagrammatical Representation S1, S2 & S3: Storage location for Raw material, Semi finished material & final products respectively SL: Storage Location for Subcontracting Vendor Sale Order Final Prod Customer SL Production Vendor Subcontractor PLANT PO Components S1 Semi Finished S2 S3 MRP1 2 6 4 5 3 Components
  • 4. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 4 Major Steps 1 - Sales activity: Sales order is created with reference to customer order (customer PO) 2 - Planning activity: Planned orders are generated as output of Material Requirement Planning (MRP) With reference to Sales order 3 - Ext. procurement: Required components procured externally using purchase order (PO) 4 - Subcontracting: Procured components send to the subcontracting vendor & received semi finished product 5 - Production: Semi finished product processed internally and gives output as final product/Assembly 6 - Delivery activity: Delivers final product/Assembly to the customer against Sale order. Bill of Materials Sales Subcontracting External Proc - Components (comp.1 & comp. 2) procured externally. - Semi finished material received from subcontracting vendor by providing components - Assembly will be available for sales after processing semi finished material internally in production department. Assembly Semi finished Comp. 1 Comp. 2
  • 5. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 5 Steps in SAP Create materials with required views - MM01 Maintain CIN master data - J1ID Create Bill of Materials (BOM) - CS01 Create Routing to Finished material - CA01 Create sale order - VA01 Run MRP - MD50 View the planned orders created - MD04 Convert component planned order to PR (PR will show a/c assgn cat as M) – MD04 Convert semi finished planned order to PR (PR will show a/c assgt cat “M” & item cat. “L”) – MD04 Convert component PR into PO for external procurement - ME21N Goods receipt with reference to sale order - MIGO View the stock (sale order stock) - MMBE Create subcontract PO with reference to semi finished PR - ME21N Maintain storage location to the subcontractor - SPRO Transfer goods to Subcontractor (movement type 311 +E) - MB1B / MIGO Stock will be updated Subcontract storage location under Sale order stock - MMBE Create challan - J1IFQ Receive goods from Subcontractor with movt type 101 (543 will be taken to the component & subcontractor storage location to be entered) - MIGO Reconciliation of challan – J1IFQ Complete challan – J1IF13 Convert finished material planned order to production order - MD04 Goods issue to the production with movement type 261 - MB1A / MIGO Confirmation of Production order - CO15 Goods receipt against Production order with movement type 101 - MB31/MIGO Order settlement for Production order - KO88 Delivery of Finished products - VL01N
  • 6. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 6 Create Materials Required views & important fields mentioned for each view VALVE100 - Finished material, material type ZHAW (for sale order) Views: Basic data1(div & mat gr), Sales, MRP1, MRP2 (proc type E), MRP3 (Strategy group 20), MRP4 (individual/collec _ ), Work scheduling, General Plant data/storage, Accounting , Costing Key Point: Maintain Strategy Group as “20” in MRP3 view Note: No purchasing view available for material type FERT/ZHAW VALVESEMI100 - Semi finished material, material type HALB (for subcontracting) Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (Sp. procurement as 30 & proc type X) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/collec. _), Work scheduling, Plant data/storage, Accounting, Costing & No sales views Key Point: Maintain Special procurement as “30” in MRP2 view
  • 7. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 7 VALVECOMP - Raw material/component (material type ROH) Views: Basic dta1 (material group), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views VALVECOMP1 - Raw material/component (material type ROH) Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views CIN Master data Use transaction code: J1ID Maintain material chapter ID combination to the component & semi finished material. Select Subcontract check box to the components Maintain assessable value to the components Components: - VALVECOMP & VALVECOMP1
  • 8. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 8 Semi finished material: - VALVESEMI100 Finished material: - VALVE100 Components: VALVECOMP & VALVECOMP1 Create Bill of Material (BOM) Use transaction code CS01 BOM1: VALVE100 – VALVESEMI100, BOM2: VALVESEMI100 – VALVECOMP, VALVECOMP1 Key Point: Maintain item category as “L”
  • 9. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 9 Create Routing to Finished material Use transaction code CA01
  • 10. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 10 Create Sale Order Use transaction code VA01 Run MRP for Sale Order Use transaction code MD50
  • 11. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 11 View the Planned Orders Created Use transaction code MD04
  • 12. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 12 Note: Total number of planned orders created = 4 Planned order 1 for VALVECOMP (component) Planned order 2 for VALVECOMP1 (component) Planned order 3 for VALVESEMI100 (semifinished/subcontacting material) Planned order 4 for VALVE100 (assembly/final product) Convert “Component” Planned Order to PR Use transaction code MD04 (Created PR contains a/c assignment category as M)
  • 13. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 13 Convert Semi Finished Planned Order to PR Use transaction code MD04 (Created PR contains a/c assignment cat as M & item cat as L)
  • 14. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 14 Convert “Component” PR into PO Use transaction code ME21N for external procurement. PO for material VALVECOMP PO for material VALVECOMP1
  • 15. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 15 Goods Receipt for Components Use transaction code MIGO Note the sale order number in item details in “where” tab
  • 16. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 16 View the Stock (sale order stock) Use transaction code MMBE
  • 17. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 17 Create Subcontract PO with Reference to Semi Finished PR Maintain Storage Location to the Subcontractor Use transaction code SPRO
  • 18. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 18 Transfer Goods/Components to Subcontractor (Subcontractor Storage Location) Use transaction code MB1B with movement type 311 +E
  • 19. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 19 Stock Overview Stock will be updated at subcontractor storage location under sale order stock. Transaction code MMBE
  • 20. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 20 Create Challan Use transaction code J1IF01
  • 21. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 21 Receive Goods (semi finished) from Subcontractor Use transaction code MIGO, with movement type 101 (543 will be taken to components), Subcontractor storage location to be entered. View the Stock of Components after Goods Receipt Stock of componets will be consumed at subcontracting storage location when semifinished goods received from subcontracting vendor.
  • 22. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 22 View the Stock of Semi-Finished after Goods Receipt
  • 23. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 23 Reconciliation of Challan Use transaction code J1IFQ Complete Challan Use transaction code J1IF13
  • 24. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 24 Convert Finished Material Planned Order to Production Order From planned order to Production order, transaction code MD04
  • 25. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 25 Note that planned order (000011696) converted as production order (00000100591) Goods Issue to the Production Use Transaction code MB1A
  • 26. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 26 Confirmation of Production Order Use Transaction code CO15
  • 27. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 27 Goods Receipt Against Production Order Use Transaction code MB31 / MIGO with movement type 101
  • 28. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 28 Order Settlement for Production Order Use Transaction code KO88
  • 29. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 29 Delivery of Finished Products Use Transaction code VL01N
  • 30. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 30 Related Content For more information, visit the Enterprise Resource Planning homepage. https://forums.sdn.sap.com/thread.jspa?messageID=7729276 https://forums.sdn.sap.com/thread.jspa?messageID=7742000 https://forums.sdn.sap.com/thread.jspa?messageID=7742915
  • 31. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 31 Disclaimer and Liability Notice This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade. SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document, and anyone using these methods does so at his/her own risk. SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or code sample, including any liability resulting from incompatibility between the content within this document and the materials and services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this document.