Jason Brown is an experienced mechanical fitter seeking new employment opportunities. He has over 20 years of experience working in power generation and maintenance roles. His career history includes working on gas and steam turbines, generators, valves and other machinery. He is proficient in using Microsoft Office software and has extensive safety and technical training. References are available upon request.
Experienced Mechanical Fitter seeking new opportunity
1. Jason Brown
38 Parkside Way
Rubery Birmingham
E-Mail: j3970bolt@hotmail.com
Marital Status: Married
B315DZ. Tel. 07803829499
PROFILE
An experienced mechanical fitter who works well within a team environment or as an individual. Highly
motivated, fit, diligent, conscientious and reliable. demanding high standards of workmanship are
manufactured at all times. Reliable, flexible, honest and self-confident are key personal qualities.
Proficient in the use of Microsoft Office software.
SKILLS SUMMARY
Experienced in repair and PPM of all power generation machinery, including gas and steam
turbines, valves, generators, correlation of data for refurbishment.
Management and site supervision within a national power station responsible for manpower and
supervision of construction for ducting and absorbers.
Training of junior team members in all aspects of installation and commissioning of projects.
CAREER HISTORY AND ACHIEVEMENTS
January 2015 to December 2016: EDF TSG
Worked as a member of TSG’s core team for two years on all three of their nuclear sites during
outages. Inbetween outages I worked at the Hams Hall blading facility.
The work I undertook there was the strip down and re-blading of rotors.
January 2013 to November 2014: ALSTOM Power Generation.
Worked at five nuclear sites, undergoing outage work. I.e. Strip down, Maintenance and rebuild of the
generators on all five sites.
February 2010 to November 2012 : Siemens, Marchwood, Kings Lynn & Killingholme , Seabank,
Killingholme A.
Worked on five sites through the outage, including strip down, de-stack of the rota and diaphragms;
And rebuild of turbine. I also assisted in the tiling of the combustion chambers. Also responsible for
Correlation of data i.e measurements, QA etc. Strip down and total rebuild of combustion units.
September 2009 to February2010: RWE, Drax & Didcot Power Station
Mechanical fitter
Covering both sites for RWE, the work entailed the strip down, refurbishment and rebuild of turbines
and valves, including the HP, IP, LP and Generator. Also responsible for the correlation of data, i.e.
measurements, QA, etc.
July 2008 to September 2009: Siemens, Teeside Power Station
Mechanical fitter
Worked for Siemen’s power generation at various sites in the UK, the work entailed the strip down,
refurbishment and rebuild of turbines and valves, including the HP, IP, LP and Generator. Also
responsible for the correlation of data, i.e. measurements, QA, etc.
December 2007 to July 2008: Agency Work
Mechanical Fitter
2. June 2007 to December 2007: Coventry Construction
Site Supervisor
Site supervisor at the Kilroot power station Belfast. The contract was to fabricate the absorber ducting
for the station. Duties including oversee and manage the Coventry construction manpower on the
Kilroot site, such as allocation of labour, payroll, health and safety, ordering of materials, and liasing
with the principle contractor namely Amec.
April 2004 to June 2007: EIWHS
Senior Mechanical Fitter
Worked on the T5 project at London Heathrow, as a Senior Mechanical Craftsman specialising in the
installation of the automated baggage handling systems.
October 2003 to April 2004: Rail Projects Ltd
Mechanical Fitter
Worked at the Northumberland Park depot Tottenham, in the mechanical servicing department. Duties
involved the servicing of the doors on the London underground tube trains, i.e. door changes, engine
changes, rollers and tracks etc.
January 2003 to October 2003: EIWHS
Mechanical Fitter
Employed at the Cannock site installing the roller bed conveyor system. Duties involved the setting out,
fitting, fabrication, welding, lining and levelling and commissioning of that system.
July 2002 to January 2003: FABRICOM Heathrow
Mechanical Fitter
Employed on the Bravo two project in the main extension the terminal one baggage handling system,
pertaining to the mechanical fitting aspect of the installation.
June 1997 to June 2002: STEELRITE Ltd
Steel Erector/Mechanical Fitter
Own company which dealt with the installation of conveyor systems and structural steelwork.
TRAINING & EDUCATION
Training
2007 - Amec Safety Watch Training (SHE) Amec Belfast
2007 - FLT driver In house
2007 - Cscs Mechanical Fitter Heathrow Training School
2007 - Cscs Steel Erector Heathrow Training School
2006 - Slinger Banksman In house
2003 - Coded Welding (Arc) Daifuku (Honda, Swindon)
2003 - Abrasive Wheels In house
2003 - Teleporter Forklift In house
2003 - BOC In house
2003 - Health & Safety Awareness In house
2009 - Safety Passport (ECITB) OSTAS, Warks
2007 - GSAT (Heathrow) ICTS Training
Education
1992 - TAO Engineering, Birmingham
Railway Industry NVQ L3
ACE card, ECITB NVQ L3 maintaining plant and mechanical systems.
Nuclear cleared, confined space trained, working at heights, Asbestos awareness, manual handling.
3. 1982 to 1987 - Archbishop Masterson School, Birmingham
GCSE: English Language (B), English Literature (B), Physics (B), Geography (B), Art (A),
Religious Education (B)
CSE: Technical Drawing (1), Maths (2)
INTERESTS
Reading, walking, keeping fit.
REFERENCES
Available on request