SlideShare a Scribd company logo
1 of 3
Servjit Aulak
Foundations | Infrastructure | Environment Page 1 of 3
Superintendent
Qualifications
CSCS Civil Engineering Site Supervisor
Other Training
Workingat Heights
Workplace FirstAid
RiggingandSlinging
Level 1 STMS
Crane Co-Ordinator/ Appointed Person
Temporary Works Supervisors (5 day course)
I ama very skilled individual with many yearsin and around the civil construction industry.I have
worked
on a variety of projects such asroads, bridges, cofferdams and building works, always giving 100% to
my role at all times. I have high levels of personal drive and commitment. Effective goal setting for self
and others. With a successful track record of building and maintaining skilled teams. I pride myself on
achieving excellent safety standardsand work well within a team. I amalso persistent and tenacious
when faced with difficulties.
Employment Record
July 14 – Present Superintendent Brian Perry Civil
Jan 14 – Jun 14 Construction Manager Trans-Tasman Civil
May 12 – Apr13 General foreman Skanska
Apr09 – May 12 General foreman Skanska
Aug 08 – Apr09 Foreman Morgan Vinci
Jul 06 – Aug 08 General Foreman Morgan Vinci
Sep 05 – Jun 06 Foreman Atkinson Formwork
May 03 –Sept 05 Section foreman Tunnelcraft
Apr98 – Mar 02 Foreman O’Rourke’sand DLR
Relevant Experience
Project: NgaurangatoAotea Quay
Date: July2014 – till Present Position: Superintendent
Manageall sub-contractorson siteHigginsthe paving and drainage,also all works
Manageourcrewwith piling, gantry bases,gantry erection on wholeproject.
Manage ITS work activities, slip formed barriers, pre-cast barriers, drainage and street lights installation
workon whole project.
Advanced workplanning withconstruction managerand projectengineer.
Daily managementof TMon site and staff and sub-contractors.
Weekly planning and organising and achieving criticalmile stone
Servjit Aulak
Foundations | Infrastructure | Environment Page 2 of 3
Project: CharterisBay CV$ 3m
Date: January2014 – June 2014 Position: Construction Manager
Monitoring,executing and supervision of civilengineering works.
Leads and manages appropriate resources for projectsand resolves issues of availability and performance
as required
Proactively identify and maintain strategicclient and sub-contractors relationship
Identify assessand managethehazardsand riskassociated with projectactivities
Safetymanagement,costcontroland purchasing
Project: Crossrail PaddingtonStation CV250million pounds
Date: May 2012 – April 2013 Position: General Foreman
Overseesite workson C405 Crossrail project
Contract involves the installation of a box measuring 260m long x25m wide and 23m deep. Consisting of
diaphragmwall,plungecolumns,sheetpiling and RC installation.
Relocation of utilityservicesand ensureallworksarecompleted withoutdamaging theGradeIIlisted façade
of the station
EnsureHealth and Safetyproceduresarefollowed.Winnerof gold award atRoSPAs2012
Excavating of 8000m3 and 16000m3 of clay
Façadeof t he
Project: M25 WideningJ16 to J23 CV 590 millionpounds
Date: April 2009 – May 2012 Position: General Foreman
Managea direct labourteamof approximately 16operativealong with numeroussub-contractors
Managing the directional drilling operations, access steps to cabinets, blockwork and paving, technology
installation worksincluding ducting installation and cabling installation.
Gantry piling operations, gantry erection, street lighting installation and directional signage installation.
Completion of grouting to gantry legsand protection worksto in-road detection loops
Managesitelogistics for related section
Project: M1 WideningJ25 to J28- Bridges 474, 475, 482 CV336millionPounds
Date: August2008 – April 2009 Position: General Foreman
Managesub-contractteamsin theconstruction of 5 numberroad bridges
Installation of pre-castbeamsection 75ton craned into place
Ensureworkwasundertaken in a safemannerand according to schedule
Managesitelogistics for related section
Project: KincardineBridge contract value120million pounds
Date: July2006 – August2008 Position: General Foreman
ManageCemetation forpiling works (1,000 piles installed)
Management of work force 80 to 100 operative, consisting of carpenter ,steel fixers, general operatives,
welders,scaffolders,engineersand pre-stressing
Managesitelogistics for related section
1.2 Kilometrelong push launch,a triple cell systemof 40,000 ton of concreteand steel and 16.5metres wide
Servjit Aulak
Foundations | Infrastructure | Environment Page 3 of 3
Project: CliveAtkinsonFormwork CV 250k to 5m pounds
Date: September2005 – June 2006 Position: Foreman
Foreman on an improvementand extension of a watertreatmentplant
Involved installing pumping station to chambers,circulartanksand diversion works
Managesitelogistics and H&S for related section
Project: Channel Tunnel Rail Link 310 RainhamCrossover
Date: May 2003 -September2005 Position: Section Foreman
Set up initial precastyard for fabrication 2.5x5m RC interlocking panels for retaining walls and RC capping
beamforbridge at Botany Way
Constructing thepierswith steel girders and RC slab for crossoverand box section over live railway line
Manageearthworksstageand finishing worksto thebridgeinstallation
Projectincluded:11.4km of track and 520m long viaductconstruction
Project: Bluewater ShoppingCentre, DocklandLightRailway andMedway Viaduct CTRL 350/410
Date: April 1998 – March 2002 Position: Foreman

More Related Content

What's hot

IAS Resume 2015
IAS Resume 2015IAS Resume 2015
IAS Resume 2015ian south
 
David Matthew Resume2
David Matthew Resume2David Matthew Resume2
David Matthew Resume2David Matthew
 
Charles Donald Jolley 2014
Charles Donald Jolley 2014Charles Donald Jolley 2014
Charles Donald Jolley 2014Don Jolley
 
MacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanMacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanScott MacKay
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Crosstown TO
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Ross Ullman
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CVDavid Smith
 
Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Manjeet Singh
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 ResumeJohn Hartman
 
Marine and Shipyard Recruitment
Marine and Shipyard RecruitmentMarine and Shipyard Recruitment
Marine and Shipyard RecruitmentAjeetsGroup
 

What's hot (20)

IAS Resume 2015
IAS Resume 2015IAS Resume 2015
IAS Resume 2015
 
David Matthew Resume2
David Matthew Resume2David Matthew Resume2
David Matthew Resume2
 
Stewart McGleish CV
Stewart McGleish CVStewart McGleish CV
Stewart McGleish CV
 
Mr Hugh McCaffrey cv
Mr Hugh McCaffrey cvMr Hugh McCaffrey cv
Mr Hugh McCaffrey cv
 
Basheer C.V.1
Basheer C.V.1Basheer C.V.1
Basheer C.V.1
 
Ian Entwistle CV
Ian Entwistle CVIan Entwistle CV
Ian Entwistle CV
 
Charles Donald Jolley 2014
Charles Donald Jolley 2014Charles Donald Jolley 2014
Charles Donald Jolley 2014
 
cv 2016
cv 2016cv 2016
cv 2016
 
Terry Johnston's CV
Terry Johnston's CVTerry Johnston's CV
Terry Johnston's CV
 
MacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanMacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger Dogman
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
 
Stephen Jones October 2016
Stephen Jones October 2016Stephen Jones October 2016
Stephen Jones October 2016
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CV
 
Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
 
C V
C VC V
C V
 
hk cv update2016
hk cv update2016hk cv update2016
hk cv update2016
 
Marine and Shipyard Recruitment
Marine and Shipyard RecruitmentMarine and Shipyard Recruitment
Marine and Shipyard Recruitment
 

Viewers also liked

ใบงานสำรวจตนเอง 611
ใบงานสำรวจตนเอง 611ใบงานสำรวจตนเอง 611
ใบงานสำรวจตนเอง 611rawinchu
 
Короткий нарис
Короткий нарисКороткий нарис
Короткий нарисNila Luchkova
 
Додаток 3 - 8
Додаток 3 - 8Додаток 3 - 8
Додаток 3 - 8270479
 
Вступ урок 1
Вступ урок 1Вступ урок 1
Вступ урок 1Nila Luchkova
 
Livret ESS 2015 2016
Livret ESS 2015 2016Livret ESS 2015 2016
Livret ESS 2015 2016Ghislain YGER
 
Keep Your Family Safe Online - Michael Kaiser
Keep Your Family Safe Online - Michael KaiserKeep Your Family Safe Online - Michael Kaiser
Keep Your Family Safe Online - Michael KaiserIT-oLogy
 
Cv in short form
Cv in short formCv in short form
Cv in short formDwight Vick
 
мяка Iграшки у сучасному декоративно ужитковому мистецтвi
мяка Iграшки у сучасному декоративно ужитковому мистецтвiмяка Iграшки у сучасному декоративно ужитковому мистецтвi
мяка Iграшки у сучасному декоративно ужитковому мистецтвiAndy Levkovich
 
Мелецька С.А.
Мелецька С.А.Мелецька С.А.
Мелецька С.А.school-2
 
презентация дихання рослин
презентация дихання рослинпрезентация дихання рослин
презентация дихання рослинElena Nazarova
 
Ivon James Resume
Ivon James ResumeIvon James Resume
Ivon James ResumeIvon James
 
Pusherアプリの作り方
Pusherアプリの作り方Pusherアプリの作り方
Pusherアプリの作り方Jun OHWADA
 
Resume for John Wilson 2015
Resume for John Wilson 2015Resume for John Wilson 2015
Resume for John Wilson 2015John Wilson
 
Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Ken Pelletier
 
CV Thiep 2015(english)
CV Thiep 2015(english)CV Thiep 2015(english)
CV Thiep 2015(english)pham thiep
 

Viewers also liked (20)

9-1-15 lab 1 resume Final Draft
9-1-15 lab 1 resume Final Draft9-1-15 lab 1 resume Final Draft
9-1-15 lab 1 resume Final Draft
 
ใบงานสำรวจตนเอง 611
ใบงานสำรวจตนเอง 611ใบงานสำรวจตนเอง 611
ใบงานสำรวจตนเอง 611
 
Короткий нарис
Короткий нарисКороткий нарис
Короткий нарис
 
Додаток 3 - 8
Додаток 3 - 8Додаток 3 - 8
Додаток 3 - 8
 
Вступ урок 1
Вступ урок 1Вступ урок 1
Вступ урок 1
 
Урок 9
Урок 9Урок 9
Урок 9
 
2558 project (1)
2558 project  (1)2558 project  (1)
2558 project (1)
 
Livret ESS 2015 2016
Livret ESS 2015 2016Livret ESS 2015 2016
Livret ESS 2015 2016
 
Keep Your Family Safe Online - Michael Kaiser
Keep Your Family Safe Online - Michael KaiserKeep Your Family Safe Online - Michael Kaiser
Keep Your Family Safe Online - Michael Kaiser
 
Cv in short form
Cv in short formCv in short form
Cv in short form
 
TIP-Demand_Side
TIP-Demand_SideTIP-Demand_Side
TIP-Demand_Side
 
мяка Iграшки у сучасному декоративно ужитковому мистецтвi
мяка Iграшки у сучасному декоративно ужитковому мистецтвiмяка Iграшки у сучасному декоративно ужитковому мистецтвi
мяка Iграшки у сучасному декоративно ужитковому мистецтвi
 
Мелецька С.А.
Мелецька С.А.Мелецька С.А.
Мелецька С.А.
 
презентация дихання рослин
презентация дихання рослинпрезентация дихання рослин
презентация дихання рослин
 
Ivon James Resume
Ivon James ResumeIvon James Resume
Ivon James Resume
 
Pusherアプリの作り方
Pusherアプリの作り方Pusherアプリの作り方
Pusherアプリの作り方
 
Resume for John Wilson 2015
Resume for John Wilson 2015Resume for John Wilson 2015
Resume for John Wilson 2015
 
Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)
 
Daniel Racasanu CV 1
Daniel Racasanu CV 1Daniel Racasanu CV 1
Daniel Racasanu CV 1
 
CV Thiep 2015(english)
CV Thiep 2015(english)CV Thiep 2015(english)
CV Thiep 2015(english)
 

Similar to Servjit Aulak CV 2016.msg

Similar to Servjit Aulak CV 2016.msg (20)

CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17CV john Halpin 6.4latest 30-01-17
CV john Halpin 6.4latest 30-01-17
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
J M AndersonCV
J M AndersonCVJ M AndersonCV
J M AndersonCV
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
 
Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
Leecvdoc
LeecvdocLeecvdoc
Leecvdoc
 
Rupert Davison latest CV
Rupert Davison latest CVRupert Davison latest CV
Rupert Davison latest CV
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
CV - Florin Tuluc 2
CV - Florin Tuluc 2CV - Florin Tuluc 2
CV - Florin Tuluc 2
 
Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Beakal Likassa - Resume
Beakal Likassa - ResumeBeakal Likassa - Resume
Beakal Likassa - Resume
 
c.v
c.vc.v
c.v
 

Servjit Aulak CV 2016.msg

  • 1. Servjit Aulak Foundations | Infrastructure | Environment Page 1 of 3 Superintendent Qualifications CSCS Civil Engineering Site Supervisor Other Training Workingat Heights Workplace FirstAid RiggingandSlinging Level 1 STMS Crane Co-Ordinator/ Appointed Person Temporary Works Supervisors (5 day course) I ama very skilled individual with many yearsin and around the civil construction industry.I have worked on a variety of projects such asroads, bridges, cofferdams and building works, always giving 100% to my role at all times. I have high levels of personal drive and commitment. Effective goal setting for self and others. With a successful track record of building and maintaining skilled teams. I pride myself on achieving excellent safety standardsand work well within a team. I amalso persistent and tenacious when faced with difficulties. Employment Record July 14 – Present Superintendent Brian Perry Civil Jan 14 – Jun 14 Construction Manager Trans-Tasman Civil May 12 – Apr13 General foreman Skanska Apr09 – May 12 General foreman Skanska Aug 08 – Apr09 Foreman Morgan Vinci Jul 06 – Aug 08 General Foreman Morgan Vinci Sep 05 – Jun 06 Foreman Atkinson Formwork May 03 –Sept 05 Section foreman Tunnelcraft Apr98 – Mar 02 Foreman O’Rourke’sand DLR Relevant Experience Project: NgaurangatoAotea Quay Date: July2014 – till Present Position: Superintendent Manageall sub-contractorson siteHigginsthe paving and drainage,also all works Manageourcrewwith piling, gantry bases,gantry erection on wholeproject. Manage ITS work activities, slip formed barriers, pre-cast barriers, drainage and street lights installation workon whole project. Advanced workplanning withconstruction managerand projectengineer. Daily managementof TMon site and staff and sub-contractors. Weekly planning and organising and achieving criticalmile stone
  • 2. Servjit Aulak Foundations | Infrastructure | Environment Page 2 of 3 Project: CharterisBay CV$ 3m Date: January2014 – June 2014 Position: Construction Manager Monitoring,executing and supervision of civilengineering works. Leads and manages appropriate resources for projectsand resolves issues of availability and performance as required Proactively identify and maintain strategicclient and sub-contractors relationship Identify assessand managethehazardsand riskassociated with projectactivities Safetymanagement,costcontroland purchasing Project: Crossrail PaddingtonStation CV250million pounds Date: May 2012 – April 2013 Position: General Foreman Overseesite workson C405 Crossrail project Contract involves the installation of a box measuring 260m long x25m wide and 23m deep. Consisting of diaphragmwall,plungecolumns,sheetpiling and RC installation. Relocation of utilityservicesand ensureallworksarecompleted withoutdamaging theGradeIIlisted façade of the station EnsureHealth and Safetyproceduresarefollowed.Winnerof gold award atRoSPAs2012 Excavating of 8000m3 and 16000m3 of clay Façadeof t he Project: M25 WideningJ16 to J23 CV 590 millionpounds Date: April 2009 – May 2012 Position: General Foreman Managea direct labourteamof approximately 16operativealong with numeroussub-contractors Managing the directional drilling operations, access steps to cabinets, blockwork and paving, technology installation worksincluding ducting installation and cabling installation. Gantry piling operations, gantry erection, street lighting installation and directional signage installation. Completion of grouting to gantry legsand protection worksto in-road detection loops Managesitelogistics for related section Project: M1 WideningJ25 to J28- Bridges 474, 475, 482 CV336millionPounds Date: August2008 – April 2009 Position: General Foreman Managesub-contractteamsin theconstruction of 5 numberroad bridges Installation of pre-castbeamsection 75ton craned into place Ensureworkwasundertaken in a safemannerand according to schedule Managesitelogistics for related section Project: KincardineBridge contract value120million pounds Date: July2006 – August2008 Position: General Foreman ManageCemetation forpiling works (1,000 piles installed) Management of work force 80 to 100 operative, consisting of carpenter ,steel fixers, general operatives, welders,scaffolders,engineersand pre-stressing Managesitelogistics for related section 1.2 Kilometrelong push launch,a triple cell systemof 40,000 ton of concreteand steel and 16.5metres wide
  • 3. Servjit Aulak Foundations | Infrastructure | Environment Page 3 of 3 Project: CliveAtkinsonFormwork CV 250k to 5m pounds Date: September2005 – June 2006 Position: Foreman Foreman on an improvementand extension of a watertreatmentplant Involved installing pumping station to chambers,circulartanksand diversion works Managesitelogistics and H&S for related section Project: Channel Tunnel Rail Link 310 RainhamCrossover Date: May 2003 -September2005 Position: Section Foreman Set up initial precastyard for fabrication 2.5x5m RC interlocking panels for retaining walls and RC capping beamforbridge at Botany Way Constructing thepierswith steel girders and RC slab for crossoverand box section over live railway line Manageearthworksstageand finishing worksto thebridgeinstallation Projectincluded:11.4km of track and 520m long viaductconstruction Project: Bluewater ShoppingCentre, DocklandLightRailway andMedway Viaduct CTRL 350/410 Date: April 1998 – March 2002 Position: Foreman