1. Jane M. Schweizer
722 13th
Avenue Bethlehem, Pa 18018
Phone: (716) 830-5702 E-Mail: jsch8124@yahoo.com
Education
University at Buffalo, The State University of New York
Graduated: May 2007
Degree: Masters Eng. Management
University at Buffalo, The State University of New York
Graduated: May 2003
Degree: B.S. Industrial Engineering
Certifications
Six Sigma Green Belt Intermediate Excel
RTI International Metals, Inc. Kent State University Fall 2007
Primavera (P6) – 102, 106, P6 Web
Critical Business Analysis
Professional Experience
FLSmidth Bethlehem, PA August 2013-Present
Project Scheduler/Coordinator
Experienced Primavera (P6) Level Planning, Coordinate/Communicate/Organize Information Across
Various Departments, Plan Project Schedules (Including WBS Strategies), Manage Schedule
Alterations in Relation to Change Orders, Develop Proposal Schedules, Create Schedules for
Various Engineering Disciplines, Integrate Schedules, Maintain/Update Detailed Project Schedules,
Examine Critical Paths, Track Total Float Changes, Provide “Look-Ahead” Schedules, Pinpoint
Potential Scheduling Issues/Risks, Compare Baseline Information To Updated Information, Inquire
About Schedule Slippages, Recap Contract Dates & Obligations With Team Members, Produce
Template Schedules, Build Cash Flow Templates, Analyze Timing Of Payment Milestones To Stay
Cash Positive, Organize Various Types of War Rooms, Tracked All Shippable Components, Provide
Invoice Amounts to Clients
Marsulex Environmental Technologies Lebanon, Pa/Clinton, NJ March2010-July2013
Project Control Engineer
Significant On-Site Scheduling Experience, Extensive Primavera (P6) Scheduling Usage, Assist In
Providing Information For Delay Claims, Implement WBS, Work Closely With Contractor
Schedulers, Integrate Contractor Schedules, Evaluate Contractor Schedules (Construction,
Engineering, Start-Up/Commissioning), Perform Plant Outage Daily Scheduling, Create/Drive
Commissioning Schedules, Assist in Assembling System Turnover Packages For Process Startup,
Track Overall Project Progress, Maintain L1, L2, & L3 Schedules, Analyze Critical Paths & Produce
Narratives, Monitor Total Float, Provide “Look-Ahead” Schedules, Examine Associated Man-
Hours, Level Resources, Initiate Progress Curves, Identify Potential Scheduling Issues, Aid in
Developing Mitigation Plans, Develop Baselines, Compare Current Information To Baselines and
Previous Updates, Question Slippage in Schedule, Emphasize Contract Dates & Obligations, Relate
Payment Milestones to Schedules, Compare Percent Completes to Invoices, Familiar With GAs,
2. PFDs, P&IDs, Logic Diagrams, & Red-Lines, Report-Out To Clients, Experience With Expediting
Portions Of A Project, Familiar With GAs, PFDs, P&IDs, Logic Diagrams, & Red-Lines, Report-
Out to Executive Management, Report-Out To Clients
RTI International Metals, Inc. Niles, OH August 2007-March 2010
Project Coordinator (Expansion Projects/Primavera (P6) Implementation)
Coordinate Information Among Project Managers, Build/Improve On Main and Secondary
Timelines, Establish Baselines, Track Progress in Relation to the Timelines/Baselines, Experience
With Delaying A Project, Recalculate Progress & Establish New Plans, Construct/Calculate Risk
Registers, Generate “What-If” Scenarios, Learn/Familiarize with Primavera, Develop Plan For
Company-Wide Use, Convert Material From MS Project Into Primavera, Oversee/Manage Initial
Primavera Implementation Within Engineering, Teach/Support Primavera Within the Company,
Troubleshoot Primavera Problems/Issues, Continually Aid In Developing Best Practices For
Inputting Financial Data Into Primavera, Attach Budgetary Information to Specific Activities,
Configure Security Roles, Populate The Program With Various Company Information, Distribute
Report-Out Information to Various Levels of Management, Aid in Organizing/Giving Updated
Presentations to All Levels of Management, Study Material/Create Presentations for Use by The
Board
RTI International Metals, Inc. Niles, OH May 2006 – August 2007
Industrial Engineer II
Perform Work Sampling Studies/Time Studies on Bottleneck Areas, Establish Cycle Times by
Product/Job/Job Elements, Determine Current Machine Capacities, Analyze Findings, Suggest
Improvements for Efficiency and Predict Their Impacts, Conduct Motion Studies, Create and
Implement Templates for Standardized Work, Construct/Provide Presentations and Begin Networks
to Promote the IE Dept., Assemble/Give Report Outs To All Levels of Management, Organize/Lead
Meetings with Management and Union Personnel, Study Material/Create Presentations for Use by
The Board, Aid in Production Forecasting, Support Continuous Improvement Projects, Oversee
Maintenance of Implemented Activities, Calculate/Audit Incentives
Aerotek assigned to GM Powertrain Tonawanda, NY June 2003 – May 2005
Global Management Systems Implementation Team
Assistant Industrial Engineer
Revise Job Instructions, Perform Time & Delay Studies, Support the Re-Balance of the Assembly
Line, Familiar with Job Element Sheets, Standard Operation Sheets, Standardized Work Charts, &
Total Planned Maintenance Sheets in accordance to GMS, Knowledgeable of 5S Elements, Identify
and Fix Safety Hazards, Address and Provide Solutions for Ergonomic Issues, Implement Workplace
Organization, Construct Housekeeping Plans, Execute Visual Management, Post Indicators and
Directions on Critical Operations, Arrange/Conduct Meetings with Hourly Workers & Staff, Provide
Regular Reports to Management on Progress, Resolve Issues Between Management & Union, Create
Timelines and Target Dates, Generate Work Schedules for Hourly Workers, Help in Continuous
Improvement and Maintenance of GMS
Other Experience
Volunteer Girl Scout Troop Leader Champion, OH March 2009 – March 2010
Lead Meetings With Brownies (Ages 6-9) & Juniors (Ages 10-12), Develop Plans And Curriculums
For Meetings, Organize Group Outings, Arrange/Manage Various Fundraisers, Maintain Detailed
Budgets