2. Important Notice
These Presentation Materials do not constitute or form part of any invitation, offer for sale or subscription or any solicitation for any
offer to buy or subscribe for any securities in the Company nor shall they or any part of them form the basis of or be relied upon in
any manner or for any purpose whatsoever.
These Presentation Materials must not be used or relied upon for the purpose of making any investment decision or engaging in an
investment activity and any decision in connection with a purchase of shares in the Company must be made solely on the basis of
the publicly available information. Accordingly, neither the Company nor its directors makes any representation or warranty in
respect of the contents of the Presentation Materials.
The information contained in the Presentation Materials is subject to amendment, revision and updating in any way without notice or
liability to any party. The presentation materials contain forward-looking statements which involve risk and uncertainties and actual
results and developments may differ materially from those expressed or implied by these statements depending on a variety of
factors. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information
or opinions contained herein, which have not been independently verified.
The delivery of these Presentation Materials shall not at any time or in any circumstance create any implication that there has been
no adverse change, or any event reasonably likely to involve any adverse change, in the condition (financial or otherwise) of the
Company since the date of these Presentation Materials.
The Presentation Materials are confidential and being supplied to you for your own information and may not be reproduced, further
distributed, passed on, or the contents otherwise divulged, directly or indirectly, to any other person (except the recipient’s
professional advisers) or published, in whole or in part, for any purpose whatsoever. The Presentation Materials may not be used for
the purpose of an offer or solicitation to subscribe for securities by anyone in any jurisdiction.
2
3. Discover Petra Diamonds
3
Cullinan
July 2008
Block Cave
16yr Mine Plan
+50yr Potential Life
Williamson
November 2008
Open Pit
17 yr Mine Plan
+50yr Potential Life
Kimberley UG
May 2010
Block Cave
11yr Mine Plan
+12yr Potential Life
Finsch
Block Cave
18yr Mine Plan
+25yr Potential Life
Koffiefontein
July 2007
Front Cave
14yr Mine Plan
+20yr Potential Life
September 2011
Petra has acquired the following five diamond mines from De Beers:
• The largest quoted pure diamond mining group (LSE: PDL) – member of FTSE 250
• One of the world’s largest diamond resources at +300 million carats
• Diversified portfolio – five major kimberlite mines and three fissure mines in production
• Exceptional growth – objective to increase production to over 5 million carats by FY 2019
• Provides direct exposure to the positive long term fundamentals of the diamond market
4. Proven Track Record – Continuous Growth
4
0.0
0.5
1.0
1.5
2.0
2.5
FY
2007
FY
2008
FY
2009
FY
2010
FY
2011
FY
2012
Gross Production Profile
Strong
production
growth due
to Finsch
acquisition
Mcts
Major increase
due to higher
volume Cullinan
mine
0
50
100
150
200
250
300
350
FY
2007
FY
2008
FY
2009
FY
2010
FY
2011
FY
2012
Gross Revenue Profile
US$
million
Acquisition
of
Koffiefontein
Recovery
in rough
diamond
prices &
sale of 507
ct Cullinan
Heritage
Finsch
contribution
boosts
revenue
Decreased
revenue due to
the economic
downturn
Q3 FY 2012
Q3 FY 2012
* The above columns suggesting full year FY 2012 production and revenue levels are for illustrative purposes only and are not market forecasts
*
*
5. A Diversified Portfolio
• Focus on Africa – source of 60% of the world’s diamonds by value
• Eight producing mines – provides flexibility in terms of portfolio performance
• Kimberlite exploration programme in Botswana
5
6. Focus On Botswana
• Africa’s premier mining jurisdiction
• World’s largest diamond producer by
value
• Superb geological prospectivity
• Stable politically and attractive fiscal
regime
• Easy logistics
• Transparent land tenure system
Petra Diamonds Botswana
• Petra Diamonds Botswana holds major
diamond exploration landholding of
22,250km² – all ‘on craton’
• Team operates a highly focused and cost
effective exploration programme
• Recent discovery of KX36 – LDD drilling
programme underway to further evaluate
this potentially high grade discovery
6
!
!
!
!
!
!
!
!
!
!
!
!
!
CKGR
Maun
Orapa
Gweta
Serowe
Kokong
Toteng
Palapye
Jwaneng
Khutswe
Gaborone
Letlhakane
Letlhakeng
Francistown
Legend
Petra Diamonds Botswana
Licences and Folios
Other Diamond Licences
0 300150
Kilometers
¯
14. KX36
New Kimberlite Discovery
• Initial drilling and micro-diamond sampling campaign
indicated:
• Initial modelled (undiluted) diamond grade
between 75-180 cpht (J Ferreira / MSA)
• Indications of a reasonably coarse diamond size
distribution from MiDA modelling (J Ferreira /
MSA)
• Surface area interpreted to be ~5 ha under 78m of
Kalahari overburden
• LDD drilling and bulk sampling campaign has now
commenced
• Results expected later in the year
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface); Deposit open at depth 14
23. • The rock is classified as a hypabyssal-facies, coherent, macrocrystic, altered
phlogopite kimberlite
• Based on the grain size of the groundmass, euhedral, opaque spinels (up to 0.07 mm)
this kimberlite is petrographically rated as high interest with respect to diamond
potential
• The development of the kimberlites indicates the intervention of hypabyssal crystallization
by a process known as second boiling. This process is likely to put an end to diamond
oxidation and should therefore be seen as a positive process with regard to diamond
preservation
23
KX36
Petrographic Assessment (by Mike Skinner)
26. Extension of holes for
Geotechnical assessment of wall rock
Total: 1,680m
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m
Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface)
KX36
Planned Delineation Drilling
(shallow & geotechnical)
26
27. Total: 1,920m
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m
Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface)
KX36
Planned Delineation Drilling
(intermediate & geotechnical)
27
28. Total: 2,400m
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m
Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface)
KX36
Planned Delineation Drilling
(deep)
28
29. Completed
In Progress
Planned
Total: 1,550m
(+/- 740 tonnes)
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m
Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface)
KX36
Initial 24” LDD Sampling
29
30. Total: 1,240m
(+/- 590 tonnes)
KX36
Proposed Infill 24” LDD Sampling
Calcretized Kimberlite
Weathered Kimberlite
Fresh Kimberlite
516m
Tonnage estimate of between
28Mt and 34Mt to base of Deposit
(516m below surface) 30
31. Some “Classics ”
• “No kimberlite has been intersected and it is considered
highly unlikely that any kimberlites are located within this
area”
• “It is quite possible that the grains recovered in this license
come from elsewhere having been transported by aeolian
and fluvial forces”