2. INTRODUCTION
Time
Cost Quality
Energy
Cost Quality
Land Time Environment
CONSIDERATIONS
Green Building
Typical Building
Green building
The practice of creating structures and using
processes that are environmentally responsible and resource-
efficient throughout a building's life-cycle from siting to design,
construction, operation, maintenance, renovation and
deconstruction.
2
Fig 1:Considerations
3. ENERGY CONSUMPSION
BACKGROUND
Respondents selecting green projects versus
certified & materialized green project
3
Fig 2: Total energy consumption
Fig 3: difference between proposed & materialized/
certified projects
4. Percentage of green building project 2018-2021
Under developed countries
Developed countries
• The USA , UK, Australia etc.
Developing Countries
• Brazil, Argentina, France etc.
Under Developed countries
• Bhutan, Myanmar etc.
Remaining- 40%
Proposed- above 60%
Remaining- 20%-25%
Proposed- 35%-45%
Remaining- 10%-20%
Proposed- 25%-30%
BACKGROUND
WHAT IS THE OBSTACLE BEHIND LOWER ADOPTION
& MATERIALIZATION OF GREEN BUILDING PROJECT
4
Fig 4: Percentage of green building project 2018-2021
5. • To identify obstacles encountered in green building
construction project management.
• To encourage practice of Green Building project
both from contractors & owners.
OBJECTIVES
SO , OUR OBJECTIVES ARE-
5
9. RESULT &
DISCUSSION
These facts result in problems like-
• Apathy from adopting Green building
project
• less engineers & contractors practice with
green building project
Comparison of cost, inform & convince!
9
10. RESULT &
DISCUSSION
Comparison among Green building first & operation cost[2]
On basis of investment, the pay back occurs
within – 2 years- 22%
5 years - 49%
10 years- 29%
Average 5-6 years !
15%
35%
20%
20%
10%
LIGHTING &
FIXTURES
RAIN WATER
HARVESTING
& PUMPING
BRICKS &
PAINTS
SOLAR PANEL
INSTALLATION
VEGETATION
& GREEN
TREATMENT
First Cost for Green Building
construction
65%
58%
34%
32%
21%
25%
OPERATING COST
IMPROVE OCCUPANT
HEALTH
DOCUMENTATION
PROVIDING QUALITY…
HIGHER VALUE AT POINT
OF SALE
PRODUCTIVITY
RENNOVATION
Decrease in cost while operation
10
Fig 7: Comparison among first & operation cost
11. RESULT &
DISCUSSION
From Government
STEPS RESULT AUS EU
(EPBD)
SINGAP
ORE
(BCA)
Obligation of Green construction
for all Government project
Involvement of contractors in
Green project & promotion
26% 15% 25%
Retrofit Green system for existing
buildings
Involvement of contractors in
Green project & promotion
30% 35% 45%
Minimum rating margin for non
government construction
Residential & commercial
buildings in a Green support
15% 18% 12%
Making Investment facilities more
available for Green projects
Inspire Real state companies ,
residential & other clients
18% 15% 15%
Reduce tax of Green equipment Within budget consideration 11% 17% 3%
Allocation of budget for GB study &
research
Inspire fresher 2% 4% 9%
Inspire involvement of skilled people &
will affect client demand
INITIAL STEP?
11
[2]
Table 1: Steps from Government & result
12. RESULT &
DISCUSSION
Level of Green Building activities in these countries[1] -
Australia
UK
Singapore
12
Fig 9: Results of these steps in UK , Singapore & Australia
13. CONCLUSION
Cost , Time & Practice
Promotion of
the facilities
towards every
perspective,
contractors ,
clients & also
fresher to be
interested to
involve in this
sector
Awareness
Government
projects ,
allocation
budget for
research ,
investment &
tax reduction
Government
steps
Make
comparative
analysis with
reliable
information ,
including
payback time
& other
facilities
Comparative
analysis
Reference:
1.Environmental-sciences/the-objective-of-green-building-Concept-environmental-
sciences-essay.php
2. Jeremiahjames374/docs/6 objectives of green building-176
13