2. ACKNOWLEDGEMENT
(i) First of all, I am extremely grateful to Almighty Allah to enabling
me to complete this report of IME (Individual Management
Experience)
(ii) I am also highly grateful to my parents for their love, prayers,
caring and sacrifices for educating and preparing me for my
future.
(iii) It is great honor to me Today I am here in 123rd Middle
Management Course Training for Sharing my IME (Individual
Management Experience with the participants / fellows in the
guide line an encouragement of Course Director Mr. Hassan
Rashid & Dy: Course Director Mr. Siddique ur Rehman )
3. MY INTRODUCTION
Name : Javed Ahmed Shaikh
Qualification : B.E (Electrical)
Joined MEPCO : December, 2002
Joined NTDC : July, 2008.
Present Posting : Deputy Manager (Tech:) O/o CE
(TSG) South NTDC, Hyderabad
@ Jamshoro
4. 500KV T/LINE SUB-DIVISIONS
500kv T/Line (North) Division NTDC, Multan Consisting of
following sub-Divisions
(i) 500 KV T/L Sub Division Multan
(ii) 500 KV T/L Sub Division Pir Mahal
(iii) 500 KV T/L Sub Division Jhang
(iv) 500 KV T/L Sub Division Faisalabad
(v) 500 KV T/L sub Division Yousfwala
(vi) 500 KV T/L sub division Sheikhupura
6. Proper Maintenance Should be carried out.
Focus on Continuity of Power Supply
Improve the efficiency of Transmission Lines
To avoid frequent trippings
Smooth Running of 500 KV Transmission Network System
OBJECTIVES
7.
8.
9.
10. Transmission Lines were fully Loaded
Transmission Lines were found fully dusty, carbon & & Bird excrement can
be on several locations.
Usually /Mostly shutdowns were not approved by NPCC due to load
Management.
Several towers of transmission Lines are installed in forest and desert areas
Access and approach was not easy due to forest and desert.
OBSERVED THE PROBLEMS
11. OBSEVERED THE PROBLEMS
Shortage of staff.
Conditions become worst day by day on Transmission Line Network
The Trappings were occurred & huge loss of Authority due to trappings.
Industries and Peoples were being effected due to cut of power supply.
12. Due to our hard efforts and close Co-ordination with higher-ups and NPCC,
we got shutdowns approved.
Properly maintenance work was completed within the short period as per
planned schedule.
The quantum of trippings were minimized of transmission lines.
Obtained the bare power interruption as compared to frequent trippings.
All work was successfully performed for the best interest of system.
ACHIEVEMENTS
13. I would like to conclude my Individual Management Experience that 5he
efficiency and goal can be achieved through following factors.
Will
Action Plan
Ability
Motivation
Performance
Dedication
CONCLUSION