1. bp
Farha Conceicao
Team Assistant
Engineering Services Team
BP Angola (Block 18) B.V.
Torres Atlantico
Av. 4 de Fevereiro n." 197. Luanda
Angola
Date: 8 August 2011
Dear,
A huge thank you for your excellent w rk done thus far in support of Greater Plutonic's
water injection re-instatement program. The quality and responsive work done on
behalf of Technip Angola on engineering design has been critical to the success of this
high profile project. This largely inside - Angola work program has demonstrated
dedicated and successful team work across the client, engineering, fabrication and
installation spectrum. While the project i.s still underway, with many stages yet ahead,
it is appropriate to say thank you for the hard work and dedication that has helped to
deliver thus far.
Collectively, we have developed and are delivering a successful 'brown field' project,
recognized within BP to be particularly challenging over new/green field developments
due to the added interactions and requirements of ongoing operations.
On behalf of all of us ifl Engineering Services and BP Angola Operations, please accept
the enclosed as a personal token of our appreciation for your contribution.
Sincerely,
IL~. P.or(SL--
Chris Schlueter
Engineering Services Manager
Kimi de Sousa
Project and Mods Team Leader
BP Angola (Block 18) BV
Registered in the Netherlands. No. 27195251
Rivium Boulevard 301. 2909 LK
Capelle aan den IJssel
Netherlands