- 1. © Canberra Institute of Technology Page 1 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
Assessment Practical/Observation (4/4)
Student Name: CIT Number:
Competency Title, Code
and Banner Code
CRN
CPCCPB3014 Install bulk insulation and pliablemembrane products
CPCCPB3027 Install ceilinginsulation products
CPCCOM1015 Carry out Measurements and Calculations
Assessment Type ☐ In the workplace ☒ Simulated environment ☐ Other
Assessment Name
Assessment 4 (of 4) – Practical AssessmentPliableMembraneProducts and Bulk Insulation
Installation
Assessment Date
Student Statement: This assessmentis my own work. Any ideas and comments made by other people havebeen
acknowledged. I understand that by emailingor submittingthis assessmentelectronically,I agree to this statement.
Student Signature: Date: / /
PRIVACY DISCLAIMER: CIT is collectingyour personal information for assessmentpurposes.The information will only be
used in accordancewith the CIT Privacy Policy.
Assessor Feedback (also complete observation checklistand questions on the lastpage)
☐ Student provided with feedback
Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date: / /
Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date: / /
Assessor Name: Assessor Signature:
Note from Assessor: Pleaserecord any reasonableadjustment that has occurred for this assessment.
- 2. © Canberra Institute of Technology Page 2 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
Assessment Task Instructions for Students
Assessment Task:
In the simulated facility,you are tasked to safely undertake floor,wall and ceilinginsulation installation work usingbulk
insulation and pliableproducts.
Specificationsfor the job:
Install a pliable membrane (sarking/wall wrap) on a wall frame minimum 2400mm high by 3 lineal metres
Install bulkinsulation to a floor Space with a minimum area of 9 squaremetres
Install bulkinsulation wall frames to a minimum of 2400mm high by 3 lineal metres
Install bulkinsulation to ceiling space with a minimum area of 9 squaremetres
Duringthe installation you will berequired to take 4 photos of the final installation for wall,ceiling and upload into eLearn.
You will berequired to complete written task five (5) at the completion of all 4 installations.
Throughout the installations you arerequired to take the followingphotographs as supplementary evidence. You will
upload these onto eLearn. Pleasetake images of:
1. Signage and barricades in correctposition
2. Locked out and tagged electrical board
3. Wall wrap atcorners,openings, bottom of wall,overlap and fixingspacing
4. Image of final job (whole wall)
Time allowed: Each installation mustbe completed within the standard work time of 30 minutes
Assessment range and conditions:
This assessmenttask will becompleted in groups of no more than 4 students. You will be assessed individually.
Prior to attempting this assessment,you must submitall written tasks (1-4).
Relevant standards provided by CIT (AS 3999, AS/NZS 3859.1/AS/NZS 3000/AS 4200.2/AS 4859.1)
The practical task mustbe completed within the standard work timeframe of 30 minutes.
Course notes with technical details
Materials provided: Assessment will be conducted in the simulated facility located on Bruce campus will access to all
equipment and materials.
Materials you may need: You will provideyour own PPE; work boots, ankle-to-wristcovered clothing,hard hat, high vis
vest or shirt,protective eye wear, dust musk, anti-cut gloves.
You will also need printed copies of Tasks 1-4 from Assessment 2 on hand for the installations.
Information for students: You may have two (2) attempts for this assessment.
If your first attempt is notsuccessful,your teacher will discuss your results with you and will arrangea second
attempt.
If your second attempt is not successful,you will berequired to re-enrol in this unit.
Only one re-assessmentattempt will begranted for each assessmentitem.
- 3. © Canberra Institute of Technology Page 3 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
You must successfully completethe followingskillson the practical observation checklist:
Observation Checklist
Installations Attempt 2
During the task the following skills were demonstrated satisfactorily:
Pliable
Membrane
(minimum
of 2400mm
high by 3
lineal
metres)
Bulk
Insulation
floor space
(minimum
area of 9
square
metres)
Bulk
insulation
wall space
(minimum
of 2400mm
high by 3
lineal
metres)
Bulk insulation
ceiling space
(minimum
area of 9
square metres)
Installation
type
(Indicate by:
Pliable, Floor,
Wall or
Ceiling)
S* NYS*
Date &
Initial
S* NYS* S* NYS* S* NYS* S* NYS*
Plan and prepare for the job
1. Actively participates in toolbox talk;confirms,and plans job
requirements with assessor
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
2. Inspects and selects tools,equipment and PPE and reports any
faults to assessorand rectificationsareimplemented as required
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
3. Undertakes an inspection of the jobsiteand reports any risks or
hazards to the assessor prior to commencement
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
4. Reviews the electrical risk assessment
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
5. Checked insulation materialsagainst materials checklistand
requirements
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
6. Select and erect signageand barricadeequipment
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
- 4. © Canberra Institute of Technology Page 4 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
7. Implements controls for unstable,fragileor brittlework surfaces
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
8. Cuts and measures insulation material to sizeand minimises waste
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
Safely isolates worksite electrical circuits
9. Isolate's worksiteelectrical circuitin accordancewith the SWMS ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
10. Installstags and locks to the main switchboard in accordanceto the
SWMS
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
Safely installs insulation materials according to job instructions and manufacturer specification
11. A) Wraps / pliable
Installsbottomwrap from a corner, tight and level and fixed at
manufacturer recommended spaces.
Lapped top layer as per manufacturer’s instructions
Performs cut out sizes for openings as per manufacturer’s
instructions,ensuringto minimisewasteand tapes any protruding
services
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
11b) Wall / floor batts
Installed as per manufacturers specifications
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
11b) Wall / floor batts
Installed as per manufacturers specifications
11c) Ceilingbatts
Installed as per manufacturers specifications
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
12. Implements SWMS and performs safety controls throughout the
task ensuringsafety to self and others
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
- 5. © Canberra Institute of Technology Page 5 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
13. Performs all four insulation installationsas per Australian Standards
from commencement to completion
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
14. Inspects installed insulation for any damageor distortion to the
surroundingenvironment and services
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
15. Conducts final inspection ensuringinsulation conforms to work
instructions,AS and manufacturers specifications
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
Completion of installation
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
16. All tools have been cleaned, checked for faults (documented and
reported for repair or replacement as required) work area is left
clean,materials and consumables arereturned to their designated
storage area
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
17. Disposed of all materials,reusingand recyclingmaterialswhen
applicableand work area is left clean
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
18. Safely reactivates power
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
19. Completed Statement of Insulation and distributed and stored
appropriately.
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
☐ ☐
Throughout the installations you are required to take the following photographs as supplementary evidence. You will upload these onto eLearn.
Photos (for each installation)
1. Signage and barricades in correctposition –1-2 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
2. Locked out and tagged electrical board –1-2 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
- 6. © Canberra Institute of Technology Page 6 of 6 Date created: 17/01/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 7/04/2022
3. Wall wrap atcorners,openings, bottom of wall,overlap and fixing
spacing and tapingaround protrudingservices –3 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
4. Wall batts - Image of whole wall,details around services –3 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
5. Floor batts - Image of whole floor, details around services –3 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
6. CeilingBatts - Clearancearound downlights,under / over wiring,
under walk boards,stringing – 4 – 5 photos
☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
*S –Satisfactory, NYS – Not Yet Satisfactory