SlideShare a Scribd company logo
1 of 9
Download to read offline
EHS NEWSLETTEREHS NEWSLETTER
October 2016
 Tracking of Environmental, Health, Safety and Energy Legislations in China
 The Latest Information on National and Local Legislation Update and 
Legislative Initiatives.
 EHS Topic: Brief Introduction to ISO14001‐2015 (GB/T 24001‐2016)
Your Trusted Partner for EHS Solution www.esdchina.com    
 EHS Topic: Brief Introduction to ISO14001 2015 (GB/T 24001 2016)
Highlight in this Issue
Technical Guidance on Comprehensive Treatment of Combustion 
Pollution of Civil Coal Use (Trial) Environment
According to the guidance, the purpose of combustion pollution treatment of 
civil coal use is for the continual improvement of ambient air quality. Various 
full scale applicative treatment toolkits as well as more effective treatmentfull‐scale applicative treatment toolkits, as well as more effective treatment 
policies and technical options were provided in the guidance for different 
districts. 
Thi S d d i h Chi i f ISO14001 2015 C d h l
Environmental Management Systems‐ Requirements with 
Guidance for Use (GB/T 24001‐2016) Environment
Jilin Emergency Plan for Special Equipment Incidents
This Standard is the Chinese version of ISO14001‐2015. Compared to the last 
edition, this is just a technical revision. The principal remained the same. 
“Prevention of pollution” is still the key idea throughout the whole standard, 
while “Continual improvement” is still the soul of the standards. 
Jilin Emergency Plan for Special Equipment Incidents
This emergency plan aimed at active response of possible special equipment 
incidents, to prevent further deterioration and secondary incidents, to deal 
with the incidents safely, ordered, scientifically and efficiently, so as to 
minimize casualties and financial loss. 
Safety
Jiangsu Measures on Pilot Reform of Construction Project 
Environmental Impact Assessment
According to the measures, the local government will implement inventory 
based management by means of establishing an eco‐space inventory, a land 
use control inventory, a pollution mass loading control inventory and an 
i d t / i t l d itt i t Th l i EIA
Environment
Administrative Measures on Soil Environmental Management of 
Contaminated Sites (Draft) 
industry / process environmental admittance inventory. The planning EIA 
inspection comments and management inventories will be available to the 
public via the official websites.
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
Environment
In accordance with the "polluters pay" principle, entities or individuals causing 
soil contamination shall bear main responsibility to perform investigation, 
control and remediation. If it is difficult to identify the polluter, the land user 
shall bear the corresponding responsibility. 
Part 1 National Legislation Update 
Chinese Name 国家安全监管总局政府网站信息发布管理办法
English Translation Administrative Measures on Information Publicity on the Official Website of State
Issuance Number 安监总厅宣教〔2016〕133号
Issued By State Administration of Work Safety
Issued Date 2016‐10‐27
Effective Date 2016‐10‐27
h
http://www.chinasafety.gov.cn/newpage/Contents/Channel 6288/2016/1031/277714/conten
Chinese URL
http://www.chinasafety.gov.cn/newpage/Contents/Channel_6288/2016/1031/277714/conten
t_277714.htm
Brief Introduction: According to the Measures, ‘www.chinasafety.gov.cn’ is the only official website of Internet Website 
of State Administration of Work Safety (SAWS), registered under the Chinese name of ‘国家安全生产监督管理总局’. The 
‘information’ refers to the governmental information produced or obtained by SAWS, recorded or preserved in certain 
formats, which is initiatively made available to the public, including specific content interpretation, publicity influence 
amplification, public opinion guidance and public convenience service. All information regarding public advantages and 
interests shall be published through the SAWS official website fully, timely and accurately.
Chinese Name 民用煤燃烧污染综合治理技术指南(试行)
English Translation
Technical Guidance on Comprehensive Treatment of Combustion Pollution of Civil Coal Use 
(Trial)
Issuance Number 环境保护部公告2016年第66号
Issued By Ministry of Environmental Protection
Issued Date 2016‐10‐22
Effective Date 2016‐10‐22
Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161031_366528.htm
Brief Introduction: The northern region of China is entering the heating 
period soon. Haze pollution due to coal firing will become a serious 
issue again. The guidance is released at the very moment to deal with 
the issue. According to the guidance, the purpose of combustion 
pollution treatment of civil coal use is for the continual improvement of 
ambient air quality Various full‐scale applicative treatment toolkits asambient air quality. Various full‐scale applicative treatment toolkits, as 
well as more effective treatment policies and technical options were 
provided in the guidance for different districts. It is also clearly aware 
that the use of high‐grade coal is a transitional approach at present 
economic and social development. In the long run, it will be replaced by 
electricity, natural gas, solar power and other clean energy.
Chinese Name 民用煤大气污染物排放清单编制技术指南(试行)
( )English Translation Technical Guidance on Establishment of Air Emission Inventory of Civil Coal Use (Trial)
Issuance Number 环境保护部公告2016年第66号
Issued By Ministry of Environmental Protection
Issued Date 2016‐10‐22
Effective Date 2016‐10‐22
Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161031_366528.htm
Brief Introduction: The Guidance is an important part of the technical guidance system of air pollution source emission 
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
inventory, serving as further supplement and completion. Now that this guidance is in force, corresponding 
requirements / suggestions of made in the other guidance upon civil coal use, i.e. Technical Guidance on Emission 
Inventory of Primary Fine Particulate Matter Sources (Trial), Technical Guidance on Emission Inventory of Primary 
Inhalable Particulate Matter Sources (Trial) and Technical Guidance on Emission Inventory of Volatile Organic Compound 
Sources (Trial), shall subject to the Guidance. The recommended discharge coefficients provided in the appendixes are 
mainly for reference. It is encouraged to replace them with local measurement and survey data.
Chinese Name 关于修改《危险废物经营单位审查和许可指南》部分条款的公告
E li h T l ti
Announcement on Modification of Certain Clauses of Inspection and Permission Guidance of
English Translation
p
Hazardous Waste Operation Entities
Issuance Number 环境保护部公告2016年第65号
Issued By Ministry of Environmental Protection
Issued Date 2016‐10‐02
Effective Date 2016‐10‐02
Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161028_366366.htm
Brief Introduction: This is a minor modification of the 2009 edition in accordance with the Notice of EnvironmentBrief Introduction: This is a minor modification of the 2009 edition, in accordance with the Notice of Environment 
Protection Administration regarding Stopping Examination and Approval of Construction Project Trial Production issued in 
April 2016. Amendment was made in article 4 and appendix 1. In article 4, the requirement on completion acceptance 
prior to hazardous waste operation permit was deleted. In appendix 1, the document submission requirements of 
existing projects (with completion acceptance) and new constructed projects were separated.
Chinese Name 高效能大气污染物控制装备评价技术要求 (GB/T 33017‐2016)
English Translation Technical Requirements of High Efficiency Air Pollution Control Equipment for AssessmentEnglish Translation Technical Requirements of High Efficiency Air Pollution Control Equipment for Assessment
Issuance Number 国家标准公告2016年第17号
Issued By General Administration of Quality Supervision, Inspection and Quarantine
Issued Date 2016‐10‐13
Effective Date 2017‐05‐01
Chinese URL http://www.sac.gov.cn/gzfw/ggcx/gjbzgg/201617
Brief Introduction: This is a series of standards of Technical requirements of high efficiency air pollution control 
equipment for assessment, including 4 parts, Part 1: General principle; Part 2: Electrostatic precipitator; Part 3: Bag filters;
Part 4: Electrostatic‐fabric integrated precipitator. The full texts of these standards are not yet available online.
Chinese Name 环境管理体系 要求及使用指南 (GB/T 24001‐2016)
English Translation Environmental Management Systems‐ Requirements with Guidance for Use (GB/T 24001)
Issuance Number 国家标准公告2016年第17号
Issued By General Administration of Quality Supervision, Inspection and Quarantiney
Issued Date 2016‐10‐13
Effective Date 2017‐05‐01
Chinese URL
http://www.sac.gov.cn/was5/web/search?channelid=97779&templet=gjcxjg_detail.jsp&search
word=STANDARD_CODE='GB/T 24001‐2016'&XZ=T&STANDARD_CODE=GB/T 24001‐2016
Brief Introduction: This Standard is the Chinese version of ISO14001‐
2015. Compared to the last edition, this is just a technical revision. 
The principal remained the same “Prevention of pollution” is stillThe principal remained the same.  Prevention of pollution  is still 
the key idea throughout whole standard, while “Continual 
improvement” is still the soul of the standards. 
An organization that wishes to demonstrate conformity with this 
International Standard can do so by:
‒ making a self‐determination and self‐declaration, or
‒ seeking confirmation of its conformance by parties having an 
interest in the organization, such as customers, or
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
interest in the organization, such as customers, or
‒ seeking confirmation of its self‐declaration by a party external to 
the organization, or
‒ seeking certification/registration of its environmental 
management system by an external organization.
Chinese Name 全民节水行动计划
English Translation National Water Conservation Action Plan
Issuance Number 发改环资[2016]2259号
Issued By National Development and Reform Commission
Issued Date 2016‐10‐28
Effective Date 2016‐10‐28
Chinese URL www.miit.gov.cn/n1146285/n1146352/n3054355/n3057542/n3057545/c5335293/content.html
Brief Introduction: The action plan clearly stipulated water conservation and pollution reduction requirements on 
industrial parks: 1) establish industrial system of water circulation and improve wastewater treatment and reuse rate; 2) 
promote using water‐saving products and implement water use efficiency labeling policy and water‐saving product 
certification; 3) conduct public institution water‐saving reform and improve corresponding management.
In districts with water deficiency, it is emphasized that initiatives should be taken to save water. Rigid restraint on water
resource should be taken seriously. Water resource bearing capacity assessment should be conducted in each county to 
establish early warning system and release warning information. For construction projects, water resources 
demonstration procedure should be implemented strictly for water quotation management. Each project should have 
complete water use plan and water conservation statistics.
Chinese Name 关于以改善环境质量为核心加强环境影响评价管理的通知Chinese Name 关于以改善环境质量为核心加强环境影响评价管理的通知
English Translation
Notification on strengthening the management of environmental impact assessment in order
to improve the environmental quality
Issuance Number 环环评[2016]150号
Issued By The Ministry of Environmental Protection
Issued Date 2016‐10‐26
Effective Date 2016‐10‐26
Chinese URL http://www.zhb.gov.cn/gkml/hbb/bwj/201610/t20161031 366546.htmp // g /g / / j/ / _
Brief Introduction: The Notification specified that approval of new projects would 
be limited in certain areas with poor environmental status, which was not able to 
meet the requirements of environmental quality assessment. In addition, industrial 
and mineral projects are strictly prohibited within the range of ecological protection 
red line, except those indispensable infrastructure projects being carried out, such 
as highway, waterway, flood controlling, pipelines, canals, communication and 
power transmissions. The Notification also proposed control suggestions on regional 
mass loading of pollution discharge optimization on regional development layoutmass loading of pollution discharge, optimization on regional development layout, 
and countermeasures of structure and scale. EIA approvals shall take additional 
account on upper limit of resource consumption, that is, energy, water, land and 
other relevant items. In the EIA inventory planning, a negative list of environmental 
access would be developed based on the selection of location, resource utilization 
efficiency, resource allocation and other aspects pertaining to the relevant subject. 
Local Legislation Update Part 2
Chinese Name 吉林省特种设备事故应急预案
English Translation Jilin Emergency Plan for Special Equipment Incidents
Issuance Number 吉质监特函〔2016〕338号
Issued By Jilin Province Bureau of Quality and Technology Supervision
Issued Date 2016‐10‐18
Effective Date 2016‐10‐18
Chinese URL http://www jlqi gov cn/index/jichaFJ/infoDetail jsp?IDS 26748
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
Brief Introduction: This emergency plan aimed at active response of possible special equipment incidents, to prevent 
further deterioration and secondary incidents, to deal with the incidents safely, ordered, scientifically and efficiently, so as
to minimize casualties and financial loss. The Plan was issued by the Province Bureau of Quality and Technology 
Supervision, applicable to explosion, damage, ineffectiveness, defect and malfunction of special equipment with 
casualties and financial loss owning to internal and/or external (factitious) reasons.
Chinese URL http://www.jlqi.gov.cn/index/jichaFJ/infoDetail.jsp?IDS=26748
Chinese Name 安徽省饮用水水源环境保护条例
English Translation Anhui Regulation on Drinking Water Source Conservation
Brief Introduction: The regulation established legal liability over the 
drinking water source damaging behaviors that was not stipulated in the 
i l C d i h h f di i
Issuance Number 安徽省人民代表大会常务委员会公告第49号
Issued By Standing Committee of Anhui People’s Congress
Issued Date 2016‐10‐08
Effective Date 2016‐12‐01
Chinese URL http://www.ahfzb.gov.cn/content/detail/57fb53a5cfd9f3a00f000003.html
superior laws. Compared with the former edition, now current 
requirements were made in 5 aspects: 1) compensation mechanism for 
ecological protection of drinking water source; 2) back‐up water source 
establishment; 3) cooperation mechanism for environmental protection; 
4) protection scope and measures of decentralized drinking water source; 
5) supervisory responsibilities of related departments. Meanwhile, 
administrative responsibilities and penalty power, as well as accountability, 
were endowed to departments of environmental protection, water 
d i i t ti t it i l bli it bli h lth
Chinese Name 江苏省建设项目环境影响评价改革试点办法
English Translation Jiangsu Measures on Pilot Reform of Construction Project Environmental Impact Assessment
Issuance Number 发文字号:苏环办﹝2016﹞257号
Issued By Environmental Protection Department of Jiangsu Province
Issued Date 2016 10 13
administration, territorial resources, public security, public health, 
transportation, agriculture, forestry and fishery.
Issued Date 2016‐10‐13
Effective Date 2016‐10‐13
Chinese URL http://www.jshb.gov.cn:8080/pub/root14/xxgkcs/201610/t20161017_375416.html
Brief Introduction: The purpose is to actively promote the reform of EIA examination and approval system, so as to 
establish a management system with deep integration between construction project EIA and pollution discharge permit, 
simplify the approval procedure, intensify beforehand and afterwards supervision and maximize the effect among 
environmental protection and economic development, by means of interspace, quality and mass loading control. The 
measures emphasized the effect of planning EIA in distribution optimization, scale control, structure adjustment and 
transformation promotion, as well as compulsive constraint on environmental admittance of construction projects.
According to the measures, the local government will implement inventory based management by means of establishing 
an eco‐space inventory, a land use control inventory, a pollution mass loading control inventory and an industry / process 
environmental admittance inventory. The planning EIA inspection comments and management inventories will be 
available to the public via the official websites.
Chinese Name 山东省企业环境信用评价办法
E li h T l ti Sh d P i i l M E t i E i t l C dit E l ti
Brief Introduction: The Measure defined the scope of evaluation, organization form, evaluation methods and scoring 
standards information entry and review reward and punishment measures evaluation results publicity and etc
English Translation Shandong Provincial Measures on Enterprises Environmental Credit Evaluation
Issuance Number 鲁环发〔2016〕204号
Issued By Shandong Environmental Protection Bureau
Issued Date 2016‐10‐27
Effective Date 2017‐03‐01
Chinese URL http://xxgk.sdein.gov.cn/gfxwj/xxyxgfxwj/201610/t20161031_301063.html
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
standards, information entry and review, reward and punishment measures, evaluation results publicity and etc. 
Shandong Environmental Protection Bureau has established a corporate environmental credit evaluation and information 
management system, which is expected to be carried out on March 3, 2017. An annual scoring system will be part of the 
measures, including issuing green card, yellow card and red card, as to record the results of assessment. The Measure 
required that environmental protections departments should publish real‐time scoring and results on official website. 
Proper social supervisions are encouraged and accepted in terms of implementation of the abovementioned measure.
Chinese Name 河北省省级环境保护资金管理使用办法
English Translation Heibei Provincial Measures on Use and Management of Environmental Protection Funds
Issuance Number ——
Issued By The People's Government of Hebei Province
Issued Date 2016‐10‐28
Effective Date 2016‐10‐28
Chinese URL http://www.shidz.com/common/content.jsp?articleId=ee790e3f57d0b782015828d02a88019d
Brief Introduction: Environmental funding priorities should be made, to 
support the identified national and provincial ecological protection key tasks, 
tilti t j t i l d h ll ti d l l li k d ith l ’tilting to projects involved heavy pollution and closely linked with people’s 
best interests. Environmental protection fund was the financial support from 
Centre Government for provincial budget for air pollution control, water 
pollution control, soil pollution prevention and control, rural energy 
conservation and other types of funds. In accordance with the environmental 
protection funds expenditure levels, the fund should be divided into provincial 
environmental protection fund and other compensation fund. The aim of this 
fund use and management was to develop innovative financial support mode 
for environmental protection Specific measures include as followed:for environmental protection. Specific measures include as followed: 
construction before compensation, award replacing subsidy, financial 
discounts and leasing, encouraging third party governance, PPP mode, 
government procurement of services and enlarging effect of fund use.
Chinese Name 宁夏回族自治区水资源管理条例
English Translation Water Resources Management Ordinance of Ningxia Autonomous Region
Issuance Number 宁夏回族自治区人民代表大会常务委员会公告第四十号
Issued By Standing Committee of the people's Congress of the Ningxia Autonomous Region
Brief Introduction: The Ordinance proposed specific contents and measures on total amount of water pollution control, 
aquatic ecology, water function areas, the protection of drinking water and limits of sewage outfall into the water body. 
The corresponding amendment measures in order to protect ground water were included as well. The Ordinance would 
take ever strict management on relevant aspects of water source protection and reservation, such as initial planning, total 
Issued By Standing Committee of the people s Congress of the Ningxia Autonomous Region
Issued Date 2016‐10‐31
Effective Date 2017‐01‐01
Chinese URL http://www.nxrd.gov.cn/zlzx/dfxfg/2016dffg/201611/t20161102_4151657.html
control of water use, implementation of water permits, water consumption efficiency, groundwater protection and etc. 
Proper attention should be paid on water conservancy projects with low design standard, inadequate facilities and 
insufficient budget against daily operation and maintenance.
InterpretationPart 3
 Administrative Measures on Soil Environmental Management of Contaminated Sites (Draft) 
污染地块土壤环境管理办法(征求意见稿)
The Measures specified the following contents: site investigation and 
risk assessment for soil, risk management and control system of 
contaminated land, and pollution control and remediation system. The 
proposed measures were to support the soil investigation system, which 
currently lacked of systematic management and could not meet the 
actual needs. In the aspect of management responsibilities, the Ministry 
of Environmental Protection is responsible for administration and 
supervision of soil pollution nationwide.
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
Local environmental departments at all levels shall be responsible for site investigation, risk assessment, risk control, 
supervision and relevant activities in the administrative area. In accordance with the "polluters pay" principle, entities or 
individuals causing soil contamination shall bear main responsibility to perform investigation, control and remediation. If it 
is difficult to identify the polluter, the land user shall bear the corresponding responsibility. Accurate definition of the 
responsibility bearer was included. The scope of the measures application lied in land closure, relocation and the user 
change of the land. To specify, radioactive contaminated sites are not within the scope of this Measures.
EHS Topic: Brief Introduction to ISO14001‐2015Part 4
This is the third edition since 2004. Compared to the last editions, this is just technical revision. The principal remained 
the same. “Prevention of pollution” is still the key idea throughout the whole standard, while “Continual improvement” is 
still the soul of the standards. The new edition expanded a lot in numbers of terms: canceled 7, added 20 and made the 
total numbers of terms to 33.
➢ A continual business cycle of planning, implementing, 
reviewing and improving;
➢ An effective EMS is developed on a “Plan, Do, Check, Act” 
(PDCA) model which embodies the concept of continual 
improvement.
➢ To manage its environmental aspects (3.2.2) ; fulfill 
compliance obligations (3.2.9) and address risks and 
opportunities (3.2.11);  
➢ Elements: policies, objectives; process.
10.3 5.2
6
7 & 8
9.1 & 9.2
9.3
4. Organization;
5. Leadership;
6. Planning;
7. Support.
10. 
Improvement
Key EMS Benefits
• Efficient use of resources
• Cost savings
• Consistency in operations
• Reduced environmental risk/liability
• Stakeholder communication/engagement
• Better rep tation ith clients/ind str
8. Operation
9. 
Performance 
Evaluation
• Better reputation with clients/industry –
competitive advantage
• Minimize paperwork and repetitive work; 
standardize
• Less accidents; formalized training and 
procedures
• Improved environmental performance
Steps for Implementing an EMS
1. Establish a company Environmental Policy
2. Create an Implementation Plan that includes:
• Scope determination
• Aspects and Impacts Analysis
• Actions to address risks and opportunities
Off-site
Activities
XYC Facility, xxx City
Off-site Supplies
Incoming
Goods/
Raw Materials
• The environmental objectives 
3. Implement and maintain the EMS
• Assign resources, roles, and, responsibilities
• Provide training to employees
• Establish process  and manage the changes
• Emergency preparedness and response
4. Check your system
• Measure and monitor progress
External
Distribution
Centers
Products To
Customers
Waste
Management
Facilities
Waste &
By-Products
Environmental 
Management System 
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
• Measure and monitor progress
• Evaluate compliance
• Internal audit
• Management Review
5. Corrective Action and Continual Improvement 
Intermediates To Other Businesses
(E.G., materials sent to
other operations for assembly)
Out of Scope – Maybe
Consider for futureWithin Scope
Out Of Scope
(Initial Pass)
ESD China Limited
About Us
ESD China Limited (ESD, www.esdchina.com) is a professional environment, energy and engineering
service firm. The firm is comprised of highly qualified scientists, engineers and management
professionals from North America, Europe, and greater China with high pride of professionalism. We
cultivate international and local best practices. In the past decades, we have provided common sense
solutions to Environment+Energy challenges for leading multinational corporations governments andsolutions to Environment+Energy challenges for leading multinational corporations, governments and
international development agencies throughout China and the region.
Globally, we are a member company of Inogen Group (Inogen®, www.inogenet.com), a global
corporation owned by environment, energy and sustainability consulting firms originated from the host
countries, referred to as Associates. Inogen® Associates lead global environment, health and safety (EHS)
management and energy consulting services with proven global expertise, and deliver common sense
EHS and energy solutions with local competence beyond the mere brand name. Together, we offer over
4,700 professionals through more than 100 offices worldwide, and have completed numerous projects in
over 120 countries.
Our core areas of expertise include soil and groundwater assessment and remediation; energy and
industrial engineering, international financing project management, pollution control engineering, socio‐
environmental impact assessment and industrial environmental, health and safety (EHS) management.
Our current services are outlined below:
More information
For more information, please contact:
Dr. Allan Zhang
Shanghai Regional Office
19D 728 Xizangzhong Road
OUR SERVICES:
• Corporate Due Diligence
• Risk Management and EHS 
Compliance Auditing
19D, 728 Xizangzhong Road,
Shanghai 200001, China
Tel : (86‐21) 5308 0914
Email: azhang@esdchina.com.cn
Dr. Michael Liang
Guangzhou Regional Office
Rm1302, World Trade Center North Tower,
• Soil & Groundwater Investigation & 
Remediation
• Regulatory Services
• Supplier Management & Auditing
371‐375 Huanshidong Road,
Guangzhou 510075, China
Tel : (86‐20) 8760 6313
Email: mjliang@esdchina.com.cn
Dr. Gong Yuyang
Beijing Regional Office
S it 1008 Bl k B 6 F t E t St
• Energy Auditing  & Industrial 
Engineering
• Industrial Hygiene Survey (IAQ, Lead 
& ACMs) 
• International Financing Project 
Management
Your Trusted Partner for EHS Solutions.                                                www.esdchina.com       
Suite 1008, Block B, 6 Futong East St,
Focus Square, Beijing 100102, China
Tel : (86‐10) 8478 3339
Email: gong@esdchina.com.cn
Management
• Pollution Control Engineering

More Related Content

What's hot

How an Environmental Management System (EMS) can help with embedding of a Car...
How an Environmental Management System (EMS) can help with embedding of a Car...How an Environmental Management System (EMS) can help with embedding of a Car...
How an Environmental Management System (EMS) can help with embedding of a Car...Scott Buckler
 
WEEE Management Policy Update from Thailand
WEEE Management Policy Update from ThailandWEEE Management Policy Update from Thailand
WEEE Management Policy Update from ThailandKeep Thailand Beautiful
 
Accounting and reporting avoided emissions along the value chain
Accounting and reporting avoided emissions along the value chainAccounting and reporting avoided emissions along the value chain
Accounting and reporting avoided emissions along the value chainLeonardo ENERGY
 
COP21 and the Philippines - Updates from the DENR
COP21 and the Philippines - Updates from the DENRCOP21 and the Philippines - Updates from the DENR
COP21 and the Philippines - Updates from the DENREnP Ragene Andrea Palma
 
Cleantech - source of success for Finland
Cleantech - source of success for FinlandCleantech - source of success for Finland
Cleantech - source of success for FinlandKaisa Hernberg
 
Carbon reduction guide_2012
Carbon reduction guide_2012Carbon reduction guide_2012
Carbon reduction guide_2012zubeditufail
 
Eco-design working plans
Eco-design working plansEco-design working plans
Eco-design working plansLeonardo ENERGY
 
The Snakes & Ladder of carbon footprinting
The Snakes & Ladder of carbon footprinting The Snakes & Ladder of carbon footprinting
The Snakes & Ladder of carbon footprinting Alice Fillan
 
Low Energy - Indoor Air Quality for Buildings
Low Energy - Indoor Air Quality for BuildingsLow Energy - Indoor Air Quality for Buildings
Low Energy - Indoor Air Quality for BuildingsCamfil UK
 
ErP measures and Energy Efficiency Labels for consumer appliances
ErP measures and Energy Efficiency Labels for consumer appliancesErP measures and Energy Efficiency Labels for consumer appliances
ErP measures and Energy Efficiency Labels for consumer appliancesLeonardo ENERGY
 
Understanding and implementing iso 14001
Understanding and implementing iso 14001Understanding and implementing iso 14001
Understanding and implementing iso 14001Ankit Goswami
 
Life Cycle Thinking - Measuring and Managing
Life Cycle Thinking - Measuring and Managing Life Cycle Thinking - Measuring and Managing
Life Cycle Thinking - Measuring and Managing Adrian Segens
 
Three Steps To Energy Efficency Windows Live Version
Three Steps To Energy Efficency  Windows Live VersionThree Steps To Energy Efficency  Windows Live Version
Three Steps To Energy Efficency Windows Live Versionmacmw
 

What's hot (19)

How an Environmental Management System (EMS) can help with embedding of a Car...
How an Environmental Management System (EMS) can help with embedding of a Car...How an Environmental Management System (EMS) can help with embedding of a Car...
How an Environmental Management System (EMS) can help with embedding of a Car...
 
Experience from Energy Management Systems Implementation
Experience from Energy Management Systems ImplementationExperience from Energy Management Systems Implementation
Experience from Energy Management Systems Implementation
 
WEEE Management Policy Update from Thailand
WEEE Management Policy Update from ThailandWEEE Management Policy Update from Thailand
WEEE Management Policy Update from Thailand
 
Accounting and reporting avoided emissions along the value chain
Accounting and reporting avoided emissions along the value chainAccounting and reporting avoided emissions along the value chain
Accounting and reporting avoided emissions along the value chain
 
Lean with green
Lean with greenLean with green
Lean with green
 
Carbon Audit
Carbon AuditCarbon Audit
Carbon Audit
 
COP21 and the Philippines - Updates from the DENR
COP21 and the Philippines - Updates from the DENRCOP21 and the Philippines - Updates from the DENR
COP21 and the Philippines - Updates from the DENR
 
Significant Improvements in Air Quality
Significant Improvements in Air QualitySignificant Improvements in Air Quality
Significant Improvements in Air Quality
 
Cleantech - source of success for Finland
Cleantech - source of success for FinlandCleantech - source of success for Finland
Cleantech - source of success for Finland
 
Carbon reduction guide_2012
Carbon reduction guide_2012Carbon reduction guide_2012
Carbon reduction guide_2012
 
Eco-design working plans
Eco-design working plansEco-design working plans
Eco-design working plans
 
The Snakes & Ladder of carbon footprinting
The Snakes & Ladder of carbon footprinting The Snakes & Ladder of carbon footprinting
The Snakes & Ladder of carbon footprinting
 
Low Energy - Indoor Air Quality for Buildings
Low Energy - Indoor Air Quality for BuildingsLow Energy - Indoor Air Quality for Buildings
Low Energy - Indoor Air Quality for Buildings
 
Cleaner Technology
Cleaner TechnologyCleaner Technology
Cleaner Technology
 
ErP measures and Energy Efficiency Labels for consumer appliances
ErP measures and Energy Efficiency Labels for consumer appliancesErP measures and Energy Efficiency Labels for consumer appliances
ErP measures and Energy Efficiency Labels for consumer appliances
 
Understanding and implementing iso 14001
Understanding and implementing iso 14001Understanding and implementing iso 14001
Understanding and implementing iso 14001
 
Life Cycle Thinking - Measuring and Managing
Life Cycle Thinking - Measuring and Managing Life Cycle Thinking - Measuring and Managing
Life Cycle Thinking - Measuring and Managing
 
Three Steps To Energy Efficency Windows Live Version
Three Steps To Energy Efficency  Windows Live VersionThree Steps To Energy Efficency  Windows Live Version
Three Steps To Energy Efficency Windows Live Version
 
Economics of IAQ
Economics of IAQEconomics of IAQ
Economics of IAQ
 

Viewers also liked

Excel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolExcel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolTim Matthews
 
Sustainability Reporting and ISO14001 Update
Sustainability Reporting and ISO14001 UpdateSustainability Reporting and ISO14001 Update
Sustainability Reporting and ISO14001 UpdateAntea Group
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5DQS Inc.
 
ISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update WebinarISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update WebinarDQS Inc.
 
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...Andre Barnarde
 
ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample  ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample Tim Matthews
 

Viewers also liked (7)

Excel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation toolExcel sheet iso14001 2015 compliance evaluation tool
Excel sheet iso14001 2015 compliance evaluation tool
 
【平成27年度】ISO14001:2015の概要及び主な変更点
【平成27年度】ISO14001:2015の概要及び主な変更点【平成27年度】ISO14001:2015の概要及び主な変更点
【平成27年度】ISO14001:2015の概要及び主な変更点
 
Sustainability Reporting and ISO14001 Update
Sustainability Reporting and ISO14001 UpdateSustainability Reporting and ISO14001 Update
Sustainability Reporting and ISO14001 Update
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5
 
ISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update WebinarISO 14001:2015 Revision Update Webinar
ISO 14001:2015 Revision Update Webinar
 
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
 
ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample  ISO 14001:2015 managment system manual sample
ISO 14001:2015 managment system manual sample
 

Similar to Latest tracking of Environmental, Health, Safety and Energy Legislations in China

Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)abtabussam
 
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...Aury Hathout
 
IRJET- Vehicular Exhaust Emission Estimation and Control Modelling
IRJET- Vehicular Exhaust Emission Estimation and Control ModellingIRJET- Vehicular Exhaust Emission Estimation and Control Modelling
IRJET- Vehicular Exhaust Emission Estimation and Control ModellingIRJET Journal
 
การบรรยาย รพ.ลดโลกร้อน (2)
การบรรยาย รพ.ลดโลกร้อน  (2)การบรรยาย รพ.ลดโลกร้อน  (2)
การบรรยาย รพ.ลดโลกร้อน (2)Benjawan Tawatsupa
 
Free workshop: Carbon Footprint 101
Free workshop: Carbon Footprint 101Free workshop: Carbon Footprint 101
Free workshop: Carbon Footprint 101Sasin SEC
 
Pr 1-textbook-1-a neu
Pr 1-textbook-1-a neuPr 1-textbook-1-a neu
Pr 1-textbook-1-a neuAgus Witono
 
Modelling the costs and benefits of clean air policy scenarios for residentia...
Modelling the costs and benefits of clean air policy scenarios for residentia...Modelling the costs and benefits of clean air policy scenarios for residentia...
Modelling the costs and benefits of clean air policy scenarios for residentia...Environmental Protection Agency, Ireland
 
LAB_Writeup for term3 of IIM Indore
LAB_Writeup for term3 of IIM IndoreLAB_Writeup for term3 of IIM Indore
LAB_Writeup for term3 of IIM Indoresanath Thumu
 
Business guide on carbon emission redution and sustainability
Business guide on carbon emission redution and sustainabilityBusiness guide on carbon emission redution and sustainability
Business guide on carbon emission redution and sustainabilityBarney Loehnis
 
(XIMB) Sustainability - Conusumer Durables Industry
(XIMB) Sustainability - Conusumer Durables Industry(XIMB) Sustainability - Conusumer Durables Industry
(XIMB) Sustainability - Conusumer Durables IndustrySustainabilityXIMB
 
The EU legislative framework for the sustainability
The EU legislative framework for the sustainability The EU legislative framework for the sustainability
The EU legislative framework for the sustainability Chris Hamans
 
Tools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.pptTools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.ppt2k17che26
 
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGES
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGESNATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGES
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGESDr Dev Kambhampati
 
EPA Inspector General Report Calling on EPA to Do More About Fugitive Methane
EPA Inspector General Report Calling on EPA to Do More About Fugitive MethaneEPA Inspector General Report Calling on EPA to Do More About Fugitive Methane
EPA Inspector General Report Calling on EPA to Do More About Fugitive MethaneMarcellus Drilling News
 
Final Presentation
Final PresentationFinal Presentation
Final Presentationjimmy91826
 
The Medical Procurement Workshop
The Medical Procurement WorkshopThe Medical Procurement Workshop
The Medical Procurement WorkshopUN SPHS
 

Similar to Latest tracking of Environmental, Health, Safety and Energy Legislations in China (20)

Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)
 
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...
ISO 14001 Tip#3 - Include the Product Life Cycle into your ISO 14001 Environm...
 
IRJET- Vehicular Exhaust Emission Estimation and Control Modelling
IRJET- Vehicular Exhaust Emission Estimation and Control ModellingIRJET- Vehicular Exhaust Emission Estimation and Control Modelling
IRJET- Vehicular Exhaust Emission Estimation and Control Modelling
 
E-waste Management Workshop: Mr. Satish Sinha
E-waste Management Workshop: Mr. Satish SinhaE-waste Management Workshop: Mr. Satish Sinha
E-waste Management Workshop: Mr. Satish Sinha
 
การบรรยาย รพ.ลดโลกร้อน (2)
การบรรยาย รพ.ลดโลกร้อน  (2)การบรรยาย รพ.ลดโลกร้อน  (2)
การบรรยาย รพ.ลดโลกร้อน (2)
 
Policy trend for natural refrigerants in Asia Pacific
Policy trend for natural refrigerants in Asia PacificPolicy trend for natural refrigerants in Asia Pacific
Policy trend for natural refrigerants in Asia Pacific
 
Free workshop: Carbon Footprint 101
Free workshop: Carbon Footprint 101Free workshop: Carbon Footprint 101
Free workshop: Carbon Footprint 101
 
Pr 1-textbook-1-a neu
Pr 1-textbook-1-a neuPr 1-textbook-1-a neu
Pr 1-textbook-1-a neu
 
Modelling the costs and benefits of clean air policy scenarios for residentia...
Modelling the costs and benefits of clean air policy scenarios for residentia...Modelling the costs and benefits of clean air policy scenarios for residentia...
Modelling the costs and benefits of clean air policy scenarios for residentia...
 
Niklas von der Assen (Aachen University) talking about Current, Best and Futu...
Niklas von der Assen (Aachen University) talking about Current, Best and Futu...Niklas von der Assen (Aachen University) talking about Current, Best and Futu...
Niklas von der Assen (Aachen University) talking about Current, Best and Futu...
 
LAB_Writeup for term3 of IIM Indore
LAB_Writeup for term3 of IIM IndoreLAB_Writeup for term3 of IIM Indore
LAB_Writeup for term3 of IIM Indore
 
Business guide on carbon emission redution and sustainability
Business guide on carbon emission redution and sustainabilityBusiness guide on carbon emission redution and sustainability
Business guide on carbon emission redution and sustainability
 
(XIMB) Sustainability - Conusumer Durables Industry
(XIMB) Sustainability - Conusumer Durables Industry(XIMB) Sustainability - Conusumer Durables Industry
(XIMB) Sustainability - Conusumer Durables Industry
 
The EU legislative framework for the sustainability
The EU legislative framework for the sustainability The EU legislative framework for the sustainability
The EU legislative framework for the sustainability
 
Tools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.pptTools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.ppt
 
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGES
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGESNATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGES
NATURAL GAS DISTRIBUTION PIPELINES- METHANE EMISSIONS CHALLENGES
 
EPA Inspector General Report Calling on EPA to Do More About Fugitive Methane
EPA Inspector General Report Calling on EPA to Do More About Fugitive MethaneEPA Inspector General Report Calling on EPA to Do More About Fugitive Methane
EPA Inspector General Report Calling on EPA to Do More About Fugitive Methane
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Oportunitats dins el Programa LIFE per a empreses i institucions públiques
Oportunitats dins el Programa LIFE per a empreses i institucions públiquesOportunitats dins el Programa LIFE per a empreses i institucions públiques
Oportunitats dins el Programa LIFE per a empreses i institucions públiques
 
The Medical Procurement Workshop
The Medical Procurement WorkshopThe Medical Procurement Workshop
The Medical Procurement Workshop
 

Recently uploaded

Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...Amil baba
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 

Recently uploaded (20)

Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
NO1 Famous Amil In Karachi Best Amil In Karachi Bangali Baba In Karachi Aamil...
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 

Latest tracking of Environmental, Health, Safety and Energy Legislations in China

  • 1. EHS NEWSLETTEREHS NEWSLETTER October 2016  Tracking of Environmental, Health, Safety and Energy Legislations in China  The Latest Information on National and Local Legislation Update and  Legislative Initiatives.  EHS Topic: Brief Introduction to ISO14001‐2015 (GB/T 24001‐2016) Your Trusted Partner for EHS Solution www.esdchina.com      EHS Topic: Brief Introduction to ISO14001 2015 (GB/T 24001 2016)
  • 2. Highlight in this Issue Technical Guidance on Comprehensive Treatment of Combustion  Pollution of Civil Coal Use (Trial) Environment According to the guidance, the purpose of combustion pollution treatment of  civil coal use is for the continual improvement of ambient air quality. Various  full scale applicative treatment toolkits as well as more effective treatmentfull‐scale applicative treatment toolkits, as well as more effective treatment  policies and technical options were provided in the guidance for different  districts.  Thi S d d i h Chi i f ISO14001 2015 C d h l Environmental Management Systems‐ Requirements with  Guidance for Use (GB/T 24001‐2016) Environment Jilin Emergency Plan for Special Equipment Incidents This Standard is the Chinese version of ISO14001‐2015. Compared to the last  edition, this is just a technical revision. The principal remained the same.  “Prevention of pollution” is still the key idea throughout the whole standard,  while “Continual improvement” is still the soul of the standards.  Jilin Emergency Plan for Special Equipment Incidents This emergency plan aimed at active response of possible special equipment  incidents, to prevent further deterioration and secondary incidents, to deal  with the incidents safely, ordered, scientifically and efficiently, so as to  minimize casualties and financial loss.  Safety Jiangsu Measures on Pilot Reform of Construction Project  Environmental Impact Assessment According to the measures, the local government will implement inventory  based management by means of establishing an eco‐space inventory, a land  use control inventory, a pollution mass loading control inventory and an  i d t / i t l d itt i t Th l i EIA Environment Administrative Measures on Soil Environmental Management of  Contaminated Sites (Draft)  industry / process environmental admittance inventory. The planning EIA  inspection comments and management inventories will be available to the  public via the official websites. Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        Environment In accordance with the "polluters pay" principle, entities or individuals causing  soil contamination shall bear main responsibility to perform investigation,  control and remediation. If it is difficult to identify the polluter, the land user  shall bear the corresponding responsibility. 
  • 3. Part 1 National Legislation Update  Chinese Name 国家安全监管总局政府网站信息发布管理办法 English Translation Administrative Measures on Information Publicity on the Official Website of State Issuance Number 安监总厅宣教〔2016〕133号 Issued By State Administration of Work Safety Issued Date 2016‐10‐27 Effective Date 2016‐10‐27 h http://www.chinasafety.gov.cn/newpage/Contents/Channel 6288/2016/1031/277714/conten Chinese URL http://www.chinasafety.gov.cn/newpage/Contents/Channel_6288/2016/1031/277714/conten t_277714.htm Brief Introduction: According to the Measures, ‘www.chinasafety.gov.cn’ is the only official website of Internet Website  of State Administration of Work Safety (SAWS), registered under the Chinese name of ‘国家安全生产监督管理总局’. The  ‘information’ refers to the governmental information produced or obtained by SAWS, recorded or preserved in certain  formats, which is initiatively made available to the public, including specific content interpretation, publicity influence  amplification, public opinion guidance and public convenience service. All information regarding public advantages and  interests shall be published through the SAWS official website fully, timely and accurately. Chinese Name 民用煤燃烧污染综合治理技术指南(试行) English Translation Technical Guidance on Comprehensive Treatment of Combustion Pollution of Civil Coal Use  (Trial) Issuance Number 环境保护部公告2016年第66号 Issued By Ministry of Environmental Protection Issued Date 2016‐10‐22 Effective Date 2016‐10‐22 Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161031_366528.htm Brief Introduction: The northern region of China is entering the heating  period soon. Haze pollution due to coal firing will become a serious  issue again. The guidance is released at the very moment to deal with  the issue. According to the guidance, the purpose of combustion  pollution treatment of civil coal use is for the continual improvement of  ambient air quality Various full‐scale applicative treatment toolkits asambient air quality. Various full‐scale applicative treatment toolkits, as  well as more effective treatment policies and technical options were  provided in the guidance for different districts. It is also clearly aware  that the use of high‐grade coal is a transitional approach at present  economic and social development. In the long run, it will be replaced by  electricity, natural gas, solar power and other clean energy. Chinese Name 民用煤大气污染物排放清单编制技术指南(试行) ( )English Translation Technical Guidance on Establishment of Air Emission Inventory of Civil Coal Use (Trial) Issuance Number 环境保护部公告2016年第66号 Issued By Ministry of Environmental Protection Issued Date 2016‐10‐22 Effective Date 2016‐10‐22 Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161031_366528.htm Brief Introduction: The Guidance is an important part of the technical guidance system of air pollution source emission  Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        inventory, serving as further supplement and completion. Now that this guidance is in force, corresponding  requirements / suggestions of made in the other guidance upon civil coal use, i.e. Technical Guidance on Emission  Inventory of Primary Fine Particulate Matter Sources (Trial), Technical Guidance on Emission Inventory of Primary  Inhalable Particulate Matter Sources (Trial) and Technical Guidance on Emission Inventory of Volatile Organic Compound  Sources (Trial), shall subject to the Guidance. The recommended discharge coefficients provided in the appendixes are  mainly for reference. It is encouraged to replace them with local measurement and survey data.
  • 4. Chinese Name 关于修改《危险废物经营单位审查和许可指南》部分条款的公告 E li h T l ti Announcement on Modification of Certain Clauses of Inspection and Permission Guidance of English Translation p Hazardous Waste Operation Entities Issuance Number 环境保护部公告2016年第65号 Issued By Ministry of Environmental Protection Issued Date 2016‐10‐02 Effective Date 2016‐10‐02 Chinese URL http://www.zhb.gov.cn/gkml/hbb/bgg/201610/t20161028_366366.htm Brief Introduction: This is a minor modification of the 2009 edition in accordance with the Notice of EnvironmentBrief Introduction: This is a minor modification of the 2009 edition, in accordance with the Notice of Environment  Protection Administration regarding Stopping Examination and Approval of Construction Project Trial Production issued in  April 2016. Amendment was made in article 4 and appendix 1. In article 4, the requirement on completion acceptance  prior to hazardous waste operation permit was deleted. In appendix 1, the document submission requirements of  existing projects (with completion acceptance) and new constructed projects were separated. Chinese Name 高效能大气污染物控制装备评价技术要求 (GB/T 33017‐2016) English Translation Technical Requirements of High Efficiency Air Pollution Control Equipment for AssessmentEnglish Translation Technical Requirements of High Efficiency Air Pollution Control Equipment for Assessment Issuance Number 国家标准公告2016年第17号 Issued By General Administration of Quality Supervision, Inspection and Quarantine Issued Date 2016‐10‐13 Effective Date 2017‐05‐01 Chinese URL http://www.sac.gov.cn/gzfw/ggcx/gjbzgg/201617 Brief Introduction: This is a series of standards of Technical requirements of high efficiency air pollution control  equipment for assessment, including 4 parts, Part 1: General principle; Part 2: Electrostatic precipitator; Part 3: Bag filters; Part 4: Electrostatic‐fabric integrated precipitator. The full texts of these standards are not yet available online. Chinese Name 环境管理体系 要求及使用指南 (GB/T 24001‐2016) English Translation Environmental Management Systems‐ Requirements with Guidance for Use (GB/T 24001) Issuance Number 国家标准公告2016年第17号 Issued By General Administration of Quality Supervision, Inspection and Quarantiney Issued Date 2016‐10‐13 Effective Date 2017‐05‐01 Chinese URL http://www.sac.gov.cn/was5/web/search?channelid=97779&templet=gjcxjg_detail.jsp&search word=STANDARD_CODE='GB/T 24001‐2016'&XZ=T&STANDARD_CODE=GB/T 24001‐2016 Brief Introduction: This Standard is the Chinese version of ISO14001‐ 2015. Compared to the last edition, this is just a technical revision.  The principal remained the same “Prevention of pollution” is stillThe principal remained the same.  Prevention of pollution  is still  the key idea throughout whole standard, while “Continual  improvement” is still the soul of the standards.  An organization that wishes to demonstrate conformity with this  International Standard can do so by: ‒ making a self‐determination and self‐declaration, or ‒ seeking confirmation of its conformance by parties having an  interest in the organization, such as customers, or Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        interest in the organization, such as customers, or ‒ seeking confirmation of its self‐declaration by a party external to  the organization, or ‒ seeking certification/registration of its environmental  management system by an external organization.
  • 5. Chinese Name 全民节水行动计划 English Translation National Water Conservation Action Plan Issuance Number 发改环资[2016]2259号 Issued By National Development and Reform Commission Issued Date 2016‐10‐28 Effective Date 2016‐10‐28 Chinese URL www.miit.gov.cn/n1146285/n1146352/n3054355/n3057542/n3057545/c5335293/content.html Brief Introduction: The action plan clearly stipulated water conservation and pollution reduction requirements on  industrial parks: 1) establish industrial system of water circulation and improve wastewater treatment and reuse rate; 2)  promote using water‐saving products and implement water use efficiency labeling policy and water‐saving product  certification; 3) conduct public institution water‐saving reform and improve corresponding management. In districts with water deficiency, it is emphasized that initiatives should be taken to save water. Rigid restraint on water resource should be taken seriously. Water resource bearing capacity assessment should be conducted in each county to  establish early warning system and release warning information. For construction projects, water resources  demonstration procedure should be implemented strictly for water quotation management. Each project should have  complete water use plan and water conservation statistics. Chinese Name 关于以改善环境质量为核心加强环境影响评价管理的通知Chinese Name 关于以改善环境质量为核心加强环境影响评价管理的通知 English Translation Notification on strengthening the management of environmental impact assessment in order to improve the environmental quality Issuance Number 环环评[2016]150号 Issued By The Ministry of Environmental Protection Issued Date 2016‐10‐26 Effective Date 2016‐10‐26 Chinese URL http://www.zhb.gov.cn/gkml/hbb/bwj/201610/t20161031 366546.htmp // g /g / / j/ / _ Brief Introduction: The Notification specified that approval of new projects would  be limited in certain areas with poor environmental status, which was not able to  meet the requirements of environmental quality assessment. In addition, industrial  and mineral projects are strictly prohibited within the range of ecological protection  red line, except those indispensable infrastructure projects being carried out, such  as highway, waterway, flood controlling, pipelines, canals, communication and  power transmissions. The Notification also proposed control suggestions on regional  mass loading of pollution discharge optimization on regional development layoutmass loading of pollution discharge, optimization on regional development layout,  and countermeasures of structure and scale. EIA approvals shall take additional  account on upper limit of resource consumption, that is, energy, water, land and  other relevant items. In the EIA inventory planning, a negative list of environmental  access would be developed based on the selection of location, resource utilization  efficiency, resource allocation and other aspects pertaining to the relevant subject.  Local Legislation Update Part 2 Chinese Name 吉林省特种设备事故应急预案 English Translation Jilin Emergency Plan for Special Equipment Incidents Issuance Number 吉质监特函〔2016〕338号 Issued By Jilin Province Bureau of Quality and Technology Supervision Issued Date 2016‐10‐18 Effective Date 2016‐10‐18 Chinese URL http://www jlqi gov cn/index/jichaFJ/infoDetail jsp?IDS 26748 Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        Brief Introduction: This emergency plan aimed at active response of possible special equipment incidents, to prevent  further deterioration and secondary incidents, to deal with the incidents safely, ordered, scientifically and efficiently, so as to minimize casualties and financial loss. The Plan was issued by the Province Bureau of Quality and Technology  Supervision, applicable to explosion, damage, ineffectiveness, defect and malfunction of special equipment with  casualties and financial loss owning to internal and/or external (factitious) reasons. Chinese URL http://www.jlqi.gov.cn/index/jichaFJ/infoDetail.jsp?IDS=26748
  • 6. Chinese Name 安徽省饮用水水源环境保护条例 English Translation Anhui Regulation on Drinking Water Source Conservation Brief Introduction: The regulation established legal liability over the  drinking water source damaging behaviors that was not stipulated in the  i l C d i h h f di i Issuance Number 安徽省人民代表大会常务委员会公告第49号 Issued By Standing Committee of Anhui People’s Congress Issued Date 2016‐10‐08 Effective Date 2016‐12‐01 Chinese URL http://www.ahfzb.gov.cn/content/detail/57fb53a5cfd9f3a00f000003.html superior laws. Compared with the former edition, now current  requirements were made in 5 aspects: 1) compensation mechanism for  ecological protection of drinking water source; 2) back‐up water source  establishment; 3) cooperation mechanism for environmental protection;  4) protection scope and measures of decentralized drinking water source;  5) supervisory responsibilities of related departments. Meanwhile,  administrative responsibilities and penalty power, as well as accountability,  were endowed to departments of environmental protection, water  d i i t ti t it i l bli it bli h lth Chinese Name 江苏省建设项目环境影响评价改革试点办法 English Translation Jiangsu Measures on Pilot Reform of Construction Project Environmental Impact Assessment Issuance Number 发文字号:苏环办﹝2016﹞257号 Issued By Environmental Protection Department of Jiangsu Province Issued Date 2016 10 13 administration, territorial resources, public security, public health,  transportation, agriculture, forestry and fishery. Issued Date 2016‐10‐13 Effective Date 2016‐10‐13 Chinese URL http://www.jshb.gov.cn:8080/pub/root14/xxgkcs/201610/t20161017_375416.html Brief Introduction: The purpose is to actively promote the reform of EIA examination and approval system, so as to  establish a management system with deep integration between construction project EIA and pollution discharge permit,  simplify the approval procedure, intensify beforehand and afterwards supervision and maximize the effect among  environmental protection and economic development, by means of interspace, quality and mass loading control. The  measures emphasized the effect of planning EIA in distribution optimization, scale control, structure adjustment and  transformation promotion, as well as compulsive constraint on environmental admittance of construction projects. According to the measures, the local government will implement inventory based management by means of establishing  an eco‐space inventory, a land use control inventory, a pollution mass loading control inventory and an industry / process  environmental admittance inventory. The planning EIA inspection comments and management inventories will be  available to the public via the official websites. Chinese Name 山东省企业环境信用评价办法 E li h T l ti Sh d P i i l M E t i E i t l C dit E l ti Brief Introduction: The Measure defined the scope of evaluation, organization form, evaluation methods and scoring  standards information entry and review reward and punishment measures evaluation results publicity and etc English Translation Shandong Provincial Measures on Enterprises Environmental Credit Evaluation Issuance Number 鲁环发〔2016〕204号 Issued By Shandong Environmental Protection Bureau Issued Date 2016‐10‐27 Effective Date 2017‐03‐01 Chinese URL http://xxgk.sdein.gov.cn/gfxwj/xxyxgfxwj/201610/t20161031_301063.html Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        standards, information entry and review, reward and punishment measures, evaluation results publicity and etc.  Shandong Environmental Protection Bureau has established a corporate environmental credit evaluation and information  management system, which is expected to be carried out on March 3, 2017. An annual scoring system will be part of the  measures, including issuing green card, yellow card and red card, as to record the results of assessment. The Measure  required that environmental protections departments should publish real‐time scoring and results on official website.  Proper social supervisions are encouraged and accepted in terms of implementation of the abovementioned measure.
  • 7. Chinese Name 河北省省级环境保护资金管理使用办法 English Translation Heibei Provincial Measures on Use and Management of Environmental Protection Funds Issuance Number —— Issued By The People's Government of Hebei Province Issued Date 2016‐10‐28 Effective Date 2016‐10‐28 Chinese URL http://www.shidz.com/common/content.jsp?articleId=ee790e3f57d0b782015828d02a88019d Brief Introduction: Environmental funding priorities should be made, to  support the identified national and provincial ecological protection key tasks,  tilti t j t i l d h ll ti d l l li k d ith l ’tilting to projects involved heavy pollution and closely linked with people’s  best interests. Environmental protection fund was the financial support from  Centre Government for provincial budget for air pollution control, water  pollution control, soil pollution prevention and control, rural energy  conservation and other types of funds. In accordance with the environmental  protection funds expenditure levels, the fund should be divided into provincial  environmental protection fund and other compensation fund. The aim of this  fund use and management was to develop innovative financial support mode  for environmental protection Specific measures include as followed:for environmental protection. Specific measures include as followed:  construction before compensation, award replacing subsidy, financial  discounts and leasing, encouraging third party governance, PPP mode,  government procurement of services and enlarging effect of fund use. Chinese Name 宁夏回族自治区水资源管理条例 English Translation Water Resources Management Ordinance of Ningxia Autonomous Region Issuance Number 宁夏回族自治区人民代表大会常务委员会公告第四十号 Issued By Standing Committee of the people's Congress of the Ningxia Autonomous Region Brief Introduction: The Ordinance proposed specific contents and measures on total amount of water pollution control,  aquatic ecology, water function areas, the protection of drinking water and limits of sewage outfall into the water body.  The corresponding amendment measures in order to protect ground water were included as well. The Ordinance would  take ever strict management on relevant aspects of water source protection and reservation, such as initial planning, total  Issued By Standing Committee of the people s Congress of the Ningxia Autonomous Region Issued Date 2016‐10‐31 Effective Date 2017‐01‐01 Chinese URL http://www.nxrd.gov.cn/zlzx/dfxfg/2016dffg/201611/t20161102_4151657.html control of water use, implementation of water permits, water consumption efficiency, groundwater protection and etc.  Proper attention should be paid on water conservancy projects with low design standard, inadequate facilities and  insufficient budget against daily operation and maintenance. InterpretationPart 3  Administrative Measures on Soil Environmental Management of Contaminated Sites (Draft)  污染地块土壤环境管理办法(征求意见稿) The Measures specified the following contents: site investigation and  risk assessment for soil, risk management and control system of  contaminated land, and pollution control and remediation system. The  proposed measures were to support the soil investigation system, which  currently lacked of systematic management and could not meet the  actual needs. In the aspect of management responsibilities, the Ministry  of Environmental Protection is responsible for administration and  supervision of soil pollution nationwide. Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        Local environmental departments at all levels shall be responsible for site investigation, risk assessment, risk control,  supervision and relevant activities in the administrative area. In accordance with the "polluters pay" principle, entities or  individuals causing soil contamination shall bear main responsibility to perform investigation, control and remediation. If it  is difficult to identify the polluter, the land user shall bear the corresponding responsibility. Accurate definition of the  responsibility bearer was included. The scope of the measures application lied in land closure, relocation and the user  change of the land. To specify, radioactive contaminated sites are not within the scope of this Measures.
  • 8. EHS Topic: Brief Introduction to ISO14001‐2015Part 4 This is the third edition since 2004. Compared to the last editions, this is just technical revision. The principal remained  the same. “Prevention of pollution” is still the key idea throughout the whole standard, while “Continual improvement” is  still the soul of the standards. The new edition expanded a lot in numbers of terms: canceled 7, added 20 and made the  total numbers of terms to 33. ➢ A continual business cycle of planning, implementing,  reviewing and improving; ➢ An effective EMS is developed on a “Plan, Do, Check, Act”  (PDCA) model which embodies the concept of continual  improvement. ➢ To manage its environmental aspects (3.2.2) ; fulfill  compliance obligations (3.2.9) and address risks and  opportunities (3.2.11);   ➢ Elements: policies, objectives; process. 10.3 5.2 6 7 & 8 9.1 & 9.2 9.3 4. Organization; 5. Leadership; 6. Planning; 7. Support. 10.  Improvement Key EMS Benefits • Efficient use of resources • Cost savings • Consistency in operations • Reduced environmental risk/liability • Stakeholder communication/engagement • Better rep tation ith clients/ind str 8. Operation 9.  Performance  Evaluation • Better reputation with clients/industry – competitive advantage • Minimize paperwork and repetitive work;  standardize • Less accidents; formalized training and  procedures • Improved environmental performance Steps for Implementing an EMS 1. Establish a company Environmental Policy 2. Create an Implementation Plan that includes: • Scope determination • Aspects and Impacts Analysis • Actions to address risks and opportunities Off-site Activities XYC Facility, xxx City Off-site Supplies Incoming Goods/ Raw Materials • The environmental objectives  3. Implement and maintain the EMS • Assign resources, roles, and, responsibilities • Provide training to employees • Establish process  and manage the changes • Emergency preparedness and response 4. Check your system • Measure and monitor progress External Distribution Centers Products To Customers Waste Management Facilities Waste & By-Products Environmental  Management System  Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        • Measure and monitor progress • Evaluate compliance • Internal audit • Management Review 5. Corrective Action and Continual Improvement  Intermediates To Other Businesses (E.G., materials sent to other operations for assembly) Out of Scope – Maybe Consider for futureWithin Scope Out Of Scope (Initial Pass)
  • 9. ESD China Limited About Us ESD China Limited (ESD, www.esdchina.com) is a professional environment, energy and engineering service firm. The firm is comprised of highly qualified scientists, engineers and management professionals from North America, Europe, and greater China with high pride of professionalism. We cultivate international and local best practices. In the past decades, we have provided common sense solutions to Environment+Energy challenges for leading multinational corporations governments andsolutions to Environment+Energy challenges for leading multinational corporations, governments and international development agencies throughout China and the region. Globally, we are a member company of Inogen Group (Inogen®, www.inogenet.com), a global corporation owned by environment, energy and sustainability consulting firms originated from the host countries, referred to as Associates. Inogen® Associates lead global environment, health and safety (EHS) management and energy consulting services with proven global expertise, and deliver common sense EHS and energy solutions with local competence beyond the mere brand name. Together, we offer over 4,700 professionals through more than 100 offices worldwide, and have completed numerous projects in over 120 countries. Our core areas of expertise include soil and groundwater assessment and remediation; energy and industrial engineering, international financing project management, pollution control engineering, socio‐ environmental impact assessment and industrial environmental, health and safety (EHS) management. Our current services are outlined below: More information For more information, please contact: Dr. Allan Zhang Shanghai Regional Office 19D 728 Xizangzhong Road OUR SERVICES: • Corporate Due Diligence • Risk Management and EHS  Compliance Auditing 19D, 728 Xizangzhong Road, Shanghai 200001, China Tel : (86‐21) 5308 0914 Email: azhang@esdchina.com.cn Dr. Michael Liang Guangzhou Regional Office Rm1302, World Trade Center North Tower, • Soil & Groundwater Investigation &  Remediation • Regulatory Services • Supplier Management & Auditing 371‐375 Huanshidong Road, Guangzhou 510075, China Tel : (86‐20) 8760 6313 Email: mjliang@esdchina.com.cn Dr. Gong Yuyang Beijing Regional Office S it 1008 Bl k B 6 F t E t St • Energy Auditing  & Industrial  Engineering • Industrial Hygiene Survey (IAQ, Lead  & ACMs)  • International Financing Project  Management Your Trusted Partner for EHS Solutions.                                                www.esdchina.com        Suite 1008, Block B, 6 Futong East St, Focus Square, Beijing 100102, China Tel : (86‐10) 8478 3339 Email: gong@esdchina.com.cn Management • Pollution Control Engineering