Highlights of a Successful Manufacturing Company
Innovative Products Innovative Manufacturing Strong Supply Chain Customer Base
High Profit Margin Cost Effective &
Competitive edge at
I4.0
Materials, Inventory
& Logistics
Competitive Pricing,
High Quality & Ease
Of Doing Business
Page 2 of 9
Continue ….
Productivity in the Manufacturing Plant (Digital Transformation)
A. KEY OBJECTIVES B. PEOPLE DEVELOPMENT
Low
Conversion
Cost
Grow
Customer
Base & Ease
Of Doing
Business
Alignment of
Functional
goals to
Factory goals
Empowerment
and
Engagement
Productivity
Strategy
1 2 3 2
1
Page 3 of 9
Continue ….
Factory Transformation to Industrial 4.0 Cultural Transformation
Productivity in Manufacturing Plant: Key Objective 1
Productivity Strategy
• Lean Flow Line
• TAKT Time (Test Vs Assy)
• Short Cycle Time
• Double UPH – OSA
Common losses
• Absenteeism
• Start of shift loss
• Change over loss
• Efficiency or learning loss
Maximise Output
With Lowest Cost
Efficient Utilisation Of
Manufacturing Space
Low
Conversion
Cost
1
Efficient Slim Flow Line
• Short Cycle
• Short Flow Line
• Centralize common area
• Mechanization
• Semi-automation
• Mechanical
• Test Multiplexing
Page 4 of 9
Continue ….
Objective :-
- Low Labour Cost
- Low Space Cost
Note :-
Conventional Productivity very Academic.
Illustration :- Productivity & Doubling of Output
Productivity Formula
Std Time X Vol X K
Productivity = --------------------------
Input Hours
Where :-
a. Std Time – time needed to build a product
b. Vol - Output quantity at the end of the shift
c. K - Manufacturing Allowance
d. Input Hours - Total Labor hours for the shift
Productivity Doubling UPH
(Units Per Hour)
Product Cost Structure
Page 4a of 9
Continue ….
Note :-
Conventional Productivity very Academic.
EEESP ( End Selling Price ) $$100
EEGP ( Gross Profit) $$20
EEFOH ( Fixed Over Head) $$25
EEBOM ( Bill of Material) $$50
EEDL ( Direct Labour) $$5
Maximize output
Productivity in Manufacturing Plant: Key Objective 2
Factory Engineering Capability
• 3D animated work instructions with
Virtualization.
• Magnetic Conveyor
• Automated Image recognition
• Auto laser Lead height check and trim
• Thermal Imaging Vs Conventional BI
• Automated Testing
• Dynamic Test for Significance
Scalable Capacity,
Flexibility And
Responsiveness
High Tech Manufacturing
Grow
Customer
Base with Low
cost of
operation &
Ease Of Doing
Business
2
Universal Main Line
• Universal Testing without unique
test fixture with literally no change
over loss.
• Multiple products with different
form factor can run on the line
simultaneously
• Multiplex Automated Test Equipment
• Automate mechanical assembly
wherever practical.
Page 5 of 9
Continue ….
Ahead of Competition
Doubling output through Lean, Productivity & Semi-automation
Productivity in Manufacturing Plant: Key Objective 3
Systematic Manufacturing Control
• Traceability and shop floor control
• Equipment maintenance and spare
parts control. (MMMS)
• Product process management control
(PPMS)
• Paperless transactions
Manufacturing Control
through IT Solutions
Productivity
Strategy
3 Product Quality
Waste Elimination
• Inspection
• Line yield by stations
• Mitigate scraps
• Field failure & warranty cost
Strategy
• Fix problem at Source
• Stop line for 3 consecutive failure of
the same kind.
Burn-in & Test
• Proactively screen out thermal defects
• Dynamic test for Significance
• Parametric auto CPk tracking
Page 6 of 9
Continue ….
Productivity in Manufacturing Plant: People Development 1
Alignment of
Functional
goals to
Factory goals
1
Team Work and Collaboration
• Common goals for every employee
• Embrace and engage every member
for total participation
• Core business - Battlefield
Awareness of Key Challenges
• Conversion Cost
• Customers satisfaction
• Competitiveness in the competition
• Grow customer base
Core Business Manufacturing
Create Conducive Working
Environment
Empowerment and Engagement
• Trust, Respect and Reliable
• Humble versus Pride (Ego)
• Good listener, patience & tolerance
• Eliminate Fear
• Learn from mistakes
• Educate and influence change
• Motivate and Support
• Encourage creativity & innovation
• Recognition and Appreciation
Page 7 of 9
Continue …. Company Wide Cultural Transformation
Productivity in Manufacturing Plant: People Development 2
Empowerment
and
Engagement
2
Behavioural change
• Authority
• Trust
• Pride
• Educate or Influence
• Mistake is not a sin. But a learning process
• Conventional thinking versus out of box
• Support & groom or develop employee
• Recognition, Motivation & Encouragement
• Choice of words. Constructive vs offensive
• Listener with patience & tolerance
• Attitude vs skills & knowledge.
• Avoid opinion or assumption. Do homework.
• Management philosophy. Who is most important ?
• Communication :-
- Share timely info
- Body language
- Project - understand & believe is achievable
- Engage all stakeholders
Page 8 of 9
Continue ….
Productivity in Manufacturing Plant: People Development 2
• Production
Operators as QC
inspectors
• Zero Tolerance
• Subject Experts
• Support projects
Training
Coffee
Meeting
Individual
Success Factor
• Operators
• IDL and IL
• Managers
• Hard working
• Work Smart
• Visibility
• Positive attitude
• Calm & Confident
• Independent &
Reliable
• Sense of urgency
• Initiative and
resourceful
• Systematic
approach.
Empowerment
and
Engagement
2 Incentive &
Recognition
• Best Line Leader
• Best Prodn Line
• Best Operator
• Zero Tolerance
• Star Award
• 3Rs Program
Page 9 of 9
End
Executive Working Experiences
Managing Director. Astec Custom Power Private Ltd (Kuantan, Malaysia) 1991 - 1997
1. Managed Power Supplies and Magnetic manufacturing plants with combined workforce at peak of 5,000 employees.
2. Major improvement - Productivity and Quality with all time high Positive P&L
3. Implemented Automated Testing Equipment using PC Based system.
APAC Director. (Quantum, Maxtor & Symbol Technology) 1997 – 2009
1. Managed Hard Disk drives Configuration and after sales support for Asia Pacific region.
2. Repair and after sales support for Symbol Scanner products.
3. Major in Reverse Logistic and setup service centres in Asia Pacific like China, Korea, India, Vietnam, etc
Managing Director. (Emerson – Artesyn ) 2011 – 2020
1. Setup magnetic manufacturing plant in Vietnam in 2011.
2. Managed Power Supplies and Magnetic manufacturing plants in Philippines with combined workforce at peak of
10,000 employee.
3. Transformed company with cultural change, positive P&L performance and digitally transformed to Industrial 4.0
4. Major improvement in Conversion cost through Lean/Productivity, Space optimization and People empowerment.
5. Introduced innovation and submitted several productivity related Patents.
6. Most preferred low cost and high tech manufacturing site by customers with huge growth in revenue year on year.
7. Received many PEZA awards given out by the President of the Philippines.
Page 10 of 12
Services Available
Onsite Consultation
1. Training
1. Lean & Productivity for Industrial Engineers (IE)
2. Lean & Productivity for Factory Engineering and Quality folks
3. Lean & Productivity for Production supervisory staff
4. Management and Behavioural Training.
2. Project
1. Select a product line as project for productivity improvement
2. Improve material flow and layout to optimise Line UPH (Unit per hour).
3. Line balancing using OSA (Operation Sequence Analysis)
4. Introduce mechanization and/or Automation
5. Introduce Single piece flow or Flow line production.
Automation (Design, fabrication, installation & implementation)
1. Software Automation
2. Processes Automation
3. Test Automation
Page 11 of 12
Services Available
Automation (Design, fabrication, installation & implementation)
1. Software Automation
1. Machine Maintenance Management System (MMMS)
2. Product Process Management System (PPMS)
3. Paperless transactions
2. Processes Automation
1. 3D animated Work instructions
2. Mechanical automation
3. Test Automation
1. Test Multiplexing
2. Universal Testing without unique Test Fixtures
3. Dynamic Test for Significance
4. Automated Image Recognition
5. Thermal testing proactively filter out potential Design, Process or component thermal
defects Page 12 of 12

More Related Content

What's hot

Growing the-digital-business-accenture-mobility-research-2015
Growing the-digital-business-accenture-mobility-research-2015Growing the-digital-business-accenture-mobility-research-2015
Growing the-digital-business-accenture-mobility-research-2015OptimediaSpain
 
Operating Model Design in a Digital World
Operating Model Design in a Digital WorldOperating Model Design in a Digital World
Operating Model Design in a Digital WorldRobert Cade
 
Digital Transformation by William Poos
Digital Transformation by William PoosDigital Transformation by William Poos
Digital Transformation by William PoosNRB
 
Digital transformation | AuroIN
Digital transformation | AuroINDigital transformation | AuroIN
Digital transformation | AuroINAuroIN
 
Fast tracking digital transformation publish
Fast tracking digital transformation publishFast tracking digital transformation publish
Fast tracking digital transformation publishPierre Gagne
 
Strategy+Digital Transformation
Strategy+Digital TransformationStrategy+Digital Transformation
Strategy+Digital Transformationthelmi
 
Digital Transformation Profile
Digital Transformation ProfileDigital Transformation Profile
Digital Transformation ProfileExo Futures
 
MBA masterclass AG - Kenny van Ierlant
MBA masterclass AG - Kenny van IerlantMBA masterclass AG - Kenny van Ierlant
MBA masterclass AG - Kenny van IerlantHans Janssen
 
MBA masterclass AG - Steven ten Napel
MBA masterclass AG - Steven ten NapelMBA masterclass AG - Steven ten Napel
MBA masterclass AG - Steven ten NapelHans Janssen
 
MBA masterclass AG - Geert van de Goor
MBA masterclass AG - Geert van de GoorMBA masterclass AG - Geert van de Goor
MBA masterclass AG - Geert van de GoorHans Janssen
 
Build a Mobile Foundation to Drive Digital Transformation Initiatives
Build a Mobile Foundation to Drive Digital Transformation InitiativesBuild a Mobile Foundation to Drive Digital Transformation Initiatives
Build a Mobile Foundation to Drive Digital Transformation InitiativesPerficient, Inc.
 
Applying The Science Of Measurement To The Art Of Advertising 1 March 2010...
Applying The Science Of Measurement To The Art Of Advertising    1 March 2010...Applying The Science Of Measurement To The Art Of Advertising    1 March 2010...
Applying The Science Of Measurement To The Art Of Advertising 1 March 2010...Ron Jacobs
 
Nasscom Chennai Emerge Forum Key People Issues By Sriram Of Avp Hr , Cogn...
Nasscom Chennai Emerge Forum   Key People Issues   By Sriram Of Avp Hr , Cogn...Nasscom Chennai Emerge Forum   Key People Issues   By Sriram Of Avp Hr , Cogn...
Nasscom Chennai Emerge Forum Key People Issues By Sriram Of Avp Hr , Cogn...Nasscom Chennai
 
2021 09-30 service cost tracking and internal chargeback
2021 09-30 service cost tracking and internal chargeback2021 09-30 service cost tracking and internal chargeback
2021 09-30 service cost tracking and internal chargebackitSMF Belgium
 
The Digital Transformation Playbook to stay relevant and keep pace in a post ...
The Digital Transformation Playbook to stay relevant and keep pace in a post ...The Digital Transformation Playbook to stay relevant and keep pace in a post ...
The Digital Transformation Playbook to stay relevant and keep pace in a post ...Blockchain Worx
 
Sage MAS Intelligence for MAS 90 & MAS 200
Sage MAS Intelligence for MAS 90 & MAS 200Sage MAS Intelligence for MAS 90 & MAS 200
Sage MAS Intelligence for MAS 90 & MAS 200Jeffrey Paulette
 
Global In-house Site contribution and value analysis
Global In-house Site contribution and value analysisGlobal In-house Site contribution and value analysis
Global In-house Site contribution and value analysisZinnov
 
Gamifying Cognizant 3.0
Gamifying Cognizant 3.0Gamifying Cognizant 3.0
Gamifying Cognizant 3.0Bhavik Kaul
 

What's hot (20)

Growing the-digital-business-accenture-mobility-research-2015
Growing the-digital-business-accenture-mobility-research-2015Growing the-digital-business-accenture-mobility-research-2015
Growing the-digital-business-accenture-mobility-research-2015
 
Operating Model Design in a Digital World
Operating Model Design in a Digital WorldOperating Model Design in a Digital World
Operating Model Design in a Digital World
 
Digital Transformation by William Poos
Digital Transformation by William PoosDigital Transformation by William Poos
Digital Transformation by William Poos
 
Digital transformation | AuroIN
Digital transformation | AuroINDigital transformation | AuroIN
Digital transformation | AuroIN
 
Fast tracking digital transformation publish
Fast tracking digital transformation publishFast tracking digital transformation publish
Fast tracking digital transformation publish
 
Strategy+Digital Transformation
Strategy+Digital TransformationStrategy+Digital Transformation
Strategy+Digital Transformation
 
Manufactures whats keeping you up
Manufactures   whats keeping you upManufactures   whats keeping you up
Manufactures whats keeping you up
 
Digital Transformation Profile
Digital Transformation ProfileDigital Transformation Profile
Digital Transformation Profile
 
MBA masterclass AG - Kenny van Ierlant
MBA masterclass AG - Kenny van IerlantMBA masterclass AG - Kenny van Ierlant
MBA masterclass AG - Kenny van Ierlant
 
MBA masterclass AG - Steven ten Napel
MBA masterclass AG - Steven ten NapelMBA masterclass AG - Steven ten Napel
MBA masterclass AG - Steven ten Napel
 
MBA masterclass AG - Geert van de Goor
MBA masterclass AG - Geert van de GoorMBA masterclass AG - Geert van de Goor
MBA masterclass AG - Geert van de Goor
 
Build a Mobile Foundation to Drive Digital Transformation Initiatives
Build a Mobile Foundation to Drive Digital Transformation InitiativesBuild a Mobile Foundation to Drive Digital Transformation Initiatives
Build a Mobile Foundation to Drive Digital Transformation Initiatives
 
Applying The Science Of Measurement To The Art Of Advertising 1 March 2010...
Applying The Science Of Measurement To The Art Of Advertising    1 March 2010...Applying The Science Of Measurement To The Art Of Advertising    1 March 2010...
Applying The Science Of Measurement To The Art Of Advertising 1 March 2010...
 
Nasscom Chennai Emerge Forum Key People Issues By Sriram Of Avp Hr , Cogn...
Nasscom Chennai Emerge Forum   Key People Issues   By Sriram Of Avp Hr , Cogn...Nasscom Chennai Emerge Forum   Key People Issues   By Sriram Of Avp Hr , Cogn...
Nasscom Chennai Emerge Forum Key People Issues By Sriram Of Avp Hr , Cogn...
 
2021 09-30 service cost tracking and internal chargeback
2021 09-30 service cost tracking and internal chargeback2021 09-30 service cost tracking and internal chargeback
2021 09-30 service cost tracking and internal chargeback
 
The Digital Transformation Playbook to stay relevant and keep pace in a post ...
The Digital Transformation Playbook to stay relevant and keep pace in a post ...The Digital Transformation Playbook to stay relevant and keep pace in a post ...
The Digital Transformation Playbook to stay relevant and keep pace in a post ...
 
IntegrtdAppro-GlblSuppChnTrans-Final-v2a
IntegrtdAppro-GlblSuppChnTrans-Final-v2aIntegrtdAppro-GlblSuppChnTrans-Final-v2a
IntegrtdAppro-GlblSuppChnTrans-Final-v2a
 
Sage MAS Intelligence for MAS 90 & MAS 200
Sage MAS Intelligence for MAS 90 & MAS 200Sage MAS Intelligence for MAS 90 & MAS 200
Sage MAS Intelligence for MAS 90 & MAS 200
 
Global In-house Site contribution and value analysis
Global In-house Site contribution and value analysisGlobal In-house Site contribution and value analysis
Global In-house Site contribution and value analysis
 
Gamifying Cognizant 3.0
Gamifying Cognizant 3.0Gamifying Cognizant 3.0
Gamifying Cognizant 3.0
 

Similar to Digital Transformation to enhance productivity and improve profitability

Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019DevanandKamble
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
Operation and value chain management
Operation and value chain managementOperation and value chain management
Operation and value chain managementAashray For Everyone
 
Ch-4 Building Competitive Advantage Through Functional-Level Strategy
Ch-4 Building Competitive Advantage Through Functional-Level StrategyCh-4 Building Competitive Advantage Through Functional-Level Strategy
Ch-4 Building Competitive Advantage Through Functional-Level Strategynimahi
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
world class manufacturing practices for mms
world class manufacturing practices for mmsworld class manufacturing practices for mms
world class manufacturing practices for mmsChandrasen Sharma
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing jaswanthLN
 
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...akshay hebbar
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Bill Bearnson
 
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...Infosys' session on IoT World - Systems Integration in an IOT world: A practi...
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...Infosys
 
Candidate Cortazzo 01 Mar 2016
Candidate Cortazzo 01 Mar 2016Candidate Cortazzo 01 Mar 2016
Candidate Cortazzo 01 Mar 2016Mark Cortazzo
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 

Similar to Digital Transformation to enhance productivity and improve profitability (20)

Landon mertz cerion nanomaterials
Landon mertz   cerion nanomaterialsLandon mertz   cerion nanomaterials
Landon mertz cerion nanomaterials
 
Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Wcm & am
Wcm & amWcm & am
Wcm & am
 
Operation and value chain management
Operation and value chain managementOperation and value chain management
Operation and value chain management
 
Management ch19
Management ch19Management ch19
Management ch19
 
Kaizen
KaizenKaizen
Kaizen
 
Ch-4 Building Competitive Advantage Through Functional-Level Strategy
Ch-4 Building Competitive Advantage Through Functional-Level StrategyCh-4 Building Competitive Advantage Through Functional-Level Strategy
Ch-4 Building Competitive Advantage Through Functional-Level Strategy
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
Unit 6.pdf
Unit 6.pdfUnit 6.pdf
Unit 6.pdf
 
world class manufacturing practices for mms
world class manufacturing practices for mmsworld class manufacturing practices for mms
world class manufacturing practices for mms
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
Productivity Improvement of a Laboratory Equipment Manufacturing Company thro...
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015
 
Lean
LeanLean
Lean
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...Infosys' session on IoT World - Systems Integration in an IOT world: A practi...
Infosys' session on IoT World - Systems Integration in an IOT world: A practi...
 
Candidate Cortazzo 01 Mar 2016
Candidate Cortazzo 01 Mar 2016Candidate Cortazzo 01 Mar 2016
Candidate Cortazzo 01 Mar 2016
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
OM.pdf
OM.pdfOM.pdf
OM.pdf
 

Recently uploaded

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 

Recently uploaded (17)

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 

Digital Transformation to enhance productivity and improve profitability

  • 2. Highlights of a Successful Manufacturing Company Innovative Products Innovative Manufacturing Strong Supply Chain Customer Base High Profit Margin Cost Effective & Competitive edge at I4.0 Materials, Inventory & Logistics Competitive Pricing, High Quality & Ease Of Doing Business Page 2 of 9 Continue ….
  • 3. Productivity in the Manufacturing Plant (Digital Transformation) A. KEY OBJECTIVES B. PEOPLE DEVELOPMENT Low Conversion Cost Grow Customer Base & Ease Of Doing Business Alignment of Functional goals to Factory goals Empowerment and Engagement Productivity Strategy 1 2 3 2 1 Page 3 of 9 Continue …. Factory Transformation to Industrial 4.0 Cultural Transformation
  • 4. Productivity in Manufacturing Plant: Key Objective 1 Productivity Strategy • Lean Flow Line • TAKT Time (Test Vs Assy) • Short Cycle Time • Double UPH – OSA Common losses • Absenteeism • Start of shift loss • Change over loss • Efficiency or learning loss Maximise Output With Lowest Cost Efficient Utilisation Of Manufacturing Space Low Conversion Cost 1 Efficient Slim Flow Line • Short Cycle • Short Flow Line • Centralize common area • Mechanization • Semi-automation • Mechanical • Test Multiplexing Page 4 of 9 Continue …. Objective :- - Low Labour Cost - Low Space Cost Note :- Conventional Productivity very Academic.
  • 5. Illustration :- Productivity & Doubling of Output Productivity Formula Std Time X Vol X K Productivity = -------------------------- Input Hours Where :- a. Std Time – time needed to build a product b. Vol - Output quantity at the end of the shift c. K - Manufacturing Allowance d. Input Hours - Total Labor hours for the shift Productivity Doubling UPH (Units Per Hour) Product Cost Structure Page 4a of 9 Continue …. Note :- Conventional Productivity very Academic. EEESP ( End Selling Price ) $$100 EEGP ( Gross Profit) $$20 EEFOH ( Fixed Over Head) $$25 EEBOM ( Bill of Material) $$50 EEDL ( Direct Labour) $$5 Maximize output
  • 6. Productivity in Manufacturing Plant: Key Objective 2 Factory Engineering Capability • 3D animated work instructions with Virtualization. • Magnetic Conveyor • Automated Image recognition • Auto laser Lead height check and trim • Thermal Imaging Vs Conventional BI • Automated Testing • Dynamic Test for Significance Scalable Capacity, Flexibility And Responsiveness High Tech Manufacturing Grow Customer Base with Low cost of operation & Ease Of Doing Business 2 Universal Main Line • Universal Testing without unique test fixture with literally no change over loss. • Multiple products with different form factor can run on the line simultaneously • Multiplex Automated Test Equipment • Automate mechanical assembly wherever practical. Page 5 of 9 Continue …. Ahead of Competition Doubling output through Lean, Productivity & Semi-automation
  • 7. Productivity in Manufacturing Plant: Key Objective 3 Systematic Manufacturing Control • Traceability and shop floor control • Equipment maintenance and spare parts control. (MMMS) • Product process management control (PPMS) • Paperless transactions Manufacturing Control through IT Solutions Productivity Strategy 3 Product Quality Waste Elimination • Inspection • Line yield by stations • Mitigate scraps • Field failure & warranty cost Strategy • Fix problem at Source • Stop line for 3 consecutive failure of the same kind. Burn-in & Test • Proactively screen out thermal defects • Dynamic test for Significance • Parametric auto CPk tracking Page 6 of 9 Continue ….
  • 8. Productivity in Manufacturing Plant: People Development 1 Alignment of Functional goals to Factory goals 1 Team Work and Collaboration • Common goals for every employee • Embrace and engage every member for total participation • Core business - Battlefield Awareness of Key Challenges • Conversion Cost • Customers satisfaction • Competitiveness in the competition • Grow customer base Core Business Manufacturing Create Conducive Working Environment Empowerment and Engagement • Trust, Respect and Reliable • Humble versus Pride (Ego) • Good listener, patience & tolerance • Eliminate Fear • Learn from mistakes • Educate and influence change • Motivate and Support • Encourage creativity & innovation • Recognition and Appreciation Page 7 of 9 Continue …. Company Wide Cultural Transformation
  • 9. Productivity in Manufacturing Plant: People Development 2 Empowerment and Engagement 2 Behavioural change • Authority • Trust • Pride • Educate or Influence • Mistake is not a sin. But a learning process • Conventional thinking versus out of box • Support & groom or develop employee • Recognition, Motivation & Encouragement • Choice of words. Constructive vs offensive • Listener with patience & tolerance • Attitude vs skills & knowledge. • Avoid opinion or assumption. Do homework. • Management philosophy. Who is most important ? • Communication :- - Share timely info - Body language - Project - understand & believe is achievable - Engage all stakeholders Page 8 of 9 Continue ….
  • 10. Productivity in Manufacturing Plant: People Development 2 • Production Operators as QC inspectors • Zero Tolerance • Subject Experts • Support projects Training Coffee Meeting Individual Success Factor • Operators • IDL and IL • Managers • Hard working • Work Smart • Visibility • Positive attitude • Calm & Confident • Independent & Reliable • Sense of urgency • Initiative and resourceful • Systematic approach. Empowerment and Engagement 2 Incentive & Recognition • Best Line Leader • Best Prodn Line • Best Operator • Zero Tolerance • Star Award • 3Rs Program Page 9 of 9 End
  • 11. Executive Working Experiences Managing Director. Astec Custom Power Private Ltd (Kuantan, Malaysia) 1991 - 1997 1. Managed Power Supplies and Magnetic manufacturing plants with combined workforce at peak of 5,000 employees. 2. Major improvement - Productivity and Quality with all time high Positive P&L 3. Implemented Automated Testing Equipment using PC Based system. APAC Director. (Quantum, Maxtor & Symbol Technology) 1997 – 2009 1. Managed Hard Disk drives Configuration and after sales support for Asia Pacific region. 2. Repair and after sales support for Symbol Scanner products. 3. Major in Reverse Logistic and setup service centres in Asia Pacific like China, Korea, India, Vietnam, etc Managing Director. (Emerson – Artesyn ) 2011 – 2020 1. Setup magnetic manufacturing plant in Vietnam in 2011. 2. Managed Power Supplies and Magnetic manufacturing plants in Philippines with combined workforce at peak of 10,000 employee. 3. Transformed company with cultural change, positive P&L performance and digitally transformed to Industrial 4.0 4. Major improvement in Conversion cost through Lean/Productivity, Space optimization and People empowerment. 5. Introduced innovation and submitted several productivity related Patents. 6. Most preferred low cost and high tech manufacturing site by customers with huge growth in revenue year on year. 7. Received many PEZA awards given out by the President of the Philippines. Page 10 of 12
  • 12. Services Available Onsite Consultation 1. Training 1. Lean & Productivity for Industrial Engineers (IE) 2. Lean & Productivity for Factory Engineering and Quality folks 3. Lean & Productivity for Production supervisory staff 4. Management and Behavioural Training. 2. Project 1. Select a product line as project for productivity improvement 2. Improve material flow and layout to optimise Line UPH (Unit per hour). 3. Line balancing using OSA (Operation Sequence Analysis) 4. Introduce mechanization and/or Automation 5. Introduce Single piece flow or Flow line production. Automation (Design, fabrication, installation & implementation) 1. Software Automation 2. Processes Automation 3. Test Automation Page 11 of 12
  • 13. Services Available Automation (Design, fabrication, installation & implementation) 1. Software Automation 1. Machine Maintenance Management System (MMMS) 2. Product Process Management System (PPMS) 3. Paperless transactions 2. Processes Automation 1. 3D animated Work instructions 2. Mechanical automation 3. Test Automation 1. Test Multiplexing 2. Universal Testing without unique Test Fixtures 3. Dynamic Test for Significance 4. Automated Image Recognition 5. Thermal testing proactively filter out potential Design, Process or component thermal defects Page 12 of 12