SlideShare a Scribd company logo
1 of 21
Download to read offline
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PENGENALAN
1. SALAH SATU ALAT PENCEGAHAN KEBAKARAN MUDAH ALIH YANG
PENTING.
2. SATU ALAT PEMADAM KEBAKARAN PERTAHANAN BARISAN HADAPAN
IAITU MEMADAM KEBAKARAN PERINGKAT API PERMULAAN.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
FAKTOR KEBERKESANAN PENGGUNAAN ALAT PEMADAM API
1. ALAT PEMADAM API MUDAH ALIH INI HENDAKLAH DILETAKAN DI TEMPAT YANG SESUAI
DAN SENTIASA DALAM KEADAAN BAIK.
2. PENGGUNAAN SATU-SATU JENIS ALAT PEMADAM API MESTILAH SESUAI DENGAN JENIS
KEBAKARAN YANG BERLAKU.
3. API KEBAKARAN YANG DI TEMUI SEMASA KECIL.
4. API KEBAKARAN DI TEMUI OLEH ORANG YANG BERSEDIA , TIDAK PANIK, SANGGUP
MELAKUKAN PEMADAMAN DAN BERKEBOLEHAN MENGGUNAKAN ALAT PEMADAM API.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PENEMPATAN ALAT PEMADAM API
1. GANTUNG PADA DINDING ATAU TIANG
• 1 Meter / 3’.3” DARI PARAS LANTAI
2. LETAK ATAS LANTAI
• HENDAKLAH DITANDAKAN DENGAN PENANDA DI BAHAGIAN ATAS ALAT PEMADAM
API TERSEBUT DENGAN KETINGGIAN 8’ DARI PARAS LANTAI DAN DIALAS TAPAKNYA.
3. JARAK PENEMPATAN ALAT PEMADAM API
• SATU ALAT PEMADAM API BOLEH MENGAWAL SEKELILING DALAM JARAK 75 KAKI
JEJARI. JADI JARAK MAKSIMUM ANTARA SATU ALAT PEMADAM API IALAH 150 KAKI.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
JENIS ALAT PEMADAM API
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
KELAS-KELAS API DAN KAEDAH PEMADAMAN
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
JENIS-JENIS ALAT PEMADAM API
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE)
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS
(CO2 STORED PRESSURE)
KEBAIKAN
1. MUDAH DI KENDALIKAN.
2. BOLEH MENGAWAL DAN MEMADAM KEBAKARAN DI PERINGKAT AWAL DENGAN
BERKESAN.
3. GASNYA BERSIH TIDAK MEMBANTU KEBAKARAN.
4. GASNYA TIDAK MERBAHAYA PADA KESIHATAN DAN TIDAK MENINGGALKAN KESAN.
5. GASNYA TIDAK MENGALIRKAN LETRIK.
6. BOLEH MENEMBUSI DI TEMPAT-TEMPAT PERMUKAAN YANG KECIL.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE)
KEBURUKAN
1. HANYA SEKALI GUNA SAHAJA.
2. KEBERATAN SELINDERNYA TIDAK SEPADAN DENGAN KANDUNGAN GAS, BERAT
KESELURUHANNYA 5 KG. TETAPI MENGANDUNGI CUMA 2.2 KG GAS SAHAJA.
3. KANDUNGAN GAS TIDAK DAPAT DI LIHAT DAN PERLU DI TIMBANG DARI MASA KESEMASA
UNTUK MENGELAKKAN KEKURANGAN DARIPADA 10%.
4. TIDAK SESUAI MEMADAM KEBAKARAN API JENIS A,B, DAN D.
5. TIDAK BOLEH MENGAWAL / MEMADAM KEBAKARAN YANG SUDAH BESAR.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
KEBAIKAN
1. MUDAH DAN SENANG DIKENDALIKAN.
2. BOLEH MENGAWAL / MEMADAM KEBAKARAN API KELAS A, B DAN C DENGAN BERKESAN.
3. PEMADAMANYA LEBIH BERKESAN JIKA DIBANDINGKAN DENGAN ALAT PEMADAM API
JENIS AIR, BUIH ATAU CO2.
4. PENGELUARANYA BOLEH DIKAWAL OLEH OPERATING LEVER
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
ALAT PEMADAM API
JENIS SERBUK KERING ( DRY POWDER )
KEBURUKANYA
1. HANYA SEKALI GUNA.
2. TEPUNGNYA BOLEH MENDATANGKAN KEROSAKAN KEPADA BAHAN-BAHAN
TERTENTU - ENJIN KERETA, BAHAN MAKANAN DAN SEBAGAINYA.
3. TIDAK BOLEH MEMADAM KEBAKARAN API LOGAM.
4. TEPUNGNYA BOLEH MENJADI BEKU SEKIRANYA DITEMPATKAN DI TEMPAT
YANG SEJUK.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
1. HENDAKLAH DIPERIKSA 1 BULAN SEKALI.
2. PASTIKAN PRESSURE GAUGE PADA TABUNG MENUNJUKKAN KEPADA KANDUNGAN PENUH.
( HIJAU - PENUH, MERAH – KOSONG ).
3. SEKIRANYA BERLAKU KEKURANGAN TEKANAN HENDAKLAH DIHANTAR KE SERVICE AGEN.
4. PASTIKAN TIADA KEROSAKAN ATAU KEKARATAN DI BAHAGIAN LUAR TABUNG.
5. PASTIKAN SAFETY PIN BERADA PADA KEDUDUKAN YANG BETUL.
6. DISCHARGE NOZEL, HOS DAN OPERATING LEVER DITENTUKAN DALAM KEADAAN BAIK DAN BERSIH.
7. SETAHUN SEKALI DIHANTAR KE SERVICE AGEN YANG BERDAFTAR UNTUK PEMERIKSAAN / UJIAN
MENDAPATKAN KELULUSAN.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
Safety pin
Nozzle
Hose
Pressure
Gauge
Cylinder
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
PEMERIKSAAN ALAT PEMADAM API
SAFETY PIN
FLAXIBLE HIGH PRESSURE HOSE PRESSURE GAUGE
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
CARA-CARA PENGGUNAAN ALAT PEMADAM API
Ingat formula P.A.S.S.
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)
CARA-CARA PENGGUNAAN ALAT PEMADAM API
Peringatan !!! Pastikan dibelakang anda ada jalan keluar dan pernafasan anda dilindungi.
1. BERDIRI IKUT ARAH ANGIN.
2. PANCUTKAN MEDIA PEMADAMAN PADA PUNCA API.
3. ALIH-ALIHKAN PANCUTAN PADA TEMPAT YANG TERBAKAR.
4. GUNAKAN BEBERAPA ALAT PEMADAM API SERENTAK KETIKA API MULA MEMBESAR.
5. PASTIKAN API BENAR-BENAR PADAM SEBELUM DI TINGGALKAN.
6. HANTAR ALAT PEMADAM API UNTUK PENYELENGGARAAN DAN PERISIAN SEMULA.
MALAYSIAN RESOURCES CORPORATION BERHAD
PROJECT MASS RAPID LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
KVMRT SSP PACKAGE S210
SAMSINAR JAUHARI
HSE MANAGER
Mobile : 019-2792217
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Mobile : 012-9835664
PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)
PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS
AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL
(CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)

More Related Content

Similar to Mrcb alat pemadam api

curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
Azlan Shah
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
Altaf Tanwar
 
2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule
Pravin Kolhe
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
MUHAMMAD SALEEM
 
tamer elshimy new cv (1)
tamer elshimy new cv (1)tamer elshimy new cv (1)
tamer elshimy new cv (1)
tamer elshimy
 
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
BenMohamedHedi
 
Bakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rdBakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rd
Backie Udang
 

Similar to Mrcb alat pemadam api (18)

04 294914 Ad3
04 294914 Ad304 294914 Ad3
04 294914 Ad3
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
 
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
MP-SLDC-DSM Account of Wind and Solar Pooling Stations for the month of Novem...
 
2016 CV LATEST
2016 CV LATEST2016 CV LATEST
2016 CV LATEST
 
2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
Company Profile FUJI DNDT 20220509.pdf
Company Profile FUJI DNDT 20220509.pdfCompany Profile FUJI DNDT 20220509.pdf
Company Profile FUJI DNDT 20220509.pdf
 
tamer elshimy new cv (1)
tamer elshimy new cv (1)tamer elshimy new cv (1)
tamer elshimy new cv (1)
 
Rnpp najmul
Rnpp najmulRnpp najmul
Rnpp najmul
 
CV Mahesh Rao (Marine engineer) - 2016
CV  Mahesh Rao (Marine engineer) - 2016CV  Mahesh Rao (Marine engineer) - 2016
CV Mahesh Rao (Marine engineer) - 2016
 
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
 
Bakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rdBakie Anak Udang - UpdateCV 3rd
Bakie Anak Udang - UpdateCV 3rd
 
Dobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge ProjectDobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge Project
 

More from HASNIZAM BIN MD SAAD

More from HASNIZAM BIN MD SAAD (20)

SHASSIC KV.pdf
SHASSIC KV.pdfSHASSIC KV.pdf
SHASSIC KV.pdf
 
KV Segamat SHASSIC.pdf
KV Segamat SHASSIC.pdfKV Segamat SHASSIC.pdf
KV Segamat SHASSIC.pdf
 
Machinery Inspection.pdf
Machinery Inspection.pdfMachinery Inspection.pdf
Machinery Inspection.pdf
 
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdfHASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
 
SHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdfSHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdf
 
Latihan Asas Pengawal Bendera
 Latihan Asas Pengawal Bendera Latihan Asas Pengawal Bendera
Latihan Asas Pengawal Bendera
 
Heat Stroke
Heat StrokeHeat Stroke
Heat Stroke
 
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdfHEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
 
SHASSIC CIS 10 2020
SHASSIC CIS 10 2020SHASSIC CIS 10 2020
SHASSIC CIS 10 2020
 
Standard Industri Pembinaan cis 10 2020
Standard Industri Pembinaan cis 10 2020Standard Industri Pembinaan cis 10 2020
Standard Industri Pembinaan cis 10 2020
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018
 
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURESSAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
 
Sila pakai topeng muka
Sila pakai topeng mukaSila pakai topeng muka
Sila pakai topeng muka
 
Prosidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkpProsidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkp
 
Garispanduan pkp pembinaan
Garispanduan pkp pembinaanGarispanduan pkp pembinaan
Garispanduan pkp pembinaan
 
Covid 19 guidance for the workplace
Covid 19 guidance for the workplaceCovid 19 guidance for the workplace
Covid 19 guidance for the workplace
 
Sohelp
SohelpSohelp
Sohelp
 
Working at height
Working at heightWorking at height
Working at height
 
Lifting using excavator
Lifting using excavatorLifting using excavator
Lifting using excavator
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Mrcb alat pemadam api

  • 1.
  • 2. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) PENGENALAN 1. SALAH SATU ALAT PENCEGAHAN KEBAKARAN MUDAH ALIH YANG PENTING. 2. SATU ALAT PEMADAM KEBAKARAN PERTAHANAN BARISAN HADAPAN IAITU MEMADAM KEBAKARAN PERINGKAT API PERMULAAN.
  • 3. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) FAKTOR KEBERKESANAN PENGGUNAAN ALAT PEMADAM API 1. ALAT PEMADAM API MUDAH ALIH INI HENDAKLAH DILETAKAN DI TEMPAT YANG SESUAI DAN SENTIASA DALAM KEADAAN BAIK. 2. PENGGUNAAN SATU-SATU JENIS ALAT PEMADAM API MESTILAH SESUAI DENGAN JENIS KEBAKARAN YANG BERLAKU. 3. API KEBAKARAN YANG DI TEMUI SEMASA KECIL. 4. API KEBAKARAN DI TEMUI OLEH ORANG YANG BERSEDIA , TIDAK PANIK, SANGGUP MELAKUKAN PEMADAMAN DAN BERKEBOLEHAN MENGGUNAKAN ALAT PEMADAM API.
  • 4. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) PENEMPATAN ALAT PEMADAM API 1. GANTUNG PADA DINDING ATAU TIANG • 1 Meter / 3’.3” DARI PARAS LANTAI 2. LETAK ATAS LANTAI • HENDAKLAH DITANDAKAN DENGAN PENANDA DI BAHAGIAN ATAS ALAT PEMADAM API TERSEBUT DENGAN KETINGGIAN 8’ DARI PARAS LANTAI DAN DIALAS TAPAKNYA. 3. JARAK PENEMPATAN ALAT PEMADAM API • SATU ALAT PEMADAM API BOLEH MENGAWAL SEKELILING DALAM JARAK 75 KAKI JEJARI. JADI JARAK MAKSIMUM ANTARA SATU ALAT PEMADAM API IALAH 150 KAKI.
  • 5. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) JENIS ALAT PEMADAM API
  • 6. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) KELAS-KELAS API DAN KAEDAH PEMADAMAN
  • 7. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) KELAS-KELAS API DAN KAEDAH PEMADAMAN
  • 8. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) KELAS-KELAS API DAN KAEDAH PEMADAMAN
  • 9. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) JENIS-JENIS ALAT PEMADAM API
  • 10. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE)
  • 11. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE) KEBAIKAN 1. MUDAH DI KENDALIKAN. 2. BOLEH MENGAWAL DAN MEMADAM KEBAKARAN DI PERINGKAT AWAL DENGAN BERKESAN. 3. GASNYA BERSIH TIDAK MEMBANTU KEBAKARAN. 4. GASNYA TIDAK MERBAHAYA PADA KESIHATAN DAN TIDAK MENINGGALKAN KESAN. 5. GASNYA TIDAK MENGALIRKAN LETRIK. 6. BOLEH MENEMBUSI DI TEMPAT-TEMPAT PERMUKAAN YANG KECIL.
  • 12. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS GAS (CO2 STORED PRESSURE) KEBURUKAN 1. HANYA SEKALI GUNA SAHAJA. 2. KEBERATAN SELINDERNYA TIDAK SEPADAN DENGAN KANDUNGAN GAS, BERAT KESELURUHANNYA 5 KG. TETAPI MENGANDUNGI CUMA 2.2 KG GAS SAHAJA. 3. KANDUNGAN GAS TIDAK DAPAT DI LIHAT DAN PERLU DI TIMBANG DARI MASA KESEMASA UNTUK MENGELAKKAN KEKURANGAN DARIPADA 10%. 4. TIDAK SESUAI MEMADAM KEBAKARAN API JENIS A,B, DAN D. 5. TIDAK BOLEH MENGAWAL / MEMADAM KEBAKARAN YANG SUDAH BESAR.
  • 13. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS SERBUK KERING ( DRY POWDER )
  • 14. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS SERBUK KERING ( DRY POWDER ) KEBAIKAN 1. MUDAH DAN SENANG DIKENDALIKAN. 2. BOLEH MENGAWAL / MEMADAM KEBAKARAN API KELAS A, B DAN C DENGAN BERKESAN. 3. PEMADAMANYA LEBIH BERKESAN JIKA DIBANDINGKAN DENGAN ALAT PEMADAM API JENIS AIR, BUIH ATAU CO2. 4. PENGELUARANYA BOLEH DIKAWAL OLEH OPERATING LEVER
  • 15. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) ALAT PEMADAM API JENIS SERBUK KERING ( DRY POWDER ) KEBURUKANYA 1. HANYA SEKALI GUNA. 2. TEPUNGNYA BOLEH MENDATANGKAN KEROSAKAN KEPADA BAHAN-BAHAN TERTENTU - ENJIN KERETA, BAHAN MAKANAN DAN SEBAGAINYA. 3. TIDAK BOLEH MEMADAM KEBAKARAN API LOGAM. 4. TEPUNGNYA BOLEH MENJADI BEKU SEKIRANYA DITEMPATKAN DI TEMPAT YANG SEJUK.
  • 16. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) PEMERIKSAAN ALAT PEMADAM API 1. HENDAKLAH DIPERIKSA 1 BULAN SEKALI. 2. PASTIKAN PRESSURE GAUGE PADA TABUNG MENUNJUKKAN KEPADA KANDUNGAN PENUH. ( HIJAU - PENUH, MERAH – KOSONG ). 3. SEKIRANYA BERLAKU KEKURANGAN TEKANAN HENDAKLAH DIHANTAR KE SERVICE AGEN. 4. PASTIKAN TIADA KEROSAKAN ATAU KEKARATAN DI BAHAGIAN LUAR TABUNG. 5. PASTIKAN SAFETY PIN BERADA PADA KEDUDUKAN YANG BETUL. 6. DISCHARGE NOZEL, HOS DAN OPERATING LEVER DITENTUKAN DALAM KEADAAN BAIK DAN BERSIH. 7. SETAHUN SEKALI DIHANTAR KE SERVICE AGEN YANG BERDAFTAR UNTUK PEMERIKSAAN / UJIAN MENDAPATKAN KELULUSAN.
  • 17. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) PEMERIKSAAN ALAT PEMADAM API Safety pin Nozzle Hose Pressure Gauge Cylinder
  • 18. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) PEMERIKSAAN ALAT PEMADAM API SAFETY PIN FLAXIBLE HIGH PRESSURE HOSE PRESSURE GAUGE
  • 19. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) CARA-CARA PENGGUNAAN ALAT PEMADAM API Ingat formula P.A.S.S.
  • 20. PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017) CARA-CARA PENGGUNAAN ALAT PEMADAM API Peringatan !!! Pastikan dibelakang anda ada jalan keluar dan pernafasan anda dilindungi. 1. BERDIRI IKUT ARAH ANGIN. 2. PANCUTKAN MEDIA PEMADAMAN PADA PUNCA API. 3. ALIH-ALIHKAN PANCUTAN PADA TEMPAT YANG TERBAKAR. 4. GUNAKAN BEBERAPA ALAT PEMADAM API SERENTAK KETIKA API MULA MEMBESAR. 5. PASTIKAN API BENAR-BENAR PADAM SEBELUM DI TINGGALKAN. 6. HANTAR ALAT PEMADAM API UNTUK PENYELENGGARAAN DAN PERISIAN SEMULA.
  • 21. MALAYSIAN RESOURCES CORPORATION BERHAD PROJECT MASS RAPID LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) KVMRT SSP PACKAGE S210 SAMSINAR JAUHARI HSE MANAGER Mobile : 019-2792217 HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Mobile : 012-9835664 PROJECT MASS RAPID TRANSIT LALUAN 2 : SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE S210 : CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT CYBERJAYA CITY CENTRE AND PUTRAJAYA SENTRAL (CONTRACT NO. MRTCORP/KVMRT-SSP/S210/CW/026/09/2017)