SlideShare a Scribd company logo
1 of 4
CURRICULAM VITA
PROPOSED POSITION IN THE PROJECT: MECHANICAL ENGINEER
EXPERT IDENTIFICATION NUMBERIN RENCO: 3287
1. FAMILY NAME: KRISHNASWAMY
2. FIRST NAME : MURALIDHARAN
3. DATE OF BIRTH: 28/06/1961
4. NATIONALITY: INDIAN
5. CIVIL STATUS: MARRIED
6. DEPENDEN: THREE CHILDREN
7. EDUCATION
INSTITUTION OLD SSLC PASSED IN 1976/77
DEGREE(s)OR DIPLOMA ( S)
OBTAINED
COMPUTER SKILLS
MECAHNICAL ENGINEER CV IS
NOT IN HAND
YES
8. LANGUAGE SKILLS 5 - READING &WRITING & SPEAKING
9. KEY QUALIFICATIONS Mechanical Engineer Expert
PERFORMS DIRECTLY AND SUPERVISES ALL INSTALLATION AND MARKING AND FITTINGS ALL
TYPE OF MECHANICAL COMPONENTS
ASSEMBLING & DISASSEMBLING HEAVY ROTATING EQUIPMENTS MECHANICAL APPLICATIONS
SUPERVISE –TEST /INSPECTION/TROUBLE SHOOT/MECHANICAL COMPONENTS
SUPERVISE-ALIGNMENT/WITH NORMAL & LAZER /LINE/LEVELING MECHANICAL EQUIPMENTS
SUPERVISE – MAINTENANCE OF MECHANICAL KIT COMPONENTS UNDERSTAND AND READ
MECHANICAL DRAWINGS, SUPERVISE SLINGING & BANKSMAIN DUTIES AND SUPERVISE RIGING
TACKLE IDENTIFICATION, CORRECT RIGGING TACKLE (IE CAPABLE OF SAFETY LIFTING THE SPECIFIED
LOADS) MECHANICAL APPLICATIONS, SUPERVISE AND SAFE SYSTEMS OF WORK METHOD
STATEMENTS
CONDUCT DAILY TOOL BOX TALKS AND SAFETY INSPECTION AT SITE, SUPERVISE SITE SAFETY
REQUIRMENTS AND [LOCAL LEGISTATION AS PER THE COMPANY POLICY]
PERFORM HANDS ON MAINTENANCE AND [REPAIRS TO GAS TURBINE AND HEAVY DUTY
CENTRIFUGAL COMPRESSORS AND STEAM TURBINE AND PUMPS AND RELATED AUXILARIES]
WORKED THIS TYPES OF TURBINES AND HEAVY DUTY COMPRESSORS
PGT-5 & PGT-10, PGT-25, MS -1002, MS- 3002, LM 2500, LM 6000, MS- 5001, MS-5002
HEAVY DUTY CENTRIFUGICAL COMPRESSORS TYPE PCL, BCL, MCL, 2BCL, 2MCL
STEAM TURBINE TYPE- NG, HNG, HG, AND VACUM PUMPS AND BOILER FEED PUMPS
ALL TYPE OF GAS SEALS & DRY GAS SEAL SPECIALIST IN ASSEMBLY& DISASSEMBLY
FINAL HOOK UP & INSTALLING COUPLING HUB AND COUPLINGS FINAL FLUSHING & BLOW ALL
PIPING ASSIST AND INSPECTER & CLIENT MECHANICAL ACTIVITIES
FURTHER MORE CAPABLE TO PERFORM DIRERCTLY THE COMMISSIONING OF THE MACHINE
ASSISTING THE CONTROL ENGINEER FOR THE STARTUP OPERATION.
SURNAME KRISHNASWAMY
NAME MURALIDHARAN
SEX MALE
CITIZENSHIP/NATIONALITY INDIAN /INDIAN
PLACEOF BIRTH KANCHIPURAM
DATE OF BIRTH 28/06/1961
PERMANENT ADDRESS PLOT-19,DOOR NO-5,FIRST FLOOR, KANNAN
NAGAR,4TH
MAIN ROAD
MADIPAKKAM,CHENNAI- INDIA
TAMILNADU , PIN 600091
CELL NO +91 9940 2752 18, 8124626655
E-MAIL KMURALI_JAY@YAHOO.CO.IN
MARITAL STATUS MARRIED
FATHER’S NAME R.KRISHNASWAMY
MOTHER’ NAME K.VASANTHA
GRANDFATHER’S NAME RANGANADHAN
RELIGION HINDU
EDUCATIONAL QUALIFICATION OLD SSLC 1976/1977
QUALIFICATION DME/MECH [CV MISSING] EARTHQUAKE IN
AHEMADABAD
PASSPORT NO JO 864649
DATE OF ISSUE 21/07/2010
DATE OF EXPIRE 20/07/2020
PLACE OF ISSUE CHENNAI
NOTES: GAS TURBINE & CE/CO /GEN/ MEC/TEC/ENG/ADVISER
PROFESSIONALRECORDSWORKEDWITH [RENCO] GE/NP- EQUIPMENTS
DATE/YEAR COMPANY LOCATION CLIENT PROJECT EQUIPMENT RESPONSIBLITIES
27/11/2006
TO
08/01/2007
HITACHI NIGERIA
BONY
ISLAND
HONDAI
HEAVY
INDUSTRIES
POWER
GENERATION
GT- 50/60
FRM -5001
GE/NP
INSTALLATION
COMMISSINING
24/03/2007
TO
20/05/2007
ROCKSON
ENGINEERING
MINISTRI OF
POWER
NIGERIA
OMUKU
GE/NP –RIVERS
STATE
MINISTRI
POWER
POWER
GENERATION
6 X 32 MW
FRM –5001
GE/NP
FIVE& SIX –UNITS
INSTALLATION
20/07/2007
TO
GENP/NAOC
AGIP
NIGERIA
OB/OB
AGIP/NAOC
GE/NP
GAS
DEVELOPMENT
GE/NP
GT/EXPANDER
GLOBAL OPERATION
AND MAINTENANCE
15/07/2009 COMPRESSORS
OPERATION
SERVICES
10/10/2009
TO
21/07/2010
GASCO/
BECHTEL
GE/NP
UAE/ABUDHABI
HABSHAN
OGD PHASE -III
BECHTEL
GE/NP
GAS
DEVELOPMENT
4 X BCL-407 C
4 X BCL –457
MS-5002 DLN
INSTALLATION FINAL
ALIGNMENT
DRY GAS SEAL DIS
ASSEMBLY &
ASSEMBLY /HOOK
UP HUB
INSTALLATION
21/07/2010 ASAB /GE/NP UAE/ABUDHABI
AGD /PHASEII
BECHTEL
GE/NP
GAS
DEVELOPMENT
BCL -505 FINAL HOOK UP
SERVICE
18/10/2010
TO
07/01/2011
UMM SHAIF
OFF SHORE
ADMA/OPCO
UAE/ABUDHABI
OFF SHORE
HONDAI HEAVY
INDUSTRIES
GAS
DEVELOPMENT
INJECTION
PGT25
BCL –405 C
3 UNITS
INSTALLATION
FINAL
ALIGNMENT/HOOK
UP/HUB /SEAL
ASSEMBLY/STARTUP
30/03/2011
TO
28/07/2011
SAUDHI
POLIMER
COMPANY/JGC
NCP-CHVERAN
SAUDHI ARABIA
AL JUBAIL
PHASE -II
JGC-NCP
GE/NP
JGC/NCP/GE/NP
ETHYLENE
PLANT
PROPENE
COMPRESSOR
2-MCL 1406
2-DMCL 1406
MCL-807
3 BCL 608
STEAM TURBINE
INSTALLATION
DRY GAS SEAL AND
FINAL HOOK UP
STARTUP
01/03/2012
TO
31/02/2013
BHAVINI/BHEL
EEPL
INDIA
KALPAKKAM
PHASE -II
BHEL/NTPC AUTOMIC
ENERGY
1 X 500 MW
3 FEED PUMPS
STEAM TURBINE
INSTALLATION
FINAL HOOK UP
25/06/2013
TO
27/08/2013
GASCO
JV/PETROFAC/GS
UAE/ABUDHABI
RUWAIS -4TH
NGL PROJECT
JV/PETROFAC/GS
GE/NP
GAS
DEVELOPMENT
PROPENE
2 X 3 MCL –1005
2 X BCL 503
COMPRESSOR
INSTALLATION
SEAL NEW
ASSEMBLY
STARTUP
04/11/2013
TO
16/11/2013
QATAR
PETROLIUM
QATAR
DUKKAN
QP/GE/NP GAS
STABLIATION
PLANT
2 X BCL 405 SERVICE&
INSPECTION
STARTUP
17/01/2014
TO
21/03/2014
GASCO
JV/PETROFAC/GS
UAE/ABUDHABI
RUWAIS –
4TH NGL PROJECT
JV/PETROFAC/GS
GE/NP
GAS
DEVELOPMENT
2 X 3MCL 1005 DRY GAS SEAL
DIS ASSEMBLY
ASSEMBLY SERVICE
13/04/2015
TO
16/08/2015
PLANTGERIA
NAOC/AGIP
NIGERIA
OB/OB
EBOCHA
KUWALE
AGIP/NAOC
PLANTGERIA
GE/NP
SIEMENS
MORETHAN 60
UNITS
NIGERIAN OIL
COMPANY
GAS BOOSTING
LOW PRESURE
MEDIUM
PRESURE
HIGH PRESURE
POWER
GENERATION
EXPANSION
OIL RECOVERY
BOOSTING
TURBO
COMPRESSORS
OPERATION AND
MAINTENENENCE
O&M
PROFESSONALRECORD WORKEDBEFORE RENCO
DATE /YEAR COMPANY LOCATION CLIENT EQUIPMENTS
TYPE
RESPONSIBLITIES
1997- 2006 ARVINDMILLS
GE/NP
INDIA
AHEMADABAD
SANTEJ/NARODA
ARVINDMILLS
GE/NP
PGT-10 X 4
GE/NP
25MW STEAM
TURBINE BHEL
INSTALLATION
OPERATION
MAINTENANCE
O&M
1996 - 1997 ONGC/BHPV
DEMAG
COMPRESSOR
INDIA
GANDHAR
ONGC/BHPV
DEMAG WEST
GERMANY
PHASEII
4 NOSDEMAG
LP /HP /MOTO-
COMPRESSORS
EQUIPMENT
ERECTION &
COMMISSIONINGAND
PIPING
1993 -1995 RTPC/MITSUBISHI
JAPAN
INDIA
RAICHUR
RAICHUR
RTPC/KARNATAKA
POWER PLANT
65 MW STEAM
TURBINE
EQUIPMENT
ERECTION AND
COMMISSIONING
LEAK TEST GEN
1992 - 1993 RELIANCE.PETRO
CHEMICAL
INDIA
PATALGANGA
RELIANCE/BHEL
RAIGARD
PETRO
CHEMICAL GT
INSTALLATION
COMMISSIONING
1991 -1992 GEB /SURATH
UTRAN
INDIA
UTRAN
GUJARAT
ELECTRIC CITY
BHEL
POWER
3X GT 32 MW
INSTALLATION
COMMISSIONING
1990 -1991 AECO/VATVA INDIA
VATVA
AHEMADABAD
AECO
BHEL
32 MW X 2
1 STEAM
TURBINE 25 MW
INSTALLATION
COMMISSIONING
PIPING
1987 -1990 VIZAGSTEEL
PLANT/VIZAG
INDIA/VIZAG
ANDERA
BHEL
DEMAG WEST
GERMANY
3 X 30 MW
TURBO
BLOWERS
ERECTION AND
COMMISSIONING
HOOK UP
1984 -1987 BHILAISTEEL
PLANT
INDIA
BHILAI/MP
GHH
BHEL/EEPL
32 MW STEAM
TURBINE
BLOWER [GHH]
INSTALLATION
1983 - 1984 TNPL/KARUR
PUGALUR
INDIA
TNPL /PUGALUR
SIEMENS/EEPL 7.5MW
18.5 MW STEAM
TURBINE
POWER GENERATION
ERECTION &
COMMISSIONING
1980 -1982 TNEB /ENNORE INDIA
TNEB
ENNORE
SHODA
BHEL
65 MW X 3
110 MW X3
STEAMTURBINE
SERVICESO&M

More Related Content

Viewers also liked (10)

Diosa Madre
Diosa MadreDiosa Madre
Diosa Madre
 
Diapo sexy yo
Diapo sexy yoDiapo sexy yo
Diapo sexy yo
 
Jocs tradicionals
Jocs tradicionalsJocs tradicionals
Jocs tradicionals
 
Framework for Designing MOOCs
Framework for Designing MOOCsFramework for Designing MOOCs
Framework for Designing MOOCs
 
El Espíritu santo perfeccionando a la iglesia: Pastor Aldo F. Acosta
El Espíritu santo perfeccionando a la iglesia: Pastor Aldo F. AcostaEl Espíritu santo perfeccionando a la iglesia: Pastor Aldo F. Acosta
El Espíritu santo perfeccionando a la iglesia: Pastor Aldo F. Acosta
 
Types of paragraph
Types of paragraphTypes of paragraph
Types of paragraph
 
Docslide.us budge wallis-magia-egipcia
Docslide.us budge wallis-magia-egipciaDocslide.us budge wallis-magia-egipcia
Docslide.us budge wallis-magia-egipcia
 
Extraterrestres rafapal
Extraterrestres rafapalExtraterrestres rafapal
Extraterrestres rafapal
 
Types of Paragraph
Types of ParagraphTypes of Paragraph
Types of Paragraph
 
LED Highbay from betop
LED Highbay from betopLED Highbay from betop
LED Highbay from betop
 

Similar to 2016 CV LATEST

JIMIT JOSHI RESUME & COVER LETTER
JIMIT JOSHI RESUME & COVER LETTERJIMIT JOSHI RESUME & COVER LETTER
JIMIT JOSHI RESUME & COVER LETTER
Jimit Joshi
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
Kee M
 
BRUNO B AMBITO RESUME,NEW UPDATE.DOC
BRUNO B AMBITO RESUME,NEW UPDATE.DOCBRUNO B AMBITO RESUME,NEW UPDATE.DOC
BRUNO B AMBITO RESUME,NEW UPDATE.DOC
Bruno Bernal Ambito
 
CV FOR JOHAN KLOPPER SR
CV FOR JOHAN KLOPPER SRCV FOR JOHAN KLOPPER SR
CV FOR JOHAN KLOPPER SR
Johan KLOPPER
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
Azlan Shah
 
Ese oniovosa cv
Ese oniovosa cvEse oniovosa cv
Ese oniovosa cv
oniovosa
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATIONTHE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
Cao Hoang Le
 
C V Dulla SUP Did - Copy
C  V Dulla SUP Did - CopyC  V Dulla SUP Did - Copy
C V Dulla SUP Did - Copy
Dulla dhanesh
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
Saleem P.P
 

Similar to 2016 CV LATEST (20)

JIMIT JOSHI RESUME & COVER LETTER
JIMIT JOSHI RESUME & COVER LETTERJIMIT JOSHI RESUME & COVER LETTER
JIMIT JOSHI RESUME & COVER LETTER
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
BRUNO B AMBITO RESUME,NEW UPDATE.DOC
BRUNO B AMBITO RESUME,NEW UPDATE.DOCBRUNO B AMBITO RESUME,NEW UPDATE.DOC
BRUNO B AMBITO RESUME,NEW UPDATE.DOC
 
JG Smit - CV
JG Smit - CVJG Smit - CV
JG Smit - CV
 
Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
 
CV FOR JOHAN KLOPPER SR
CV FOR JOHAN KLOPPER SRCV FOR JOHAN KLOPPER SR
CV FOR JOHAN KLOPPER SR
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Satendra bio
Satendra bioSatendra bio
Satendra bio
 
Company Profile Wooil 2014
Company Profile Wooil 2014Company Profile Wooil 2014
Company Profile Wooil 2014
 
Ese oniovosa cv
Ese oniovosa cvEse oniovosa cv
Ese oniovosa cv
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATIONTHE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
 
SELVAM DOSS QAQC CV
SELVAM DOSS QAQC CVSELVAM DOSS QAQC CV
SELVAM DOSS QAQC CV
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
C V Dulla SUP Did - Copy
C  V Dulla SUP Did - CopyC  V Dulla SUP Did - Copy
C V Dulla SUP Did - Copy
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 

2016 CV LATEST

  • 1. CURRICULAM VITA PROPOSED POSITION IN THE PROJECT: MECHANICAL ENGINEER EXPERT IDENTIFICATION NUMBERIN RENCO: 3287 1. FAMILY NAME: KRISHNASWAMY 2. FIRST NAME : MURALIDHARAN 3. DATE OF BIRTH: 28/06/1961 4. NATIONALITY: INDIAN 5. CIVIL STATUS: MARRIED 6. DEPENDEN: THREE CHILDREN 7. EDUCATION INSTITUTION OLD SSLC PASSED IN 1976/77 DEGREE(s)OR DIPLOMA ( S) OBTAINED COMPUTER SKILLS MECAHNICAL ENGINEER CV IS NOT IN HAND YES 8. LANGUAGE SKILLS 5 - READING &WRITING & SPEAKING 9. KEY QUALIFICATIONS Mechanical Engineer Expert PERFORMS DIRECTLY AND SUPERVISES ALL INSTALLATION AND MARKING AND FITTINGS ALL TYPE OF MECHANICAL COMPONENTS ASSEMBLING & DISASSEMBLING HEAVY ROTATING EQUIPMENTS MECHANICAL APPLICATIONS SUPERVISE –TEST /INSPECTION/TROUBLE SHOOT/MECHANICAL COMPONENTS SUPERVISE-ALIGNMENT/WITH NORMAL & LAZER /LINE/LEVELING MECHANICAL EQUIPMENTS SUPERVISE – MAINTENANCE OF MECHANICAL KIT COMPONENTS UNDERSTAND AND READ MECHANICAL DRAWINGS, SUPERVISE SLINGING & BANKSMAIN DUTIES AND SUPERVISE RIGING TACKLE IDENTIFICATION, CORRECT RIGGING TACKLE (IE CAPABLE OF SAFETY LIFTING THE SPECIFIED LOADS) MECHANICAL APPLICATIONS, SUPERVISE AND SAFE SYSTEMS OF WORK METHOD STATEMENTS CONDUCT DAILY TOOL BOX TALKS AND SAFETY INSPECTION AT SITE, SUPERVISE SITE SAFETY REQUIRMENTS AND [LOCAL LEGISTATION AS PER THE COMPANY POLICY] PERFORM HANDS ON MAINTENANCE AND [REPAIRS TO GAS TURBINE AND HEAVY DUTY CENTRIFUGAL COMPRESSORS AND STEAM TURBINE AND PUMPS AND RELATED AUXILARIES] WORKED THIS TYPES OF TURBINES AND HEAVY DUTY COMPRESSORS
  • 2. PGT-5 & PGT-10, PGT-25, MS -1002, MS- 3002, LM 2500, LM 6000, MS- 5001, MS-5002 HEAVY DUTY CENTRIFUGICAL COMPRESSORS TYPE PCL, BCL, MCL, 2BCL, 2MCL STEAM TURBINE TYPE- NG, HNG, HG, AND VACUM PUMPS AND BOILER FEED PUMPS ALL TYPE OF GAS SEALS & DRY GAS SEAL SPECIALIST IN ASSEMBLY& DISASSEMBLY FINAL HOOK UP & INSTALLING COUPLING HUB AND COUPLINGS FINAL FLUSHING & BLOW ALL PIPING ASSIST AND INSPECTER & CLIENT MECHANICAL ACTIVITIES FURTHER MORE CAPABLE TO PERFORM DIRERCTLY THE COMMISSIONING OF THE MACHINE ASSISTING THE CONTROL ENGINEER FOR THE STARTUP OPERATION. SURNAME KRISHNASWAMY NAME MURALIDHARAN SEX MALE CITIZENSHIP/NATIONALITY INDIAN /INDIAN PLACEOF BIRTH KANCHIPURAM DATE OF BIRTH 28/06/1961 PERMANENT ADDRESS PLOT-19,DOOR NO-5,FIRST FLOOR, KANNAN NAGAR,4TH MAIN ROAD MADIPAKKAM,CHENNAI- INDIA TAMILNADU , PIN 600091 CELL NO +91 9940 2752 18, 8124626655 E-MAIL KMURALI_JAY@YAHOO.CO.IN MARITAL STATUS MARRIED FATHER’S NAME R.KRISHNASWAMY MOTHER’ NAME K.VASANTHA GRANDFATHER’S NAME RANGANADHAN RELIGION HINDU EDUCATIONAL QUALIFICATION OLD SSLC 1976/1977 QUALIFICATION DME/MECH [CV MISSING] EARTHQUAKE IN AHEMADABAD PASSPORT NO JO 864649 DATE OF ISSUE 21/07/2010 DATE OF EXPIRE 20/07/2020 PLACE OF ISSUE CHENNAI NOTES: GAS TURBINE & CE/CO /GEN/ MEC/TEC/ENG/ADVISER PROFESSIONALRECORDSWORKEDWITH [RENCO] GE/NP- EQUIPMENTS DATE/YEAR COMPANY LOCATION CLIENT PROJECT EQUIPMENT RESPONSIBLITIES 27/11/2006 TO 08/01/2007 HITACHI NIGERIA BONY ISLAND HONDAI HEAVY INDUSTRIES POWER GENERATION GT- 50/60 FRM -5001 GE/NP INSTALLATION COMMISSINING 24/03/2007 TO 20/05/2007 ROCKSON ENGINEERING MINISTRI OF POWER NIGERIA OMUKU GE/NP –RIVERS STATE MINISTRI POWER POWER GENERATION 6 X 32 MW FRM –5001 GE/NP FIVE& SIX –UNITS INSTALLATION 20/07/2007 TO GENP/NAOC AGIP NIGERIA OB/OB AGIP/NAOC GE/NP GAS DEVELOPMENT GE/NP GT/EXPANDER GLOBAL OPERATION AND MAINTENANCE
  • 3. 15/07/2009 COMPRESSORS OPERATION SERVICES 10/10/2009 TO 21/07/2010 GASCO/ BECHTEL GE/NP UAE/ABUDHABI HABSHAN OGD PHASE -III BECHTEL GE/NP GAS DEVELOPMENT 4 X BCL-407 C 4 X BCL –457 MS-5002 DLN INSTALLATION FINAL ALIGNMENT DRY GAS SEAL DIS ASSEMBLY & ASSEMBLY /HOOK UP HUB INSTALLATION 21/07/2010 ASAB /GE/NP UAE/ABUDHABI AGD /PHASEII BECHTEL GE/NP GAS DEVELOPMENT BCL -505 FINAL HOOK UP SERVICE 18/10/2010 TO 07/01/2011 UMM SHAIF OFF SHORE ADMA/OPCO UAE/ABUDHABI OFF SHORE HONDAI HEAVY INDUSTRIES GAS DEVELOPMENT INJECTION PGT25 BCL –405 C 3 UNITS INSTALLATION FINAL ALIGNMENT/HOOK UP/HUB /SEAL ASSEMBLY/STARTUP 30/03/2011 TO 28/07/2011 SAUDHI POLIMER COMPANY/JGC NCP-CHVERAN SAUDHI ARABIA AL JUBAIL PHASE -II JGC-NCP GE/NP JGC/NCP/GE/NP ETHYLENE PLANT PROPENE COMPRESSOR 2-MCL 1406 2-DMCL 1406 MCL-807 3 BCL 608 STEAM TURBINE INSTALLATION DRY GAS SEAL AND FINAL HOOK UP STARTUP 01/03/2012 TO 31/02/2013 BHAVINI/BHEL EEPL INDIA KALPAKKAM PHASE -II BHEL/NTPC AUTOMIC ENERGY 1 X 500 MW 3 FEED PUMPS STEAM TURBINE INSTALLATION FINAL HOOK UP 25/06/2013 TO 27/08/2013 GASCO JV/PETROFAC/GS UAE/ABUDHABI RUWAIS -4TH NGL PROJECT JV/PETROFAC/GS GE/NP GAS DEVELOPMENT PROPENE 2 X 3 MCL –1005 2 X BCL 503 COMPRESSOR INSTALLATION SEAL NEW ASSEMBLY STARTUP 04/11/2013 TO 16/11/2013 QATAR PETROLIUM QATAR DUKKAN QP/GE/NP GAS STABLIATION PLANT 2 X BCL 405 SERVICE& INSPECTION STARTUP 17/01/2014 TO 21/03/2014 GASCO JV/PETROFAC/GS UAE/ABUDHABI RUWAIS – 4TH NGL PROJECT JV/PETROFAC/GS GE/NP GAS DEVELOPMENT 2 X 3MCL 1005 DRY GAS SEAL DIS ASSEMBLY ASSEMBLY SERVICE 13/04/2015 TO 16/08/2015 PLANTGERIA NAOC/AGIP NIGERIA OB/OB EBOCHA KUWALE AGIP/NAOC PLANTGERIA GE/NP SIEMENS MORETHAN 60 UNITS NIGERIAN OIL COMPANY GAS BOOSTING LOW PRESURE MEDIUM PRESURE HIGH PRESURE POWER GENERATION EXPANSION OIL RECOVERY BOOSTING TURBO COMPRESSORS OPERATION AND MAINTENENENCE O&M PROFESSONALRECORD WORKEDBEFORE RENCO DATE /YEAR COMPANY LOCATION CLIENT EQUIPMENTS TYPE RESPONSIBLITIES 1997- 2006 ARVINDMILLS GE/NP INDIA AHEMADABAD SANTEJ/NARODA ARVINDMILLS GE/NP PGT-10 X 4 GE/NP 25MW STEAM TURBINE BHEL INSTALLATION OPERATION MAINTENANCE O&M 1996 - 1997 ONGC/BHPV DEMAG COMPRESSOR INDIA GANDHAR ONGC/BHPV DEMAG WEST GERMANY PHASEII 4 NOSDEMAG LP /HP /MOTO- COMPRESSORS EQUIPMENT ERECTION & COMMISSIONINGAND PIPING 1993 -1995 RTPC/MITSUBISHI JAPAN INDIA RAICHUR RAICHUR RTPC/KARNATAKA POWER PLANT 65 MW STEAM TURBINE EQUIPMENT ERECTION AND COMMISSIONING
  • 4. LEAK TEST GEN 1992 - 1993 RELIANCE.PETRO CHEMICAL INDIA PATALGANGA RELIANCE/BHEL RAIGARD PETRO CHEMICAL GT INSTALLATION COMMISSIONING 1991 -1992 GEB /SURATH UTRAN INDIA UTRAN GUJARAT ELECTRIC CITY BHEL POWER 3X GT 32 MW INSTALLATION COMMISSIONING 1990 -1991 AECO/VATVA INDIA VATVA AHEMADABAD AECO BHEL 32 MW X 2 1 STEAM TURBINE 25 MW INSTALLATION COMMISSIONING PIPING 1987 -1990 VIZAGSTEEL PLANT/VIZAG INDIA/VIZAG ANDERA BHEL DEMAG WEST GERMANY 3 X 30 MW TURBO BLOWERS ERECTION AND COMMISSIONING HOOK UP 1984 -1987 BHILAISTEEL PLANT INDIA BHILAI/MP GHH BHEL/EEPL 32 MW STEAM TURBINE BLOWER [GHH] INSTALLATION 1983 - 1984 TNPL/KARUR PUGALUR INDIA TNPL /PUGALUR SIEMENS/EEPL 7.5MW 18.5 MW STEAM TURBINE POWER GENERATION ERECTION & COMMISSIONING 1980 -1982 TNEB /ENNORE INDIA TNEB ENNORE SHODA BHEL 65 MW X 3 110 MW X3 STEAMTURBINE SERVICESO&M