The document appears to be a curriculum vitae for Muralidharan Krishnaswamy, who is applying for a position as a mechanical engineer. Krishnaswamy has over 30 years of experience working as a mechanical engineer on projects around the world, including installing, maintaining, and repairing machines like gas turbines, compressors, pumps and other mechanical equipment. He provides details on his educational background and qualifications, as well as an extensive work history with various companies where he has specialized in mechanical applications, installation, commissioning, and operations and maintenance of industrial machinery.
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
2016 CV LATEST
1. CURRICULAM VITA
PROPOSED POSITION IN THE PROJECT: MECHANICAL ENGINEER
EXPERT IDENTIFICATION NUMBERIN RENCO: 3287
1. FAMILY NAME: KRISHNASWAMY
2. FIRST NAME : MURALIDHARAN
3. DATE OF BIRTH: 28/06/1961
4. NATIONALITY: INDIAN
5. CIVIL STATUS: MARRIED
6. DEPENDEN: THREE CHILDREN
7. EDUCATION
INSTITUTION OLD SSLC PASSED IN 1976/77
DEGREE(s)OR DIPLOMA ( S)
OBTAINED
COMPUTER SKILLS
MECAHNICAL ENGINEER CV IS
NOT IN HAND
YES
8. LANGUAGE SKILLS 5 - READING &WRITING & SPEAKING
9. KEY QUALIFICATIONS Mechanical Engineer Expert
PERFORMS DIRECTLY AND SUPERVISES ALL INSTALLATION AND MARKING AND FITTINGS ALL
TYPE OF MECHANICAL COMPONENTS
ASSEMBLING & DISASSEMBLING HEAVY ROTATING EQUIPMENTS MECHANICAL APPLICATIONS
SUPERVISE –TEST /INSPECTION/TROUBLE SHOOT/MECHANICAL COMPONENTS
SUPERVISE-ALIGNMENT/WITH NORMAL & LAZER /LINE/LEVELING MECHANICAL EQUIPMENTS
SUPERVISE – MAINTENANCE OF MECHANICAL KIT COMPONENTS UNDERSTAND AND READ
MECHANICAL DRAWINGS, SUPERVISE SLINGING & BANKSMAIN DUTIES AND SUPERVISE RIGING
TACKLE IDENTIFICATION, CORRECT RIGGING TACKLE (IE CAPABLE OF SAFETY LIFTING THE SPECIFIED
LOADS) MECHANICAL APPLICATIONS, SUPERVISE AND SAFE SYSTEMS OF WORK METHOD
STATEMENTS
CONDUCT DAILY TOOL BOX TALKS AND SAFETY INSPECTION AT SITE, SUPERVISE SITE SAFETY
REQUIRMENTS AND [LOCAL LEGISTATION AS PER THE COMPANY POLICY]
PERFORM HANDS ON MAINTENANCE AND [REPAIRS TO GAS TURBINE AND HEAVY DUTY
CENTRIFUGAL COMPRESSORS AND STEAM TURBINE AND PUMPS AND RELATED AUXILARIES]
WORKED THIS TYPES OF TURBINES AND HEAVY DUTY COMPRESSORS
2. PGT-5 & PGT-10, PGT-25, MS -1002, MS- 3002, LM 2500, LM 6000, MS- 5001, MS-5002
HEAVY DUTY CENTRIFUGICAL COMPRESSORS TYPE PCL, BCL, MCL, 2BCL, 2MCL
STEAM TURBINE TYPE- NG, HNG, HG, AND VACUM PUMPS AND BOILER FEED PUMPS
ALL TYPE OF GAS SEALS & DRY GAS SEAL SPECIALIST IN ASSEMBLY& DISASSEMBLY
FINAL HOOK UP & INSTALLING COUPLING HUB AND COUPLINGS FINAL FLUSHING & BLOW ALL
PIPING ASSIST AND INSPECTER & CLIENT MECHANICAL ACTIVITIES
FURTHER MORE CAPABLE TO PERFORM DIRERCTLY THE COMMISSIONING OF THE MACHINE
ASSISTING THE CONTROL ENGINEER FOR THE STARTUP OPERATION.
SURNAME KRISHNASWAMY
NAME MURALIDHARAN
SEX MALE
CITIZENSHIP/NATIONALITY INDIAN /INDIAN
PLACEOF BIRTH KANCHIPURAM
DATE OF BIRTH 28/06/1961
PERMANENT ADDRESS PLOT-19,DOOR NO-5,FIRST FLOOR, KANNAN
NAGAR,4TH
MAIN ROAD
MADIPAKKAM,CHENNAI- INDIA
TAMILNADU , PIN 600091
CELL NO +91 9940 2752 18, 8124626655
E-MAIL KMURALI_JAY@YAHOO.CO.IN
MARITAL STATUS MARRIED
FATHER’S NAME R.KRISHNASWAMY
MOTHER’ NAME K.VASANTHA
GRANDFATHER’S NAME RANGANADHAN
RELIGION HINDU
EDUCATIONAL QUALIFICATION OLD SSLC 1976/1977
QUALIFICATION DME/MECH [CV MISSING] EARTHQUAKE IN
AHEMADABAD
PASSPORT NO JO 864649
DATE OF ISSUE 21/07/2010
DATE OF EXPIRE 20/07/2020
PLACE OF ISSUE CHENNAI
NOTES: GAS TURBINE & CE/CO /GEN/ MEC/TEC/ENG/ADVISER
PROFESSIONALRECORDSWORKEDWITH [RENCO] GE/NP- EQUIPMENTS
DATE/YEAR COMPANY LOCATION CLIENT PROJECT EQUIPMENT RESPONSIBLITIES
27/11/2006
TO
08/01/2007
HITACHI NIGERIA
BONY
ISLAND
HONDAI
HEAVY
INDUSTRIES
POWER
GENERATION
GT- 50/60
FRM -5001
GE/NP
INSTALLATION
COMMISSINING
24/03/2007
TO
20/05/2007
ROCKSON
ENGINEERING
MINISTRI OF
POWER
NIGERIA
OMUKU
GE/NP –RIVERS
STATE
MINISTRI
POWER
POWER
GENERATION
6 X 32 MW
FRM –5001
GE/NP
FIVE& SIX –UNITS
INSTALLATION
20/07/2007
TO
GENP/NAOC
AGIP
NIGERIA
OB/OB
AGIP/NAOC
GE/NP
GAS
DEVELOPMENT
GE/NP
GT/EXPANDER
GLOBAL OPERATION
AND MAINTENANCE
3. 15/07/2009 COMPRESSORS
OPERATION
SERVICES
10/10/2009
TO
21/07/2010
GASCO/
BECHTEL
GE/NP
UAE/ABUDHABI
HABSHAN
OGD PHASE -III
BECHTEL
GE/NP
GAS
DEVELOPMENT
4 X BCL-407 C
4 X BCL –457
MS-5002 DLN
INSTALLATION FINAL
ALIGNMENT
DRY GAS SEAL DIS
ASSEMBLY &
ASSEMBLY /HOOK
UP HUB
INSTALLATION
21/07/2010 ASAB /GE/NP UAE/ABUDHABI
AGD /PHASEII
BECHTEL
GE/NP
GAS
DEVELOPMENT
BCL -505 FINAL HOOK UP
SERVICE
18/10/2010
TO
07/01/2011
UMM SHAIF
OFF SHORE
ADMA/OPCO
UAE/ABUDHABI
OFF SHORE
HONDAI HEAVY
INDUSTRIES
GAS
DEVELOPMENT
INJECTION
PGT25
BCL –405 C
3 UNITS
INSTALLATION
FINAL
ALIGNMENT/HOOK
UP/HUB /SEAL
ASSEMBLY/STARTUP
30/03/2011
TO
28/07/2011
SAUDHI
POLIMER
COMPANY/JGC
NCP-CHVERAN
SAUDHI ARABIA
AL JUBAIL
PHASE -II
JGC-NCP
GE/NP
JGC/NCP/GE/NP
ETHYLENE
PLANT
PROPENE
COMPRESSOR
2-MCL 1406
2-DMCL 1406
MCL-807
3 BCL 608
STEAM TURBINE
INSTALLATION
DRY GAS SEAL AND
FINAL HOOK UP
STARTUP
01/03/2012
TO
31/02/2013
BHAVINI/BHEL
EEPL
INDIA
KALPAKKAM
PHASE -II
BHEL/NTPC AUTOMIC
ENERGY
1 X 500 MW
3 FEED PUMPS
STEAM TURBINE
INSTALLATION
FINAL HOOK UP
25/06/2013
TO
27/08/2013
GASCO
JV/PETROFAC/GS
UAE/ABUDHABI
RUWAIS -4TH
NGL PROJECT
JV/PETROFAC/GS
GE/NP
GAS
DEVELOPMENT
PROPENE
2 X 3 MCL –1005
2 X BCL 503
COMPRESSOR
INSTALLATION
SEAL NEW
ASSEMBLY
STARTUP
04/11/2013
TO
16/11/2013
QATAR
PETROLIUM
QATAR
DUKKAN
QP/GE/NP GAS
STABLIATION
PLANT
2 X BCL 405 SERVICE&
INSPECTION
STARTUP
17/01/2014
TO
21/03/2014
GASCO
JV/PETROFAC/GS
UAE/ABUDHABI
RUWAIS –
4TH NGL PROJECT
JV/PETROFAC/GS
GE/NP
GAS
DEVELOPMENT
2 X 3MCL 1005 DRY GAS SEAL
DIS ASSEMBLY
ASSEMBLY SERVICE
13/04/2015
TO
16/08/2015
PLANTGERIA
NAOC/AGIP
NIGERIA
OB/OB
EBOCHA
KUWALE
AGIP/NAOC
PLANTGERIA
GE/NP
SIEMENS
MORETHAN 60
UNITS
NIGERIAN OIL
COMPANY
GAS BOOSTING
LOW PRESURE
MEDIUM
PRESURE
HIGH PRESURE
POWER
GENERATION
EXPANSION
OIL RECOVERY
BOOSTING
TURBO
COMPRESSORS
OPERATION AND
MAINTENENENCE
O&M
PROFESSONALRECORD WORKEDBEFORE RENCO
DATE /YEAR COMPANY LOCATION CLIENT EQUIPMENTS
TYPE
RESPONSIBLITIES
1997- 2006 ARVINDMILLS
GE/NP
INDIA
AHEMADABAD
SANTEJ/NARODA
ARVINDMILLS
GE/NP
PGT-10 X 4
GE/NP
25MW STEAM
TURBINE BHEL
INSTALLATION
OPERATION
MAINTENANCE
O&M
1996 - 1997 ONGC/BHPV
DEMAG
COMPRESSOR
INDIA
GANDHAR
ONGC/BHPV
DEMAG WEST
GERMANY
PHASEII
4 NOSDEMAG
LP /HP /MOTO-
COMPRESSORS
EQUIPMENT
ERECTION &
COMMISSIONINGAND
PIPING
1993 -1995 RTPC/MITSUBISHI
JAPAN
INDIA
RAICHUR
RAICHUR
RTPC/KARNATAKA
POWER PLANT
65 MW STEAM
TURBINE
EQUIPMENT
ERECTION AND
COMMISSIONING
4. LEAK TEST GEN
1992 - 1993 RELIANCE.PETRO
CHEMICAL
INDIA
PATALGANGA
RELIANCE/BHEL
RAIGARD
PETRO
CHEMICAL GT
INSTALLATION
COMMISSIONING
1991 -1992 GEB /SURATH
UTRAN
INDIA
UTRAN
GUJARAT
ELECTRIC CITY
BHEL
POWER
3X GT 32 MW
INSTALLATION
COMMISSIONING
1990 -1991 AECO/VATVA INDIA
VATVA
AHEMADABAD
AECO
BHEL
32 MW X 2
1 STEAM
TURBINE 25 MW
INSTALLATION
COMMISSIONING
PIPING
1987 -1990 VIZAGSTEEL
PLANT/VIZAG
INDIA/VIZAG
ANDERA
BHEL
DEMAG WEST
GERMANY
3 X 30 MW
TURBO
BLOWERS
ERECTION AND
COMMISSIONING
HOOK UP
1984 -1987 BHILAISTEEL
PLANT
INDIA
BHILAI/MP
GHH
BHEL/EEPL
32 MW STEAM
TURBINE
BLOWER [GHH]
INSTALLATION
1983 - 1984 TNPL/KARUR
PUGALUR
INDIA
TNPL /PUGALUR
SIEMENS/EEPL 7.5MW
18.5 MW STEAM
TURBINE
POWER GENERATION
ERECTION &
COMMISSIONING
1980 -1982 TNEB /ENNORE INDIA
TNEB
ENNORE
SHODA
BHEL
65 MW X 3
110 MW X3
STEAMTURBINE
SERVICESO&M