SlideShare a Scribd company logo
1 of 41
Download to read offline
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
HASNIZAM BIN MD SAAD
Mobile : 012-9835664
Email : hasnizamsaad77@gmail.com
CIS 10:2020
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
8.00 am – 8.30 am
Registration
8.30 am – 9.00 am
Construction Industry
Overview
9.00 am – 10.30 am
SHASSIC Overview
10.30 am – 10.45 am
Morning Break
10.45 am – 12.00
noon
Assessors Guide
- Document Check
12.00 noon – 1.00 noon
Assessors Guide
- Workplace Inspection
1.00 noon – 2.00 pm
Lunch
2.00 pm – 3.00 pm
Assessors Guide
- Interview
3.00 pm – 3.15 pm
SHASSIC Ecosystem
3.15 pm – 3.45 pm
Q&A
3.45 pm – 4.00 pm
Afternoon Break
4.00 pm – 5.00 pm
SHASSIC Exam
10.45 am – 12.00 noon
Assessors Guide
- Document Check
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Construction Law/Legislation
Related to Safety & Health (incorporated in SHASSIC)
ACT 520 (1994)
Akta Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
Section 25, Section 33, Section 33A, Section 35
01
ACT 514 (1994)
Occupational Safety and Health Act (DOSH)
Section 15, Section 16, Section 24, Act 514 Regulation s
02
ACT 139 (1967)
Factory and Machinery Act (DOSH)
Section 19, Part IV, Part V, Act 139 Regulations
03
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
MS 1722 : 2011
Occupational Health and Safety Management Systems
(OHSMS)
ISO 45001 : 2018
Occupational Health and Safety Management System
MS 2558 : 2014
Garispanduan Tanda Amaran Keselamatan dan Kesihatan
OSHAS 18001 : 2007
Health and Safety Management System
CIS 10 : 2018
Safety Health Assessment in Construction (SHASSIC)
CIS 14 : 2009
Guidelines On Construction Activities At Night
CIS 15 : 2009
Guidelines On Prevention Of Fall
At Construction Site
CIS 23 : 2018
Safe Use of Falsework and Formwork in Construction
CIS 16 : 2009
Guidelines For Works At Confined Areas In
Construction Site
CIS 17 : 2010
Guidelines For Working At Noisy And Dusty Areas In
Construction Site
CIS 25 : 2018
Construction Activities Risk Assessment (CARA) - HIRARC
CIS 27 : 2019
0SH Specifications and BQ for Construction Works
Standards
Related to Safety & Health
1
2
3
4
5
6
7
8
9
10
11
12
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
What is SHASSIC
SAFETY AND HEALTH
ASSESSMENT SYSTEM IN
CONSTRUCTION
INDEPENDENT method to ASSESS and EVALUATE the SAFETY &
HEALTH PERFORMANCE for construction works/projects
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
SHASSIC
Application –
WHEN?
Physical Work progress
Workers at full strength
Construction at peak
Many activities
Potential Accident
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Objectives of SHASSIC
Standardised Assessment
Corrective and Preventive Measures
Continual Improvement
Benchmark OSH Performance
Assess OSH Performance
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
SHASSIC Assessment Approach
Document Check
Workplace Inspection
Interview
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Document
Check
Workplace
Inspection
Interview
COMPONENTS SUB-TOTAL WEIGHTAGE (100%) TOTAL WEIGHTAGE
Construction Planning
Stage (CPS)
Construction Stage (CS)
General Location 1 Location 2 Location 3
Category A Category B Category C
Assessment Weightage
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Checking of OSH related documents and
records which will enable assessor to
determine the compliances of OSH
requirements
DOCUMENT CHECK
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
DOCUMENT CHECK
01
02
03
04
05
57 checklist
Divided into CPS(16) and CS(41)
CPS – 20% , CS – 80%
Refer to page 12, 13 14 & 15 – CIS 10:2020
OSH Policy, HIRARC , Green Card , JKKP Registration,
BOWEC , SHC, DP, SHO , SSS Training, OSH Mgt
system, ERP,SOP,PMT, PMT etc
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Assessment Checklist
DOCUMENT CHECK
57
checklist 57
Construction Planning Stage
16
Construction Stage
41
20% 80%
W=20%
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Formula
DOCUMENT CHECK
Construction
Planning Stage
(CPS)
Construction Stage
(CS)
Total for Document
Check
STAGES FORMULA
Total Number of C Scored
16 – Number of NA
x 20 (%)
Total Number of C Scored
41 – Number of NA
x 80 (%)
( CPS + CS ) x 20%
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Example Calculation
DOCUMENT CHECK
Projek ABC score 10 Compliance (C) and 0
NA for Construction Planning Stage and 11
Non-Compliance (NC), 5 Not-Applicable
(NA) for Construction Stage.
What is the SHASSIC score for Document
Check?
Construction Planning Stage ( 16Q – 20%)
C = 10
NA = 0
DC CPS =
Construction Stage ( 41Q – 80%)
NC = 11
NA = 5
C = 41 – 11 – 5 = 25
DC CS =
TOTAL FOR DC = (12.5 + 55.56) x 20% = 13.61
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Workplace Inspection
01 03
Divided into 2 checklists
• General OSH Management
• 3 high risk activities at
different locations
9 checklists for general (10%)
21 checklists for each
3 high risk activities (90%)
• Working at Height
• Lifting Operation
• Concreting Works
04
Page 16, 17 & 18
CIS 10:2020
02
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Assessment Checklist
Workplace Inspection
72
checklist
General Checks
21 21 21
10%
W=60%
9
30% 30% 30%
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Formula
Workplace Inspection
General OSH
Management (G)
Total for Workplace
Inspection
STAGES FORMULA
Total Number of C Scored
9 – Number of NA
x 10 (%)
( G + C + L + H ) x 60%
Concrete Work (C)
Lifting Operation (L)
Working at Height (H)
Total Number of C Scored
21 – Number of NA
x 30 (%)
Total Number of C Scored
21 – Number of NA
x 30 (%)
Total Number of C Scored
21 – Number of NA
x 30 (%)
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
MRCB LEARNING DEVELOPMENT CENTRE
LEVEL 30, MENARA ALIANZ SENTRAL,
NO.203, JALAN TUN SAMBANTHAN,
KUALA LUMPUR SENTRAL,
50470 KUALA LUMPUR
Example Calculation
Workplace Inspection
x 30 (%)
x 30 (%)
x 30 (%)
General OSH Management (10%) = 7.33
Concrete Work (30%) = 27.54
Lifting Operation (30%) = 15.48
Working at Height (30%) = 9.58
TOTAL WI
= ( 7.33 + 27.54 + 15.48 + 9.58 ) x 60%
= 35.96
If the score for general OSH
management is 7.33, concrete work
is 27.54, lifting operation is 15.48,
and working at height is 9.58,
what is the total SHASSIC score
for Workplace Inspection?
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Workplace Inspection
Special Situations
x 30 (%)
x 30 (%)
x 30 (%)
01
02
03
Only 1 High Risk Activity
Only 2 High Risk Activity
NO High-Risk Activity
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Workplace Inspection
Special Situations
x 30 (%)
x 30 (%)
x 30 (%)
Only 1 High Risk Activity
Only 1 High Risk Activity
1 High Risk multiply by 3
Example :
1. General OSH Management (10%) = 7.33
2. High Risk Activity
• Concrete Work (30%) = 25.31
• Lifting Operations (30%) = NO Activity
• Working at Heights (30%) = NO Activity
Calculation :
1. General OSH Management (10%) = 7.33
2. High Risk Activity = 25.31 x 3 = 75.93
Total WI
= (7.33 + 75.93) x 60%
= 49.96
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Workplace Inspection
Special Situations
x 30 (%)
Only 2 High Risk Activity
Example :
1. General OSH Management (10%) =
6.54
2. High Risk Activity
• Concrete Work (30%) = 25.31
• Lifting Operations (30%) = 17.83
• Working at Heights (30%) = NO
Activity
Calculation :
1. General OSH Management (10%) =
6.54
2. High Risk Activity =
Total WI
= (6.54 + 64.71) x 60%
= 42.75
Only 2 High Risk Activity
25.31 + 17.83
2
x 3 = 64.71
Average Marks for High Risk
Multiply by 3
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Workplace Inspection
Special Situations
x 30 (%)
No High-Risk Activity
Calculation :
For WI, maximum possible score for General OSH
Management = 6.00
For this example,
WI for General OSH Management
= 7.78 x 60% = 4.69
Total SHASSIC Score =
(15.12 + 4.69 + 12.17) x 2.174
= 69.52
Example :
1. Document Check = 15.12
2. Interview = 12.17
3. General OSH Management, C= 7, NC=2
(7/(9)x10% = 7.78
4. NO High Risk Activity
If no high-risk activities, the total score for Document Check + General
Checks for Workplace Inspection and Interview score shall be added and
multiply by 2.174
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Employee
Interview
x 30 (%)
Category A
Managerial Personnel
– Project Manager, Construction
Manager, Site Agent and Project
Engineer (1 employee)
20% of overall
weightage
Selected from all
level of
occupation
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Employee
Interview
x 30 (%)
Category B
Supervisory Personnel
– Site Supervisor, Designated Person, OSH
Committee Members, Safety Health Officer
(3 employee)
20% of overall
weightage
Selected from all
level of
occupation
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Employee
Interview
People carrying out work at site, skilled or non-
skilled worker (9 workers, recommended 3 from
each high-risk work activities)
20% of overall
weightage
Selected from all
level of
occupation
Category C
Working Personnel
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Assessment Checklist
INTERVIEW
186
checklist
Category No Of
Checklist
No of
Person
Total
Checklist
Sub
Weightage
A - Managerial 9 1 9 50
B - Supervisory 8 3 24 30
C - Workers 17 9 153 20
186
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Formula
INTERVIEW
Category A
Total for Workplace
Inspection
STAGES FORMULA
Total Number of C Scored
9 – Number of NA
x 50 (%)
( A + B + C ) x 20%
Category B
Total Number of C Scored
24 – Number of NA
x 30 (%)
Category C
Total Number of C Scored
153 – Number of NA
x 20 (%)
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Example Calculation
INTERVIEW
Managerial (9Q – 50%)
NC = 2
NA = 0
C = 7 TOTAL INTERVIEW
= ( 38.89 + 22.11 + 17.36 ) x 20%
= 15.67%
Supervisor (24Q – 30%)
NC = 5
NA = 5
C = 14
Working Personnel (153Q – 20%)
C = 125
NA = 9
If the NC for Managerial category is 2 and no
NA, Supervisory category NC=5 & NA=5, and C
for Working Personnel is 125 with NA=9,
What is the SHASSIC score for the Employee
Interview out of total SHASSIC score ?
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
STAR RANKING
90% - 100%
(5 STAR)
80% - 89.9%
(4 STAR)
70% - 79.9%
(3 STAR)
60% - 69.9%
(2 STAR)
50% - 59.9%
(1 STAR)
49% & below - CERTIFICATE OF
PARTICIPATION
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Document Check
CONSTRUCTION PLANNING STAGE
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Document Check
CONSTRUCTION STAGE
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Workplace
Inspection
GENERAL OSH MANAGEMENT
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Workplace
Inspection
CONSTRUCTION WORK ACTIVITIES
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Interview
MANAGERIAL
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Interview
SUPERVISORY
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
ASSESSORS GUIDE
Interview
WORKERS
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
BENEFIT OF SHASSIC
01 02 03
04 05 06 07
Automatic CCD
Points = 20 CCD
point for
registration
renewal (only 1
star above)
SHASSIC
Certificate
for each
project
FREE
assessment
Towards OHSAS
18001 /
MS1722/ISO45001
Certification
Towards
Continuous
Improvement
Can participate
in MCIEA for
Safety Category
Contractor’s
readiness
(OSHCIM)
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
SHASSIC
Assessment PROCESS
APPLICATION
- Application
Form
received by
CIDB
CONFIRMATION ON
PROJECT STATUS
- Physical progress of
project must be within
25%-75%
NOTIFICATION ON ASSESSMENT
DATE & IMPLEMENTATION
- Assessment by accredited CIDB
SHASSIC Assessors
PREPARATION
OF REPORT &
SCORE
- The assessors
will assess and
prepare
SHASSIC report
and score
NOTIFICATION ON
SHASSIC SCORE
- SHASSIC score will be
notified to the applicant
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Becoming
SHASSIC Assessors
Attended a one day SHASSIC
course and passed the
examination and have a
minimum of 5 years
experience in the
construction industry; or
Attended a one day SHASSIC
course and certified as OSH
Lead Auditor with a
minimum of in the
construction industry 3
years experience
(Construction Project site)
I AM A SHASSIC
ASSESSORS
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
CIS 10: 2020
1 Day assessment only
RM350/Assessor/day
Accommodation outside
Klang Valley RM165/day
Mileage RM0.70/km
Benefit of
SHASSIC Assessors
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER
Mobile : 012-9835664
Email : hasnizamsaad77@gmail.com
HASNIZAM MD SAAD
SAFETY & HEALTH OFFICER

More Related Content

More from HASNIZAM BIN MD SAAD

More from HASNIZAM BIN MD SAAD (20)

SHASSIC KV.pdf
SHASSIC KV.pdfSHASSIC KV.pdf
SHASSIC KV.pdf
 
Machinery Inspection.pdf
Machinery Inspection.pdfMachinery Inspection.pdf
Machinery Inspection.pdf
 
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdfHASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
 
SHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdfSHASSIC HASNIZAM.pdf
SHASSIC HASNIZAM.pdf
 
Latihan Asas Pengawal Bendera
 Latihan Asas Pengawal Bendera Latihan Asas Pengawal Bendera
Latihan Asas Pengawal Bendera
 
Heat Stroke
Heat StrokeHeat Stroke
Heat Stroke
 
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdfHEALTH EFFECTS OF CIGARETTE SMOKING.pdf
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
 
Standard Industri Pembinaan cis 10 2020
Standard Industri Pembinaan cis 10 2020Standard Industri Pembinaan cis 10 2020
Standard Industri Pembinaan cis 10 2020
 
Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018SHASSIC CIS 10 : 2018
SHASSIC CIS 10 : 2018
 
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURESSAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
 
Sila pakai topeng muka
Sila pakai topeng mukaSila pakai topeng muka
Sila pakai topeng muka
 
Prosidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkpProsidur standard operasi (sop) kebenaran pkp
Prosidur standard operasi (sop) kebenaran pkp
 
Garispanduan pkp pembinaan
Garispanduan pkp pembinaanGarispanduan pkp pembinaan
Garispanduan pkp pembinaan
 
Covid 19 guidance for the workplace
Covid 19 guidance for the workplaceCovid 19 guidance for the workplace
Covid 19 guidance for the workplace
 
Sohelp
SohelpSohelp
Sohelp
 
Working at height
Working at heightWorking at height
Working at height
 
Mrcb forklift training
Mrcb forklift trainingMrcb forklift training
Mrcb forklift training
 
Lifting using excavator
Lifting using excavatorLifting using excavator
Lifting using excavator
 
Competent person
Competent person Competent person
Competent person
 

Recently uploaded

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 

Recently uploaded (20)

Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 

KV Segamat SHASSIC.pdf

  • 1. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER HASNIZAM BIN MD SAAD Mobile : 012-9835664 Email : hasnizamsaad77@gmail.com CIS 10:2020
  • 2. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER 8.00 am – 8.30 am Registration 8.30 am – 9.00 am Construction Industry Overview 9.00 am – 10.30 am SHASSIC Overview 10.30 am – 10.45 am Morning Break 10.45 am – 12.00 noon Assessors Guide - Document Check 12.00 noon – 1.00 noon Assessors Guide - Workplace Inspection 1.00 noon – 2.00 pm Lunch 2.00 pm – 3.00 pm Assessors Guide - Interview 3.00 pm – 3.15 pm SHASSIC Ecosystem 3.15 pm – 3.45 pm Q&A 3.45 pm – 4.00 pm Afternoon Break 4.00 pm – 5.00 pm SHASSIC Exam 10.45 am – 12.00 noon Assessors Guide - Document Check
  • 3. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Construction Law/Legislation Related to Safety & Health (incorporated in SHASSIC) ACT 520 (1994) Akta Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) Section 25, Section 33, Section 33A, Section 35 01 ACT 514 (1994) Occupational Safety and Health Act (DOSH) Section 15, Section 16, Section 24, Act 514 Regulation s 02 ACT 139 (1967) Factory and Machinery Act (DOSH) Section 19, Part IV, Part V, Act 139 Regulations 03
  • 4. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER MS 1722 : 2011 Occupational Health and Safety Management Systems (OHSMS) ISO 45001 : 2018 Occupational Health and Safety Management System MS 2558 : 2014 Garispanduan Tanda Amaran Keselamatan dan Kesihatan OSHAS 18001 : 2007 Health and Safety Management System CIS 10 : 2018 Safety Health Assessment in Construction (SHASSIC) CIS 14 : 2009 Guidelines On Construction Activities At Night CIS 15 : 2009 Guidelines On Prevention Of Fall At Construction Site CIS 23 : 2018 Safe Use of Falsework and Formwork in Construction CIS 16 : 2009 Guidelines For Works At Confined Areas In Construction Site CIS 17 : 2010 Guidelines For Working At Noisy And Dusty Areas In Construction Site CIS 25 : 2018 Construction Activities Risk Assessment (CARA) - HIRARC CIS 27 : 2019 0SH Specifications and BQ for Construction Works Standards Related to Safety & Health 1 2 3 4 5 6 7 8 9 10 11 12
  • 5. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER What is SHASSIC SAFETY AND HEALTH ASSESSMENT SYSTEM IN CONSTRUCTION INDEPENDENT method to ASSESS and EVALUATE the SAFETY & HEALTH PERFORMANCE for construction works/projects
  • 6. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER SHASSIC Application – WHEN? Physical Work progress Workers at full strength Construction at peak Many activities Potential Accident
  • 7. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Objectives of SHASSIC Standardised Assessment Corrective and Preventive Measures Continual Improvement Benchmark OSH Performance Assess OSH Performance
  • 8. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER SHASSIC Assessment Approach Document Check Workplace Inspection Interview
  • 9. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Document Check Workplace Inspection Interview COMPONENTS SUB-TOTAL WEIGHTAGE (100%) TOTAL WEIGHTAGE Construction Planning Stage (CPS) Construction Stage (CS) General Location 1 Location 2 Location 3 Category A Category B Category C Assessment Weightage
  • 10. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Checking of OSH related documents and records which will enable assessor to determine the compliances of OSH requirements DOCUMENT CHECK
  • 11. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER DOCUMENT CHECK 01 02 03 04 05 57 checklist Divided into CPS(16) and CS(41) CPS – 20% , CS – 80% Refer to page 12, 13 14 & 15 – CIS 10:2020 OSH Policy, HIRARC , Green Card , JKKP Registration, BOWEC , SHC, DP, SHO , SSS Training, OSH Mgt system, ERP,SOP,PMT, PMT etc
  • 12. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Assessment Checklist DOCUMENT CHECK 57 checklist 57 Construction Planning Stage 16 Construction Stage 41 20% 80% W=20%
  • 13. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Formula DOCUMENT CHECK Construction Planning Stage (CPS) Construction Stage (CS) Total for Document Check STAGES FORMULA Total Number of C Scored 16 – Number of NA x 20 (%) Total Number of C Scored 41 – Number of NA x 80 (%) ( CPS + CS ) x 20%
  • 14. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Example Calculation DOCUMENT CHECK Projek ABC score 10 Compliance (C) and 0 NA for Construction Planning Stage and 11 Non-Compliance (NC), 5 Not-Applicable (NA) for Construction Stage. What is the SHASSIC score for Document Check? Construction Planning Stage ( 16Q – 20%) C = 10 NA = 0 DC CPS = Construction Stage ( 41Q – 80%) NC = 11 NA = 5 C = 41 – 11 – 5 = 25 DC CS = TOTAL FOR DC = (12.5 + 55.56) x 20% = 13.61
  • 15. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Workplace Inspection 01 03 Divided into 2 checklists • General OSH Management • 3 high risk activities at different locations 9 checklists for general (10%) 21 checklists for each 3 high risk activities (90%) • Working at Height • Lifting Operation • Concreting Works 04 Page 16, 17 & 18 CIS 10:2020 02
  • 16. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Assessment Checklist Workplace Inspection 72 checklist General Checks 21 21 21 10% W=60% 9 30% 30% 30%
  • 17. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Formula Workplace Inspection General OSH Management (G) Total for Workplace Inspection STAGES FORMULA Total Number of C Scored 9 – Number of NA x 10 (%) ( G + C + L + H ) x 60% Concrete Work (C) Lifting Operation (L) Working at Height (H) Total Number of C Scored 21 – Number of NA x 30 (%) Total Number of C Scored 21 – Number of NA x 30 (%) Total Number of C Scored 21 – Number of NA x 30 (%)
  • 18. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER MRCB LEARNING DEVELOPMENT CENTRE LEVEL 30, MENARA ALIANZ SENTRAL, NO.203, JALAN TUN SAMBANTHAN, KUALA LUMPUR SENTRAL, 50470 KUALA LUMPUR Example Calculation Workplace Inspection x 30 (%) x 30 (%) x 30 (%) General OSH Management (10%) = 7.33 Concrete Work (30%) = 27.54 Lifting Operation (30%) = 15.48 Working at Height (30%) = 9.58 TOTAL WI = ( 7.33 + 27.54 + 15.48 + 9.58 ) x 60% = 35.96 If the score for general OSH management is 7.33, concrete work is 27.54, lifting operation is 15.48, and working at height is 9.58, what is the total SHASSIC score for Workplace Inspection?
  • 19. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Workplace Inspection Special Situations x 30 (%) x 30 (%) x 30 (%) 01 02 03 Only 1 High Risk Activity Only 2 High Risk Activity NO High-Risk Activity
  • 20. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Workplace Inspection Special Situations x 30 (%) x 30 (%) x 30 (%) Only 1 High Risk Activity Only 1 High Risk Activity 1 High Risk multiply by 3 Example : 1. General OSH Management (10%) = 7.33 2. High Risk Activity • Concrete Work (30%) = 25.31 • Lifting Operations (30%) = NO Activity • Working at Heights (30%) = NO Activity Calculation : 1. General OSH Management (10%) = 7.33 2. High Risk Activity = 25.31 x 3 = 75.93 Total WI = (7.33 + 75.93) x 60% = 49.96
  • 21. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Workplace Inspection Special Situations x 30 (%) Only 2 High Risk Activity Example : 1. General OSH Management (10%) = 6.54 2. High Risk Activity • Concrete Work (30%) = 25.31 • Lifting Operations (30%) = 17.83 • Working at Heights (30%) = NO Activity Calculation : 1. General OSH Management (10%) = 6.54 2. High Risk Activity = Total WI = (6.54 + 64.71) x 60% = 42.75 Only 2 High Risk Activity 25.31 + 17.83 2 x 3 = 64.71 Average Marks for High Risk Multiply by 3
  • 22. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Workplace Inspection Special Situations x 30 (%) No High-Risk Activity Calculation : For WI, maximum possible score for General OSH Management = 6.00 For this example, WI for General OSH Management = 7.78 x 60% = 4.69 Total SHASSIC Score = (15.12 + 4.69 + 12.17) x 2.174 = 69.52 Example : 1. Document Check = 15.12 2. Interview = 12.17 3. General OSH Management, C= 7, NC=2 (7/(9)x10% = 7.78 4. NO High Risk Activity If no high-risk activities, the total score for Document Check + General Checks for Workplace Inspection and Interview score shall be added and multiply by 2.174
  • 23. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Employee Interview x 30 (%) Category A Managerial Personnel – Project Manager, Construction Manager, Site Agent and Project Engineer (1 employee) 20% of overall weightage Selected from all level of occupation
  • 24. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Employee Interview x 30 (%) Category B Supervisory Personnel – Site Supervisor, Designated Person, OSH Committee Members, Safety Health Officer (3 employee) 20% of overall weightage Selected from all level of occupation
  • 25. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Employee Interview People carrying out work at site, skilled or non- skilled worker (9 workers, recommended 3 from each high-risk work activities) 20% of overall weightage Selected from all level of occupation Category C Working Personnel
  • 26. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Assessment Checklist INTERVIEW 186 checklist Category No Of Checklist No of Person Total Checklist Sub Weightage A - Managerial 9 1 9 50 B - Supervisory 8 3 24 30 C - Workers 17 9 153 20 186
  • 27. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Formula INTERVIEW Category A Total for Workplace Inspection STAGES FORMULA Total Number of C Scored 9 – Number of NA x 50 (%) ( A + B + C ) x 20% Category B Total Number of C Scored 24 – Number of NA x 30 (%) Category C Total Number of C Scored 153 – Number of NA x 20 (%)
  • 28. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Example Calculation INTERVIEW Managerial (9Q – 50%) NC = 2 NA = 0 C = 7 TOTAL INTERVIEW = ( 38.89 + 22.11 + 17.36 ) x 20% = 15.67% Supervisor (24Q – 30%) NC = 5 NA = 5 C = 14 Working Personnel (153Q – 20%) C = 125 NA = 9 If the NC for Managerial category is 2 and no NA, Supervisory category NC=5 & NA=5, and C for Working Personnel is 125 with NA=9, What is the SHASSIC score for the Employee Interview out of total SHASSIC score ?
  • 29. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER STAR RANKING 90% - 100% (5 STAR) 80% - 89.9% (4 STAR) 70% - 79.9% (3 STAR) 60% - 69.9% (2 STAR) 50% - 59.9% (1 STAR) 49% & below - CERTIFICATE OF PARTICIPATION
  • 30. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Document Check CONSTRUCTION PLANNING STAGE
  • 31. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Document Check CONSTRUCTION STAGE
  • 32. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Workplace Inspection GENERAL OSH MANAGEMENT
  • 33. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Workplace Inspection CONSTRUCTION WORK ACTIVITIES
  • 34. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Interview MANAGERIAL
  • 35. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Interview SUPERVISORY
  • 36. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER ASSESSORS GUIDE Interview WORKERS
  • 37. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER BENEFIT OF SHASSIC 01 02 03 04 05 06 07 Automatic CCD Points = 20 CCD point for registration renewal (only 1 star above) SHASSIC Certificate for each project FREE assessment Towards OHSAS 18001 / MS1722/ISO45001 Certification Towards Continuous Improvement Can participate in MCIEA for Safety Category Contractor’s readiness (OSHCIM)
  • 38. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER SHASSIC Assessment PROCESS APPLICATION - Application Form received by CIDB CONFIRMATION ON PROJECT STATUS - Physical progress of project must be within 25%-75% NOTIFICATION ON ASSESSMENT DATE & IMPLEMENTATION - Assessment by accredited CIDB SHASSIC Assessors PREPARATION OF REPORT & SCORE - The assessors will assess and prepare SHASSIC report and score NOTIFICATION ON SHASSIC SCORE - SHASSIC score will be notified to the applicant
  • 39. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Becoming SHASSIC Assessors Attended a one day SHASSIC course and passed the examination and have a minimum of 5 years experience in the construction industry; or Attended a one day SHASSIC course and certified as OSH Lead Auditor with a minimum of in the construction industry 3 years experience (Construction Project site) I AM A SHASSIC ASSESSORS
  • 40. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER CIS 10: 2020 1 Day assessment only RM350/Assessor/day Accommodation outside Klang Valley RM165/day Mileage RM0.70/km Benefit of SHASSIC Assessors
  • 41. HASNIZAM MD SAAD SAFETY & HEALTH OFFICER Mobile : 012-9835664 Email : hasnizamsaad77@gmail.com HASNIZAM MD SAAD SAFETY & HEALTH OFFICER