Rnpp najmul

691 views

Published on

• Introduction
• Present Condition of Bangladesh
• Rooppur Nuclear Power Plant
• RNPP at a Glance
• Safety Standards for RNPP
• A video clip on RNPP • Conclusion

Published in: Engineering
  • Login to see the comments

  • Be the first to like this

Rnpp najmul

  1. 1. Rooppur Nuclear Power Plant 1 Submitted by Md. Najmul Hosain MSc in NSE Student ID: 1016280017 11/26/2016 Presentation on Military Institute of Science and Technology (MIST)
  2. 2. Presentation Outline 2 • Introduction • Present Condition of Bangladesh • Rooppur Nuclear Power Plant • RNPP at a Glance • Safety Standards for RNPP • A video clip on RNPP • Conclusion 11/26/2016
  3. 3. Introduction 3 Main Plant Construction of Rooppur Nuclear Power Plant, Bangladesh going to Start 11/26/2016
  4. 4. 4 Introduction 11/26/2016
  5. 5. Present Condition of Bangladesh 5 Source- official website of Bangladesh Power Development Board link - http://www.bpdb.gov.bd/ 11/26/2016
  6. 6. Present Condition of Bangladesh 611/26/2016
  7. 7. Present Condition of Bangladesh Source- Workshop on Energy Assessment and Pre-feasibility/feasibility Studies for Nuclear Power Program link - http://www.iaea.org/NuclearPower/Downloadable/Meetings/2014/2014-03-17-03-21- WSINIG/DAY1/COUNTRY/Bangladesh_Presentation_at_Korea_17-21_March_2014.pdf11/26/2016 7
  8. 8. So, what do we do? 8 Nuclear can be a solution. 11/26/2016
  9. 9. Ruppur Nuclear Power Plant  In 1961, first proposed to build a nuclear power plant.  Accordingly that year Govt. acquired 253.90 acre of land in Ruppur in Pabna district. In 1963, the plant was approved. 911/26/2016
  10. 10. Rooppur Nuclear Power Plant  After the independence in 1974 Bangladesh Govt. started discussion with Russia, which was not successful.  Finally, in February 2011, Bangladesh got an agreement with Russia to build RNPP. 1011/26/2016
  11. 11. Ruppur Nuclear Power Plant  The inter-govt agreement (IGA) was officially signed on 2 November 2011.  Prime Minister of Bangladesh ( Sheikh Hasina ) laying the foundation stone of Bangladesh’s first nuclear power plant on 2 October 2013. 1111/26/2016
  12. 12. RNPP at a Glance  Capacity : 2400MW with two units of 1200 MW each.  Technology: VVER-1200 ( Water- Water Energetic Reactor), Russian.  Generation of Reactor: GEN-III+  Fuel: 235 Uranium Dioxide. 1211/26/2016
  13. 13. RNPP at a Glance  Construction by: State Atomic Energy Corporation, Rosatom, Russia.  Cost of the Project: $12.65 billion Russia: $11.385 (90%) BD : $1.265 (10%)  Opening: Targeted Launch of 1st unit in year 2022 and 2nd in year 2023.  Longevity: 60 years and extend to another 20 years. 1311/26/2016
  14. 14. Safety Standards for RNPP Third-generation technology . Protected by Five layers of security. “Post-Fukushima” safety features( can work for 72 hrs in any critical or emergency Sit). Russia will take back the nuclear waste generated by the plant. 1411/26/2016
  15. 15. Rooppur Nuclear Power Plant Video Clips Video Clips 1511/26/2016
  16. 16. Conclution 16 Feasible if fulfilled all standards. Safety has to be the main concern than economic facts. Countries long term benefit has to be ensured in all contracts from all sides. A Bangladeshi nuclear specialist team has to be raised. 11/26/2016
  17. 17. Any Question? 1711/26/2016

×