Overview of activities in WP2
Advanced manufacturing and after sales service supply chain
design
Bram Westerweel
Agenda
• Current status update
− PhD level courses
− Research proposal
• Research framework
− Potential topics
• Future activities
11/12/2015Update WP2 2
Current status update
• Starting point: February 2015
• Research school BETA requires:
• PhD level course load of 40 ects (1120 hours)
• Full research proposal after 1 year
• Currently completed:
• 910 hours of course load
• Concept research proposal (including research framework)
11/12/2015Introduction to WP2 3
Research framework
• The capital goods lifecycle:
• Each stage presents different topics to investigate. Design and exploitation
stages seem most interesting and most relevant for AM & service logistics
Introduction to WP2 411/12/2015
Design Production Exploitation Disposal
SINTAS (2015-2019)
Additive manufacturing
in service supply chains
WP1
WP2
Supply chain design
WP3
Product design
decisions (TCO
perspective)
AM concepts in the
exploitation phase
1. Service supply chain design
2. Temporary replacement
3. TBD
4. TBD
Topics in the exploitation stage
1) Current service supply chains are usually multi-echelon structures.
• Which conditions cause a shift to a series of independent single-echelon
systems? Take into account:
− Lead times
− Component costs
− Reliability
2) Some critical components have very long lead times. To protect
against downtime they must be stocked.
• Could AM be used to provide temporary replacements, buying time to
source the regular component or complete a mission?
Introduction to WP2 511/12/2015
Regular central
source
D1 D2
LT1 LT2
Local (AM)
source
Local (AM)
source
D1 D2
S0
LT0
S1' S2'
LT1' LT2'
Versus
S1 S2
Topics in the design stage
Introduction to WP2 611/12/2015
• Shifting to AM requires (re)visiting the design stage
• Quantify the required investment
• Quantify performance benefits and logistical benefits
• There is scientific work on interactions between (re)design stage
decisions and total cost of ownership (TCO)
• Some of our work will be positioned there
Design Production Exploitation Disposal
Future activities
• Finish up with coursework
• Complete the research proposal (February 2016)
• Part of this is identifying additional topics!
• Complete a first paper (summer 2016)
Introduction to WP2 711/12/2015
februari ’16 februari ’19
januari ’17 januari ’18 januari ’19
september ’16
Draft Paper 1
1-2-2016
Research proposal
april ’17
Draft Paper 2
december ’17
Draft Paper 3
1-2018 - 6-2018
Visit external
university
januari ’19
PhD Thesis

More Related Content

Viewers also liked

презентация икс 2016 новая
презентация икс 2016 новаяпрезентация икс 2016 новая
презентация икс 2016 новаяarealconsulting
 
150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)SINTAS
 
150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)SINTAS
 
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015Yi Xu
 
Confident Group Project Althena
Confident Group Project AlthenaConfident Group Project Althena
Confident Group Project AlthenaConfident Group
 

Viewers also liked (7)

презентация икс 2016 новая
презентация икс 2016 новаяпрезентация икс 2016 новая
презентация икс 2016 новая
 
150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)
 
150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)
 
Dkbm indonesia
Dkbm indonesiaDkbm indonesia
Dkbm indonesia
 
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015
Developing Internal Agile Coaches - Global Scrum Gathering Shanghai 2015
 
SOA
SOASOA
SOA
 
Confident Group Project Althena
Confident Group Project AlthenaConfident Group Project Althena
Confident Group Project Althena
 

Similar to 151111 Progress Update WP2 (Bram Westerweel)

Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Association for Project Management
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aCu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aBrandon Smith
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Torben Haagh
 
Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Shashidhar MG
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanCCT International
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersSchneider Electric
 
Service Execution Process.pptx
Service Execution Process.pptxService Execution Process.pptx
Service Execution Process.pptxssuserfb3b311
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTNur Ain Samsudin
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 
BEST-Intro-MT (1).ppt
BEST-Intro-MT (1).pptBEST-Intro-MT (1).ppt
BEST-Intro-MT (1).pptLalitbalani1
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersSchneider Electric
 
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning ContextSimon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning ContextAssociation for Project Management
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo
 
Maintenance presentation 2015
Maintenance presentation 2015Maintenance presentation 2015
Maintenance presentation 2015Rory Hulley
 

Similar to 151111 Progress Update WP2 (Bram Westerweel) (20)

Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
Dounreay’s Nuclear Flask Loading Facility Project – A New Delivery Strategy, ...
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aCu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
 
Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017Resume_Shashi_19-Jan-2017
Resume_Shashi_19-Jan-2017
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for Owners
 
Service Execution Process.pptx
Service Execution Process.pptxService Execution Process.pptx
Service Execution Process.pptx
 
layout planning
layout planninglayout planning
layout planning
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
BEST-Intro-MT (1).ppt
BEST-Intro-MT (1).pptBEST-Intro-MT (1).ppt
BEST-Intro-MT (1).ppt
 
BEST-Intro-MT.ppt
BEST-Intro-MT.pptBEST-Intro-MT.ppt
BEST-Intro-MT.ppt
 
Fundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for OwnersFundamentals of Managing the Data Center Life Cycle for Owners
Fundamentals of Managing the Data Center Life Cycle for Owners
 
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning ContextSimon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
Simon Coles, Dounreay: Strategic Challenges in a Decommissioning Context
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
 
Maintenance presentation 2015
Maintenance presentation 2015Maintenance presentation 2015
Maintenance presentation 2015
 
CV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linkeCV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linke
 

More from SINTAS

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D PrintingSINTAS
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AMSINTAS
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote LocationsSINTAS
 
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service LogisticsSINTAS
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussionSINTAS
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)SINTAS
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)SINTAS
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)SINTAS
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)SINTAS
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)SINTAS
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)SINTAS
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)SINTAS
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)SINTAS
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)SINTAS
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)SINTAS
 
170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)SINTAS
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)SINTAS
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)SINTAS
 

More from SINTAS (20)

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
 
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussion
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)
 
171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)
 
170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)
 

Recently uploaded

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 

Recently uploaded (20)

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

151111 Progress Update WP2 (Bram Westerweel)

  • 1. Overview of activities in WP2 Advanced manufacturing and after sales service supply chain design Bram Westerweel
  • 2. Agenda • Current status update − PhD level courses − Research proposal • Research framework − Potential topics • Future activities 11/12/2015Update WP2 2
  • 3. Current status update • Starting point: February 2015 • Research school BETA requires: • PhD level course load of 40 ects (1120 hours) • Full research proposal after 1 year • Currently completed: • 910 hours of course load • Concept research proposal (including research framework) 11/12/2015Introduction to WP2 3
  • 4. Research framework • The capital goods lifecycle: • Each stage presents different topics to investigate. Design and exploitation stages seem most interesting and most relevant for AM & service logistics Introduction to WP2 411/12/2015 Design Production Exploitation Disposal SINTAS (2015-2019) Additive manufacturing in service supply chains WP1 WP2 Supply chain design WP3 Product design decisions (TCO perspective) AM concepts in the exploitation phase 1. Service supply chain design 2. Temporary replacement 3. TBD 4. TBD
  • 5. Topics in the exploitation stage 1) Current service supply chains are usually multi-echelon structures. • Which conditions cause a shift to a series of independent single-echelon systems? Take into account: − Lead times − Component costs − Reliability 2) Some critical components have very long lead times. To protect against downtime they must be stocked. • Could AM be used to provide temporary replacements, buying time to source the regular component or complete a mission? Introduction to WP2 511/12/2015 Regular central source D1 D2 LT1 LT2 Local (AM) source Local (AM) source D1 D2 S0 LT0 S1' S2' LT1' LT2' Versus S1 S2
  • 6. Topics in the design stage Introduction to WP2 611/12/2015 • Shifting to AM requires (re)visiting the design stage • Quantify the required investment • Quantify performance benefits and logistical benefits • There is scientific work on interactions between (re)design stage decisions and total cost of ownership (TCO) • Some of our work will be positioned there Design Production Exploitation Disposal
  • 7. Future activities • Finish up with coursework • Complete the research proposal (February 2016) • Part of this is identifying additional topics! • Complete a first paper (summer 2016) Introduction to WP2 711/12/2015 februari ’16 februari ’19 januari ’17 januari ’18 januari ’19 september ’16 Draft Paper 1 1-2-2016 Research proposal april ’17 Draft Paper 2 december ’17 Draft Paper 3 1-2018 - 6-2018 Visit external university januari ’19 PhD Thesis