SlideShare a Scribd company logo
1 of 46
Lecture 14
Power Flow
Professor Tom Overbye
Department of Electrical and
Computer Engineering
ECE 476
POWER SYSTEM ANALYSIS
1
Announcements
 Be reading Chapter 6, also Chapter 2.4 (Network Equations).
 HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6
but does not need to be turned in.
 First exam is October 11 during class. Closed book, closed
notes, one note sheet and calculators allowed. Exam covers
thru the end of lecture 13 (today)
 An example previous exam (2008) is posted. Note this is
exam was given earlier in the semester in 2008 so it did not
include power flow, but the 2011 exam will (at least
partially)
2
Modeling Voltage Dependent Load
So far we've assumed that the load is independent of
the bus voltage (i.e., constant power). However, the
power flow can be easily extended to include voltage
depedence with both the real and reactive l
Di Di
1
1
oad. This
is done by making P and Q a function of :
( cos sin ) ( ) 0
( sin cos ) ( ) 0
i
n
i k ik ik ik ik Gi Di i
k
n
i k ik ik ik ik Gi Di i
k
V
V V G B P P V
V V G B Q Q V
 
 


   
   


3
Voltage Dependent Load Example
2
2 2 2 2
2 2
2 2 2 2 2
2 2 2 2
In previous two bus example now assume the load is
constant impedance, so
P ( ) (10sin ) 2.0 0
( ) ( 10cos ) (10) 1.0 0
Now calculate the power flow Jacobian
10 cos 10sin 4.0
( )
10
V V
Q V V V
V V
J


 
  
    


x
x
x
2 2 2 2 2
sin 10cos 20 2.0
V V V
 
 
 
  
 
4
Voltage Dependent Load, cont'd
(0)
2
2 2 2
(0)
2 2
2 2 2 2
(0)
1
(1)
0
Again set 0, guess
1
Calculate
(10sin ) 2.0 2.0
f( )
1.0
( 10cos ) (10) 1.0
10 4
( )
0 12
0 10 4 2.0 0.1667
Solve
1 0 12 1.0 0.9167
v
V V
V V V



 
   
 
 
  
 
   
 
 
  
 
 
  
 

      
  
     
     
x
x
J x
x

 
 
5
Voltage Dependent Load, cont'd
Line Z = 0.1j
One Two
1.000 pu
0.894 pu
160 MW
80 MVR
160.0 MW
120.0 MVR
-10.304 Deg
160.0 MW
120.0 MVR
-160.0 MW
-80.0 MVR
With constant impedance load the MW/Mvar load at
bus 2 varies with the square of the bus 2 voltage
magnitude. This if the voltage level is less than 1.0,
the load is lower than 200/100 MW/Mvar
6
Dishonest Newton-Raphson
 Since most of the time in the Newton-Raphson
iteration is spend calculating the inverse of the
Jacobian, one way to speed up the iterations is to
only calculate/inverse the Jacobian occasionally
– known as the “Dishonest” Newton-Raphson
– an extreme example is to only calculate the Jacobian for
the first iteration
( 1) ( ) ( ) -1 ( )
( 1) ( ) (0) -1 ( )
( )
Honest: - ( ) ( )
Dishonest: - ( ) ( )
Both require ( ) for a solution
v v v v
v v v
v






x x J x f x
x x J x f x
f x
7
Dishonest Newton-Raphson Example
2
1
(0)
( ) ( )
( ) ( ) 2
(0)
( 1) ( ) ( ) 2
(0)
Use the Dishonest Newton-Raphson to solve
( ) - 2 0
( )
( )
1
(( ) - 2)
2
1
(( ) - 2)
2
v v
v v
v v v
f x x
df x
x f x
dx
x x
x
x x x
x


 
 
   
 
 
   
 
 
   
 
8
Dishonest N-R Example, cont’d
( 1) ( ) ( ) 2
(0)
(0)
( ) ( )
1
(( ) - 2)
2
Guess x 1. Iteratively solving we get
v (honest) (dishonest)
0 1 1
1 1.5 1.5
2 1.41667 1.375
3 1.41422 1.429
4 1.41422 1.408
v v v
v v
x x x
x
x x
  
   
 

We pay a price
in increased
iterations, but
with decreased
computation
per iteration
9
Two Bus Dishonest ROC
Slide shows the region of convergence for different initial
guesses for the 2 bus case using the Dishonest N-R
Red region
converges
to the high
voltage
solution,
while the
yellow region
converges
to the low
voltage
solution
10
Honest N-R Region of Convergence
Maximum
of 15
iterations
11
Decoupled Power Flow
 The completely Dishonest Newton-Raphson is not
used for power flow analysis. However several
approximations of the Jacobian matrix are used.
 One common method is the decoupled power flow.
In this approach approximations are used to
decouple the real and reactive power equations.
12
Decoupled Power Flow Formulation
( ) ( )
( ) ( )
( )
( )
( ) ( ) ( )
( )
2 2 2
( )
( )
General form of the power flow problem
( )
( )
( )
where
( )
( )
( )
v v
v v
v
v
v v v
v
D G
v
v
n Dn Gn
P P P
P P P
 
 
     

  
 
  
   
  
  
     
 
 
 
 
 
 
 
 
   
 
 
 
P P
θ
θ V P x
f x
Q x
V
Q Q
θ V
x
P x
x
13
Decoupling Approximation
( ) ( )
( )
( ) ( )
( )
( ) ( ) ( )
Usually the off-diagonal matrices, and
are small. Therefore we approximate them as zero:
( )
( )
( )
Then the problem
v v
v
v v
v
v v v
 
 
 

     
 

 
  
   
 
 
  
   
 
 

 
P Q
V θ
P
0
θ P x
θ
f x
Q Q x
V
0
V
1 1
( ) ( )
( )
( ) ( ) ( )
can be decoupled
( ) ( )
v v
v
v v v
 
   
 
       
   
 
   
P Q
θ P x V Q x
θ V
14
Off-diagonal Jacobian Terms
 
 
Justification for Jacobian approximations:
1. Usually r x, therefore
2. Usually is small so sin 0
Therefore
cos sin 0
cos sin 0
ij ij
ij ij
i
i ij ij ij ij
j
i
i j ij ij ij ij
j
G B
V G B
V V G B
 
 
 


  


   

P
V
Q
θ
15
Decoupled N-R Region of Convergence
16
Fast Decoupled Power Flow
 By continuing with our Jacobian approximations we
can actually obtain a reasonable approximation that
is independent of the voltage magnitudes/angles.
 This means the Jacobian need only be built/inverted
once.
 This approach is known as the fast decoupled power
flow (FDPF)
 FDPF uses the same mismatch equations as
standard power flow so it should have same solution
 The FDPF is widely used, particularly when we
only need an approximate solution
17
FDPF Approximations
ij
( ) ( )
( )
( ) 1 1
( ) ( )
bus
The FDPF makes the following approximations:
1. G 0
2. 1
3. sin 0 cos 1
Then
( ) ( )
Where is just the imaginary part of the ,
except the slack bus row/co
i
ij ij
v v
v
v
v v
V
j
 
 


 
 
   
 
P x Q x
θ B V B
V V
B Y G B
lumn are omitted
18
FDPF Three Bus Example
Line Z = j0.07
Line Z = j0.05 Line Z = j0.1
One Two
200 MW
100 MVR
Three 1.000 pu
200 MW
100 MVR
Use the FDPF to solve the following three bus system
34.3 14.3 20
14.3 24.3 10
20 10 30
bus j

 
 
 
 

 
 
Y
19
FDPF Three Bus Example, cont’d
1
(0)
(0)
2 2
3 3
34.3 14.3 20
24.3 10
14.3 24.3 10
10 30
20 10 30
0.0477 0.0159
0.0159 0.0389
Iteratively solve, starting with an initial voltage guess
0 1
0 1
bus j
V
V




 

 
 
     
  
 

 
 
 
 
  
 
 
 
    
 
 
   
 
   
Y B
B
(1)
2
3
0 0.0477 0.0159 2 0.1272
0 0.0159 0.0389 2 0.1091



 
 
  
         
  
         
  
       
 
20
FDPF Three Bus Example, cont’d
(1)
2
3
i
i i
1
(2)
2
3
1 0.0477 0.0159 1 0.9364
1 0.0159 0.0389 1 0.9455
P ( )
( cos sin )
V V
0.1272 0.0477 0.0159
0.1091 0.0159 0.0389
n
Di Gi
k ik ik ik ik
k
V
V
P P
V G B
 



 
         
  
         
 
       
 


  
  
     
 
     
  
   
 

x
(2)
2
3
0.151 0.1361
0.107 0.1156
0.924
0.936
0.1384 0.9224
Actual solution:
0.1171 0.9338
V
V

   

   

   
   

   
 
 

   
 
   

   
θ V
21
FDPF Region of Convergence
22
“DC” Power Flow
 The “DC” power flow makes the most severe
approximations:
– completely ignore reactive power, assume all the voltages
are always 1.0 per unit, ignore line conductance
 This makes the power flow a linear set of equations,
which can be solved directly
1


θ B P
23
Power System Control
 A major problem with power system operation is
the limited capacity of the transmission system
– lines/transformers have limits (usually thermal)
– no direct way of controlling flow down a transmission
line (e.g., there are no valves to close to limit flow)
– open transmission system access associated with industry
restructuring is stressing the system in new ways
 We need to indirectly control transmission line flow
by changing the generator outputs
24
DC Power Flow Example
25
DC Power Flow Example
26
DC Power Flow 5 Bus Example
slack
One
Two
Three
Four
Five
A
MVA
A
MVA
A
MVA
A
MVA
A
MVA
1.000 pu 1.000 pu
1.000 pu
1.000 pu
1.000 pu
0.000 Deg -4.125 Deg
-18.695 Deg
-1.997 Deg
0.524 Deg
360 MW
0 Mvar
520 MW
0 Mvar
800 MW
0 Mvar
80 MW
0 Mvar
Notice with the dc power flow all of the voltage magnitudes are
1 per unit.
27
Indirect Transmission Line Control
What we would like to determine is how a change in
generation at bus k affects the power flow on a line
from bus i to bus j.
The assumption is
that the change
in generation is
absorbed by the
slack bus
28
Power Flow Simulation - Before
One way to determine the impact of a generator change
is to compare a before/after power flow.
For example below is a three bus case with an overload
Z for all lines = j0.1
One Two
200 MW
100 MVR
200.0 MW
71.0 MVR
Three 1.000 pu
0 MW
64 MVR
131.9 MW
68.1 MW 68.1 MW
124%
29
Power Flow Simulation - After
Z for all lines = j0.1
Limit for all lines = 150 MVA
One Two
200 MW
100 MVR
105.0 MW
64.3 MVR
Three
1.000 pu
95 MW
64 MVR
101.6 MW
3.4 MW 98.4 MW
92%
100%
Increasing the generation at bus 3 by 95 MW (and hence
decreasing it at bus 1 by a corresponding amount), results
in a 31.3 drop in the MW flow on the line from bus 1 to 2.
30
Analytic Calculation of Sensitivities
 Calculating control sensitivities by repeat power
flow solutions is tedious and would require many
power flow solutions. An alternative approach is to
analytically calculate these values
The power flow from bus i to bus j is
sin( )
So We just need to get
i j i j
ij i j
ij ij
i j ij
ij
ij Gk
V V
P
X X
P
X P
 
 
  

  
   
 

31
Analytic Sensitivities
1
From the fast decoupled power flow we know
( )
So to get the change in due to a change of
generation at bus k, just set ( ) equal to
all zeros except a minus one at position k.
0
1
0

  



  

θ B P x
θ
P x
P Bus k

 
 

 
 
 
 

32
Three Bus Sensitivity Example
line
bus
1
2
3
For the previous three bus case with Z 0.1
20 10 10
20 10
10 20 10
10 20
10 10 20
Hence for a change of generation at bus 3
20 10 0 0.0333
10 20 1 0.0667
j
j





 

 
 
     
  
 

 
 
 
      
 
      
  
    
 
Y B
3 to 1
3 to 2 2 to 1
0.0667 0
Then P 0.667 pu
0.1
P 0.333 pu P 0.333 pu




  
   
33
Balancing Authority Areas
 An balancing authority area (use to be called
operating areas) has traditionally represented
the portion of the interconnected electric grid
operated by a single utility
 Transmission lines that join two areas are
known as tie-lines.
 The net power out of an area is the sum of the
flow on its tie-lines.
 The flow out of an area is equal to
34
Area Control Error (ACE)
 The area control error (ace) is the difference
between the actual flow out of an area and
the scheduled flow, plus a frequency
component
 Ideally the ACE should always be zero.
 Because the load is constantly changing, each
utility must constantly change its generation
to “chase” the ACE.
int sched
ace 10
P P f

   
35
Automatic Generation Control
 Most utilities use automatic generation
control (AGC) to automatically change their
generation to keep their ACE close to zero.
 Usually the utility control center calculates
ACE based upon tie-line flows; then the
AGC module sends control signals out to the
generators every couple seconds.
36
Power Transactions
 Power transactions are contracts between
generators and loads to do power
transactions.
 Contracts can be for any amount of time at
any price for any amount of power.
 Scheduled power transactions are
implemented by modifying the value of Psched
used in the ACE calculation
37
PTDFs
 Power transfer distribution factors (PTDFs) show
the linear impact of a transfer of power.
 PTDFs calculated using the fast decoupled power
flow B matrix
1
( )
Once we know we can derive the change in
the transmission line flows
Except now we modify several elements in ( ),
in portion to how the specified generators would
participate in the pow

  


θ B P x
θ
P x
er transfer
38
Nine Bus PTDF Example
10%
60%
55%
64%
57%
11%
74%
24%
32%
A
G
B
C
D
E
I
F
H
300.0 MW
400.0 MW 300.0 MW
250.0 MW
250.0 MW
200.0 MW
250.0 MW
150.0 MW
150.0 MW
44%
71%
0.00 deg
71.1 MW
92%
Figure shows initial flows for a nine bus power system
39
Nine Bus PTDF Example, cont'd
43%
57%
13%
35%
20%
10%
2%
34%
34%
32%
A
G
B
C
D
E
I
F
H
300.0 MW
400.0 MW 300.0 MW
250.0 MW
250.0 MW
200.0 MW
250.0 MW
150.0 MW
150.0 MW
34%
30%
0.00 deg
71.1 MW
Figure now shows percentage PTDF flows from A to I
40
Nine Bus PTDF Example, cont'd
6%
6%
12%
61%
12%
6%
19%
21%
21%
A
G
B
C
D
E
I
F
H
300.0 MW
400.0 MW 300.0 MW
250.0 MW
250.0 MW
200.0 MW
250.0 MW
150.0 MW
150.0 MW
20%
18%
0.00 deg
71.1 MW
Figure now shows percentage PTDF flows from G to F
41
WE to TVA PTDFs
42
Line Outage Distribution Factors (LODFS)
 LODFs are used to approximate the change in the
flow on one line caused by the outage of a second
line
– typically they are only used to determine the change in
the MW flow
– LODFs are used extensively in real-time operations
– LODFs are state-independent but do dependent on the
assumed network topology
,
l l k k
P LODF P
 
43
Flowgates
 The real-time loading of the power grid is accessed
via “flowgates”
 A flowgate “flow” is the real power flow on one or
more transmission element for either base case
conditions or a single contingency
– contingent flows are determined using LODFs
 Flowgates are used as proxies for other types of
limits, such as voltage or stability limits
 Flowgates are calculated using a spreadsheet
44
NERC Regional Reliability Councils
NERC
is the
North
American
Electric
Reliability
Council
45
NERC Reliability Coordinators
Source: http://www.nerc.com/page.php?cid=5%7C67%7C206

More Related Content

Similar to ECE4762011_Lect14.ppt

about power system operation and control13197214.ppt
about power system operation and control13197214.pptabout power system operation and control13197214.ppt
about power system operation and control13197214.pptMohammedAhmed66819
 
UNIT-III complex reactive three phase.ppt
UNIT-III complex reactive three phase.pptUNIT-III complex reactive three phase.ppt
UNIT-III complex reactive three phase.pptAbinaya Saraswathy T
 
Load flow study Part-I
Load flow study Part-ILoad flow study Part-I
Load flow study Part-IAsif Jamadar
 
ECE4762008_Lect23.ppt
ECE4762008_Lect23.pptECE4762008_Lect23.ppt
ECE4762008_Lect23.pptVIGNESHRAJR3
 
Fault Analysis using Z Bus..pdf
Fault Analysis using Z Bus..pdfFault Analysis using Z Bus..pdf
Fault Analysis using Z Bus..pdfSaravanan A
 
ECEN615_Fall2020_Lect4.pptx
ECEN615_Fall2020_Lect4.pptxECEN615_Fall2020_Lect4.pptx
ECEN615_Fall2020_Lect4.pptxPrasenjitDey49
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysisdivyanshuprakashrock
 
A novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistorsA novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistorsIJRES Journal
 
Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutionsAbha Tripathi
 
Unit1 And 2 Sample Solutions
Unit1 And 2 Sample SolutionsUnit1 And 2 Sample Solutions
Unit1 And 2 Sample SolutionsAbha Tripathi
 
Lecture 09 em transmission lines
Lecture 09   em transmission linesLecture 09   em transmission lines
Lecture 09 em transmission linesAmit Rastogi
 
Electrical Engineering - 2008 Unsolved Paper
Electrical Engineering - 2008 Unsolved PaperElectrical Engineering - 2008 Unsolved Paper
Electrical Engineering - 2008 Unsolved PaperVasista Vinuthan
 
Computer-Methods-in-Power-Systems.pptx
Computer-Methods-in-Power-Systems.pptxComputer-Methods-in-Power-Systems.pptx
Computer-Methods-in-Power-Systems.pptxGodspower Bruno, GMNSE
 
Electrical Engineering - 2006 Unsolved Paper
Electrical Engineering - 2006 Unsolved PaperElectrical Engineering - 2006 Unsolved Paper
Electrical Engineering - 2006 Unsolved PaperVasista Vinuthan
 

Similar to ECE4762011_Lect14.ppt (20)

Lecture 8
Lecture 8Lecture 8
Lecture 8
 
about power system operation and control13197214.ppt
about power system operation and control13197214.pptabout power system operation and control13197214.ppt
about power system operation and control13197214.ppt
 
UNIT-III complex reactive three phase.ppt
UNIT-III complex reactive three phase.pptUNIT-III complex reactive three phase.ppt
UNIT-III complex reactive three phase.ppt
 
Load flow study Part-I
Load flow study Part-ILoad flow study Part-I
Load flow study Part-I
 
ECE4762008_Lect23.ppt
ECE4762008_Lect23.pptECE4762008_Lect23.ppt
ECE4762008_Lect23.ppt
 
Fault Analysis using Z Bus..pdf
Fault Analysis using Z Bus..pdfFault Analysis using Z Bus..pdf
Fault Analysis using Z Bus..pdf
 
ECEN615_Fall2020_Lect4.pptx
ECEN615_Fall2020_Lect4.pptxECEN615_Fall2020_Lect4.pptx
ECEN615_Fall2020_Lect4.pptx
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysis
 
A novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistorsA novel voltage reference without the operational amplifier and resistors
A novel voltage reference without the operational amplifier and resistors
 
Report_AKbar_PDF
Report_AKbar_PDFReport_AKbar_PDF
Report_AKbar_PDF
 
Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutions
 
Unit1 And 2 Sample Solutions
Unit1 And 2 Sample SolutionsUnit1 And 2 Sample Solutions
Unit1 And 2 Sample Solutions
 
Lecture 09 em transmission lines
Lecture 09   em transmission linesLecture 09   em transmission lines
Lecture 09 em transmission lines
 
Electrical Engineering - 2008 Unsolved Paper
Electrical Engineering - 2008 Unsolved PaperElectrical Engineering - 2008 Unsolved Paper
Electrical Engineering - 2008 Unsolved Paper
 
Computer-Methods-in-Power-Systems.pptx
Computer-Methods-in-Power-Systems.pptxComputer-Methods-in-Power-Systems.pptx
Computer-Methods-in-Power-Systems.pptx
 
transformer
transformertransformer
transformer
 
Resonant circuits
Resonant circuitsResonant circuits
Resonant circuits
 
FinalReport
FinalReportFinalReport
FinalReport
 
INCIDENCE MATRIX
INCIDENCE MATRIXINCIDENCE MATRIX
INCIDENCE MATRIX
 
Electrical Engineering - 2006 Unsolved Paper
Electrical Engineering - 2006 Unsolved PaperElectrical Engineering - 2006 Unsolved Paper
Electrical Engineering - 2006 Unsolved Paper
 

More from Godspower Bruno, GMNSE

Introduction to Power Electronics Students Version.ppt
Introduction to Power Electronics Students Version.pptIntroduction to Power Electronics Students Version.ppt
Introduction to Power Electronics Students Version.pptGodspower Bruno, GMNSE
 
basicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptxbasicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptxGodspower Bruno, GMNSE
 
62-power-semiconductor-devices (1).ppt
62-power-semiconductor-devices (1).ppt62-power-semiconductor-devices (1).ppt
62-power-semiconductor-devices (1).pptGodspower Bruno, GMNSE
 
Lecture-slides_-Literature-review (1).pptx
Lecture-slides_-Literature-review (1).pptxLecture-slides_-Literature-review (1).pptx
Lecture-slides_-Literature-review (1).pptxGodspower Bruno, GMNSE
 
chapter_33_alternating_current_circuits_0.pptx
chapter_33_alternating_current_circuits_0.pptxchapter_33_alternating_current_circuits_0.pptx
chapter_33_alternating_current_circuits_0.pptxGodspower Bruno, GMNSE
 

More from Godspower Bruno, GMNSE (20)

Introduction to Power Electronics Students Version.ppt
Introduction to Power Electronics Students Version.pptIntroduction to Power Electronics Students Version.ppt
Introduction to Power Electronics Students Version.ppt
 
windenergy.ppt
windenergy.pptwindenergy.ppt
windenergy.ppt
 
MAT1033.12.4.ppt
MAT1033.12.4.pptMAT1033.12.4.ppt
MAT1033.12.4.ppt
 
Newton.ppt
Newton.pptNewton.ppt
Newton.ppt
 
Thesis schematics.pptx
Thesis schematics.pptxThesis schematics.pptx
Thesis schematics.pptx
 
NAWEA2015_NOVOA_Final_MODIFIED.pptx
NAWEA2015_NOVOA_Final_MODIFIED.pptxNAWEA2015_NOVOA_Final_MODIFIED.pptx
NAWEA2015_NOVOA_Final_MODIFIED.pptx
 
Presentation-for-teachers.pptx
Presentation-for-teachers.pptxPresentation-for-teachers.pptx
Presentation-for-teachers.pptx
 
62-power-semiconductor-devices.ppt
62-power-semiconductor-devices.ppt62-power-semiconductor-devices.ppt
62-power-semiconductor-devices.ppt
 
basicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptxbasicsinstrumentandcontrol-170425220125.pptx
basicsinstrumentandcontrol-170425220125.pptx
 
62-power-semiconductor-devices (1).ppt
62-power-semiconductor-devices (1).ppt62-power-semiconductor-devices (1).ppt
62-power-semiconductor-devices (1).ppt
 
Lecture-slides_-Literature-review (1).pptx
Lecture-slides_-Literature-review (1).pptxLecture-slides_-Literature-review (1).pptx
Lecture-slides_-Literature-review (1).pptx
 
LoadModeling.ppt
LoadModeling.pptLoadModeling.ppt
LoadModeling.ppt
 
LoadModeling (1).ppt
LoadModeling (1).pptLoadModeling (1).ppt
LoadModeling (1).ppt
 
facts__unit-5_and_6.pptx
facts__unit-5_and_6.pptxfacts__unit-5_and_6.pptx
facts__unit-5_and_6.pptx
 
chapter_33_alternating_current_circuits_0.pptx
chapter_33_alternating_current_circuits_0.pptxchapter_33_alternating_current_circuits_0.pptx
chapter_33_alternating_current_circuits_0.pptx
 
Tranp.pptx
Tranp.pptxTranp.pptx
Tranp.pptx
 
powerflowproblem.ppt
powerflowproblem.pptpowerflowproblem.ppt
powerflowproblem.ppt
 
Load_Flow.pptx
Load_Flow.pptxLoad_Flow.pptx
Load_Flow.pptx
 
NSECOMPILED QUESTIONS.pdf
NSECOMPILED QUESTIONS.pdfNSECOMPILED QUESTIONS.pdf
NSECOMPILED QUESTIONS.pdf
 
ECE4762011_Lect14.ppt
ECE4762011_Lect14.pptECE4762011_Lect14.ppt
ECE4762011_Lect14.ppt
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 

ECE4762011_Lect14.ppt

  • 1. Lecture 14 Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS
  • 2. 1 Announcements  Be reading Chapter 6, also Chapter 2.4 (Network Equations).  HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need to be turned in.  First exam is October 11 during class. Closed book, closed notes, one note sheet and calculators allowed. Exam covers thru the end of lecture 13 (today)  An example previous exam (2008) is posted. Note this is exam was given earlier in the semester in 2008 so it did not include power flow, but the 2011 exam will (at least partially)
  • 3. 2 Modeling Voltage Dependent Load So far we've assumed that the load is independent of the bus voltage (i.e., constant power). However, the power flow can be easily extended to include voltage depedence with both the real and reactive l Di Di 1 1 oad. This is done by making P and Q a function of : ( cos sin ) ( ) 0 ( sin cos ) ( ) 0 i n i k ik ik ik ik Gi Di i k n i k ik ik ik ik Gi Di i k V V V G B P P V V V G B Q Q V                
  • 4. 3 Voltage Dependent Load Example 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 In previous two bus example now assume the load is constant impedance, so P ( ) (10sin ) 2.0 0 ( ) ( 10cos ) (10) 1.0 0 Now calculate the power flow Jacobian 10 cos 10sin 4.0 ( ) 10 V V Q V V V V V J               x x x 2 2 2 2 2 sin 10cos 20 2.0 V V V           
  • 5. 4 Voltage Dependent Load, cont'd (0) 2 2 2 2 (0) 2 2 2 2 2 2 (0) 1 (1) 0 Again set 0, guess 1 Calculate (10sin ) 2.0 2.0 f( ) 1.0 ( 10cos ) (10) 1.0 10 4 ( ) 0 12 0 10 4 2.0 0.1667 Solve 1 0 12 1.0 0.9167 v V V V V V                                                              x x J x x     
  • 6. 5 Voltage Dependent Load, cont'd Line Z = 0.1j One Two 1.000 pu 0.894 pu 160 MW 80 MVR 160.0 MW 120.0 MVR -10.304 Deg 160.0 MW 120.0 MVR -160.0 MW -80.0 MVR With constant impedance load the MW/Mvar load at bus 2 varies with the square of the bus 2 voltage magnitude. This if the voltage level is less than 1.0, the load is lower than 200/100 MW/Mvar
  • 7. 6 Dishonest Newton-Raphson  Since most of the time in the Newton-Raphson iteration is spend calculating the inverse of the Jacobian, one way to speed up the iterations is to only calculate/inverse the Jacobian occasionally – known as the “Dishonest” Newton-Raphson – an extreme example is to only calculate the Jacobian for the first iteration ( 1) ( ) ( ) -1 ( ) ( 1) ( ) (0) -1 ( ) ( ) Honest: - ( ) ( ) Dishonest: - ( ) ( ) Both require ( ) for a solution v v v v v v v v       x x J x f x x x J x f x f x
  • 8. 7 Dishonest Newton-Raphson Example 2 1 (0) ( ) ( ) ( ) ( ) 2 (0) ( 1) ( ) ( ) 2 (0) Use the Dishonest Newton-Raphson to solve ( ) - 2 0 ( ) ( ) 1 (( ) - 2) 2 1 (( ) - 2) 2 v v v v v v v f x x df x x f x dx x x x x x x x                            
  • 9. 8 Dishonest N-R Example, cont’d ( 1) ( ) ( ) 2 (0) (0) ( ) ( ) 1 (( ) - 2) 2 Guess x 1. Iteratively solving we get v (honest) (dishonest) 0 1 1 1 1.5 1.5 2 1.41667 1.375 3 1.41422 1.429 4 1.41422 1.408 v v v v v x x x x x x           We pay a price in increased iterations, but with decreased computation per iteration
  • 10. 9 Two Bus Dishonest ROC Slide shows the region of convergence for different initial guesses for the 2 bus case using the Dishonest N-R Red region converges to the high voltage solution, while the yellow region converges to the low voltage solution
  • 11. 10 Honest N-R Region of Convergence Maximum of 15 iterations
  • 12. 11 Decoupled Power Flow  The completely Dishonest Newton-Raphson is not used for power flow analysis. However several approximations of the Jacobian matrix are used.  One common method is the decoupled power flow. In this approach approximations are used to decouple the real and reactive power equations.
  • 13. 12 Decoupled Power Flow Formulation ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) 2 2 2 ( ) ( ) General form of the power flow problem ( ) ( ) ( ) where ( ) ( ) ( ) v v v v v v v v v v D G v v n Dn Gn P P P P P P                                                              P P θ θ V P x f x Q x V Q Q θ V x P x x
  • 14. 13 Decoupling Approximation ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) Usually the off-diagonal matrices, and are small. Therefore we approximate them as zero: ( ) ( ) ( ) Then the problem v v v v v v v v v                                            P Q V θ P 0 θ P x θ f x Q Q x V 0 V 1 1 ( ) ( ) ( ) ( ) ( ) ( ) can be decoupled ( ) ( ) v v v v v v                           P Q θ P x V Q x θ V
  • 15. 14 Off-diagonal Jacobian Terms     Justification for Jacobian approximations: 1. Usually r x, therefore 2. Usually is small so sin 0 Therefore cos sin 0 cos sin 0 ij ij ij ij i i ij ij ij ij j i i j ij ij ij ij j G B V G B V V G B                   P V Q θ
  • 16. 15 Decoupled N-R Region of Convergence
  • 17. 16 Fast Decoupled Power Flow  By continuing with our Jacobian approximations we can actually obtain a reasonable approximation that is independent of the voltage magnitudes/angles.  This means the Jacobian need only be built/inverted once.  This approach is known as the fast decoupled power flow (FDPF)  FDPF uses the same mismatch equations as standard power flow so it should have same solution  The FDPF is widely used, particularly when we only need an approximate solution
  • 18. 17 FDPF Approximations ij ( ) ( ) ( ) ( ) 1 1 ( ) ( ) bus The FDPF makes the following approximations: 1. G 0 2. 1 3. sin 0 cos 1 Then ( ) ( ) Where is just the imaginary part of the , except the slack bus row/co i ij ij v v v v v v V j                 P x Q x θ B V B V V B Y G B lumn are omitted
  • 19. 18 FDPF Three Bus Example Line Z = j0.07 Line Z = j0.05 Line Z = j0.1 One Two 200 MW 100 MVR Three 1.000 pu 200 MW 100 MVR Use the FDPF to solve the following three bus system 34.3 14.3 20 14.3 24.3 10 20 10 30 bus j               Y
  • 20. 19 FDPF Three Bus Example, cont’d 1 (0) (0) 2 2 3 3 34.3 14.3 20 24.3 10 14.3 24.3 10 10 30 20 10 30 0.0477 0.0159 0.0159 0.0389 Iteratively solve, starting with an initial voltage guess 0 1 0 1 bus j V V                                                            Y B B (1) 2 3 0 0.0477 0.0159 2 0.1272 0 0.0159 0.0389 2 0.1091                                              
  • 21. 20 FDPF Three Bus Example, cont’d (1) 2 3 i i i 1 (2) 2 3 1 0.0477 0.0159 1 0.9364 1 0.0159 0.0389 1 0.9455 P ( ) ( cos sin ) V V 0.1272 0.0477 0.0159 0.1091 0.0159 0.0389 n Di Gi k ik ik ik ik k V V P P V G B                                                                           x (2) 2 3 0.151 0.1361 0.107 0.1156 0.924 0.936 0.1384 0.9224 Actual solution: 0.1171 0.9338 V V                                             θ V
  • 22. 21 FDPF Region of Convergence
  • 23. 22 “DC” Power Flow  The “DC” power flow makes the most severe approximations: – completely ignore reactive power, assume all the voltages are always 1.0 per unit, ignore line conductance  This makes the power flow a linear set of equations, which can be solved directly 1   θ B P
  • 24. 23 Power System Control  A major problem with power system operation is the limited capacity of the transmission system – lines/transformers have limits (usually thermal) – no direct way of controlling flow down a transmission line (e.g., there are no valves to close to limit flow) – open transmission system access associated with industry restructuring is stressing the system in new ways  We need to indirectly control transmission line flow by changing the generator outputs
  • 25. 24 DC Power Flow Example
  • 26. 25 DC Power Flow Example
  • 27. 26 DC Power Flow 5 Bus Example slack One Two Three Four Five A MVA A MVA A MVA A MVA A MVA 1.000 pu 1.000 pu 1.000 pu 1.000 pu 1.000 pu 0.000 Deg -4.125 Deg -18.695 Deg -1.997 Deg 0.524 Deg 360 MW 0 Mvar 520 MW 0 Mvar 800 MW 0 Mvar 80 MW 0 Mvar Notice with the dc power flow all of the voltage magnitudes are 1 per unit.
  • 28. 27 Indirect Transmission Line Control What we would like to determine is how a change in generation at bus k affects the power flow on a line from bus i to bus j. The assumption is that the change in generation is absorbed by the slack bus
  • 29. 28 Power Flow Simulation - Before One way to determine the impact of a generator change is to compare a before/after power flow. For example below is a three bus case with an overload Z for all lines = j0.1 One Two 200 MW 100 MVR 200.0 MW 71.0 MVR Three 1.000 pu 0 MW 64 MVR 131.9 MW 68.1 MW 68.1 MW 124%
  • 30. 29 Power Flow Simulation - After Z for all lines = j0.1 Limit for all lines = 150 MVA One Two 200 MW 100 MVR 105.0 MW 64.3 MVR Three 1.000 pu 95 MW 64 MVR 101.6 MW 3.4 MW 98.4 MW 92% 100% Increasing the generation at bus 3 by 95 MW (and hence decreasing it at bus 1 by a corresponding amount), results in a 31.3 drop in the MW flow on the line from bus 1 to 2.
  • 31. 30 Analytic Calculation of Sensitivities  Calculating control sensitivities by repeat power flow solutions is tedious and would require many power flow solutions. An alternative approach is to analytically calculate these values The power flow from bus i to bus j is sin( ) So We just need to get i j i j ij i j ij ij i j ij ij ij Gk V V P X X P X P                  
  • 32. 31 Analytic Sensitivities 1 From the fast decoupled power flow we know ( ) So to get the change in due to a change of generation at bus k, just set ( ) equal to all zeros except a minus one at position k. 0 1 0            θ B P x θ P x P Bus k               
  • 33. 32 Three Bus Sensitivity Example line bus 1 2 3 For the previous three bus case with Z 0.1 20 10 10 20 10 10 20 10 10 20 10 10 20 Hence for a change of generation at bus 3 20 10 0 0.0333 10 20 1 0.0667 j j                                                         Y B 3 to 1 3 to 2 2 to 1 0.0667 0 Then P 0.667 pu 0.1 P 0.333 pu P 0.333 pu           
  • 34. 33 Balancing Authority Areas  An balancing authority area (use to be called operating areas) has traditionally represented the portion of the interconnected electric grid operated by a single utility  Transmission lines that join two areas are known as tie-lines.  The net power out of an area is the sum of the flow on its tie-lines.  The flow out of an area is equal to
  • 35. 34 Area Control Error (ACE)  The area control error (ace) is the difference between the actual flow out of an area and the scheduled flow, plus a frequency component  Ideally the ACE should always be zero.  Because the load is constantly changing, each utility must constantly change its generation to “chase” the ACE. int sched ace 10 P P f     
  • 36. 35 Automatic Generation Control  Most utilities use automatic generation control (AGC) to automatically change their generation to keep their ACE close to zero.  Usually the utility control center calculates ACE based upon tie-line flows; then the AGC module sends control signals out to the generators every couple seconds.
  • 37. 36 Power Transactions  Power transactions are contracts between generators and loads to do power transactions.  Contracts can be for any amount of time at any price for any amount of power.  Scheduled power transactions are implemented by modifying the value of Psched used in the ACE calculation
  • 38. 37 PTDFs  Power transfer distribution factors (PTDFs) show the linear impact of a transfer of power.  PTDFs calculated using the fast decoupled power flow B matrix 1 ( ) Once we know we can derive the change in the transmission line flows Except now we modify several elements in ( ), in portion to how the specified generators would participate in the pow       θ B P x θ P x er transfer
  • 39. 38 Nine Bus PTDF Example 10% 60% 55% 64% 57% 11% 74% 24% 32% A G B C D E I F H 300.0 MW 400.0 MW 300.0 MW 250.0 MW 250.0 MW 200.0 MW 250.0 MW 150.0 MW 150.0 MW 44% 71% 0.00 deg 71.1 MW 92% Figure shows initial flows for a nine bus power system
  • 40. 39 Nine Bus PTDF Example, cont'd 43% 57% 13% 35% 20% 10% 2% 34% 34% 32% A G B C D E I F H 300.0 MW 400.0 MW 300.0 MW 250.0 MW 250.0 MW 200.0 MW 250.0 MW 150.0 MW 150.0 MW 34% 30% 0.00 deg 71.1 MW Figure now shows percentage PTDF flows from A to I
  • 41. 40 Nine Bus PTDF Example, cont'd 6% 6% 12% 61% 12% 6% 19% 21% 21% A G B C D E I F H 300.0 MW 400.0 MW 300.0 MW 250.0 MW 250.0 MW 200.0 MW 250.0 MW 150.0 MW 150.0 MW 20% 18% 0.00 deg 71.1 MW Figure now shows percentage PTDF flows from G to F
  • 42. 41 WE to TVA PTDFs
  • 43. 42 Line Outage Distribution Factors (LODFS)  LODFs are used to approximate the change in the flow on one line caused by the outage of a second line – typically they are only used to determine the change in the MW flow – LODFs are used extensively in real-time operations – LODFs are state-independent but do dependent on the assumed network topology , l l k k P LODF P  
  • 44. 43 Flowgates  The real-time loading of the power grid is accessed via “flowgates”  A flowgate “flow” is the real power flow on one or more transmission element for either base case conditions or a single contingency – contingent flows are determined using LODFs  Flowgates are used as proxies for other types of limits, such as voltage or stability limits  Flowgates are calculated using a spreadsheet
  • 45. 44 NERC Regional Reliability Councils NERC is the North American Electric Reliability Council
  • 46. 45 NERC Reliability Coordinators Source: http://www.nerc.com/page.php?cid=5%7C67%7C206