SlideShare a Scribd company logo
TENDER DOCUMENT
FOR
VOLUME – 5
Issued to M/s
Website: www.wapcos.co.in
Email: commercial@wapcos.co.in
Lining, Repair & Construction of Right Main Canal and its Structures
from RD 51.72 to 68.37 km under North Koel Reservoir Project,
Jharkhand and Bihar
Estimated Cost (Rs. 91.01 Crores)
TENDER NO: WAP/INFRA./NK/RMC(P4)/2019
Tender Drawings- Part 2r- Structures
AQUEDUCT
RD 52.56 CANAL SYPHON OVER BATRE RIVER
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
CANAL SYPHON AT RD:52.56
GENERAL ARRANGMENT-ORIGINAL
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (1/4)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
NOTES:-
TENDER DRAWING
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
CANAL SYPHON AT RD:52.56
GENERAL ARRANGEMENT-MODIFIED
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (2/4)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
NOTES:-
1
2
3
4
5
6
FSL (m)
BED LEVEL (m)
FSD (m)
7
8
9
DISCHARGE (m³/s)
VELOCITY (m/s)
FREE BOARD (m)
1
2
SILT FACTOR
BEARING PRESSURE
(kN/m²)
BED WIDTH (m)
BED SLOPE
SIDE SLOPE
TENDER DRAWING
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
CANAL SYPHON AT RD:52.56
MODIFIED TRANSITION DETAILS
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (3/4)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
NOTES:-
DISTANCE FROM
CANAL SECTION 1-1
(m)
TOP WIDTH
(REFER PLAN -1)
BED WIDTH
(REFER PLAN -2)
DISTANCE FROM
EXISTING WALL (m)
DISTANCE FROM
EXISTING BED (m)
DISTANCE FROM
CANAL SECTION 3-3
(m)
TOP WIDTH
(REFER PLAN -1)
BED WIDTH
(REFER PLAN -2)
DISTANCE FROM
EXISTING WALL (m)
DISTANCE FROM
EXISTING BED (m)
TENDER DRAWING
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
CANAL SYPHON AT RD:52.56
CONCRETE OUTLINE & REINFORCEMENT DETAILS
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (4/4)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
NOTES:-
TENDER DRAWING
RD 55.26 AQUEDUCT
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
AQUEDUCT AT RD: 55.26
GENERAL ARRANGEMENT - ORIGINAL
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (1/5)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
NOTES:-
TENDER DRAWING
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (2/5)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
AQUEDUCT AT RD: 55.26
GENERAL ARRANGEMENT - MODIFIED
NOTES:-
1
2
3
4
5
6
FSL (m)
BED LEVEL (m)
FSD (m)
7
8
9
DISCHARGE (m³/s)
VELOCITY (m/s)
FREE BOARD (m)
1
2
SILT FACTOR
BEARING PRESSURE
(4m DEEP) (kN/m²)
BED WIDTH (m)
BED SLOPE
SIDE SLOPE
TENDER DRAWING
3 BEARING PRESSURE
(2m DEEP) (kN/m²)
DISTANCE FROM
CANAL SECTION 3-3
(m)
"TOP WIDTH
(REFER KEY PLAN 1)"
"BED WIDTH
(REFER KEY PLAN 2)"
DISTANCE FROM
EXISTING WALL (m)
DISTANCE FROM
EXISTING BED (m)
DISTANCE FROM
CANAL SECTION 1-1
(m)
"TOP WIDTH
(REFER KEY PLAN 1)"
"BED WIDTH
(REFER KEY PLAN 2)"
DISTANCE FROM
EXISTING WALL (m)
DISTANCE FROM
EXISTING BED (m)
NOTES:-
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
AQUEDUCT AT RD: 55.26
MODIFIED TRANSITION DETAILS
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (3/5)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
TENDER DRAWING
NOTES:-
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
AQUEDUCT AT RD: 55.26
CONCRETE OUTLINE DETAILS
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (4/5)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
TENDER DRAWING
DRAWING TITLE :-
PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT,
BIHAR & JHARKHAND
DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (5/5)
DRAWN BY:- CHECKED BY:- APPROVED BY:-
AQUEDUCT AT RD: 55.26
REINFORCEMENT DETAILS
NOTES:-
S. NO. MEMBER MINIMUM COVER OF REINFORCEMENT
TENDER DRAWING

More Related Content

Similar to Vol V Drawing Structures 2r.pdf

Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
Robin Dargavel BEng (Hons)
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
MUDASSAR AFZAL
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
Mary Calkins
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
PRABIR DATTA
 
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
MOHAMMED SHAROOQ
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Huan Duong Quoc
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
Sumit Singh
 

Similar to Vol V Drawing Structures 2r.pdf (20)

Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Report
ReportReport
Report
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
CV-Priono_Update
CV-Priono_UpdateCV-Priono_Update
CV-Priono_Update
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
Fixture Design for Vertical Turning Lathe (HMT Pvt Ltd).
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
Mukusi Guesthouse
Mukusi GuesthouseMukusi Guesthouse
Mukusi Guesthouse
 
500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report500 MW synchronous generator rotor construction report
500 MW synchronous generator rotor construction report
 

Recently uploaded

Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
rrimika1
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
adityakushalsaha
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
SudhanshuMandlik
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
madhavlakhanpal29
 
Top 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen DesignsTop 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen Designs
Finzo Kitchens
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
Pixel poets
 

Recently uploaded (13)

Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Top 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen DesignsTop 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen Designs
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 

Vol V Drawing Structures 2r.pdf

  • 1. TENDER DOCUMENT FOR VOLUME – 5 Issued to M/s Website: www.wapcos.co.in Email: commercial@wapcos.co.in Lining, Repair & Construction of Right Main Canal and its Structures from RD 51.72 to 68.37 km under North Koel Reservoir Project, Jharkhand and Bihar Estimated Cost (Rs. 91.01 Crores) TENDER NO: WAP/INFRA./NK/RMC(P4)/2019 Tender Drawings- Part 2r- Structures
  • 3. RD 52.56 CANAL SYPHON OVER BATRE RIVER
  • 4. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND CANAL SYPHON AT RD:52.56 GENERAL ARRANGMENT-ORIGINAL DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (1/4) DRAWN BY:- CHECKED BY:- APPROVED BY:- NOTES:- TENDER DRAWING
  • 5. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND CANAL SYPHON AT RD:52.56 GENERAL ARRANGEMENT-MODIFIED DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (2/4) DRAWN BY:- CHECKED BY:- APPROVED BY:- NOTES:- 1 2 3 4 5 6 FSL (m) BED LEVEL (m) FSD (m) 7 8 9 DISCHARGE (m³/s) VELOCITY (m/s) FREE BOARD (m) 1 2 SILT FACTOR BEARING PRESSURE (kN/m²) BED WIDTH (m) BED SLOPE SIDE SLOPE TENDER DRAWING
  • 6. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND CANAL SYPHON AT RD:52.56 MODIFIED TRANSITION DETAILS DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (3/4) DRAWN BY:- CHECKED BY:- APPROVED BY:- NOTES:- DISTANCE FROM CANAL SECTION 1-1 (m) TOP WIDTH (REFER PLAN -1) BED WIDTH (REFER PLAN -2) DISTANCE FROM EXISTING WALL (m) DISTANCE FROM EXISTING BED (m) DISTANCE FROM CANAL SECTION 3-3 (m) TOP WIDTH (REFER PLAN -1) BED WIDTH (REFER PLAN -2) DISTANCE FROM EXISTING WALL (m) DISTANCE FROM EXISTING BED (m) TENDER DRAWING
  • 7. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND CANAL SYPHON AT RD:52.56 CONCRETE OUTLINE & REINFORCEMENT DETAILS DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-024 (4/4) DRAWN BY:- CHECKED BY:- APPROVED BY:- NOTES:- TENDER DRAWING
  • 9. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND AQUEDUCT AT RD: 55.26 GENERAL ARRANGEMENT - ORIGINAL DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (1/5) DRAWN BY:- CHECKED BY:- APPROVED BY:- NOTES:- TENDER DRAWING
  • 10. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (2/5) DRAWN BY:- CHECKED BY:- APPROVED BY:- AQUEDUCT AT RD: 55.26 GENERAL ARRANGEMENT - MODIFIED NOTES:- 1 2 3 4 5 6 FSL (m) BED LEVEL (m) FSD (m) 7 8 9 DISCHARGE (m³/s) VELOCITY (m/s) FREE BOARD (m) 1 2 SILT FACTOR BEARING PRESSURE (4m DEEP) (kN/m²) BED WIDTH (m) BED SLOPE SIDE SLOPE TENDER DRAWING 3 BEARING PRESSURE (2m DEEP) (kN/m²)
  • 11. DISTANCE FROM CANAL SECTION 3-3 (m) "TOP WIDTH (REFER KEY PLAN 1)" "BED WIDTH (REFER KEY PLAN 2)" DISTANCE FROM EXISTING WALL (m) DISTANCE FROM EXISTING BED (m) DISTANCE FROM CANAL SECTION 1-1 (m) "TOP WIDTH (REFER KEY PLAN 1)" "BED WIDTH (REFER KEY PLAN 2)" DISTANCE FROM EXISTING WALL (m) DISTANCE FROM EXISTING BED (m) NOTES:- DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND AQUEDUCT AT RD: 55.26 MODIFIED TRANSITION DETAILS DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (3/5) DRAWN BY:- CHECKED BY:- APPROVED BY:- TENDER DRAWING
  • 12. NOTES:- DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND AQUEDUCT AT RD: 55.26 CONCRETE OUTLINE DETAILS DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (4/5) DRAWN BY:- CHECKED BY:- APPROVED BY:- TENDER DRAWING
  • 13. DRAWING TITLE :- PROJECT TITLE :- NORTH KOEL RESERVOIR PROJECT, BIHAR & JHARKHAND DRAWING NO :- WAP/INFRA/NORTH KOEL/RMC-025 (5/5) DRAWN BY:- CHECKED BY:- APPROVED BY:- AQUEDUCT AT RD: 55.26 REINFORCEMENT DETAILS NOTES:- S. NO. MEMBER MINIMUM COVER OF REINFORCEMENT TENDER DRAWING