Statistics Informed Decisions Using Data 5th edition by Michael Sullivan solu...
Aim Directional - Record Well
1. PROVEN RESULTS
Record well drilled in Reeves County, Texas. Spud to TD in
11.98 days, 1278 ft/day average.
Operator Location
Apache Corporation Reeves County, Texas, USA
Well Type Total Runs
Horizontal 4
Distance Drilled Job Duration
15,311 ft 169.16 Drilling hours
Overall Average ROP Products/Services
89.86’/hr Aim-Contender Motors
RTOC Survey QA/QC & Distance Monitoring
(Contact an Aim rep. for more information)
Customer Objectives
• Drill from spud to total depth(TD) in 19.00 days.
• Average 768 ft/day from spud to total depth (TD).
• % Overall NPT = 10%
Results
• Drilled from spud to total depth (TD) in 11.98 Days
• Averaged 1278 ft/day from spud to total depth (TD)
• % Overall NPT = 3%
Value to Client
• Reduced days and cost on the well.
• The minimal sliding and reduced dog legs improved running casing to bottom.
• The operator experienced minimal NPT allowing the focus to stay on quality drilling and operations for the entire well and
was stated in the end to be a “World Class Drilling Performance”.
Trinidad Pena
Director of Sales