Successfully drilled from spud (Includes Surface Hole) to total depth (TD) in 15.20 days. One run in intermediate section, 5669’ in 90.89hrs Drilled Curve Section in under 24hrs (20hr Curve) Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)Read less