PROJECT SUMMARY
Overview
Analysis & Live QA
Reporting
OPTMIZING THE PROCESS/
FUTURE STEPS
Changes to CAMS – Prioritizing
them.
CAMS PRESENT vs FUTURE
Time Tracking
CHANNEL 7 Now vs Next Year
MORE INPUTS FROM
ANDREW/DUNCAN
MEETING AGENDA
6. 6
PROJECT OVERVIEW
FOUR PHASES OF CHANNEL 7
Building Functional Areas
Component List & Room
Templates
Training Inspectors
On-site inspection
Monitoring Inspection.
QA Checks
Data Analysis
Defect Table
Client Dashboard
Data Loading
Inspection
Analysis & QA Checks
Reporting
7. 7 7
Commerce Slides
ROOM ‘TEMPLATES’
BUILDING FUCTIONAL
AREAS
COMPONENT LIST
LOADING INTO IPAD
PRE-LOADING DATA
FOUR LEVELS OF DATA LOADING
Getting the data from building plans
into excel. Naming & ordering rooms.
Developing a comprehensive list of
components & Hierarchies – to be
used for future projects a well.
Finding efficient ways to load all
these components into the IPAD –
without crashing the app.
Deciding which ‘room-types’ should
include which components – further
reducing inspector’s time.
8. 8 8
Commerce Slides
INSPECTION
SETTING UP CAMS/IPAD
This includes setting up admins and
inspectors – along with configuring
the IPad.
Inspectors were training for two
hours – provided with YouTube
tutorials
TRAINING INSPECTORS ONSITE INSPECTION
The inspection lasted over 5 days –
with about 90% of the rooms being
inspected.
24. 24 24
Commerce Slides
ROOM ‘TEMPLATES’
BUILDING FUCTIONAL
AREAS
COMPONENT LIST
LOADING INTO IPAD
PRE-LOADING DATA
CURRENT STATE
3
days
3
days
2
days
1
day
25. 25 25
Commerce Slides
ROOM ‘TEMPLATES’
BUILDING FUCTIONAL
AREAS
COMPONENT LIST
LOADING INTO IPAD
PRE-LOADING DATA
CHANNEL 7 – NEXT YEAR
3
days
0
days
3
days
0
days
2
days
0
days
1
days
1
hour
26. 26 26
Commerce Slides
ROOM ‘TEMPLATES’
BUILDING FUCTIONAL
AREAS
COMPONENT LIST
LOADING INTO IPAD
PRE-LOADING DATA
CHANNEL 7 – NEXT YEAR
3
days
0
days
3
days
0
days
2
days
0
days
1
days
1
hour
35. 35
PROJECT OVERVIEW
FOUR PHASES OF CHANNEL 7
Data Loading
Inspection
8
days
1
hour
9
days
5.2
days
Analysis & QA Checks
2
days
2
hours
Reporting
2
days
1
day
36. 36
13 14 15 16 17 18 19 20 21 22 23 24
Inspection
Live + Office based QA
Report : Front End
Report : Dashboard + PDF
1 2 3 4 5 6 7 8 9 10 11 12
Setup – Security & CAMS
Building Functional Areas
Component List
Room Templates
36
CHANNEL 7 - PROTOTYPE
37. 37
Report : Dashboard + PDF
(4.1, 4.3)
Client Dashboard (4.4)
1 2 3 4 5 6 7 8 9 10 11 12
Data Loading (1.1 – 1.4)
Inspection (2.1 – 2.3)
Live + Office Based QA (3.1
– 3.2)
Report : Front End (4.2)
37
CHANNEL 7 – NEXT YEAR
NEED TO BE OPTIMIZED TO BE STANDARDISED