SlideShare a Scribd company logo
Intelligent parking on a roll.
What is TemPark?

•   Problem: You need a well-defined parking area for a short period of time     (1
    week-10 years). You want Temporary parking that is cost-effective and
    easy/fast to install. You want parking that is flexible and portable to your
    changing demands. You want the parking area to be environmentally friendly...


•   Solution: TemPark was designed for this niche
.
•   The TemPark structure is 100 % permeable. A durable mesh core, sandwiched
    and heat-fused between top and bottom geotextile surfaces, allows water to
    easily pass through the substrate and readily drain into the soil, eliminating
    runoff problems and any need for retention basins.


•   TemPark lasts up to 10 years and handles 10,000 lbs/4,500 kilo vehicles driving
    over it 1,000 times per day at recommended speeds of 15mph/25kph.
Houston Community College: Houston TX
Fast growing college with new buildings being constructed.
Temporary parking needed for two years.
BLG Logistics: Kelheim Germany

One of the largest global finished vehicle logistics service
providers working with all major OEM’s
Client: Ford-Detroit MI
Over 100 acres involving multiple sites
Client: Ford- Oakville Canada
56 acres used for new product launch
Before:
Ford Motor Company-Virginia Beach VA
New Vehicle Launch. Site is former landfill next to Assembly
Plant.
After:
Client Ford-Virginia Beach, VA
Over 40 acres of TemPark used for three years. Client testimonial
letter mentions “Millions Saved” through using TemPark…
Cost-Benefit Analysis: From 10 acre site

Gravel Parking                                   TemPark
•   Time Engineer                     3 Weeks    •   3 Days
•   Time Permit Review Process        6 Weeks    •   2 Weeks
•   Time Construction                 9 Weeks    •   2 Weeks
•        TOTAL                       18 Weeks    •   4 Weeks, 3 Days


•   Cost Survey,/Storm Water         $32,750     •   TemPark hard cost is less than gravel .
•   Cost Erosion Control              16,750
•   Cost Top Soil Strip                96,120
•   Cost Fine Grade                    75,000    •   Tempark can be reinstalled at another site
•   Cost Retention Basin               45,000        and recovering over 50% of Material cost.
•   Cost Ditching                       40,000
•   Cost Culverts, Basins, Outlets      25,000   •   Site is returned back to nature with minimal
•   Cost Gravel 6”                     216,000       intrusion.
•   Cost Seeding                        20,000
•           TOTAL                     $566,620
How TemPark Saves Money



•   Capitalization- Up to 80% Less Costly than Asphalt
•   Possible Tax Write-Off versus Long-Term Amortization
•   Better Land Utilization-No Retention Pond Needed
•   Better Land Utilization-Repurposing
•   Asset Mobility-Reusing TemPark saves 50%
•   Operational Savings-Damages/Cleaning/Transportation
•   Managerial Flexibility-Postponement Strategy
•   Managerial Flexibility-Core Competency Effect
How TemPark Saves Time

•   80% Faster Installation than asphalt
•   Zoning
•   Permitting
•   Logistics: Finding Vehicle, Moving Vehicle, Inspections
•   Opportunity Costs
How TemPark Saves the Environment

•   No Retention Ponds Needed
•   No Run-Off/Wastewater Treatment Needed
•   No Moisture Starvation to Soil Substrate
•   Easy Removal of TemPark
•   Easy Return to Natural Site
•   Ability to Use Landfill Space
•   Corporate Goodwill-Green PR
• *

More Related Content

What's hot

Energent Group: Frac Sand Trends
Energent Group: Frac Sand TrendsEnergent Group: Frac Sand Trends
Energent Group: Frac Sand Trends
Todd Bush
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
Eitan Sharir
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Michael R. Barr
 
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
Kristy Marshall
 
4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications
Kristy Marshall
 
Terminal Blend Rubber Bitumen
Terminal Blend Rubber BitumenTerminal Blend Rubber Bitumen
Terminal Blend Rubber Bitumen
California Asphalt Pavement Association
 
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
Kristy Marshall
 
Tx cs pa_4_mile_3.12
Tx cs pa_4_mile_3.12Tx cs pa_4_mile_3.12
Tx cs pa_4_mile_3.12
Tensar
 
Highbank Resources - MDRC Presentation
Highbank Resources - MDRC PresentationHighbank Resources - MDRC Presentation
Highbank Resources - MDRC Presentation
Follow me on Twitter @Stockshaman
 
Cold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban AreasCold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban Areas
California Asphalt Pavement Association
 
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Akhil Prabhakar
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
Enbridge Inc.
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
ref-iqhub
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In Chevron
Yokogawa1
 
Industrial minerals oilfield minerals outlook 2014 final
Industrial minerals oilfield minerals outlook 2014 finalIndustrial minerals oilfield minerals outlook 2014 final
Industrial minerals oilfield minerals outlook 2014 finalPLG Consulting
 
Cold in Place Recycling (CIR)
Cold in Place Recycling (CIR)Cold in Place Recycling (CIR)
Cold in Place Recycling (CIR)
MSA Professional Services, Inc.
 
Shell Case Study-How to venture into a new country for Oil and Gas exploration?
Shell Case Study-How to venture into a new country for Oil and Gas exploration?Shell Case Study-How to venture into a new country for Oil and Gas exploration?
Shell Case Study-How to venture into a new country for Oil and Gas exploration?Akhil Prabhakar
 
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilVelocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilJohn Glenning
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
Enbridge Inc.
 

What's hot (19)

Energent Group: Frac Sand Trends
Energent Group: Frac Sand TrendsEnergent Group: Frac Sand Trends
Energent Group: Frac Sand Trends
 
Hgd presentation
Hgd presentationHgd presentation
Hgd presentation
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
 
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
 
4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications
 
Terminal Blend Rubber Bitumen
Terminal Blend Rubber BitumenTerminal Blend Rubber Bitumen
Terminal Blend Rubber Bitumen
 
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
 
Tx cs pa_4_mile_3.12
Tx cs pa_4_mile_3.12Tx cs pa_4_mile_3.12
Tx cs pa_4_mile_3.12
 
Highbank Resources - MDRC Presentation
Highbank Resources - MDRC PresentationHighbank Resources - MDRC Presentation
Highbank Resources - MDRC Presentation
 
Cold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban AreasCold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban Areas
 
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
Shell case study: How should ‘Bion Oil’, an oil & gas giant, expand its busin...
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In Chevron
 
Industrial minerals oilfield minerals outlook 2014 final
Industrial minerals oilfield minerals outlook 2014 finalIndustrial minerals oilfield minerals outlook 2014 final
Industrial minerals oilfield minerals outlook 2014 final
 
Cold in Place Recycling (CIR)
Cold in Place Recycling (CIR)Cold in Place Recycling (CIR)
Cold in Place Recycling (CIR)
 
Shell Case Study-How to venture into a new country for Oil and Gas exploration?
Shell Case Study-How to venture into a new country for Oil and Gas exploration?Shell Case Study-How to venture into a new country for Oil and Gas exploration?
Shell Case Study-How to venture into a new country for Oil and Gas exploration?
 
Velocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_CouncilVelocys ppt141028_Gasification_Technologies_Council
Velocys ppt141028_Gasification_Technologies_Council
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
 

Viewers also liked

Turisme terres de l'ebre
Turisme terres de l'ebreTurisme terres de l'ebre
Turisme terres de l'ebrecpradesferrando
 
Perilaku konsumen 1
Perilaku konsumen 1 Perilaku konsumen 1
Perilaku konsumen 1 reregians
 
Volga IT - 2012 Final round task analisys
Volga IT - 2012 Final round task analisysVolga IT - 2012 Final round task analisys
Volga IT - 2012 Final round task analisysAlex Erofeev
 
Volga-IT 2013. Problem Analysis
Volga-IT 2013. Problem AnalysisVolga-IT 2013. Problem Analysis
Volga-IT 2013. Problem AnalysisAlex Erofeev
 
Perumahan mandiri jalan sei padang kelurahan medan sunggal
Perumahan mandiri jalan sei padang kelurahan medan sunggalPerumahan mandiri jalan sei padang kelurahan medan sunggal
Perumahan mandiri jalan sei padang kelurahan medan sunggalReni Astuti
 

Viewers also liked (6)

Turisme terres de l'ebre
Turisme terres de l'ebreTurisme terres de l'ebre
Turisme terres de l'ebre
 
Perilaku konsumen 1
Perilaku konsumen 1 Perilaku konsumen 1
Perilaku konsumen 1
 
Volga IT - 2012 Final round task analisys
Volga IT - 2012 Final round task analisysVolga IT - 2012 Final round task analisys
Volga IT - 2012 Final round task analisys
 
Asteng revisi
Asteng revisiAsteng revisi
Asteng revisi
 
Volga-IT 2013. Problem Analysis
Volga-IT 2013. Problem AnalysisVolga-IT 2013. Problem Analysis
Volga-IT 2013. Problem Analysis
 
Perumahan mandiri jalan sei padang kelurahan medan sunggal
Perumahan mandiri jalan sei padang kelurahan medan sunggalPerumahan mandiri jalan sei padang kelurahan medan sunggal
Perumahan mandiri jalan sei padang kelurahan medan sunggal
 

Similar to Tem Park2011

New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USKristopher Vardell
 
2016 apwa ch pres cir and fdr 4 20-16
2016 apwa ch pres cir and fdr 4 20-162016 apwa ch pres cir and fdr 4 20-16
2016 apwa ch pres cir and fdr 4 20-16
Florida Public Works Expo - 2016 - Tampa, Florida
 
2022 CalAPA Spring Educational Workshop on CIR and CCPR
2022 CalAPA Spring Educational Workshop on CIR and CCPR2022 CalAPA Spring Educational Workshop on CIR and CCPR
2022 CalAPA Spring Educational Workshop on CIR and CCPR
California Asphalt Pavement Association
 
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
Forth
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
Martin (Marty) McDonald
 
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
California Asphalt Pavement Association
 
Cement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & InnovationsCement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & Innovations
Altra Industrial Motion
 
Wicked Hyper Presentation: Future of Container Ports
Wicked Hyper Presentation: Future of Container PortsWicked Hyper Presentation: Future of Container Ports
Wicked Hyper Presentation: Future of Container Ports
Lora Cecere
 
Zoning presentation
Zoning presentationZoning presentation
Zoning presentation
bdinkel
 
Twin Shaft Continuous Mix Plants Features & Versatility
Twin Shaft Continuous Mix Plants Features & VersatilityTwin Shaft Continuous Mix Plants Features & Versatility
Twin Shaft Continuous Mix Plants Features & Versatility
Rapid International USA
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo Machine
Tamar Swan
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam design & Techincal Consultancy Pvt Ltd.
 
Csu venture pitch_tong
Csu venture pitch_tongCsu venture pitch_tong
Csu venture pitch_tong
Wilmer A Martelo Sarabia
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_Victor Momoh
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tamparacr2s2
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampaconverde
 
Technology Innovation in the Mining Sector
Technology Innovation in the Mining SectorTechnology Innovation in the Mining Sector
Technology Innovation in the Mining Sector
SammyOmbiro1
 
Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitationhsiengineering
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
California Asphalt Pavement Association
 

Similar to Tem Park2011 (20)

New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
2016 apwa ch pres cir and fdr 4 20-16
2016 apwa ch pres cir and fdr 4 20-162016 apwa ch pres cir and fdr 4 20-16
2016 apwa ch pres cir and fdr 4 20-16
 
2022 CalAPA Spring Educational Workshop on CIR and CCPR
2022 CalAPA Spring Educational Workshop on CIR and CCPR2022 CalAPA Spring Educational Workshop on CIR and CCPR
2022 CalAPA Spring Educational Workshop on CIR and CCPR
 
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
What’s Unique about Energy Metrics for EV Terminal Tractors? What are the Key...
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR2022 Spring Educational Workshop presentation on QA for CIR and CCPR
2022 Spring Educational Workshop presentation on QA for CIR and CCPR
 
Cement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & InnovationsCement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & Innovations
 
Wicked Hyper Presentation: Future of Container Ports
Wicked Hyper Presentation: Future of Container PortsWicked Hyper Presentation: Future of Container Ports
Wicked Hyper Presentation: Future of Container Ports
 
Zoning presentation
Zoning presentationZoning presentation
Zoning presentation
 
Twin Shaft Continuous Mix Plants Features & Versatility
Twin Shaft Continuous Mix Plants Features & VersatilityTwin Shaft Continuous Mix Plants Features & Versatility
Twin Shaft Continuous Mix Plants Features & Versatility
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo Machine
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Csu venture pitch_tong
Csu venture pitch_tongCsu venture pitch_tong
Csu venture pitch_tong
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_
 
HAULAGE
HAULAGEHAULAGE
HAULAGE
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
 
Bioblend presentation tampa
Bioblend presentation tampaBioblend presentation tampa
Bioblend presentation tampa
 
Technology Innovation in the Mining Sector
Technology Innovation in the Mining SectorTechnology Innovation in the Mining Sector
Technology Innovation in the Mining Sector
 
Presentation on Full Depth Rehabilitation
Presentation on Full Depth RehabilitationPresentation on Full Depth Rehabilitation
Presentation on Full Depth Rehabilitation
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
 

Tem Park2011

  • 2. What is TemPark? • Problem: You need a well-defined parking area for a short period of time (1 week-10 years). You want Temporary parking that is cost-effective and easy/fast to install. You want parking that is flexible and portable to your changing demands. You want the parking area to be environmentally friendly... • Solution: TemPark was designed for this niche . • The TemPark structure is 100 % permeable. A durable mesh core, sandwiched and heat-fused between top and bottom geotextile surfaces, allows water to easily pass through the substrate and readily drain into the soil, eliminating runoff problems and any need for retention basins. • TemPark lasts up to 10 years and handles 10,000 lbs/4,500 kilo vehicles driving over it 1,000 times per day at recommended speeds of 15mph/25kph.
  • 3. Houston Community College: Houston TX Fast growing college with new buildings being constructed. Temporary parking needed for two years.
  • 4. BLG Logistics: Kelheim Germany One of the largest global finished vehicle logistics service providers working with all major OEM’s
  • 5. Client: Ford-Detroit MI Over 100 acres involving multiple sites
  • 6. Client: Ford- Oakville Canada 56 acres used for new product launch
  • 7. Before: Ford Motor Company-Virginia Beach VA New Vehicle Launch. Site is former landfill next to Assembly Plant.
  • 8. After: Client Ford-Virginia Beach, VA Over 40 acres of TemPark used for three years. Client testimonial letter mentions “Millions Saved” through using TemPark…
  • 9. Cost-Benefit Analysis: From 10 acre site Gravel Parking TemPark • Time Engineer 3 Weeks • 3 Days • Time Permit Review Process 6 Weeks • 2 Weeks • Time Construction 9 Weeks • 2 Weeks • TOTAL 18 Weeks • 4 Weeks, 3 Days • Cost Survey,/Storm Water $32,750 • TemPark hard cost is less than gravel . • Cost Erosion Control 16,750 • Cost Top Soil Strip 96,120 • Cost Fine Grade 75,000 • Tempark can be reinstalled at another site • Cost Retention Basin 45,000 and recovering over 50% of Material cost. • Cost Ditching 40,000 • Cost Culverts, Basins, Outlets 25,000 • Site is returned back to nature with minimal • Cost Gravel 6” 216,000 intrusion. • Cost Seeding 20,000 • TOTAL $566,620
  • 10. How TemPark Saves Money • Capitalization- Up to 80% Less Costly than Asphalt • Possible Tax Write-Off versus Long-Term Amortization • Better Land Utilization-No Retention Pond Needed • Better Land Utilization-Repurposing • Asset Mobility-Reusing TemPark saves 50% • Operational Savings-Damages/Cleaning/Transportation • Managerial Flexibility-Postponement Strategy • Managerial Flexibility-Core Competency Effect
  • 11. How TemPark Saves Time • 80% Faster Installation than asphalt • Zoning • Permitting • Logistics: Finding Vehicle, Moving Vehicle, Inspections • Opportunity Costs
  • 12. How TemPark Saves the Environment • No Retention Ponds Needed • No Run-Off/Wastewater Treatment Needed • No Moisture Starvation to Soil Substrate • Easy Removal of TemPark • Easy Return to Natural Site • Ability to Use Landfill Space • Corporate Goodwill-Green PR
  • 13. • *