1. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
GENERAL INFORMATION
Project Name Ark@Gambas
Developer’s
Name
HLS Development Pte Ltd
District D27 / Sembawang
Zoning B1
Tenure 60 years from 20/02/2012
Address 7 Gambas Cres Singapore 757087
General
Description
9-storey Multiple-user light
industrial B1 development with
roof garden on Lot 05948T Mukim
13 at Gambas Ave/ Gambas Cres:
Total: 294 units
137 units Type A
64 units Type B
24 units Type C
6 units Type D
18 units Type E
4 units Type F
40 units Type M
1 staff canteen
2 roof terraces on L8
No. of Storeys 9
Type / No. of
Units
Total Units:
293 factory units
1 canteen
Available Units
(Approx in area)
Immediate
Occupancy
Over 95% Units Are Fully Sold
Level 2 – Level 9 (Sold Out)
Canteen – (Sold & in Operation)
Level 1 – left 14 units only
Unit #10 to Unit #15 (Type M2),
Unit #22 to Unit #27 (Type M2)
209 sqm / 2,249.68 sq ft
Unit #21 (Type M6) Corner
207 sqm / 2,228.15 sq ft
Unit #37 (Type M1)
209 sqm / 2,249.68 sq ft
T.O.P. 21st
Nov 2014
Legal Completion
Date
Nov 2017
Site Area (approx.) 21,426.7 sqm / 230,635 sq ft
Maintenance
Fees
Defects Liability
Period
$273 pm + GST (pay half yearly)
The 12 months defects liability
period will run till 20th
Nov 2015.
2. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
TECHNICAL SPECIFICATIONS (Refer to Developer Building Specifications for details)
Floor to Floor
Height
1
st
to 2
nd
storey: approx. 7.0m
2
nd
onwards up to 9
th
storey: please
refer to building specification for
details.
Estimated from 4.0m to 6.0m
Power Supply
Provision
(in approx.)
Factory/Production Units
Unit Area – greater than 200m2
is 100A, 3-Phase Isolator
Floor and Wall
Finishing and
Attached Toilet
Floor Finishes:
Factory units
Power trowel with hardener to
production and power trowel to
mezzanine. The toilet within the
unit has porcelain and/or ceramic
tiles to the floor and wall.
Wall Finishes:
The wall finish is skim coat with
paint finish
Passenger Lifts
Cargo Lifts
Service Lifts
Floor Loading
Passenger Lift: 4
Passenger cum Fire Lift: 2
Service Lift: 2 (2,000 kg)
Cargo Lift: 2 (2,000 kg)
Production
1
st
storey: 12.5 kN/m2
1
st
storey Mezz: 3.0 kN/m2
Doors for Units Doors: Fire-rated and non-fire
rated doors
Car park lots
(2 lots per unit)
40 footer loading/
unloading bay
830 common car parking lots
6 common handicap car park
15 common lorry parking lots
4 common articulated Vehicle/
Lorry parking lots
Developer Details
Developer Name : HLS DEVELOPMENT PTE LTD
Mode of Sale : Direct Developer Sale
Type of Sale Document Used: Developer Booking Form & Developer’s OTP Document
Payment Scheme:
*Booking Fee or Option Money = 5% + GST (7% GST of 5%) - agent to collect 2 cheques
(Note: *Option Money will be forfeited if Buyer didn’t Exercise OTP)
OTP Exercise Date: Within 2 weeks. To pay Deposit 10% 10% - 5% (Option Money)
= 5% + GST (of 5%). On Exercise Date, cheque to pay to NAME OF DEVELOPER
Completion Date:
Within 8 weeks from date of OTP Exercise Date = 80-90% (TBA by Developer Lawyer)
DEVELOPER’S SOLICITOR MESSRS LEONG CHUA & WONG
(Attn: Mr Chua Leong Hin)
3. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
Developer: Hock Lian Seng
Other Projects: Ark@KB, Ark@Gambas, The Skywoods
Joint Marketing By:
4. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
Location Plan
5. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
Connectivity
Site Plan
6. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
7. Private & Confidential. Not for Unauthorised Circulation.
Subject to change without prior notice.
DEVELOPER DISCOUNTED SALE PRICE
Discount 15% by Developer as at 29 July 2015 - All Ground Floor Units