Learning Objectives
1. Connect all points of a network while
minimizing total distance using the minimal-
spanning tree technique
2. Determine the maximum flow through a
network using the maximal-flow technique
3. Find the shortest path through a network
using the shortest-route technique
4. Understand the important role of software in
solving network problems
After completing this chapter, students will be able to:After completing this chapter, students will be able to:
© 2009 Prentice-Hall, Inc. 12 – 3
Chapter Outline
12.112.1 Introduction
12.212.2 Minimal-Spanning Tree Technique
12.312.3 Maximal-Flow Technique
12.412.4 Shortest-Route Technique
© 2009 Prentice-Hall, Inc. 12 – 4
 This chapter covers three network models that
can be used to solve a variety of problems
 The minimal-spanning tree techniqueminimal-spanning tree technique determines
a path through a network that connects all the
points while minimizing the total distance
 The maximal-flow techniquemaximal-flow technique finds the maximum
flow of any quantity or substance through a
network
 The shortest-route techniqueshortest-route technique can find the
shortest path through a network
Introduction
© 2009 Prentice-Hall, Inc. 12 – 5
 Large scale problems may require hundreds or
thousands of iterations making efficient
computer programs a necessity
 All types of networks use a common terminology
 The points on a network are called nodesnodes and
may be represented as circles of squares
 The lines connecting the nodes are called arcsarcs
Introduction
© 2009 Prentice-Hall, Inc. 12 – 6
Minimal-Spanning Tree Technique
 The minimal-spanning tree technique involves
connecting all the points of a network together
while minimizing the distance between them
 The Lauderdale Construction Company is
developing a housing project
 They want to determine the least expensive way
to provide water and power to each house
 There are eight houses in the project and the
distance between them is shown in Figure 12.1
© 2009 Prentice-Hall, Inc. 12 – 7
Minimal-Spanning Tree Technique
 Steps for the minimal-spanning tree
technique
1. Select any node in the network
2. Connect this node to the nearest node that
minimizes the total distance
3. Considering all the nodes that are now
connected, find and connect the nearest node
that is not connected. If there is a tie, select
one arbitrarily. A tie suggests there may be
more than one optimal solution.
4. Repeat the third step until all nodes are
connected
© 2009 Prentice-Hall, Inc. 12 – 8
Minimal-Spanning Tree Technique
 Network for Lauderdale Construction
3
3
2
3
2
4
2
5
6
7
1
5
1
2
3
4
5
6
7
8
3
Gulf
Figure 12.1
© 2009 Prentice-Hall, Inc. 12 – 9
Minimal-Spanning Tree Technique
 Start by arbitrarily selecting node 1
 The nearest node is node 3 at a distance of 2 (200
feet) and we connect those nodes
 Considering nodes 1 and 3, we look for the next
nearest node
 This is node 4, the closest to node 3
 We connect those nodes
 We now look for the nearest unconnected node to
nodes 1, 3, and 4
 This is either node 2 or node 6
 We pick node 2 and connect it to node 3
© 2009 Prentice-Hall, Inc. 12 – 10
Minimal-Spanning Tree Technique
 Following this same process we connect from
node 2 to node 5
 We then connect node 3 to node 6
 Node 6 will connect to node 8
 The last connection to be made is node 8 to node
7
 The total distance is found by adding up the
distances in the arcs used in the spanning tree
2 + 2 + 3 + 3 + 3 + 1 + 2 = 16 (or 1,600 feet)
© 2009 Prentice-Hall, Inc. 12 – 11
Minimal-Spanning Tree Technique
 All iterations for Lauderdale Construction
Figures 12.2 – 12.5
3
3
2
3
2
4
2
5
6
7
1
5
1
2
3
4
5
6
7
8
3
Gulf
© 2009 Prentice-Hall, Inc. 12 – 12
Maximal-Flow Technique
 The maximal-flow technique allows us to
determine the maximum amount of a material that
can flow through a network
 Waukesha Wisconsin is in the process of
developing a road system for the downtown area
 They want to determine the maximum number of
cars that can flow through the town from west to
east
 The road network is shown in Figure 12.7
 The numbers by the nodes indicate the number of
cars that can flow fromfrom the node
© 2009 Prentice-Hall, Inc. 12 – 13
Maximal-Flow Technique
 Four steps of the Maximal-Flow Technique
1. Pick any path from the start (sourcesource) to the
finish (sinksink) with some flow. If no path with
flow exists, then the optimal solution has
been found.
2. Find the arc on this path with the smallest
flow capacity available. Call this capacity C.
This represents the maximum additional
capacity that can be allocated to this route.
© 2009 Prentice-Hall, Inc. 12 – 14
Maximal-Flow Technique
 Four steps of the Maximal-Flow Technique
3. For each node on this path, decrease the flow
capacity in the direction of flow by the
amount C. For each node on the path,
increase the flow capacity in the reverse
direction by the amount C.
4. Repeat these steps until an increase in flow is
no longer possible
© 2009 Prentice-Hall, Inc. 12 – 15
Maximal-Flow Technique
 Road network for Waukesha
Capacity in Hundreds
of Cars per Hour
West
Point
East
Point
Figure 12.6
10
0 2
1
3
1
1
1
2
2
1
3
6
0
2
0 1
1
1
2
3
4
5
6
© 2009 Prentice-Hall, Inc. 12 – 16
Maximal-Flow Technique
 We start by arbitrarily picking the path 1–2–6
which is at the top of the network
 The maximum flow is 2 units from node 2 to
node 6
 The path capacity is adjusted by adding 2 to the
westbound flows and subtracting 2 from the
eastbound flows
 The result is the new path in Figure 12.7 which
shows the new relative capacity of the path at
this stage
© 2009 Prentice-Hall, Inc. 12 – 17
Maximal-Flow Technique
 Capacity adjustment for path 1–2–6 iteration 1
Figure 12.7
2
2
1
3
1
2
6
4
0
3
1
1
2
6
Old Path
New Path
Add 2
Subtract 2
© 2009 Prentice-Hall, Inc. 12 – 18
Maximal-Flow Technique
 We repeat this process by picking the path 1–2–
4–6
 The maximum capacity along this path is 1
 The path capacity is adjusted by adding 1 to the
westbound flows and subtracting 1 from the
eastbound flows
 The result is the new path in Figure 12.8
 We repeat this process by picking the path 1–3–
5–6
 The maximum capacity along this path is 2
 Figure 12.9 shows this adjusted path
© 2009 Prentice-Hall, Inc. 12 – 19
Maximal-Flow Technique
 Second iteration for Waukesha road system
Figure 12.8
10
0 2
1
3
1
2
0
4
0
4
0
6
0
2
0 2
0
1
2
3
4
5
6
1
1
3
1
1
1
1
2
4
6
Old Path
New Network
Add 1
Subtract 1
© 2009 Prentice-Hall, Inc. 12 – 20
Maximal-Flow Technique
 Third and final iteration for Waukesha road
system
Figure 12.9
8
2 0
3
3
1
2
0
4
0
4
0
4
2
2
0 2
0
1
2
3
4
5
6
© 2009 Prentice-Hall, Inc. 12 – 21
Maximal-Flow Technique
 There are no more paths from nodes 1 to 6 with
unused capacity so this represents a final
iteration
 The maximum flow through this network is 500
cars
PATH FLOW (CARS PER HOUR)
1–2–6 200
1–2–4–6 100
1–3–5–6 200
Total 500
© 2009 Prentice-Hall, Inc. 12 – 22
Shortest-Route Technique
 The shortest-route techniqueshortest-route technique finds how a person
or item can travel from one location to another
while minimizing the total distance traveled
 It finds the shortest route to a series of
destinations
 Ray Design, Inc. transports beds, chairs, and
other furniture from the factory to the warehouse
 They would like to find the route with the shortest
distance
 The road network is shown in Figure 12.10
© 2009 Prentice-Hall, Inc. 12 – 23
Shortest-Route Technique
 Roads from Ray’s plant to warehouse
Plant
Warehouse
100
200
50
40
100
200
100
100
1501
2
3
4
5
6
Figure 12.10
© 2009 Prentice-Hall, Inc. 12 – 24
Shortest-Route Technique
 Steps of the shortest-route technique
1. Find the nearest node to the origin (plant).
Put the distance in a box by the node.
2. Find the next-nearest node to the origin and
put the distance in a box by the node. Several
paths may have to be checked to find the
nearest node.
3. Repeat this process until you have gone
through the entire network. The last distance
at the ending node will be the distance of the
shortest route.
© 2009 Prentice-Hall, Inc. 12 – 25
Shortest-Route Technique
 We can see that the nearest node to the plant is
node 2
 We connect these two nodes
 After investigation, we find node 3 is the next
nearest node but there are two possible paths
 The shortest path is 1–2–3 with a distance of 150
 We repeat the process and find the next node is
node 5 by going through node 3
 The next nearest node is either 4 or 6 and 6 turns
out to be closer
 The shortest path is 1–2–3–5–6 with a distance of
290 miles
© 2009 Prentice-Hall, Inc. 12 – 26
Shortest-Route Technique
 First iteration for Ray Design
Plant
Warehouse
100
200
50
40
100
200
100
100
1501
2
3
4
5
6
Figure 12.11
100
© 2009 Prentice-Hall, Inc. 12 – 27
Shortest-Route Technique
 Second iteration for Ray Design
Figure 12.12
Plant
Warehouse
100
200
50
40
100
200
100
100
1501
2
3
4
5
6
100
150
© 2009 Prentice-Hall, Inc. 12 – 28
Shortest-Route Technique
 Third iteration for Ray Design
Figure 12.13
Plant
Warehouse
100
200
50
40
100
200
100
100
1501
2
3
4
5
6
100
150 190
© 2009 Prentice-Hall, Inc. 12 – 29
Shortest-Route Technique
 Fourth and final iteration for Ray Design
Figure 12.14
Plant
Warehouse
100
200
50
40
100
200
100
100
1501
2
3
4
5
6
100
150 190
290

More Related Content

What's hot

Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanMuhammad Haseeb Sultan
 
Transportation problems1
Transportation problems1Transportation problems1
Transportation problems1Firas Husseini
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and PrinciplesAzmir Latif Beg
 
Models of inventory control
Models of inventory controlModels of inventory control
Models of inventory controlPriyanka Mangla
 
Post-optimal analysis of LPP
Post-optimal analysis of LPPPost-optimal analysis of LPP
Post-optimal analysis of LPPRAVI PRASAD K.J.
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process LayoutsDhrumil Shah
 
Waiting Line Management
Waiting Line Management Waiting Line Management
Waiting Line Management Joshua Miranda
 
Transportation model
Transportation modelTransportation model
Transportation modelLokesh Payasi
 
Cost control and cost reduction techniques
Cost control and cost reduction techniquesCost control and cost reduction techniques
Cost control and cost reduction techniquesDeepthiPrabhu9
 
Quantity discount
Quantity discountQuantity discount
Quantity discountHriday Bora
 
Transportation problem
Transportation problemTransportation problem
Transportation problemA B
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizePhillip Leonard Petate
 

What's hot (20)

INVENTORY MODELS
INVENTORY MODELSINVENTORY MODELS
INVENTORY MODELS
 
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
 
Stepping Stone Method
Stepping Stone MethodStepping Stone Method
Stepping Stone Method
 
Line balancing
Line balancingLine balancing
Line balancing
 
Transportation problems1
Transportation problems1Transportation problems1
Transportation problems1
 
5. transportation problems
5. transportation problems5. transportation problems
5. transportation problems
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Models of inventory control
Models of inventory controlModels of inventory control
Models of inventory control
 
Post-optimal analysis of LPP
Post-optimal analysis of LPPPost-optimal analysis of LPP
Post-optimal analysis of LPP
 
scheduling
schedulingscheduling
scheduling
 
2. cost of quality
2. cost of quality2. cost of quality
2. cost of quality
 
Product & Process Layouts
Product & Process LayoutsProduct & Process Layouts
Product & Process Layouts
 
Waiting Line Management
Waiting Line Management Waiting Line Management
Waiting Line Management
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Value analysis
Value analysisValue analysis
Value analysis
 
Cost control and cost reduction techniques
Cost control and cost reduction techniquesCost control and cost reduction techniques
Cost control and cost reduction techniques
 
Quantity discount
Quantity discountQuantity discount
Quantity discount
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 
Heizer mod e
Heizer mod eHeizer mod e
Heizer mod e
 

Similar to Chp12networksmodel 121128084640-phpapp01

Quantitative Analysis for Management, Tenth Edition
Quantitative Analysis for Management, Tenth EditionQuantitative Analysis for Management, Tenth Edition
Quantitative Analysis for Management, Tenth Editionwilmeg
 
MDM-Chapter-9-Updated latest.pptx
MDM-Chapter-9-Updated latest.pptxMDM-Chapter-9-Updated latest.pptx
MDM-Chapter-9-Updated latest.pptxJimSotio
 
Prim's Algorithm for Optimizing Fiber Optic Trajectory Planning
Prim's Algorithm for Optimizing Fiber Optic Trajectory PlanningPrim's Algorithm for Optimizing Fiber Optic Trajectory Planning
Prim's Algorithm for Optimizing Fiber Optic Trajectory PlanningUniversitas Pembangunan Panca Budi
 
352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-docBookStoreLib
 
352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-docFiras Husseini
 
On minimizing data forwarding schedule in multi transmit receive wireless mes...
On minimizing data forwarding schedule in multi transmit receive wireless mes...On minimizing data forwarding schedule in multi transmit receive wireless mes...
On minimizing data forwarding schedule in multi transmit receive wireless mes...redpel dot com
 
Internetworking devices
Internetworking devicesInternetworking devices
Internetworking devicesA Singh
 
Newton-raphson method to solve systems of non-linear equations in VANET perfo...
Newton-raphson method to solve systems of non-linear equations in VANET perfo...Newton-raphson method to solve systems of non-linear equations in VANET perfo...
Newton-raphson method to solve systems of non-linear equations in VANET perfo...journalBEEI
 
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptx
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptxIMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptx
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptxssuser7256f7
 
An Adaptive Routing Algorithm for Communication Networks using Back Pressure...
An Adaptive Routing Algorithm for Communication Networks  using Back Pressure...An Adaptive Routing Algorithm for Communication Networks  using Back Pressure...
An Adaptive Routing Algorithm for Communication Networks using Back Pressure...IJMER
 
12 Multiple Access
12 Multiple Access12 Multiple Access
12 Multiple AccessAhmar Hashmi
 
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...Eswar Publications
 
Efectos de nodos ieee 802.15.4 zig bee
Efectos de nodos ieee 802.15.4 zig beeEfectos de nodos ieee 802.15.4 zig bee
Efectos de nodos ieee 802.15.4 zig beeGregorio Toro Rivera
 
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...cscpconf
 
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...csandit
 
Y11 m02 networks
Y11 m02  networksY11 m02  networks
Y11 m02 networksXu Wei
 
Routing for Sensors with Parameters as used in Agricultural Field
Routing for Sensors with Parameters as used in Agricultural FieldRouting for Sensors with Parameters as used in Agricultural Field
Routing for Sensors with Parameters as used in Agricultural FieldIDES Editor
 

Similar to Chp12networksmodel 121128084640-phpapp01 (20)

Quantitative Analysis for Management, Tenth Edition
Quantitative Analysis for Management, Tenth EditionQuantitative Analysis for Management, Tenth Edition
Quantitative Analysis for Management, Tenth Edition
 
MDM-Chapter-9-Updated latest.pptx
MDM-Chapter-9-Updated latest.pptxMDM-Chapter-9-Updated latest.pptx
MDM-Chapter-9-Updated latest.pptx
 
Network flow
Network flowNetwork flow
Network flow
 
Chapter5.pdf
Chapter5.pdfChapter5.pdf
Chapter5.pdf
 
Prim's Algorithm for Optimizing Fiber Optic Trajectory Planning
Prim's Algorithm for Optimizing Fiber Optic Trajectory PlanningPrim's Algorithm for Optimizing Fiber Optic Trajectory Planning
Prim's Algorithm for Optimizing Fiber Optic Trajectory Planning
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc
 
352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc352735336 rsh-qam11-tif-11-doc
352735336 rsh-qam11-tif-11-doc
 
On minimizing data forwarding schedule in multi transmit receive wireless mes...
On minimizing data forwarding schedule in multi transmit receive wireless mes...On minimizing data forwarding schedule in multi transmit receive wireless mes...
On minimizing data forwarding schedule in multi transmit receive wireless mes...
 
Internetworking devices
Internetworking devicesInternetworking devices
Internetworking devices
 
Newton-raphson method to solve systems of non-linear equations in VANET perfo...
Newton-raphson method to solve systems of non-linear equations in VANET perfo...Newton-raphson method to solve systems of non-linear equations in VANET perfo...
Newton-raphson method to solve systems of non-linear equations in VANET perfo...
 
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptx
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptxIMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptx
IMPROVEMENT IVESTIGATION OF THE TCP ALGORITHMS.pptx
 
An Adaptive Routing Algorithm for Communication Networks using Back Pressure...
An Adaptive Routing Algorithm for Communication Networks  using Back Pressure...An Adaptive Routing Algorithm for Communication Networks  using Back Pressure...
An Adaptive Routing Algorithm for Communication Networks using Back Pressure...
 
12 Multiple Access
12 Multiple Access12 Multiple Access
12 Multiple Access
 
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...
Mitigating Link Failures & Implementing Security Mechanism in Multipath Flows...
 
Efectos de nodos ieee 802.15.4 zig bee
Efectos de nodos ieee 802.15.4 zig beeEfectos de nodos ieee 802.15.4 zig bee
Efectos de nodos ieee 802.15.4 zig bee
 
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...
A CROSS-LAYER BASED SCALABLE CHANNEL SLOT RE-UTILIZATION TECHNIQUE FOR WIRELE...
 
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...
A Cross Layer Based Scalable Channel Slot Re-Utilization Technique for Wirele...
 
Y11 m02 networks
Y11 m02  networksY11 m02  networks
Y11 m02 networks
 
Routing for Sensors with Parameters as used in Agricultural Field
Routing for Sensors with Parameters as used in Agricultural FieldRouting for Sensors with Parameters as used in Agricultural Field
Routing for Sensors with Parameters as used in Agricultural Field
 

More from Firas Husseini (20)

Ali M Fadel CV
Ali M Fadel  CVAli M Fadel  CV
Ali M Fadel CV
 
Slides for ch08
Slides for ch08Slides for ch08
Slides for ch08
 
Slides for ch07
Slides for ch07Slides for ch07
Slides for ch07
 
Slides for ch06
Slides for ch06Slides for ch06
Slides for ch06
 
Slides for ch05
Slides for ch05Slides for ch05
Slides for ch05
 
Rsh qam11 ch10 ge
Rsh qam11 ch10 geRsh qam11 ch10 ge
Rsh qam11 ch10 ge
 
Rsh qam11 ch09 ge
Rsh qam11 ch09 geRsh qam11 ch09 ge
Rsh qam11 ch09 ge
 
Rsh qam11 ch08 ge
Rsh qam11 ch08 geRsh qam11 ch08 ge
Rsh qam11 ch08 ge
 
Rsh qam11 ch07 ge
Rsh qam11 ch07 geRsh qam11 ch07 ge
Rsh qam11 ch07 ge
 
Rsh qam11 ch06 ge
Rsh qam11 ch06 geRsh qam11 ch06 ge
Rsh qam11 ch06 ge
 
Rsh qam11 ch05 ge
Rsh qam11 ch05 geRsh qam11 ch05 ge
Rsh qam11 ch05 ge
 
Rsh qam11 ch04 ge
Rsh qam11 ch04 geRsh qam11 ch04 ge
Rsh qam11 ch04 ge
 
Rsh qam11 ch03
Rsh qam11 ch03Rsh qam11 ch03
Rsh qam11 ch03
 
Rsh qam11 ch03 ge
Rsh qam11 ch03 geRsh qam11 ch03 ge
Rsh qam11 ch03 ge
 
Rsh qam11 ch02
Rsh qam11 ch02Rsh qam11 ch02
Rsh qam11 ch02
 
Rsh qam11 ch01
Rsh qam11 ch01Rsh qam11 ch01
Rsh qam11 ch01
 
Render03 140622012601-phpapp02
Render03 140622012601-phpapp02Render03 140622012601-phpapp02
Render03 140622012601-phpapp02
 
Render03 140622012601-phpapp02 (1)
Render03 140622012601-phpapp02 (1)Render03 140622012601-phpapp02 (1)
Render03 140622012601-phpapp02 (1)
 
Render01edited 121120194704-phpapp02
Render01edited 121120194704-phpapp02Render01edited 121120194704-phpapp02
Render01edited 121120194704-phpapp02
 
Render 09
Render 09Render 09
Render 09
 

Recently uploaded

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 

Recently uploaded (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 

Chp12networksmodel 121128084640-phpapp01

  • 1. © 2008 Prentice-Hall, Inc. Chapter 12 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides created by Jeff Heyl Network Models © 2009 Prentice-Hall, Inc.
  • 2. © 2009 Prentice-Hall, Inc. 12 – 2 Learning Objectives 1. Connect all points of a network while minimizing total distance using the minimal- spanning tree technique 2. Determine the maximum flow through a network using the maximal-flow technique 3. Find the shortest path through a network using the shortest-route technique 4. Understand the important role of software in solving network problems After completing this chapter, students will be able to:After completing this chapter, students will be able to:
  • 3. © 2009 Prentice-Hall, Inc. 12 – 3 Chapter Outline 12.112.1 Introduction 12.212.2 Minimal-Spanning Tree Technique 12.312.3 Maximal-Flow Technique 12.412.4 Shortest-Route Technique
  • 4. © 2009 Prentice-Hall, Inc. 12 – 4  This chapter covers three network models that can be used to solve a variety of problems  The minimal-spanning tree techniqueminimal-spanning tree technique determines a path through a network that connects all the points while minimizing the total distance  The maximal-flow techniquemaximal-flow technique finds the maximum flow of any quantity or substance through a network  The shortest-route techniqueshortest-route technique can find the shortest path through a network Introduction
  • 5. © 2009 Prentice-Hall, Inc. 12 – 5  Large scale problems may require hundreds or thousands of iterations making efficient computer programs a necessity  All types of networks use a common terminology  The points on a network are called nodesnodes and may be represented as circles of squares  The lines connecting the nodes are called arcsarcs Introduction
  • 6. © 2009 Prentice-Hall, Inc. 12 – 6 Minimal-Spanning Tree Technique  The minimal-spanning tree technique involves connecting all the points of a network together while minimizing the distance between them  The Lauderdale Construction Company is developing a housing project  They want to determine the least expensive way to provide water and power to each house  There are eight houses in the project and the distance between them is shown in Figure 12.1
  • 7. © 2009 Prentice-Hall, Inc. 12 – 7 Minimal-Spanning Tree Technique  Steps for the minimal-spanning tree technique 1. Select any node in the network 2. Connect this node to the nearest node that minimizes the total distance 3. Considering all the nodes that are now connected, find and connect the nearest node that is not connected. If there is a tie, select one arbitrarily. A tie suggests there may be more than one optimal solution. 4. Repeat the third step until all nodes are connected
  • 8. © 2009 Prentice-Hall, Inc. 12 – 8 Minimal-Spanning Tree Technique  Network for Lauderdale Construction 3 3 2 3 2 4 2 5 6 7 1 5 1 2 3 4 5 6 7 8 3 Gulf Figure 12.1
  • 9. © 2009 Prentice-Hall, Inc. 12 – 9 Minimal-Spanning Tree Technique  Start by arbitrarily selecting node 1  The nearest node is node 3 at a distance of 2 (200 feet) and we connect those nodes  Considering nodes 1 and 3, we look for the next nearest node  This is node 4, the closest to node 3  We connect those nodes  We now look for the nearest unconnected node to nodes 1, 3, and 4  This is either node 2 or node 6  We pick node 2 and connect it to node 3
  • 10. © 2009 Prentice-Hall, Inc. 12 – 10 Minimal-Spanning Tree Technique  Following this same process we connect from node 2 to node 5  We then connect node 3 to node 6  Node 6 will connect to node 8  The last connection to be made is node 8 to node 7  The total distance is found by adding up the distances in the arcs used in the spanning tree 2 + 2 + 3 + 3 + 3 + 1 + 2 = 16 (or 1,600 feet)
  • 11. © 2009 Prentice-Hall, Inc. 12 – 11 Minimal-Spanning Tree Technique  All iterations for Lauderdale Construction Figures 12.2 – 12.5 3 3 2 3 2 4 2 5 6 7 1 5 1 2 3 4 5 6 7 8 3 Gulf
  • 12. © 2009 Prentice-Hall, Inc. 12 – 12 Maximal-Flow Technique  The maximal-flow technique allows us to determine the maximum amount of a material that can flow through a network  Waukesha Wisconsin is in the process of developing a road system for the downtown area  They want to determine the maximum number of cars that can flow through the town from west to east  The road network is shown in Figure 12.7  The numbers by the nodes indicate the number of cars that can flow fromfrom the node
  • 13. © 2009 Prentice-Hall, Inc. 12 – 13 Maximal-Flow Technique  Four steps of the Maximal-Flow Technique 1. Pick any path from the start (sourcesource) to the finish (sinksink) with some flow. If no path with flow exists, then the optimal solution has been found. 2. Find the arc on this path with the smallest flow capacity available. Call this capacity C. This represents the maximum additional capacity that can be allocated to this route.
  • 14. © 2009 Prentice-Hall, Inc. 12 – 14 Maximal-Flow Technique  Four steps of the Maximal-Flow Technique 3. For each node on this path, decrease the flow capacity in the direction of flow by the amount C. For each node on the path, increase the flow capacity in the reverse direction by the amount C. 4. Repeat these steps until an increase in flow is no longer possible
  • 15. © 2009 Prentice-Hall, Inc. 12 – 15 Maximal-Flow Technique  Road network for Waukesha Capacity in Hundreds of Cars per Hour West Point East Point Figure 12.6 10 0 2 1 3 1 1 1 2 2 1 3 6 0 2 0 1 1 1 2 3 4 5 6
  • 16. © 2009 Prentice-Hall, Inc. 12 – 16 Maximal-Flow Technique  We start by arbitrarily picking the path 1–2–6 which is at the top of the network  The maximum flow is 2 units from node 2 to node 6  The path capacity is adjusted by adding 2 to the westbound flows and subtracting 2 from the eastbound flows  The result is the new path in Figure 12.7 which shows the new relative capacity of the path at this stage
  • 17. © 2009 Prentice-Hall, Inc. 12 – 17 Maximal-Flow Technique  Capacity adjustment for path 1–2–6 iteration 1 Figure 12.7 2 2 1 3 1 2 6 4 0 3 1 1 2 6 Old Path New Path Add 2 Subtract 2
  • 18. © 2009 Prentice-Hall, Inc. 12 – 18 Maximal-Flow Technique  We repeat this process by picking the path 1–2– 4–6  The maximum capacity along this path is 1  The path capacity is adjusted by adding 1 to the westbound flows and subtracting 1 from the eastbound flows  The result is the new path in Figure 12.8  We repeat this process by picking the path 1–3– 5–6  The maximum capacity along this path is 2  Figure 12.9 shows this adjusted path
  • 19. © 2009 Prentice-Hall, Inc. 12 – 19 Maximal-Flow Technique  Second iteration for Waukesha road system Figure 12.8 10 0 2 1 3 1 2 0 4 0 4 0 6 0 2 0 2 0 1 2 3 4 5 6 1 1 3 1 1 1 1 2 4 6 Old Path New Network Add 1 Subtract 1
  • 20. © 2009 Prentice-Hall, Inc. 12 – 20 Maximal-Flow Technique  Third and final iteration for Waukesha road system Figure 12.9 8 2 0 3 3 1 2 0 4 0 4 0 4 2 2 0 2 0 1 2 3 4 5 6
  • 21. © 2009 Prentice-Hall, Inc. 12 – 21 Maximal-Flow Technique  There are no more paths from nodes 1 to 6 with unused capacity so this represents a final iteration  The maximum flow through this network is 500 cars PATH FLOW (CARS PER HOUR) 1–2–6 200 1–2–4–6 100 1–3–5–6 200 Total 500
  • 22. © 2009 Prentice-Hall, Inc. 12 – 22 Shortest-Route Technique  The shortest-route techniqueshortest-route technique finds how a person or item can travel from one location to another while minimizing the total distance traveled  It finds the shortest route to a series of destinations  Ray Design, Inc. transports beds, chairs, and other furniture from the factory to the warehouse  They would like to find the route with the shortest distance  The road network is shown in Figure 12.10
  • 23. © 2009 Prentice-Hall, Inc. 12 – 23 Shortest-Route Technique  Roads from Ray’s plant to warehouse Plant Warehouse 100 200 50 40 100 200 100 100 1501 2 3 4 5 6 Figure 12.10
  • 24. © 2009 Prentice-Hall, Inc. 12 – 24 Shortest-Route Technique  Steps of the shortest-route technique 1. Find the nearest node to the origin (plant). Put the distance in a box by the node. 2. Find the next-nearest node to the origin and put the distance in a box by the node. Several paths may have to be checked to find the nearest node. 3. Repeat this process until you have gone through the entire network. The last distance at the ending node will be the distance of the shortest route.
  • 25. © 2009 Prentice-Hall, Inc. 12 – 25 Shortest-Route Technique  We can see that the nearest node to the plant is node 2  We connect these two nodes  After investigation, we find node 3 is the next nearest node but there are two possible paths  The shortest path is 1–2–3 with a distance of 150  We repeat the process and find the next node is node 5 by going through node 3  The next nearest node is either 4 or 6 and 6 turns out to be closer  The shortest path is 1–2–3–5–6 with a distance of 290 miles
  • 26. © 2009 Prentice-Hall, Inc. 12 – 26 Shortest-Route Technique  First iteration for Ray Design Plant Warehouse 100 200 50 40 100 200 100 100 1501 2 3 4 5 6 Figure 12.11 100
  • 27. © 2009 Prentice-Hall, Inc. 12 – 27 Shortest-Route Technique  Second iteration for Ray Design Figure 12.12 Plant Warehouse 100 200 50 40 100 200 100 100 1501 2 3 4 5 6 100 150
  • 28. © 2009 Prentice-Hall, Inc. 12 – 28 Shortest-Route Technique  Third iteration for Ray Design Figure 12.13 Plant Warehouse 100 200 50 40 100 200 100 100 1501 2 3 4 5 6 100 150 190
  • 29. © 2009 Prentice-Hall, Inc. 12 – 29 Shortest-Route Technique  Fourth and final iteration for Ray Design Figure 12.14 Plant Warehouse 100 200 50 40 100 200 100 100 1501 2 3 4 5 6 100 150 190 290