SlideShare a Scribd company logo
1 of 32
Download to read offline
Your energy project already begins long before
the actual construction, long before the turning of the first sod.
It begins in your head. 1
20
GW
20
GW
3 COMPANY MISSION
4 OUR BUSINESS FOCUS
6 PHOTOVOLTAIC SYSTEMS
10 WIND ENERGY
14 ENERGY STORAGE
15 OUR BANK LISTINGS
17 PROJECT EXAMPLES
31 CONTACT
2
COMPANY MISSION
◼︎
Full service provider
◼︎
Clear focus on large-scale project
◼︎
Experienced technology leader worldwide
Customer oriented service focus on large-scale
renewables projects worldwide
3
OUR BUSINESS FOCUS
◼︎
Photovoltaics
◼︎
Wind Energy On- and Offshore
◼︎
Energy Storage, Sector Integration, Power-to-Gas
◼︎
Global Market presence
4
Hands-on experience regarding Wind-/PV-System design,
construction and operation
MANAGEMENT TEAM
5
Dr. Florian Krug Christian Schram
PHOTOVOLTAIC SYSTEMS
6
OUR PV EXPERIENCE
20 GWp inspected
Very experienced inspectors-team
7
PV SERVICE PORTFOLIO
8
Thermography Analysis
IEC Measurements
Drone Inspection
Module Tests
Consulting/Design
Construction Supervision
Energy yield assessment
Technical Inspection
Due Diligence
Supplier Audit
More than 1.000 projects inspected since 2010
OUR PV REFERENCES (EXCERPT)
9
Jocksdorf/Germany
100 MWp
Senftenberg/Germany
82 MWp
Eggebek/Germany
80 MWp
Aquitaine/France
110 MWp
Lerchenborg/Denmark
60 MWp
Monte Cristi/Dom. Rep.
58 MWp
Pompogne/France
40 MWp
Hiroshima/Japan
50 MWp
Nisa/Portugal
66 MWp
Delfzijl/Netherlands
30 MWp
WIND ON-/OFFSHORE
10
OUR WIND EXPERIENCE
11
20 GW inspected
Senior technical advisor team
WIND SERVICE PORTFOLIO
12
Construction
supervision
Energy yield
verification
Technical inspection
Due Diligence Thermography analysis
Consulting/Design
Lightning tests
Supplier audit
More than 500 projects inspected since 2010
OUR WIND REFERENCES (EXCERPT)
13
Dornbock, Kleinpaschleben,
Pobzig, Hermannsburg, Masendorf (73 MWp)
Straubenhardt (33 MW)
Speckberg (28 MW)
Reußenköge (89 MW) Borwede (21 MW)
Schmölln (13 MW)
Amtenhauser Berg
(16 MW)
Ahorn-Buch (11 MW)
Hoyerhagen (27 MW) Kladrum (9 MW)
ENERGY STORAGE, SECTOR
INTEGRATION, POWER-TO-GAS
14
Expiring feed-in tariffs and new requirements on
dispatchability of generation require integration of storage
Production of green hydrogen enables new business cases
for existing assets in emerging markets across sectors
Project design and selection of technology are crucial for
profitable operation
K&S provides expertise and experience independent of
manufacturers to investors, EPCs and operators
BANK LISTINGS (EXCERPT)
15
EPC/INVESTOR LISTINGS
16
better energy
Worldwide project experience available
OVERVIEW TRANSACTIONS
17
ENERGY STORAGE Tomakomai / 20 MWh
◼︎
Hokaido, Japan
◼︎
Li-Ion, central inverter
◼︎
Technical consulting grid connection, PAC/FAC procedure,
technical inspection, module tests, U/I measurements
JAPAN
18
GERMANY
SOLARPARK Witznitz / 605 MWp
◼︎
Silicon, string inverter
◼︎
Due Diligence, Construction supervision,
Energy yield assessment, technical inspection, Thermography
19
SOLARPARK Klettzwitz / 170 MWp
◼︎
Silicon, string inverter
◼︎
Construction supervision, Energy yield assessment
DOMINICAN REPUBLIC
Solar park Monte Cristi / 58 MWp
◼︎
Silicon, central inverter
◼︎
Construction supervision, technical inspection
20
FRANCE
SOLARPARK Aquitaine / 110 MWp
◼︎
Silicon, string inverter
◼︎
Due Diligence, Construction supervision,
Energy yield assessment, technical inspection, Thermography,
module tests, U/I measurements
21
SOLARPARK Pompogne / 40 MWp
◼︎
Silicon, central inverter
◼︎
Construction supervision, technical inspection
DENMARK
SOLARPARK Vandel 1 / 75 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
22
SOLARPARK Lerchenborg / 60 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
NETHERLANDS
SOLARPARK Delfzijl / 30 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
23
SOLARPARK Vlissingen / 50 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
JAPAN
SOLARPARK Kawasaki / 20 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
24
SOLARPARK Hiroshima / 50 MWp
◼︎
Silicon, central inverter
◼︎
Site survey, design, yield
simulation, consulting key supplier/EPC
UKRAINE
SOLARPARK Ganska / 19 MWp
◼︎
Silicon, string inverter
◼︎
Technical Due Diligence,
PAC/FAC procedure, technical inspection
25
SOLARPARK Semypolky / 9 MWp
◼︎
Silicon, central inverter
◼︎
Technical Due Diligence,
PAC/FAC procedure, technical inspection
SPAIN
PV ROOFTOP Saragozza /10 MWp
◼︎
Thin film laminates (amorphous Si), central inverters
◼︎
Construction supervision, technical inspection
26
SOLARPARK Bienvenida / 180 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
GREAT BRITAIN
SOLARPARK CADDINGTON / 5 MWp
◼︎
Silicon, central inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
27
SOLARPARK WOODHOUSE / 5 MWp
◼︎
Silicon, central inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
IRELAND
SOLARPARK Rosspile / 140 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
28
SOLARPARK Gillinstown / 138 MWp
◼︎
Silicon, string inverter
◼︎
Technical consulting grid connection,
PAC/FAC procedure, technical inspection
GERMANY
ONSHORE WP Luechow / 86 MWp
◼︎
Direct Drive
◼︎
Due Diligence, technical inspection, consulting
29
WP Dornbock, Kleinpaschleben, Pobzig, Hermannsburg,
Masendorf / 73 MWp
◼︎
Drivetrain
◼︎
Due Diligence, construction supervision,
technical inspection
FINLAND
WP Norra Hunna / 16 MWp
◼︎
Direct Drive
◼︎
Due Diligence, construction supervision
30
WP Takanebacken / 28 MWp
◼︎
Drivetrain
◼︎
Due Diligence, construction supervision,
technical inspection
20
GW
K&S Ingenieurpartnerschaft Krug & Schram
Radlkoferstrasse 2
81373 Munich
Germany
+49 89 741185174
office@krugundschram.com
www.krugundschram.com
31
This presentation has been prepared by K&S. The presentation and information are provided for information
purpose only. They are without commitment and do not represent or establish any contractual relationship
between K&S and the party informed. Any claims, opinions and estimates in this presentation are - regardless of
source - given in good faith but errors may occur. The information given in this presentation is non- binding and
subject to change, addition and deletion without notice. No liability is assumed or warranty provided and warranty
claims based on the use of this presentation or on a wrong or incomplete information are excluded. Any liability
shall be governed exclusively by a contract concluded. The document is based on the information from the
management K&S. The information presented in this document is compressed and represents the state of
knowledge from today. It is emphasized that this document does not constitute a sales prospectus and that
despite careful research, the author does not carry any liability for the information stated. Reproduction and
disclosure of the document to the third parties are permitted only in coordination with K&S. If you are not the
intended recipient of this document, please destroy this document immediately.
© K&S. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any
means, electronic or mechanical, including photography, recording, or any information storage and retrieval
system, without permission from K&S.
LEGAL INFORMATION
32

More Related Content

Similar to Renewable Energy Project Experience

Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Dutch Power
 
151111 csp today seville 2015
151111 csp today seville 2015151111 csp today seville 2015
151111 csp today seville 2015esmesm
 
CSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGCSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGEvelyn Tao
 
FWP 2017 l Guillaume DAMBLANS, FEM
FWP 2017 l Guillaume DAMBLANS, FEMFWP 2017 l Guillaume DAMBLANS, FEM
FWP 2017 l Guillaume DAMBLANS, FEMBluesign
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy
 
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingLeonardo ENERGY
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTArkady Mitnik
 
swe_0316_e-paper [Pages 66 - 70]
swe_0316_e-paper [Pages 66 - 70]swe_0316_e-paper [Pages 66 - 70]
swe_0316_e-paper [Pages 66 - 70]? Sergio Cardamas
 
CSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGCSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGJane Xu
 
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Cluster TWEED
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioSyed Arafath, PMI-SP certified
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation Romelectro
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationDamian Coetzee
 
CTE WIND CIVIL ENGINEERING (brochure)
CTE WIND CIVIL ENGINEERING (brochure)CTE WIND CIVIL ENGINEERING (brochure)
CTE WIND CIVIL ENGINEERING (brochure)Jean-bernard Casanove
 

Similar to Renewable Energy Project Experience (20)

Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
 
151111 csp today seville 2015
151111 csp today seville 2015151111 csp today seville 2015
151111 csp today seville 2015
 
CSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGCSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENG
 
FWP 2017 l Guillaume DAMBLANS, FEM
FWP 2017 l Guillaume DAMBLANS, FEMFWP 2017 l Guillaume DAMBLANS, FEM
FWP 2017 l Guillaume DAMBLANS, FEM
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M Presentation
 
Sidima AG Template_Rev1
Sidima AG Template_Rev1Sidima AG Template_Rev1
Sidima AG Template_Rev1
 
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORT
 
swe_0316_e-paper [Pages 66 - 70]
swe_0316_e-paper [Pages 66 - 70]swe_0316_e-paper [Pages 66 - 70]
swe_0316_e-paper [Pages 66 - 70]
 
CSun Company Brochure
CSun Company Brochure CSun Company Brochure
CSun Company Brochure
 
CSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENGCSUN_CompanyBrochure_ENG
CSUN_CompanyBrochure_ENG
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 
About freepower 012010
About freepower 012010About freepower 012010
About freepower 012010
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
 
CTE WIND CIVIL ENGINEERING (brochure)
CTE WIND CIVIL ENGINEERING (brochure)CTE WIND CIVIL ENGINEERING (brochure)
CTE WIND CIVIL ENGINEERING (brochure)
 
GloSho'14: Germany Showcase - Angelika Geiger
GloSho'14: Germany Showcase - Angelika Geiger GloSho'14: Germany Showcase - Angelika Geiger
GloSho'14: Germany Showcase - Angelika Geiger
 

Recently uploaded

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Renewable Energy Project Experience

  • 1. Your energy project already begins long before the actual construction, long before the turning of the first sod. It begins in your head. 1 20 GW
  • 2. 20 GW 3 COMPANY MISSION 4 OUR BUSINESS FOCUS 6 PHOTOVOLTAIC SYSTEMS 10 WIND ENERGY 14 ENERGY STORAGE 15 OUR BANK LISTINGS 17 PROJECT EXAMPLES 31 CONTACT 2
  • 3. COMPANY MISSION ◼︎ Full service provider ◼︎ Clear focus on large-scale project ◼︎ Experienced technology leader worldwide Customer oriented service focus on large-scale renewables projects worldwide 3
  • 4. OUR BUSINESS FOCUS ◼︎ Photovoltaics ◼︎ Wind Energy On- and Offshore ◼︎ Energy Storage, Sector Integration, Power-to-Gas ◼︎ Global Market presence 4
  • 5. Hands-on experience regarding Wind-/PV-System design, construction and operation MANAGEMENT TEAM 5 Dr. Florian Krug Christian Schram
  • 7. OUR PV EXPERIENCE 20 GWp inspected Very experienced inspectors-team 7
  • 8. PV SERVICE PORTFOLIO 8 Thermography Analysis IEC Measurements Drone Inspection Module Tests Consulting/Design Construction Supervision Energy yield assessment Technical Inspection Due Diligence Supplier Audit
  • 9. More than 1.000 projects inspected since 2010 OUR PV REFERENCES (EXCERPT) 9 Jocksdorf/Germany 100 MWp Senftenberg/Germany 82 MWp Eggebek/Germany 80 MWp Aquitaine/France 110 MWp Lerchenborg/Denmark 60 MWp Monte Cristi/Dom. Rep. 58 MWp Pompogne/France 40 MWp Hiroshima/Japan 50 MWp Nisa/Portugal 66 MWp Delfzijl/Netherlands 30 MWp
  • 11. OUR WIND EXPERIENCE 11 20 GW inspected Senior technical advisor team
  • 12. WIND SERVICE PORTFOLIO 12 Construction supervision Energy yield verification Technical inspection Due Diligence Thermography analysis Consulting/Design Lightning tests Supplier audit
  • 13. More than 500 projects inspected since 2010 OUR WIND REFERENCES (EXCERPT) 13 Dornbock, Kleinpaschleben, Pobzig, Hermannsburg, Masendorf (73 MWp) Straubenhardt (33 MW) Speckberg (28 MW) Reußenköge (89 MW) Borwede (21 MW) Schmölln (13 MW) Amtenhauser Berg (16 MW) Ahorn-Buch (11 MW) Hoyerhagen (27 MW) Kladrum (9 MW)
  • 14. ENERGY STORAGE, SECTOR INTEGRATION, POWER-TO-GAS 14 Expiring feed-in tariffs and new requirements on dispatchability of generation require integration of storage Production of green hydrogen enables new business cases for existing assets in emerging markets across sectors Project design and selection of technology are crucial for profitable operation K&S provides expertise and experience independent of manufacturers to investors, EPCs and operators
  • 17. Worldwide project experience available OVERVIEW TRANSACTIONS 17
  • 18. ENERGY STORAGE Tomakomai / 20 MWh ◼︎ Hokaido, Japan ◼︎ Li-Ion, central inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection, module tests, U/I measurements JAPAN 18
  • 19. GERMANY SOLARPARK Witznitz / 605 MWp ◼︎ Silicon, string inverter ◼︎ Due Diligence, Construction supervision, Energy yield assessment, technical inspection, Thermography 19 SOLARPARK Klettzwitz / 170 MWp ◼︎ Silicon, string inverter ◼︎ Construction supervision, Energy yield assessment
  • 20. DOMINICAN REPUBLIC Solar park Monte Cristi / 58 MWp ◼︎ Silicon, central inverter ◼︎ Construction supervision, technical inspection 20
  • 21. FRANCE SOLARPARK Aquitaine / 110 MWp ◼︎ Silicon, string inverter ◼︎ Due Diligence, Construction supervision, Energy yield assessment, technical inspection, Thermography, module tests, U/I measurements 21 SOLARPARK Pompogne / 40 MWp ◼︎ Silicon, central inverter ◼︎ Construction supervision, technical inspection
  • 22. DENMARK SOLARPARK Vandel 1 / 75 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection 22 SOLARPARK Lerchenborg / 60 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection
  • 23. NETHERLANDS SOLARPARK Delfzijl / 30 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection 23 SOLARPARK Vlissingen / 50 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection
  • 24. JAPAN SOLARPARK Kawasaki / 20 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection 24 SOLARPARK Hiroshima / 50 MWp ◼︎ Silicon, central inverter ◼︎ Site survey, design, yield simulation, consulting key supplier/EPC
  • 25. UKRAINE SOLARPARK Ganska / 19 MWp ◼︎ Silicon, string inverter ◼︎ Technical Due Diligence, PAC/FAC procedure, technical inspection 25 SOLARPARK Semypolky / 9 MWp ◼︎ Silicon, central inverter ◼︎ Technical Due Diligence, PAC/FAC procedure, technical inspection
  • 26. SPAIN PV ROOFTOP Saragozza /10 MWp ◼︎ Thin film laminates (amorphous Si), central inverters ◼︎ Construction supervision, technical inspection 26 SOLARPARK Bienvenida / 180 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection
  • 27. GREAT BRITAIN SOLARPARK CADDINGTON / 5 MWp ◼︎ Silicon, central inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection 27 SOLARPARK WOODHOUSE / 5 MWp ◼︎ Silicon, central inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection
  • 28. IRELAND SOLARPARK Rosspile / 140 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection 28 SOLARPARK Gillinstown / 138 MWp ◼︎ Silicon, string inverter ◼︎ Technical consulting grid connection, PAC/FAC procedure, technical inspection
  • 29. GERMANY ONSHORE WP Luechow / 86 MWp ◼︎ Direct Drive ◼︎ Due Diligence, technical inspection, consulting 29 WP Dornbock, Kleinpaschleben, Pobzig, Hermannsburg, Masendorf / 73 MWp ◼︎ Drivetrain ◼︎ Due Diligence, construction supervision, technical inspection
  • 30. FINLAND WP Norra Hunna / 16 MWp ◼︎ Direct Drive ◼︎ Due Diligence, construction supervision 30 WP Takanebacken / 28 MWp ◼︎ Drivetrain ◼︎ Due Diligence, construction supervision, technical inspection
  • 31. 20 GW K&S Ingenieurpartnerschaft Krug & Schram Radlkoferstrasse 2 81373 Munich Germany +49 89 741185174 office@krugundschram.com www.krugundschram.com 31
  • 32. This presentation has been prepared by K&S. The presentation and information are provided for information purpose only. They are without commitment and do not represent or establish any contractual relationship between K&S and the party informed. Any claims, opinions and estimates in this presentation are - regardless of source - given in good faith but errors may occur. The information given in this presentation is non- binding and subject to change, addition and deletion without notice. No liability is assumed or warranty provided and warranty claims based on the use of this presentation or on a wrong or incomplete information are excluded. Any liability shall be governed exclusively by a contract concluded. The document is based on the information from the management K&S. The information presented in this document is compressed and represents the state of knowledge from today. It is emphasized that this document does not constitute a sales prospectus and that despite careful research, the author does not carry any liability for the information stated. Reproduction and disclosure of the document to the third parties are permitted only in coordination with K&S. If you are not the intended recipient of this document, please destroy this document immediately. © K&S. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photography, recording, or any information storage and retrieval system, without permission from K&S. LEGAL INFORMATION 32