SlideShare a Scribd company logo
1 of 62
Romelectro Presentation
discover the business power
Mission
Standing for the Group’s ethical principles, our services’ quality and
promoting the highest professional standards generate our clients’
appreciation. What makes us different in the energy and environment
market are: our unique technological solutions already implemented, the
integrated approach and our experts’ specializations and skills diversity.
Flexibility and adaptation to current challenges represent our strengths.
A group of powerful companies united by a common purpose “turning
objectives into results”
Vision
Our Group members’ experience and tradition have gathered common
valences:
 Creativity, determination, cooperation, transparency;
 Trust, solidarity, honesty, integrity;
 Responsibility in inter-human relations and partnerships;
 Respect for the environment and the community
Values
1971 Romelectro is set up as the foreign trade
company of the Ministry of Energy
1974-1978 First export works for dams and OHTLs in
Iran and Algeria
1980 Complex T&D contracts in Egypt, Iraq,
Jordan, Lebanon, Malaysia
1982–1984 Turnkey works of Vafregan Dam in Iran
1990 Power T&D works in the Philippines and
Thailand
1993 Romelectro is present in 19 countries
1994 Romelectro becomes a 100% private
company
2004 Starting of the turnkey execution works for
the Complex Hydro-development of Jiu
Canyon, Bumbești–Livezeni Stretch
44 years at a Glance (1)
discover the business power
2005 Romelectro becomes major shareholder in
ISPE, CELPI and Electromontaj Carpaţi
Sibiu, setting up Romelectro Group
2008 Romelectro becomes investor of Ecogen
Energy Buzau and starts the Construction
of a Combined Heat and Power Plant in
Buzău
2009 Romelectro becomes investor of Voineasa
Micro Hydro Power Plant
2007-2014 Romelectro develops environmental
protection competencies (low Nox burners,
Dense Slurry Systems, Flue Gas
Desulphurisation)
2014 Romelectro signs the contract with
Timisoara Municipality for first
representative Waste to Energy contract in
Romania
2014 Romelectro signed the contract for Bradu
400/220/110/20 kV substation Refurbishing
2015 Romelectro signed the contract for
Stejaru HPP Refurbishment
44 years at a Glance (2)
discover the business power
EPC Contractor, Project Developer
and Investor in the fields of power and
heat generation, power transmission
& distribution, environmental
protection and industry
Leader as consulting and
engineering company in
the field of power
generation, power T&D,
environmental protection
and industry
Contractor for design,
construction and testing for
steel structures in the field of
power T&D and
telecommunication.
Contractor for
construction and
installation works
for power
Transmission and
Distribution
projects.
Romelectro Group structure
Roles on the market
• EPC Contractor
• Investor
• Project Developer
• Strategic Partner
• Electricity trader
About Romelectro
MARKET AREAS
Power
Generation -
Thermal
Environmental
Protection
IndustryPower
Generation -
Hydro
Power
Transmission
and
Distribution
About Romelectro
Romelectro offer
• Turn-key contracting
• Studies, research and development
• Technical consultancy
• Commercial and institutional consultancy
• FEED, Basic and detailed engineering
• Equipment supplier
• Installation and assembling services
• Civil works
• Site supervision and project management
• Commissioning
• Rehabilitation and modernisation programs
As Romelectro’s expertise over the years extends to most of the heat and power plants in
Romania, we have the necessary competences, technologies, resources and know-how
to answer to our clients’ needs for both green field projects and existing power plants.
As investor and project developer, Romelectro transformed the existing power plant of
Buzău into a modern Combined Heat and Power Plant, using high efficiency technology.
References:
• Complex rehabilitation, retrofitting and upgrading programs in the field of thermal power
plants and cogeneration plants developed for more than 3,000 MW.
• Engineering and design for more than 15,000 MW in conventional & nuclear power
plants, representing 90% of the total installed capacity of Romania.
• Projects for new facilities using both conventional fuels and renewable energy sources
(biomass, biofuel, waste).
IndustryPower
Generation
Hydro
Environmental
Protection
Power
Trasmisson &
Distrbution
Power Generation - Thermal
• As EPC Contractor, Romelectro is leading the complex development of the Jiu River on
Bumbeşti–Livezeni stretch and the construction of two hydropower plants with an
installed power of more than 60 MW.
• As investor and general contractor, Romelectro developed 3 Micro Hydro Power Plants
on Mănăileasa River with an installed power of 1.45 MW.
• Romelectro carried out the feasibility studies for the Ramdane Djamel and Zaouia
Dams (Algeria); detailed technical design for the Bougous and Bouhalloufa Dams
(Algeria); turnkey execution of the Vafreghan Dam (Iran); execution of the El – Fakia
(Algeria) and turnkey heightening of the Ksob Dam (Algeria).
•Recently Romelectro signed for the rehabilitation of Stejaru HPP 210 MW.
Power Generation - Hydro
Power
Generation
Thermal
Environmental
Protection
Power
Trasmisson &
Distrbution
Industry
Power Generation - Hydro
Romelectro’s capabilities in the Power Transmission and Distribution field have been
proved through the 45 years long hystory of domestic and international projects:
• Engineering for more than 22,000 km of OHTLs in Romania and about 10,000 km OHTLs
(750 kV, 400 kV, 220 kV, 110 kV) km in countries like Iran, Iraq, Philippines, Jordan, Syria,
Algeria or Malaysia
• Design, engineering, construction for more than 150 high voltage substations
• Grid connection studies for more than 30,000 MW of wind energy farms
• Strategies and forecasting studies for the National Power System
Power
Generation
Thermal
IndustryPower
Generation
Hydro
Environmental
Protection
Power Transmission & Distribution
Power
Generation
Thermal
IndustryPower
Generation
Hydro
Power
Trasmisson &
Distrbution
Environmental Protection
In line with the environmental protection related goals set by the EU Energy 2020
Strategy and the EU Energy 2050 Roadmap, Romelectro promotes and implements the
most advanced tehnologies:
• Ash and slag removal and storage in dense slurry system: projects for 12 coal-fired
boilers at Oltenia Energy Complex.
• Flue gas desulphurization at Ișalnița TPP.
• NOx emission reduction: projects for 14 gas-fired boilers at Galați CHPP, Iernut TPP,
Progresu CHPP, București Vest CHPP and București Sud CHPP.
Energy efficiency in Industry
Romelectro takes over the whole chain from technical general audit to implementation,
going through: Technical audit (thermal, electrical, utilities), Projects technical-economic
analysis – opportunity, prefeasibility and feasibility studies, cost – benefit analysis, Business
plan, Identifying financing/co-financing sources for investment, financial model, social,
economic and environmental impact assessment, turn-key contracts.
We cover all energetic issuesFactory energy dispatcher
• Energy management system
• New power generation resources
• Specific thermal, mechanical and electrical solutions
• Electrical distribution system SCADA systems (electric/thermal power, water, natural
gas, heavy fuel oil etc)
• DCS or PLC systems for process management
• Process simulation systems
• Security systems, Video - data - voice networks
Power
Generation
Thermal
Power
Generation Hydro
Environmental
Protection
Power
Trasmisson &
Distrbution
Industry
V
PROJECTS
FACTS AND FIGURES
•2 x 315 MW power units
• 3317 ÷ 5543 mg/Nm³ rated sulphur
dioxide emission, estimated in the
current operation
• 200 mg/Nm³ maximum SO₂
concentration after project
implementation
• Wet desulphurization plant using
limestone slurry
• 96% desulphurization efficiency
Ișalnița TPP - Flue gas desulphurisation system
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Scope of the project: reducing the sulphur dioxide
(SO₂) emissions, discharged together with the flue
gas resulting from power units no. 7 and no. 8 at
Ișalniţa TPP – SE Craiova – Oltenia Energy
Complex.
The two plants are being executed identically, with
the same type of equipment, delivered by the same
suppliers.
Starting year: 2012
Commissioning year: 2014
Client: Oltenia Energy Complex – SE Craiova
Babcock Noell GmbH – Consortium Leader
Romelectro – Consortium Partner
Ispe – Engineering
Dense Slurry System at Turceni TPP
Turceni TPP is the largest coal fired producer, supplying
more than 10% of the energy consumed in Romania.
Scope of the project: Solutions for discharge, transport and
storage of the waste resulting from the coal firing process at
Turceni TPP, using dense slurry technology. The new
investment consists mainly of:
• two dense slurry preparation stations
• bagger pumps replacement
• dry ash transport installation
• air compressor station
• one wastewater treatment plant
Starting year: 2009
Commissioning year: 2012
Client: Turceni TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 4 × 330 MW units
• 4 × 155 t/h of dry solids
(30 t/h bottom ash + 105 t/h fly
ash
+ 20 t/h FGD gypsum)
• 5 × 450 kW + 1 × 250 kW
Atlascopco compressors
• 8 sets of Metso Mineral
centrifugal pump grups
• CIRCUMIX continuous mixing
technology
• 4900 m transport distance
• 24 m geodetic level difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Turceni TPP - Dense Slurry System
Dense Slurry System at Craiova II CHPP
Part of Oltenia Energy Complex, Craiova II CHPP
(2 × 150 MW) has a significant importance both for the
Romanian power sector and for the city of Craiova, being the
only heat producer both for population and strategic industrial
consumers such as Ford automotive factory and other plants
on the industrial platform.
Scope of the project: Increasing the stability of the Valea
Mănăstirii slag and ash deposit by executing the installations
for ash and slag dense fluid and by developing the storage
for the first hightening.
Starting year: 2008
Commissioning year: 2010
Client: Craiova II CHPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 2 × 150 MW power units (+8
district heating boilers)
• 2 × 86 t/h of dry solids
• (6 t/h bottom ash + 60 t/h fly ash +
20 t/h dry gypsum)
• 1:1 water to solid ratio
• CIRCUMIX continuous mixing
technology
• 2 × 140 m3/h + 1 × 110 m3/h
transport slurry lines
• 3 sets of Feluwa hose diaphragm
slurry pumps for distance transport
• 9400 m transport distance
• 90 m geodetic level difference
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Craiova II CHPP - Dense Slurry System
Ișalnița TPP - Dense Slurry System
Part of Oltenia Energy Complex, Ișalnița TPP
(2 × 315 MW) has a significant importance for the
Romanian power sector being one of the largest power
generation capacities operation in Romania.
Scope of the project: Increasing the stability of the slag and
ash storage of SE Ișalnița, on the right and left banks of Jiu
river, using dense fluid technology. The solution is designed to
transform the existing heavily polluting ash handling system to
match the eco-friendly dense slurry technology.
Starting year: 2008
Commissioning year: 2010
Client: Ișalnița TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 2 × 315 MW power units, 4 ×
510 t/h boilers
• 4 × 77 t/h of dry solids (5 t/h
bottom ash + 52 t/h fly ash + 20
t/h dry gypsum)
• CIRCUMIX continuous mixing
technology
• 3 × 120 m3/h transport slurry
lines – 1 ash field
• 4 sets of Warman centrifugal
pump groups
• 3 pumps/group for distance
transport
• 4600 m transport distance
• 45 m geodetic level difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Rovinari TPP - Dense Slurry System
The second largest coal fired producer in Romania, with an
installed power of 1320 MW (4 x 330 MW), Rovinari TPP
supplies about 9% of the total electricity generated on the
local market.
Scope of the project: New ash and slag deposit in Gârla and
new installations for collecting, preparation, discharge and
storage of dense slurry in Rovinari TPP (4 x 330 MW)
Starting year: 2008
Commissioning year: 2010
Client: Rovinari TPP
Romelectro: EPC Contractor
FACTS AND FIGURES
• 4 x 330 MW units
• 4 x 190 t/h at dry solids (30 t/h fly
bottom ash + 127 t/h fly ash + 33 t/h
dry gypsum)
• CIRCUMIX continuous mixing
technology
• 4 x 270 m3/h transport slurry lines
• 4 sets of Warman centrifugal pump
groups
• 7000 m transport distance
• 32 m geodetic level difference.
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Galați CHPP Low NOx (1)
Scope of the project: : Modernization and retrofitting of firing
systems of 4 x 420 t/h boilers at Galati CHPP, by implementation
of low NOx burners and automatic BMS and DCS.
For each of the C6, C7 and C8 steam boilers , the new
installation consists of:
• 6 low NOx mixed burners for heavy fuel oil and natural gas
• a new modern system for heavy fuel oil and natural gas supply
• a new BMS (Burner Management System) unit
• a new DCS (Distributed Control System) unit
• emission monitoring system
• methane leakage monitoring system
PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 4 x 420 t/h steam boilers
• 6 x 53 MW mixed heavy fuel oil –
natural gas low NOx burners/boiler
body (for C6, C7 and C8)
• 6 x 53 MW natural gas low NOx
burners/boiler body (for C5)
Galați CHPP Low NOx (2)
For C5 steam boiler, the new installation consists of:
• 6 low NOx burners for natural gas
• 8 low NOx burners for blast furnace gas
• a new modern system for natural gas supply
• a new modern system for blast furnace gas supply
• a new BMS (Burner Management System) unit
• a new DCS (Distributed Control System) unit
• emission monitoring system
• methane leakage monitoring system
Starting year: 2008
Commissioning year: 2013
Client: Electrocentrale Galați
Romelectro: EPC Contractor
PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 8 x 21 MW blast furnace gas
low NOx burners /boiler body
• BMS type SIL3, failsafe, double
redundant /boiler body
• DCS type Ovation /boiler body
Iernut TPP - Low NOx
Scope of the project: modernization and retrofitting of firing
systems of 4 x 320 t/h natural gas fired boilers at Iernut TPP,
by implementation of low NOx burners and automatic BMS.
For each boiler, the new installation consists of:
• 10 low NOx burners
• a new modern system for natural gas supply
• a new BMS (Burner Management System) unit
• upgrading and extension of existing DCS for integration of
new BMS
• emission monitoring system
• methane leakage monitoring system
Starting year: 2009
Commissioning year: 2011
Client: ELCEN București
Romelectro: EPC Contractor
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
FACTS AND FIGURES
• 2 x 215 MW units
• 2 x 640 t/h (4 x 320 t/h) steam
boilers type PK-47-2
• 10 x 30 MW low NOx burners /
boiler body
• BMS type SIL3, failsafe, triple
redundant / boiler body
FACTS AND FIGURES
• 2 x 420 t/h steam boilers
• 4 ESP casings are to be fitted with
new inner instalation components
• 400 mm collecting electrodes
spacing optimised design
• 24 new high-performance 120 kW
power transformers with high-
frequency technology to supply high
voltage to the retrofitted ESP’s
• 2 new improved ESP monitoring
and control systems
•48 mg/Nm³ maximum dust
emissions at ESP’s outlet, after
project completion
Govora CHPP - Electrostatic precipitators modernization
PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
Govora CHPP is the only thermal energy producer
for Râmnicu-Vâlcea area in Romania. It is also the
only steam supplier for Râmnicu Vâlcea industrial
platform and it can deliver power to the national
power grid.
Scope of the project: Modernization of the
electrostatic precipitators for boilers no. 5 and no.
6 at Govora CHPP, aiming to reduce the level of
dust emissions at maximum 48 mg/Nm3 at ESP’s
outlet.
Starting year: 2012
Commissioning year: 2013
Client: Govora CHPP
Romelectro – EPC Contractor
Techno Montaj – Mechanical erection
Icpet Eco – Engineering and design
FACTS AND FIGURES
• 4 x 420 t/h steam boilers
• min 121% power efficiency
calculated according to the
“Waste Directive”
• min 5.64 Mwe installed electric
power
• min. 86% boiler efficiency
• Noxious emissions at the
stack - according to Directive
2008/98/EC
• 87000 tons/year - estimated
quantity of fuel to be processed
Timișoara TPP - Waste-to-Energy
PROJECTS > THERMAL POWER
It is the first major project in Romania in the field of Waste-to-
Energy, according to the National Waste Management Strategy,
included in the Waste Management Plan
This project proposes the execution of an alternative fuel
incineration plant, fuel resulting from the sorting process of
municipal waste and generation of electricity and heat.
Objectives:
- Discarding the sorted waste by conversion of the resulting
alternative fuel into energy, by means of a high efficiency
cogeneration plant;
- Reducing the methane gas consumption by replacing it with this
alternative fuel, the result being approximately 16 million m3/year.
Starting year: 2013
Commissioning year: 2016
Client: International Recycling Energy
Romelectro – Consortium Leader
Baumgarte Boylers Systems GmgH – Consortium Partner
ISPE – General Designer
PROJECTS > THERMAL POWER
Rovinari TPP unit 4
Modernization of Electric and Automation Installations
• The executed works provided an efficient operation of Power Unit No. 4, in safe and
highly reliable conditions. Moreover, the requirements related to the environmental
legislation shall also be achieved in operation.
• Full replacement of the 6 and 0.4 kV substations, the DC substations, rectifiers, inverters,
and 24 and 220 V DC stationary batteries, digital protections for the power unit, static
excitation, substation and IT aggregates for the electrostatic precipitators, DCS –
Distributed Control System, firing control system, measurement loops in the boiler and
machinery halls, Governor control system of the steam turbine and boiler feed pump
turbine.
•ROMELECTRO, acting as Consortium Leader had to identify the best technical solutions
and harmonization of the delivered equipment with the existing or refurbished installations.
Starting year: 2013
Commissioning year: 2014
Client: Complexul Energetic Oltenia – Rovinari TPP Co
PARTNERSHIP
Romelectro – Consortium Leader
SAEM Energomontaj IEA – Consortium Partner
ISPE – Engineering and Design
Investment for Combined Heat and Power Plant in Buzău
PROJECTS › CONGENERATION
As investor and general contractor, Romelectro
developed the project transforming the existing
power plant of Buzău into a modern combined
heat and power plant, using high efficiency
technology.
The new generation capacity is operated by the
Special Purpose Vehicle (SPV) created on the
basis of private–public joint venture.
Starting year: 2008
Commissioning year: 2009
Client: Ecogen Buzău (IPP)
Romelectro: Investor, EPC Contractor
FACTS AND FIGURES
• Inhabitants of Buzău City: ~150,000
• Length of primary district heating
system: ~26 km
• Length of secondary district heating
system: ~56 km
• Total number of apartments: ~35,000
• Number of apartments supplied:
~21,000
Buzău CHPP - Investment for Combined Heat and Power Plant
PROJECTS > THERMAL POWER
Complex Hydro-Development of Jiu Valley
PROJECTS › HYDROPOWER
As EPC Contractor, Romelectro executes the complex development of the Jiu River
on Bumbești–Livezeni stretch and the construction of two hydropower plants
(Dumitra and Bumbesti) with an installed power of approximately 60 MW and
Livezeni dam. This project represent the most important investment in Romania in
hydropower field after 1990.
Starting year: 2004
Commissioning year: 2013 (Dumitra HPP), 2014 (Bumbești HPP)
Client: Hidroelectrica
Romelectro: EPC Contractor, Consortium Leader
Hidroelectrica and ISPH: Consortium Partners
Jiu Canyon - Complex Hydro-Development
PROJECTS > HYDROPOWER
Rehabilitation of Voineasa Micro Hydro Power Plant
PROJECTS › HYDROPOWER
Romelectro became the owner of the hydro power capacity on Mănăileasa River in
2006.
As investor and EPC Contractor, in 2009 Romelectro started the works for the
complete rehabilitation of Voineasa MHPP, creating a new and efficient capacity for
harvesting the renewable potential of Mănăileasa River.
Scope of the project: developing the 3 Micro Hydro Power Plants on Mănăileasa River
with an installed power of 1.45 MW by replacing the old generation capacities with new
hydro-mechanical and electrical equipment.
Starting year: 2009
Commissioning year: 2011
Romelectro: Investor and EPC Contractor
Voineasa Micro Hydro Power Plant Rehabilitation
PROJECTS > HYDROPOWER
Complex Hydro-Development of Jiu Valley
Scope of the project: Romelectro is leading for 6 years in a row the turn key project CHE
Stejaru Rehabilitation - “Hydropower Romanian School”.
Starting year: 2015
Commissioning year: 2021
Romelectro: EPC Contractor
The Hydropower, the central point of the Complex Landscaping of the Bistrita River, with an
installed capacity of 210 MW and over 50 years of functioning, summing up over 1.000.000
working hours, is preparing for the implementing of some state-of-the-art solutions, that will
assure a high level of availability and security for at least the following 30 years.
Client: Hidroelectrica
Romelectro: General Contractor, Consortium Leader
Litostroj Power Slovenia: Consortium Partner
Stejaru HPP Rehabiliation
PROJECTS > HYDROPOWER
Refurbishment of the 400/110 kV Brașov Substation
The 400/110 kV electrical substation in Brașov has a particular importance for the National Power
System and for the local grid. It represents a junction for power lines connecting Muntenia, South
Transylvania and the poorly covered Moldovian area. The substation supplies the local consumption
area (around 167 MW) being also the connecting point for Brașov TPP.
Scope of the project: upgrading of the primary and secondary circuits in the 400/110kV substation, by
full refurbishing. The purpose is to complete a new 400 kV outdoor electrical substation, equipped
with the modern high-performance conventional installations, as well as a new indoor 110 kV
electrical substation, equipped with SF6 insulated installations (GIS cells).
Starting year: 2010
Commissioning year: 2013
Client: Transelectrica
Romelectro: EPC Contractor, Consortium Leader
CG Holdings Belgium NV: Consortium Partner
ISPE: Engineering and design
Electromontaj Carpați Sibiu: Erection and commissioning works
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
400/110 kV Brașov Substation Refurbishment
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
PROJECTS › POWER TRANSPORT & DISTRIBUTION
Scope of the project:
• replacing the existing primary switch gear
• replacing the AT 400 MVA
• modernising the internal services
• introducing the numerical and SCADA protections and control systems - it is now possible for the
substation to be fully remote-controlled by means of the (territorial and national) dispatch
• retrofitting works on the drainage and sewage system
• modernising the heating, climatising, security as well as the fire extinction system.
Starting year: 2004
Commissioning year: 2006
Client: Transelectrica – Cluj Subsidiary
JACOBSEN Elektro As (Norway): Consortium Leader
Romelectro: Local Partner
400/220 kV Roşiori Electrical Substation Retrofitting
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
PROJECTS › POWER TRANSPORT & DISTRIBUTION
Modernization of Electrical Substations
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
• Refurbishment of the 220/110 kV Barboși Substation
• Refurbishment and modernization of 110 kV and 220 kV bays in FAI Substation
• Extension and modernization of the 110/20 kV Dumbrava - Sibiu Substation
• Primary equipment upgrade in the 110/20 kV Petrila Substation
• Refurbishment of the 220/110/20 kV Turnu Măgurele Substation
• Upgrade of the 110 kV bays in HPP Ciunget Substation
• Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP
• Modernization of the 110 kV Electrical Substation of Govora HPP
• Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation
• Modernization of the 220/110 kV Vetiş Electrical Substation
PROJECTS › POWER TRANSPORT & DISTRIBUTION
BARBOSI ELECTRICAL SUBSTATION 220/110kV
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
In 2013, Romelectro began the works for refurbishing the Barbosi substation, consisting of:
•Replacing the existing primary equipment in the substation due to their old age (over 30 years of
operation);
•Replacing the existing protections with modern digital protections;
•Introducing the central control system (SCADA) so that the substation will operate with no personnel;
•Increasing the safety in operation of the substation for both the electricity supply of the 0 (zero) degree
consumer - Arcelor Mittal Galati and the wind electricity transit in the Dobrogea area towards the
Moldova area through 220kV Lacul Sarat-Filesti OHTL in the 220kV Barbosi Substation - 220kV
Focsani Vest OHTL.
CLIENT:
Transelectrica – ST Constanta
PROJECT STARTING YEAR: 2013
PROJECT COMPLETION YEAR: 2014
PARTNERSHIP:
Romelectro: EPC Contractor, Consortium Leader
Electromontaj Carpati Sibiu: Consortium Partner
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: to connect the Dumeşti and Românești Wind Farms to the National Power Grid
through a new 110 kV line cell executed in the 220/110 kV FAI Substation
The characteristics of this projects are:
• mounting of new 110 kV cell in the FAI substation, required to connect the new user;
• mounting the control and protection equipment in the FAI substation for the new 110 kV cell in
Dumeşti Wind Farm;
• providing a measurement group in the 110 kV FAI transformer station to meter the electricity
consumed /generated by the user;
• providing the equipment to monitor the quality of the electricity for the new 110 kV cell in Dumeşti
Wind Farm.
Starting year: 2013
Commissioning year: 2014
Client: Transelectrica
Romelectro: EPC Contractor
Connection of 99 MW Dumești and 30 MW Românești Wind
Power Plants to the National Power Grid
Refurbishment of the 400/110 kV Brașov Substation
The 400/220/110 kV Bradu Substation is of special importance for the National Power Grid and also
for Pitești and Rîmnicu Vâlcea areas. It represents an important connection point of the Muntenia
and Oltenia networks with the one in Transylvania.
The main refurbishing works shall consist in:
• refurbishment of the 400 kV Substation, 220 kV Substation, 110 kV Substation and of 20 kV
Substation
• procurement and mounting of 2 x 400/400/80 MVA, 400/231/22 kV autotransformers
• procurement and mounting of 2 x 200/200/60 MVA, 231/121/10,5 kV autotransformers
• procurement and mounting of 2 x 16 MVA, 110/20 kV transformers
• control – protection (SCPA) and metering system
• remote protection and telecommunication systems
• refurbishing the DC and AC internal services installation
• constructions and architecture works
• achieving the 400 kV Țânțăreni OHTL connection
Starting year: 2014
Commissioning year: 2018
Client: Transelectrica
Romelectro: EPC Contractor
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Refurbishment of the 400/220/110 kV Bradu Substation
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
Grid Connection of the Green Field 800 MW CCGT Brazi
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: the (400)/220/110 kV Banca Substation was conceived to evacuate in National
Power Grid a power of approximately 406 MW generated by Ivesti, Falciu 1 and Falciu 2 Wind
Farms.
The characteristics of this projects are:
• execution of a (400)/220/110 kV transformer substation
• connection of the transformer substation in 220 kV DC Gutinaș-FAI and Gutinaș- Munteni OHTL
(belonging to Transelectrica-ST Bacău) by means of an approximately 0.3 km 220 kV DC OHTL
• regulating the coexistence of the 110 kV Bârlad- Roșiești OHTL (belonging to EoN Moldova) to the
220 kV OHTL in the Banca Substation;
Starting year: 2012
Commissioning year: 2013
Client: Transelectrica
Romelectro: EPC Contractor
Connection of 300 MW Ivești, 88 MW Falciu 1 and 18 MW Falciu 2 Wind Power
Plants to the National Power System through the new (400)/220/110 kV Banca
Substation
Grid Connection of the Green Field 800 MW CCGT Brazi
PROJECTS › POWER TRANSMISSION & DISTRIBUTION
Scope of the project: supplying and installing two new
Overhead Transmission Lines in order to connect the Green
Field 860 MW CCGT (Combined Cycle Gas Turbine) Brazi
to the National Power System.
Starting year: 2008
Commissioning year: 2010
Client: OMV Petrom
Romelectro: EPC Contractor
FACTS AND FIGURES
Connection point: 400/220/110 kV
Brazi West Substation
Length: 3 km
Voltage level:
• 400 kV for the double circuit
DONAU type towers
• 220 kV for the simple circuit
RODELTA type towers
Distance between the axes: 80 m
Grid Connection of the Green Field 860 MW CCGT Brazi
PROJECTS > POWER TRANSMISSION & DISTRIBUTION
44 Years of Sustainable Development on Domestic and
International Markets
Project Client Contract performance
period
Execution of a Waste-to-Energy Plant and incorporating it within
Timișoara Sud TPP
International Recycling
Timișoara (IRE)
2014 – 2016
Rehabilitation and modernization of 330 MW Power Unit No. 4
operating on lignite in SE Rovinari; Modernization of the electric
power and automation plants
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Process water supply installation for the desulphurization plants
related to power units no. 4 and 5
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Execution of works for taking over the gypsum slurry from the flue
gas desulphurization plant of unit no. 4 to the dense slurry plant
related to unit no. 3
Oltenia Energy Complex –
SE Rovinari
2014 – 2014
Automation Works - Interconnection of the dense slurry plant to the
dry ash collecting and taking over plant of Cenextra related to the
project: "Ash collecting, transport and automatic loading plant, unit
no. 3
Oltenia Energy Complex –
SE Turceni
2014 – 2014
Rehabilitation / Modernization of the electrostatic precipitator in
power unit no. 7, execution and connection of the gas circuit
between power unit no. 7 and desulphurization plant no. 6
Oltenia Energy Complex –
SE Turceni
2014 – 2014
Interface execution between the dense slurry plant and the
desulphurization plant
Oltenia Energy Complex –
SE Turceni
2012 – 2014
Flue gas desulphurization plants for power units no. 7 and
no. 8 at Ișalniţa TPP
Oltenia Energy Complex –
SE Craiova
2012 – 2014
Modernization of the excitation system and protections of Unit 7
generator in Ișalnița TPP
Oltenia Energy Complex –
SE Craiova
2012 - 2014
Electrostatic precipitators modernization at Govora CHPP Govora CHPP 2012 – 2013
Projects in Romania
THERMAL POWER PROJECTS
Projects in Romania
Proiect Client Contract performance
period
Solutions for discharge, transport and storage of the waste resulting
from the coal firing process at Turceni TPP, using dense slurry
technology
Oltenia Energy Complex –
SE Turceni
2009 – 2012
Modernization and retrofitting of firing systems of
4 x 320 t/h gas fired boilers at Iernut TPP, by implementation of low
NOx burners and automatic BMS
ELCEN București
Iernut TPP
2009 – 2011
Modernization and retrofitting of firing systems of 5 x 420 t/h boilers
at Galati CHPP, by implementation of low NOx burners and
automatic BMS and DCS
Electrocentrale Galați
Galați CHPP
2008 – 2013
Investement for Combined Heat and Power Plant of 6 MWe and 80
Gcal in Buzău
Ecogen Buzău (IPP) 2008 – 2009
Increasing the stability of the slag and ash storage of Ișalnița (2 x
315 MW), on the right and left banks of Jiu river, using dense fluid
technology
SE Craiova
Ișalnița TPP
2008 – 2010
Refurbishment and upgrade of electrical and automation installation
for 330 MW unit no. 6 at TPP Rovinari
SE Rovinari 2008 – 2010
New ash and slag deposit in Gârla and new installations for
collecting, preparation, discharge and storage of dense slurry in
Rovinari TPP (4 x 330 MW)
SE Rovinari 2008 – 2010
Increasing the stability of the Valea Mănăstirii slag and ash deposit
by executing the installations for ash and slag dense fluid and by
developing the storage for the first hightening
SE Craiova
Craiova II CHPP
2008 – 2010
Rehabilitation of the 420 t/h CR 1737 type boilers in order to
increase the safety in operation, especially on heavy fuel oil and for
dual operation, including low NOx burners – Progresu CHPP - boiler
2
ELCEN București
Progresu CHPP
2007 – 2007
THERMAL POWER PROJECTS
Projects in Romania
Projects in Romania
Project Client Contract performance
period
Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the
safety in operation, especially on heavy fuel oil and for dual operation,
including low NOx burners – Progresu CHPP, boilers 3 and 4
ELCEN București
Progresu CHPP
2006 – 2007
Rehabilitation and modernizing of 315 MW unit no. 7 in Işalniţa TPP SE Craiova
Ișalnița TPP
2005 - 2006
Rehabilitation of the firing installations for 525 t/h steam boiler no.2 in
Bucureşti Vest CHPP and no. 5 and 6 in Bucureşti Sud CHPP, by replacing
with modern low NOx burners
ELCEN București 2004 – 2006
Refurbishment of 330 MW units no. 4 and 5 in Turceni TPP (Program A3) Turceni TPP 1995 – 2003
Refurbishment of 330 MW units no. 3 and 7 in Turceni TPP
and no. 5 and 6 in Rovinari TPP (Program A2)
Turceni TPP
Rovinari TPP
1994 – 1998
Refurbishment of 330 MW units no. 2 and 6 in Turceni TPP
and no. 3 and 4 in Rovinari TPP (Program A1)
Turceni TPP
Rovinari TPP
1991 - 1994
Projects in Romania
HIDRO POWER PROJECTS
Project Client Contract performance
period
Hydropower development of the Jiu River on the Livezeni – Bumbeşti
strech, with the execution of 2 hydropower
plants with an installed power of 60 MW
Hidroelectrica 2004 – 2014
Rehabilitation of Voineasa Micro Hydro Power Plant,
Voineasa I, II, III
Romelectro 2009 – 2011
THERMAL POWER PROJECTS
Projects in Romania
Proiect Client Contract performance
period
Rehabilitation of the 400/220/110/20 kV Bradu Substation Transelectrica 2014 - 2018
Switching to a 400 kV voltage of the Porțile de Fier – Reșița –
Timișoara – Sacalaz – Arad axis/Stage I: Extension of the 400 kV
Porțile de Fier Substation
Transelectrica
Craiova Subsidiary
2013 - 2015
Rehabilitation of the 220/110 kV Barboși Substation Transelectrica 2012 - 2014
Turnkey (400)/220/110 kV Banca Substation Transelectrica 2012 - 2013
Refurbishment of the 400/110 kV Braşov Substation Transelectrica 2010 – 2013
Refurbishment and modernization of the 110 kV and 220 kV
bays in FAI Substation
Transelectrica
Bacău Subsidiary
2007 - 2011
Extension and modernization aiming to increase the safety
in operation of the 110/20 kV Dumbrava Sibiu Substation
Electrica Transilvania
Sud
2007 – 2009
Primary equipment upgrade in the 110/20 kV Petrila Substation Transelectrica 2007 – 2007
Refurbishment of the 220/110/20 kV Turnu Măgurele Substation Transelectrica 2006 - 2011
Modernization of the protection systems of 250 MVA transformer and
110 kV PDB in 400/110 kV Braşov, Dârste, Domneşti, Medgidia Sud,
Pelicanu, Tulcea Vest, Smârdan, Drăgăneşti Olt Substations
Transelectrica 2006 – 2009
Upgrade of the 110 kV bays in HPP Ciunget Substation Hidroelectrica
Râmnicu Vâlcea
Subsidiary
2006 – 2008
Modernization of the 110 kV Electrical Substation of
Râmnicu Vâlcea HPP
Hidroelectrica
Râmnicu Vâlcea
Subsidiary
2006 - 2007
ELECTRICAL SUBSTATIONS
Projects in Romania
Projects in Romania
Proiect Client Contract performance
period
Modernization of the 110kV Electrical Substation of Govora HPP Hidroelectrica
Râmnicu Vâlcea Subsidiary
2006 – 2007
Turnkey refurbishment of the 110/10 (20) kV Bucureşti Centru Substation Electrica Muntenia
Sud
2005 – 2007
Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation Transelectrica 2005 – 2005
Refurbishment of the 400/220 kV Roşiori Electrical Substation Transelectrica
Cluj Subsidiary
2004 – 2006
Modernizing works at the 220/110 kV Vetiş Electrical Substation Transelectrica
Cluj Subsidiary
2004 – 2006
Turnkey modernization of the 110/20 kV Electrical Substation
Borsec
Electrica Transilvania Sud 2003 – 2005
Turnkey modernization of the 110/10 kV Cluj Centru Electrical Substation Electrica Transilvania Nord 2003 - 2004
Turnkey refurbishment of the 6(20) kV Fileşti – Galaţi connection
Substation
Electrica Muntenia Nord 2002 – 2003
ELECTRICAL SUBSTATIONS
Projects in Romania
Projects in Romania
Proiect Client Contract performance
period
Connection to the Electricity Transmission Network of 99 MW Dumești
Wind Farm and 30 MW Românești Wind Farm, by executing a 110 kV
line cell in the 220/110 kV Fai Substation
Transelectrica
Bacau Subsidiary
2013 - 2014
Coexistence conditions between the existing 110 kV Bârlad – Roșiori
OHTL and new 220 kV OHTL connections for the (400)/220/110
kV Banca Substation for connecting 300 MW Ivești, 88 MW Falciu and
18 MW Falciu 2 Wind Farms to the electric grid
Transelectrica 2012 - 2013
Top overhaul of 400 kV Mintia-Sibiu OHTL Transelectrica 2011 - 2014
Rehabilitation of the 220 kV OHTL Lotru - Sibiu Transelectrica 2007 – 2010
400 kV OHTL Oradea – Nadab – Békéscsaba, new interconnexion line
with Hungary
Transelectrica 2006 – 2008
Rehabilitation of the 400 kV Bucureşti South – Gura Ialomiţei OHTL Transelectrica 2006 - 2007
Execution of 220kV and 400 kV connections of Iernut Substations Transelectrica 2005 – 2006
Emergency works of the Sibiu – Țânțăreni 400 kV OHTL Transelectrica 2005 – 2005
Rehabilitation of 220 kV Brazi Vest – Târgovişte OHTL Transelectrica 2004 - 2005
Improving the dispatcher transmission system by executing the
interconnecting of the data transmission system between the National
Dispatch Centers in Romania and Bulgaria
Transelectrica 2003 – 2004
Rehabilitation of 220 kV Borzeşti – Gutinaş OHTL Transelectrica 2003 – 2003
Projects in Romania
OVERHEAD TRANSMISSION LINES
Projects in RomaniaMajor Projects in Asia
PHILIPPINES
THAILAND
Project Client Contract performance
period
138 kV Compostela - Banilad OHTL
Technical specification:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
2xACSR 400 mm2 Condor conductors, silicon rubber insulation, OPGW and
AWG 7 and 6 safety conductors.
National Electric Power
Corporation (NPC)
1994 – 1999
230 kV Talisay - Compostela OHTL
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc-plated poles, active
ACSR 772 mm2 MARTIN conductors, silicon rubber insulation, OPGW and
AWG 7 and 6 safety conductors.
National Electric Power
Corporation (NPC)
1994 – 1999
Project Client Contract performance
period
230 kV OHTL Phuket Junction - Phuket 2
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
795 MCM ACSR/AW phase conductors, porcelain insulation, OPGW and
AWG 7 and 8 safety conductors.
Electricity Generating
Authority of Thailand
(EGAT)
1998 – 2002
230 kV OHTL Phangnga - Phuket 2
Technical specifications:
Foundation pads and chimneys, double triangle hot zinc plated poles, active
2x1272 MCM ACSR/AW PHEASANT conductors, porcelain insulation,
OPGW and AWG 7 and 8 safety conductors.
Electricity Generating
Authority of Thailand
(EGAT)
1998 – 2000
Projects in RomaniaMajor Projects in Middle East
JORDAN
Project Client Project completion
date
D.C Bayader - Amman - Quatrana - Ghar Safi - Ma’an 132 kV OHTL
(310 km)
Jordan Electric Authority 1982
D.C. Ma’an - Aqaba and Amman – Sahab 132 kV OHTL (210 km) Jordan Electric Authority 1984
D.C. Irbid - Yarmouk University 33 kV OHTL (12 km) Yarmouk University 1984
D.C. Subeihi - 33kV OHTL King Talal dam (11 km) Yarmouk University 1986
D.C. Irbid - Wadi Arab 33 kV OHTL (25 km) Jordan Electric Authority 1986
846A JEPCO – Bringing electricity to 14 villages Jordan Electric Power
Company
1986
Zarqa – Sabha 132 kV OHTL (40 km) National Electric Power
Corporation
1995
25 / 84 – 33 kV and 11kV Medium Voltage OHTL (160 km) Jordan Electric Authority 1987
D.C. Ma’an - Esheidiyeh - Kharrana - Azraq - Rishah 132kV OHTL
(327 km)
Jordan Electric Authority 1988
Queen Alia International Airport – Sweima 132 kV OHTL (38 km) National Electric Power
Corporation
2000
Subeihi - Waqqas 132 kV OHTL National Electric Power
Corporation
2005
Projects in RomaniaMajor Projects in Middle East
IRAQ
Project Client Project completion
date
33 kV S.C. OHTL (Northern Area – 210 km; Central Area – 220 km;
Western Area – 400 km)
General Rural Electricity
Department
1984
33 kV S.C. OHTL (Baghdad Area – 90 km) Baghdad Electrical
Distribution
1986
400 kV D.C. OHTL Musaiyb - Baghdad South Musaiyb – Babylon
(87.5 km)
Major Electrical Projects
Implementation
Department
1988
400 kV D.C. OHTL Babylon – Qadisiya (101.5 km) Major Electrical Projects
Implementation
Department
1988
D.C. Tuba – 6.9 km; Hammar – 7.5 km; 132 kV OHTL; Ramadi –
11.1km Samadiya – 1.8 km; Mashtel – 0.4 km; Annah – 2.4 km
Major Electrical Projects
Implementation
Department
1989
D.C. Arbil – Dokan 132 kV OHTL (83.8 km) Major Electrical Projects
Implementation
Department
1989
132 kV D.C. OHTL Darbandikhan - Sulaimaniya 111.5 km (Kirkuk
Industries – 5 km; Tarmia - 14.8 km, Musaiyb - 42.2 km)
Major Electrical Projects
Implementation
Department
1989
Projects in RomaniaMajor Projects in Middle East
ELECTRIC TRANSFORMERS & DISTRIBUTION SUBSTATION
TECHNICAL ASSISTANCE, CONSULTING & EQUIPMENT SUPPLY
Project Country Client Contract performance
period
Sheich Said -(Aleppo) Syria Sheich Said – Aleppo Cement
Factory
1975 - 1977
Al Quaim Cement Plant 2X34 MVA; 33/6.6 kV Iraq Ministry of Industry and Minerals 1982– 1985
Sinjar Cement Plant S/S Iraq Ministry of Industry and Minerals 1982 – 1985
AL Quaim Limestone Quarry S/S Iraq Ministry of Industry and Minerals 1994 – 1999
Project Country Client Contract performance
period
Technical assistance and consulting on operating and
repairing equipment
Kuwait Ministry of Energy and Water 1991 - 1999
Delivery of telecommunication poles Kuwait National Mobil
Telecommunication Company
1998– 1998
Delivery of telecommunication poles Kuwait National Mobil
Telecommunication Company
1999 – 1999
Technical assistance and consulting on operating and
repairing equipment
United Arab
Emirates
(Abu Dhabi)
Technical assistance and
consulting on operating and
repairing equipment
1999 – 2001
Projects in RomaniaMajor Projects in Middle East
IRAN
Turnkey execution of the Vafregan dam
Short description of the objective
Arch-shaped concrete dam, having an accumulation volume of 230 million cubic meters, which has
been built with a view to ensuring water supply for the city of Saveh and also, to providing irrigation to
an area of nearly 60.000 ha. At the same time, a hydroelectric plant has been built, having an overall
installed capacity of 11 MW.
Client
Teheran Regional Water Board (TRWB)
Location
Iran, 200 km south of Teheran
Project completion date
1992
Partnership
RAH VA SAHTEMAN (MOLAVI) Teheran - associate partner
Projects in RomaniaMajor Projects in North Africa
ALGERIA
Feasibility studies for the RAMDANE DJAMEL and ZAOUIA dams. Expertise
of the Technical Project for the dams BOUGOUS and Bouhalloufa
Description
The core business of the contract consisted of Romelectro conducting the projects for the Ramdane
Djamel and Zaouia dams in the Feasibility Study stage.
According to the Special Prescription Book, the services were provided in the following 5 stages:
Stage 1: Defining the options and the reconaissance program
Stage 2: Hydrological study
Stage 3: Geological and geo-technical study
Stage 4: Solution study
Stage 5: Feasibility study and bid documents
Also, for the same client, Agence Nationale des Barrages et Transfert (ANBT), the expertise of the
technical project for Bouhalloufa and Bougous was conducted. The core business of the contract was
for the APD study expertise to be conducted APD according to the Special Prescription Book.
Project starting date
November 2002 (Ramdane and Zaouia)
May 2001 (Bougous)
April 2002 (Bouhalloufa)
Project completion date
November 2003 (Ramdane and Zaouia)
April 2002 (Bougous)
September 2002 (Bouhalloufa)
Projects in RomaniaMajor Projects in North Africa
ALGERIA
EL-Fakia dam execution
Short description of the objective
Dam made of rock blocks piles endowed with a clay core, 49 m high and a 390m crown, which has
been built with a view to ensuring water supply for the city of M’Sila and also, to irrigating
80.000 ha of farm land.
Client: Directorate for Hydraulic Projects and Works (DHPW)
Location: Algeria, 30 km from M’Sila
Project completion date: 1985
SONAGHTER - associate local partner
Turnkey heightening of the Ksob dam
Short description of the objective
Romelectro has conducted the works aimed at heightening the existing dam by
10m by means of a turnkey contract. It is a complex project which has called for
rock excavations of over 37.000 cm,
casings of over 100.000 mp and nearly 2.500 tones of metallic partners.
Client: Directorate for Hydraulic Projects (DHP)
Location: Algeria, Pre-Sahara area, 30 km from the city of M’Sila
Project completion date: 1976
SONAGHTER -associate local partner
1. Performance of studies, designs and technical assistance
Morocco Sidi - Benour Substation
Kenya Kinogoni Mining Complex Substation
China Sini - Veni TPP
Peru various locations
2. Turnkey projects:
Bangladesh 21 sets of 33/11 kV 2.5 and 5 MWA transformer substations
25 sets of 11/0.4 kV 100-200 kVA transformer substations
Pakistan The Lasbella 132/63 kV 2x25 MWA transformer substation
Iraq The Al Qaim 33/6.6 kV 2x34 MWA + 132/6.6 10 MWA
transformer substation
The Sinjar 33/6.6 kV 3x34 MWA transformer substation
Transformers and Distributions Substations
Other projects abroad
Client Country Project Type Scope of supply Consulting
Engineer
Year
JEPCO Jordan Turnkey GLST - 132 kV T/L NEPA 2000
NAPOCOR Philippines Turnkey GLST, assembling elements
- 500 kV
Edwin
Ladingnon
2000
Intracom SA Greece,
Intrarom SA Romania
Romania Supply Hot dip galvanised tubular steel
antenna towers - 30, 50 m high
Intrarom SA 2000
NMTC Kuwait Turnkey Lattice steel antenna towers
- 70 m high
NMTC 2000
Hayat Kuwait Supply Lattice steel antenna towers
- 64 m high
NMTC 2000
NMTC Kuwait Supply Hot dip galvanized tubular
steel towers for antennae
- 40, 75, 100 m high
MTCo 2000
NMTC Kuwait Supply Hot dip galvanized tubular steel
towers for antennae
- 25, 30, 40, 75 m high
MTCo 1999
MEM Peru Design,
Testing,
Supply
GLST - 220 kV MEM 1999
JEPCO Jordan Turnkey GLST, assembling
elements - 132 kV
NEPA 1998
Other projects abroad
Major Export Projects
Client Country Project Type Scope of Supply Consulting
Engineer
Year
MEM Peru Design,
Testing,
Supply
GLST - 138 kV MEM 1998
ONUR CIVATA Turkey Supply Fittings 1998
JEPCO Jordan Supply,
Erection
GLST - 132 kV NEPCO 1998
Consorcio GyM Cosapi Peru Supply GLST - 220 kV MEM 1998
Consorcio Cosapi
-Abengoa
Peru Supply GLST - 220 kV MEM 1998
Consorcio Cosapi
-Balarezo
Peru Supply GLST - 138 kV MEM 1998
EGAT Thailand Design,
Testing,
Supply
GLST, assembling
elements - 115, 230 kV
EGAT 1997
MEM Peru Design,
Testing,
Supply
GLST, assembling
elements - 60-138 kV
MEM 1997
Mobifon Romania Supply Hot dip galvanized
lattice steel towers for
telecommunications
- 40 m high
MOBIFON 1997
Other projects abroad
Client Country Project Type Scope of Supply Consulting
Engineer
Year
National Mobile
Telecommunication Co.
(NMTC)
Kuwait Supply Steel lattice towers for
antennae - 70 m high
MTCo 1997
TREC Iran Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir 1997
EEA Egypt Supply Fittings EEA 1997
NAPOCOR Philippines Turnkey GLST - 138, 230 kV Sweed Power &
EEDD-NPC
1997
Public Establishment for
Distribution and Exploitation
of Electric Energy
Syria Supply Gantry towers for
transformer station,
clamps & fittings - 66/20 kV
PEDEEE 1996
National Electric Power
Authority
Nigeria Supply GLST, lighting poles, gantry
towers for
132/33 kV substation
NEPA 1996
Avangan Iran Design,
Testing
GLST - 230 kV Moshanir 1996
Ministry of Energy and Mines
(MEM)
Peru Supply GLST - 60 kV MEM 1995,
1996
National Power Corporation
(NAPOCOR)
Philippines Turnkey GLST, clamps, fittings,
composite insulator strings,
power conductors, OHGW,
OPGW - 132, 230 kV
Sweed Power 1995
Major Export ProjectsOther projects abroad
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
Power Generation
and Transmission
Co. - Ramin
Iran Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Ghods Niroo 1995
K.E.SH. - Tirana Albania Supply Clamps & fittings
- 132 kV
K.E.SH. 1995
Moshanir P.E. Co. Iran Design,
Testing
GLST - 230 kV Moshanir 1995
Tavanir Iran Design,
Testing
GLST - 63 kV MATN 1995
TREC Iran Design,
Testing,
Supply
GLST - 400 kV Moshanir 1993
TREC Iran Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir 1993
AREC Iran Design,
Testing,
Supply
Clamps & fittings - 154,
132, 230 kV
Moshanir 1993
KWPA Iran Supply AAAC conductor Moshanir 1993
National Iranian
Copper Industry
Co. - Sirjan
Iran Design,
Testing,
Supply
GLST, clamps, OHGW –
230 kV
Moshanir 1993
Major Export ProjectsOther projects abroad
Major Export Projects
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
Ministry of Energy
and Water
Kuwait Supply Steelworks, assembling
elements
MEW 1993
JEA Jordan Turnkey GLST - 132 kV JEA 1993
BREC Iran Design,
Testing, Supply
Clamps - 230 kV Moshanir 1993
West Regional Electric Co.
(WREC)
Iran Design,
Testing, Supply
Clamps & fittings –
63, 132 kV
Gharb Niroo 1993
Bakhtaran Regional Electric
Co. (BREC)
Iran Design,
Testing, Supply
GLST, clamps, assembling
elements
- 230 kV
Moshanir 1993
BREC Iran Design,
Testing, Supply
GLST, assembly elements –
400 kV
Moshanir 1993
WREP Iran Design,
Testing, Supply
GLST - 132 kV Gharb Niroo 1992
JEA Jordan Design, Supply,
Erection
GLST - 132 kV JEA 1992,
1994
KWPA Iran Design,
Testing,
Supply
GLST, clamps & fittings,
assembling elements,
insulators - 400 kV
Ghods Niroo 1992
Other projects abroad
Major Export Projects
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
WREP Iran Design,
Testing,
Supply
GLST, assembling
elements - 63 kV
Moshanir 1992
Guilan Regional
Electric Co. (GREC)
Iran Design,
Testing,
Supply
GLST, assembling
elements - 230 kV
Moshanir 1992
Avangan Co. Iran Supply Galvanized bolts & nuts 1992
AREC Iran Design,
Testing, Supply
GLST, assembling
elements - 230, 400 kV
Mona Co. 1992
Tehran Regional
Electric Co. (TREC)
Iran Design,
Testing,
Supply
GLST, assembling
elements - 400 kV
Moshanir 1992
EAC Cyprus Supply GLST - 132 kV, tower cross
arms
EAC 1992
Telecommunications
Co. of Iran
Iran Supply Assembling elements 1992
AREC Iran Design,
Testing,
Supply
GLST, assembling
elements, clamps & fittings,
insulators - 230 kV
Moshanir 1991
Electrification of a railway
station –
Salonic Idomeni
Greece Supply Lattice horizontal
galvanized girders
Odon
Odostromaton
1991
Other projects abroad
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
EAC Cyprus Supply Galvanized steel cross arms EAC 1991
AREC Iran Supply GLST, clamps and fittings
insulators and earth system
- 63,132, 230 kV
Moshanir 1991
AREC Iran Design,
Testing,
Supply
GLST, assembly elements,
clamps - 132/154 kV
interconnection
Moshanir 1991
Azerbaijan Regional Electric
Co. (AREC)
Iran Supply GLST - 400 kV Moshanir 1990
EAC Cyprus Supply GLST - 132 kV EAC 1990
Boyer Tirana Albania Supply Clamps & fittings, insulators Boyer 1990
EEA Egypt Design, Supply GLST and assembling elements
- 220 kV
EEA 1990
WREP Iran Turnkey GLST - 63, 132 kV Mahab Ghodss 1989
EAC Cyprus Design,
Supply
GLST - 132 kV EAC 1989
Major Export ProjectsOther projects abroad
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
DGMPRE Iraq Design,
Testing,
Supply
Conductors - 400 kV DGMPRE 1988
JEA Jordan Turnkey GLST -132 kV JEA 1987
Electricity Authority of
Cyprus (EAC)
Cyprus Design, Supply GLST - 132 kV EAC 1987
DGMPRE Iraq Turnkey GLST - 132 kV DGMPRE 1986,
1987
DGMPRE Iraq Design, Supply Materials - 132 kV DGMPRE 1986
EEA Egypt Turnkey GLST - 220 kV EEA 1986
EEA Egypt Design, Supply Clamps & fittings,
insulators - 220 kV
EEA 1986
DGMPRE Iraq Turnkey GLST - 400 kV DGMPRE 1985
Public Corporation for Electric
Power
South
Yemen
Design, ErectionWooden poles –
11, 33 kV
Ewbank 1984
Major Export ProjectsOther projects abroad
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
Egyptian Electricity Authority
(EEA)
Egypt Turnkey GLST - 220 kV EEA 1984
JEPCO Jordan Turnkey Spun concrete
poles - 11, 33 kV
JEA and JEPCO 1984
Jordan Valley Authority Jordan Turnkey GLST - 33 kV Stanley Consultants
Inc. + Harza Eng.
(USA)
1983,
1984
DGMPRE Iraq Turnkey GLST - 63 kV DGMPRE 1983
West Regional Electric
Power (WREP)
Iran Turnkey GLST - 63 kV Mahab Ghodss 1983
WREP Iran Turnkey GLST - 132 kV Mahab Ghodss 1983
Electricity Board of the
States of Malaya
Malaysia Turnkey GLST - 132 kV Crown Agency 1983
Yarmouk University Jordan Turnkey GLST - 33 kV Preece, Cardew &
Rider
1982
KWPA Iran Design,
Supply
GLST - 132, 230 kV Motor Columbus 1982
Major Export ProjectsOther projects abroad
Client Country Project
Type
Scope of Supply Consulting
Engineer
Year
Directorate General Of Minor
Projects & Rural
Electrification
Baghdad Electricity
Distribution (DGMPRE)
Iraq Turnkey GLST - 33 kV DGMPRE 1981
JEPCO Jordan Turnkey GLST - 132 kV Ewbank (GB) 1981
Jordan Electricity Authority
(JEPCO)
Jordan Turnkey GLST - 132 kV Preece, Cardew 1979
Azerbaidjan Regional Electric
Co. (AREC)
Iran Turnkey GLST - 63 kV Mahab Ghodss 1978
TAVANIR Iran Turnkey GLST - 230 kV Motor Columbus
(Switzerland)
1977,
1982
KWPA Iran Turnkey GLST - 230 kV Development &
Resources
1975
Khuzestan Water and Power
Authority (KWPA)
Iran Turnkey GLST - 132 kV Development &
Resources (USA)
1975
Electricité du Liban Lebanon Turnkey GLST - 150 kV Surveillance de Geneve
(Switzerland)
1975
Electricité du Liban Lebanon Turnkey GLST - 66 kV Lebanon Electricity 1972
Major Export ProjectsOther projects abroad
Contact
Romelectro
Address: 1-3 Lacul Tei Blvd.
020371 Bucharest, Romania
Phone: 004 021 2004 305
office@romelectro.ro
www.romelectro.ro
Contact

More Related Content

What's hot

Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Stefan Larsson
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten SaltYara International
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015Stefan Larsson
 
Anders t. madsen.pdf
Anders t. madsen.pdfAnders t. madsen.pdf
Anders t. madsen.pdfKun Con
 
Renewable energy and water treatment: emerging opportunities
Renewable energy and water treatment: emerging opportunitiesRenewable energy and water treatment: emerging opportunities
Renewable energy and water treatment: emerging opportunitiesCambridgeIP Ltd
 
imec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenimec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenecoTips
 
E+PC Power & Energy Capability
E+PC Power & Energy CapabilityE+PC Power & Energy Capability
E+PC Power & Energy CapabilityBCreaven
 
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...ecoTips
 
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plantChristopher Gray
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)1000kv technologies
 
Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheetJens Schulz
 
Day2 session 3: Lebanon
Day2 session 3: LebanonDay2 session 3: Lebanon
Day2 session 3: LebanonRCREEE
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for IndustriesLilianaSimhas
 
Armorgreen PowerPoint [ENGLISH]
Armorgreen PowerPoint [ENGLISH]Armorgreen PowerPoint [ENGLISH]
Armorgreen PowerPoint [ENGLISH]Frédéric AUTRET
 
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTION
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTIONATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTION
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTIONDesignTeam8
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...ako_corporate
 

What's hot (20)

Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten Salt
 
Small is beautiful
Small is beautifulSmall is beautiful
Small is beautiful
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
Presentation sunthetics b3_c_stefan_larssonmastonstrale 2015
 
Anders t. madsen.pdf
Anders t. madsen.pdfAnders t. madsen.pdf
Anders t. madsen.pdf
 
Renewable energy and water treatment: emerging opportunities
Renewable energy and water treatment: emerging opportunitiesRenewable energy and water treatment: emerging opportunities
Renewable energy and water treatment: emerging opportunities
 
imec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenimec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellen
 
E+PC Power & Energy Capability
E+PC Power & Energy CapabilityE+PC Power & Energy Capability
E+PC Power & Energy Capability
 
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...
imec ecoTips Bizzclub over duurzame energie, zonnecellen, batterijtechnologie...
 
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
 
Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)Km88 solar powered hho brown gas fuel cell (wecompress)
Km88 solar powered hho brown gas fuel cell (wecompress)
 
Brochure of TFM (PV energy)
Brochure of TFM (PV energy)Brochure of TFM (PV energy)
Brochure of TFM (PV energy)
 
Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheet
 
Day2 session 3: Lebanon
Day2 session 3: LebanonDay2 session 3: Lebanon
Day2 session 3: Lebanon
 
Introduction to Cofely and Southampton
Introduction to Cofely and SouthamptonIntroduction to Cofely and Southampton
Introduction to Cofely and Southampton
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for Industries
 
Armorgreen PowerPoint [ENGLISH]
Armorgreen PowerPoint [ENGLISH]Armorgreen PowerPoint [ENGLISH]
Armorgreen PowerPoint [ENGLISH]
 
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTION
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTIONATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTION
ATTAINING A SUSTAINABLE EV BATTERY RECYCLING SOLUTION
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
 

Similar to Romelectro general presentation

Romelectro Arabia - Industry Offer 2017
Romelectro Arabia - Industry Offer 2017Romelectro Arabia - Industry Offer 2017
Romelectro Arabia - Industry Offer 2017Anka Volintiru
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeriaRCREEE
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for IndustriesRomelectro
 
ISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGNicolas Baldrich
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1dCORE
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Sirris
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2John Churchill
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...The Business Council of Mongolia
 
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Cluster TWEED
 
Shemar Power Engineering_Overall Composite Insulation Solutions for Power Grids
Shemar Power Engineering_Overall Composite Insulation Solutions for Power GridsShemar Power Engineering_Overall Composite Insulation Solutions for Power Grids
Shemar Power Engineering_Overall Composite Insulation Solutions for Power GridsYingwei Wang
 

Similar to Romelectro general presentation (20)

Romelectro Arabia - Industry Offer 2017
Romelectro Arabia - Industry Offer 2017Romelectro Arabia - Industry Offer 2017
Romelectro Arabia - Industry Offer 2017
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for Industries
 
ISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENGISTMO SOLAR PRESENTATION 2016_ ENG
ISTMO SOLAR PRESENTATION 2016_ ENG
 
Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1Earth_Renewed_CNRGH2.1
Earth_Renewed_CNRGH2.1
 
GenComm - Project
GenComm - ProjectGenComm - Project
GenComm - Project
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
 
Door Systems Presentation 2012
Door Systems Presentation 2012Door Systems Presentation 2012
Door Systems Presentation 2012
 
JC Professional Profile 2
JC Professional Profile 2JC Professional Profile 2
JC Professional Profile 2
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
 
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
 
Shemar Power Engineering_Overall Composite Insulation Solutions for Power Grids
Shemar Power Engineering_Overall Composite Insulation Solutions for Power GridsShemar Power Engineering_Overall Composite Insulation Solutions for Power Grids
Shemar Power Engineering_Overall Composite Insulation Solutions for Power Grids
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from AbengoaThe Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
The Energy-Water Nexus (Thirsty Energy), by Pol Adarve from Abengoa
 
WQ-2
WQ-2WQ-2
WQ-2
 

Recently uploaded

CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free DeliveryPooja Nehwal
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 

Recently uploaded (20)

CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 

Romelectro general presentation

  • 2. Mission Standing for the Group’s ethical principles, our services’ quality and promoting the highest professional standards generate our clients’ appreciation. What makes us different in the energy and environment market are: our unique technological solutions already implemented, the integrated approach and our experts’ specializations and skills diversity. Flexibility and adaptation to current challenges represent our strengths. A group of powerful companies united by a common purpose “turning objectives into results” Vision Our Group members’ experience and tradition have gathered common valences:  Creativity, determination, cooperation, transparency;  Trust, solidarity, honesty, integrity;  Responsibility in inter-human relations and partnerships;  Respect for the environment and the community Values
  • 3. 1971 Romelectro is set up as the foreign trade company of the Ministry of Energy 1974-1978 First export works for dams and OHTLs in Iran and Algeria 1980 Complex T&D contracts in Egypt, Iraq, Jordan, Lebanon, Malaysia 1982–1984 Turnkey works of Vafregan Dam in Iran 1990 Power T&D works in the Philippines and Thailand 1993 Romelectro is present in 19 countries 1994 Romelectro becomes a 100% private company 2004 Starting of the turnkey execution works for the Complex Hydro-development of Jiu Canyon, Bumbești–Livezeni Stretch 44 years at a Glance (1) discover the business power
  • 4. 2005 Romelectro becomes major shareholder in ISPE, CELPI and Electromontaj Carpaţi Sibiu, setting up Romelectro Group 2008 Romelectro becomes investor of Ecogen Energy Buzau and starts the Construction of a Combined Heat and Power Plant in Buzău 2009 Romelectro becomes investor of Voineasa Micro Hydro Power Plant 2007-2014 Romelectro develops environmental protection competencies (low Nox burners, Dense Slurry Systems, Flue Gas Desulphurisation) 2014 Romelectro signs the contract with Timisoara Municipality for first representative Waste to Energy contract in Romania 2014 Romelectro signed the contract for Bradu 400/220/110/20 kV substation Refurbishing 2015 Romelectro signed the contract for Stejaru HPP Refurbishment 44 years at a Glance (2) discover the business power
  • 5. EPC Contractor, Project Developer and Investor in the fields of power and heat generation, power transmission & distribution, environmental protection and industry Leader as consulting and engineering company in the field of power generation, power T&D, environmental protection and industry Contractor for design, construction and testing for steel structures in the field of power T&D and telecommunication. Contractor for construction and installation works for power Transmission and Distribution projects. Romelectro Group structure
  • 6. Roles on the market • EPC Contractor • Investor • Project Developer • Strategic Partner • Electricity trader About Romelectro MARKET AREAS Power Generation - Thermal Environmental Protection IndustryPower Generation - Hydro Power Transmission and Distribution
  • 7. About Romelectro Romelectro offer • Turn-key contracting • Studies, research and development • Technical consultancy • Commercial and institutional consultancy • FEED, Basic and detailed engineering • Equipment supplier • Installation and assembling services • Civil works • Site supervision and project management • Commissioning • Rehabilitation and modernisation programs
  • 8. As Romelectro’s expertise over the years extends to most of the heat and power plants in Romania, we have the necessary competences, technologies, resources and know-how to answer to our clients’ needs for both green field projects and existing power plants. As investor and project developer, Romelectro transformed the existing power plant of Buzău into a modern Combined Heat and Power Plant, using high efficiency technology. References: • Complex rehabilitation, retrofitting and upgrading programs in the field of thermal power plants and cogeneration plants developed for more than 3,000 MW. • Engineering and design for more than 15,000 MW in conventional & nuclear power plants, representing 90% of the total installed capacity of Romania. • Projects for new facilities using both conventional fuels and renewable energy sources (biomass, biofuel, waste). IndustryPower Generation Hydro Environmental Protection Power Trasmisson & Distrbution Power Generation - Thermal
  • 9. • As EPC Contractor, Romelectro is leading the complex development of the Jiu River on Bumbeşti–Livezeni stretch and the construction of two hydropower plants with an installed power of more than 60 MW. • As investor and general contractor, Romelectro developed 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW. • Romelectro carried out the feasibility studies for the Ramdane Djamel and Zaouia Dams (Algeria); detailed technical design for the Bougous and Bouhalloufa Dams (Algeria); turnkey execution of the Vafreghan Dam (Iran); execution of the El – Fakia (Algeria) and turnkey heightening of the Ksob Dam (Algeria). •Recently Romelectro signed for the rehabilitation of Stejaru HPP 210 MW. Power Generation - Hydro Power Generation Thermal Environmental Protection Power Trasmisson & Distrbution Industry Power Generation - Hydro
  • 10. Romelectro’s capabilities in the Power Transmission and Distribution field have been proved through the 45 years long hystory of domestic and international projects: • Engineering for more than 22,000 km of OHTLs in Romania and about 10,000 km OHTLs (750 kV, 400 kV, 220 kV, 110 kV) km in countries like Iran, Iraq, Philippines, Jordan, Syria, Algeria or Malaysia • Design, engineering, construction for more than 150 high voltage substations • Grid connection studies for more than 30,000 MW of wind energy farms • Strategies and forecasting studies for the National Power System Power Generation Thermal IndustryPower Generation Hydro Environmental Protection Power Transmission & Distribution
  • 11. Power Generation Thermal IndustryPower Generation Hydro Power Trasmisson & Distrbution Environmental Protection In line with the environmental protection related goals set by the EU Energy 2020 Strategy and the EU Energy 2050 Roadmap, Romelectro promotes and implements the most advanced tehnologies: • Ash and slag removal and storage in dense slurry system: projects for 12 coal-fired boilers at Oltenia Energy Complex. • Flue gas desulphurization at Ișalnița TPP. • NOx emission reduction: projects for 14 gas-fired boilers at Galați CHPP, Iernut TPP, Progresu CHPP, București Vest CHPP and București Sud CHPP.
  • 12. Energy efficiency in Industry Romelectro takes over the whole chain from technical general audit to implementation, going through: Technical audit (thermal, electrical, utilities), Projects technical-economic analysis – opportunity, prefeasibility and feasibility studies, cost – benefit analysis, Business plan, Identifying financing/co-financing sources for investment, financial model, social, economic and environmental impact assessment, turn-key contracts. We cover all energetic issuesFactory energy dispatcher • Energy management system • New power generation resources • Specific thermal, mechanical and electrical solutions • Electrical distribution system SCADA systems (electric/thermal power, water, natural gas, heavy fuel oil etc) • DCS or PLC systems for process management • Process simulation systems • Security systems, Video - data - voice networks Power Generation Thermal Power Generation Hydro Environmental Protection Power Trasmisson & Distrbution Industry
  • 14. FACTS AND FIGURES •2 x 315 MW power units • 3317 ÷ 5543 mg/Nm³ rated sulphur dioxide emission, estimated in the current operation • 200 mg/Nm³ maximum SO₂ concentration after project implementation • Wet desulphurization plant using limestone slurry • 96% desulphurization efficiency Ișalnița TPP - Flue gas desulphurisation system PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION Scope of the project: reducing the sulphur dioxide (SO₂) emissions, discharged together with the flue gas resulting from power units no. 7 and no. 8 at Ișalniţa TPP – SE Craiova – Oltenia Energy Complex. The two plants are being executed identically, with the same type of equipment, delivered by the same suppliers. Starting year: 2012 Commissioning year: 2014 Client: Oltenia Energy Complex – SE Craiova Babcock Noell GmbH – Consortium Leader Romelectro – Consortium Partner Ispe – Engineering
  • 15. Dense Slurry System at Turceni TPP Turceni TPP is the largest coal fired producer, supplying more than 10% of the energy consumed in Romania. Scope of the project: Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology. The new investment consists mainly of: • two dense slurry preparation stations • bagger pumps replacement • dry ash transport installation • air compressor station • one wastewater treatment plant Starting year: 2009 Commissioning year: 2012 Client: Turceni TPP Romelectro: EPC Contractor FACTS AND FIGURES • 4 × 330 MW units • 4 × 155 t/h of dry solids (30 t/h bottom ash + 105 t/h fly ash + 20 t/h FGD gypsum) • 5 × 450 kW + 1 × 250 kW Atlascopco compressors • 8 sets of Metso Mineral centrifugal pump grups • CIRCUMIX continuous mixing technology • 4900 m transport distance • 24 m geodetic level difference. PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION Turceni TPP - Dense Slurry System
  • 16. Dense Slurry System at Craiova II CHPP Part of Oltenia Energy Complex, Craiova II CHPP (2 × 150 MW) has a significant importance both for the Romanian power sector and for the city of Craiova, being the only heat producer both for population and strategic industrial consumers such as Ford automotive factory and other plants on the industrial platform. Scope of the project: Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening. Starting year: 2008 Commissioning year: 2010 Client: Craiova II CHPP Romelectro: EPC Contractor FACTS AND FIGURES • 2 × 150 MW power units (+8 district heating boilers) • 2 × 86 t/h of dry solids • (6 t/h bottom ash + 60 t/h fly ash + 20 t/h dry gypsum) • 1:1 water to solid ratio • CIRCUMIX continuous mixing technology • 2 × 140 m3/h + 1 × 110 m3/h transport slurry lines • 3 sets of Feluwa hose diaphragm slurry pumps for distance transport • 9400 m transport distance • 90 m geodetic level difference PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION Craiova II CHPP - Dense Slurry System
  • 17. Ișalnița TPP - Dense Slurry System Part of Oltenia Energy Complex, Ișalnița TPP (2 × 315 MW) has a significant importance for the Romanian power sector being one of the largest power generation capacities operation in Romania. Scope of the project: Increasing the stability of the slag and ash storage of SE Ișalnița, on the right and left banks of Jiu river, using dense fluid technology. The solution is designed to transform the existing heavily polluting ash handling system to match the eco-friendly dense slurry technology. Starting year: 2008 Commissioning year: 2010 Client: Ișalnița TPP Romelectro: EPC Contractor FACTS AND FIGURES • 2 × 315 MW power units, 4 × 510 t/h boilers • 4 × 77 t/h of dry solids (5 t/h bottom ash + 52 t/h fly ash + 20 t/h dry gypsum) • CIRCUMIX continuous mixing technology • 3 × 120 m3/h transport slurry lines – 1 ash field • 4 sets of Warman centrifugal pump groups • 3 pumps/group for distance transport • 4600 m transport distance • 45 m geodetic level difference. PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
  • 18. Rovinari TPP - Dense Slurry System The second largest coal fired producer in Romania, with an installed power of 1320 MW (4 x 330 MW), Rovinari TPP supplies about 9% of the total electricity generated on the local market. Scope of the project: New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW) Starting year: 2008 Commissioning year: 2010 Client: Rovinari TPP Romelectro: EPC Contractor FACTS AND FIGURES • 4 x 330 MW units • 4 x 190 t/h at dry solids (30 t/h fly bottom ash + 127 t/h fly ash + 33 t/h dry gypsum) • CIRCUMIX continuous mixing technology • 4 x 270 m3/h transport slurry lines • 4 sets of Warman centrifugal pump groups • 7000 m transport distance • 32 m geodetic level difference. PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION
  • 19. Galați CHPP Low NOx (1) Scope of the project: : Modernization and retrofitting of firing systems of 4 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS. For each of the C6, C7 and C8 steam boilers , the new installation consists of: • 6 low NOx mixed burners for heavy fuel oil and natural gas • a new modern system for heavy fuel oil and natural gas supply • a new BMS (Burner Management System) unit • a new DCS (Distributed Control System) unit • emission monitoring system • methane leakage monitoring system PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION FACTS AND FIGURES • 4 x 420 t/h steam boilers • 6 x 53 MW mixed heavy fuel oil – natural gas low NOx burners/boiler body (for C6, C7 and C8) • 6 x 53 MW natural gas low NOx burners/boiler body (for C5)
  • 20. Galați CHPP Low NOx (2) For C5 steam boiler, the new installation consists of: • 6 low NOx burners for natural gas • 8 low NOx burners for blast furnace gas • a new modern system for natural gas supply • a new modern system for blast furnace gas supply • a new BMS (Burner Management System) unit • a new DCS (Distributed Control System) unit • emission monitoring system • methane leakage monitoring system Starting year: 2008 Commissioning year: 2013 Client: Electrocentrale Galați Romelectro: EPC Contractor PROJECTS › ENVIRONMENTAL PROTECTIONPROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION FACTS AND FIGURES • 8 x 21 MW blast furnace gas low NOx burners /boiler body • BMS type SIL3, failsafe, double redundant /boiler body • DCS type Ovation /boiler body
  • 21. Iernut TPP - Low NOx Scope of the project: modernization and retrofitting of firing systems of 4 x 320 t/h natural gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS. For each boiler, the new installation consists of: • 10 low NOx burners • a new modern system for natural gas supply • a new BMS (Burner Management System) unit • upgrading and extension of existing DCS for integration of new BMS • emission monitoring system • methane leakage monitoring system Starting year: 2009 Commissioning year: 2011 Client: ELCEN București Romelectro: EPC Contractor PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION FACTS AND FIGURES • 2 x 215 MW units • 2 x 640 t/h (4 x 320 t/h) steam boilers type PK-47-2 • 10 x 30 MW low NOx burners / boiler body • BMS type SIL3, failsafe, triple redundant / boiler body
  • 22. FACTS AND FIGURES • 2 x 420 t/h steam boilers • 4 ESP casings are to be fitted with new inner instalation components • 400 mm collecting electrodes spacing optimised design • 24 new high-performance 120 kW power transformers with high- frequency technology to supply high voltage to the retrofitted ESP’s • 2 new improved ESP monitoring and control systems •48 mg/Nm³ maximum dust emissions at ESP’s outlet, after project completion Govora CHPP - Electrostatic precipitators modernization PROJECTS > THERMAL POWER > ENVIRONMENTAL PROTECTION Govora CHPP is the only thermal energy producer for Râmnicu-Vâlcea area in Romania. It is also the only steam supplier for Râmnicu Vâlcea industrial platform and it can deliver power to the national power grid. Scope of the project: Modernization of the electrostatic precipitators for boilers no. 5 and no. 6 at Govora CHPP, aiming to reduce the level of dust emissions at maximum 48 mg/Nm3 at ESP’s outlet. Starting year: 2012 Commissioning year: 2013 Client: Govora CHPP Romelectro – EPC Contractor Techno Montaj – Mechanical erection Icpet Eco – Engineering and design
  • 23. FACTS AND FIGURES • 4 x 420 t/h steam boilers • min 121% power efficiency calculated according to the “Waste Directive” • min 5.64 Mwe installed electric power • min. 86% boiler efficiency • Noxious emissions at the stack - according to Directive 2008/98/EC • 87000 tons/year - estimated quantity of fuel to be processed Timișoara TPP - Waste-to-Energy PROJECTS > THERMAL POWER It is the first major project in Romania in the field of Waste-to- Energy, according to the National Waste Management Strategy, included in the Waste Management Plan This project proposes the execution of an alternative fuel incineration plant, fuel resulting from the sorting process of municipal waste and generation of electricity and heat. Objectives: - Discarding the sorted waste by conversion of the resulting alternative fuel into energy, by means of a high efficiency cogeneration plant; - Reducing the methane gas consumption by replacing it with this alternative fuel, the result being approximately 16 million m3/year. Starting year: 2013 Commissioning year: 2016 Client: International Recycling Energy Romelectro – Consortium Leader Baumgarte Boylers Systems GmgH – Consortium Partner ISPE – General Designer
  • 24. PROJECTS > THERMAL POWER Rovinari TPP unit 4 Modernization of Electric and Automation Installations • The executed works provided an efficient operation of Power Unit No. 4, in safe and highly reliable conditions. Moreover, the requirements related to the environmental legislation shall also be achieved in operation. • Full replacement of the 6 and 0.4 kV substations, the DC substations, rectifiers, inverters, and 24 and 220 V DC stationary batteries, digital protections for the power unit, static excitation, substation and IT aggregates for the electrostatic precipitators, DCS – Distributed Control System, firing control system, measurement loops in the boiler and machinery halls, Governor control system of the steam turbine and boiler feed pump turbine. •ROMELECTRO, acting as Consortium Leader had to identify the best technical solutions and harmonization of the delivered equipment with the existing or refurbished installations. Starting year: 2013 Commissioning year: 2014 Client: Complexul Energetic Oltenia – Rovinari TPP Co PARTNERSHIP Romelectro – Consortium Leader SAEM Energomontaj IEA – Consortium Partner ISPE – Engineering and Design
  • 25. Investment for Combined Heat and Power Plant in Buzău PROJECTS › CONGENERATION As investor and general contractor, Romelectro developed the project transforming the existing power plant of Buzău into a modern combined heat and power plant, using high efficiency technology. The new generation capacity is operated by the Special Purpose Vehicle (SPV) created on the basis of private–public joint venture. Starting year: 2008 Commissioning year: 2009 Client: Ecogen Buzău (IPP) Romelectro: Investor, EPC Contractor FACTS AND FIGURES • Inhabitants of Buzău City: ~150,000 • Length of primary district heating system: ~26 km • Length of secondary district heating system: ~56 km • Total number of apartments: ~35,000 • Number of apartments supplied: ~21,000 Buzău CHPP - Investment for Combined Heat and Power Plant PROJECTS > THERMAL POWER
  • 26. Complex Hydro-Development of Jiu Valley PROJECTS › HYDROPOWER As EPC Contractor, Romelectro executes the complex development of the Jiu River on Bumbești–Livezeni stretch and the construction of two hydropower plants (Dumitra and Bumbesti) with an installed power of approximately 60 MW and Livezeni dam. This project represent the most important investment in Romania in hydropower field after 1990. Starting year: 2004 Commissioning year: 2013 (Dumitra HPP), 2014 (Bumbești HPP) Client: Hidroelectrica Romelectro: EPC Contractor, Consortium Leader Hidroelectrica and ISPH: Consortium Partners Jiu Canyon - Complex Hydro-Development PROJECTS > HYDROPOWER
  • 27. Rehabilitation of Voineasa Micro Hydro Power Plant PROJECTS › HYDROPOWER Romelectro became the owner of the hydro power capacity on Mănăileasa River in 2006. As investor and EPC Contractor, in 2009 Romelectro started the works for the complete rehabilitation of Voineasa MHPP, creating a new and efficient capacity for harvesting the renewable potential of Mănăileasa River. Scope of the project: developing the 3 Micro Hydro Power Plants on Mănăileasa River with an installed power of 1.45 MW by replacing the old generation capacities with new hydro-mechanical and electrical equipment. Starting year: 2009 Commissioning year: 2011 Romelectro: Investor and EPC Contractor Voineasa Micro Hydro Power Plant Rehabilitation PROJECTS > HYDROPOWER
  • 28. Complex Hydro-Development of Jiu Valley Scope of the project: Romelectro is leading for 6 years in a row the turn key project CHE Stejaru Rehabilitation - “Hydropower Romanian School”. Starting year: 2015 Commissioning year: 2021 Romelectro: EPC Contractor The Hydropower, the central point of the Complex Landscaping of the Bistrita River, with an installed capacity of 210 MW and over 50 years of functioning, summing up over 1.000.000 working hours, is preparing for the implementing of some state-of-the-art solutions, that will assure a high level of availability and security for at least the following 30 years. Client: Hidroelectrica Romelectro: General Contractor, Consortium Leader Litostroj Power Slovenia: Consortium Partner Stejaru HPP Rehabiliation PROJECTS > HYDROPOWER
  • 29. Refurbishment of the 400/110 kV Brașov Substation The 400/110 kV electrical substation in Brașov has a particular importance for the National Power System and for the local grid. It represents a junction for power lines connecting Muntenia, South Transylvania and the poorly covered Moldovian area. The substation supplies the local consumption area (around 167 MW) being also the connecting point for Brașov TPP. Scope of the project: upgrading of the primary and secondary circuits in the 400/110kV substation, by full refurbishing. The purpose is to complete a new 400 kV outdoor electrical substation, equipped with the modern high-performance conventional installations, as well as a new indoor 110 kV electrical substation, equipped with SF6 insulated installations (GIS cells). Starting year: 2010 Commissioning year: 2013 Client: Transelectrica Romelectro: EPC Contractor, Consortium Leader CG Holdings Belgium NV: Consortium Partner ISPE: Engineering and design Electromontaj Carpați Sibiu: Erection and commissioning works PROJECTS › POWER TRANSMISSION & DISTRIBUTION 400/110 kV Brașov Substation Refurbishment PROJECTS > POWER TRANSMISSION & DISTRIBUTION
  • 30. PROJECTS › POWER TRANSPORT & DISTRIBUTION Scope of the project: • replacing the existing primary switch gear • replacing the AT 400 MVA • modernising the internal services • introducing the numerical and SCADA protections and control systems - it is now possible for the substation to be fully remote-controlled by means of the (territorial and national) dispatch • retrofitting works on the drainage and sewage system • modernising the heating, climatising, security as well as the fire extinction system. Starting year: 2004 Commissioning year: 2006 Client: Transelectrica – Cluj Subsidiary JACOBSEN Elektro As (Norway): Consortium Leader Romelectro: Local Partner 400/220 kV Roşiori Electrical Substation Retrofitting PROJECTS > POWER TRANSMISSION & DISTRIBUTION
  • 31. PROJECTS › POWER TRANSPORT & DISTRIBUTION Modernization of Electrical Substations PROJECTS > POWER TRANSMISSION & DISTRIBUTION • Refurbishment of the 220/110 kV Barboși Substation • Refurbishment and modernization of 110 kV and 220 kV bays in FAI Substation • Extension and modernization of the 110/20 kV Dumbrava - Sibiu Substation • Primary equipment upgrade in the 110/20 kV Petrila Substation • Refurbishment of the 220/110/20 kV Turnu Măgurele Substation • Upgrade of the 110 kV bays in HPP Ciunget Substation • Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP • Modernization of the 110 kV Electrical Substation of Govora HPP • Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation • Modernization of the 220/110 kV Vetiş Electrical Substation
  • 32. PROJECTS › POWER TRANSPORT & DISTRIBUTION BARBOSI ELECTRICAL SUBSTATION 220/110kV PROJECTS > POWER TRANSMISSION & DISTRIBUTION In 2013, Romelectro began the works for refurbishing the Barbosi substation, consisting of: •Replacing the existing primary equipment in the substation due to their old age (over 30 years of operation); •Replacing the existing protections with modern digital protections; •Introducing the central control system (SCADA) so that the substation will operate with no personnel; •Increasing the safety in operation of the substation for both the electricity supply of the 0 (zero) degree consumer - Arcelor Mittal Galati and the wind electricity transit in the Dobrogea area towards the Moldova area through 220kV Lacul Sarat-Filesti OHTL in the 220kV Barbosi Substation - 220kV Focsani Vest OHTL. CLIENT: Transelectrica – ST Constanta PROJECT STARTING YEAR: 2013 PROJECT COMPLETION YEAR: 2014 PARTNERSHIP: Romelectro: EPC Contractor, Consortium Leader Electromontaj Carpati Sibiu: Consortium Partner
  • 33. PROJECTS › POWER TRANSMISSION & DISTRIBUTION Scope of the project: to connect the Dumeşti and Românești Wind Farms to the National Power Grid through a new 110 kV line cell executed in the 220/110 kV FAI Substation The characteristics of this projects are: • mounting of new 110 kV cell in the FAI substation, required to connect the new user; • mounting the control and protection equipment in the FAI substation for the new 110 kV cell in Dumeşti Wind Farm; • providing a measurement group in the 110 kV FAI transformer station to meter the electricity consumed /generated by the user; • providing the equipment to monitor the quality of the electricity for the new 110 kV cell in Dumeşti Wind Farm. Starting year: 2013 Commissioning year: 2014 Client: Transelectrica Romelectro: EPC Contractor Connection of 99 MW Dumești and 30 MW Românești Wind Power Plants to the National Power Grid
  • 34. Refurbishment of the 400/110 kV Brașov Substation The 400/220/110 kV Bradu Substation is of special importance for the National Power Grid and also for Pitești and Rîmnicu Vâlcea areas. It represents an important connection point of the Muntenia and Oltenia networks with the one in Transylvania. The main refurbishing works shall consist in: • refurbishment of the 400 kV Substation, 220 kV Substation, 110 kV Substation and of 20 kV Substation • procurement and mounting of 2 x 400/400/80 MVA, 400/231/22 kV autotransformers • procurement and mounting of 2 x 200/200/60 MVA, 231/121/10,5 kV autotransformers • procurement and mounting of 2 x 16 MVA, 110/20 kV transformers • control – protection (SCPA) and metering system • remote protection and telecommunication systems • refurbishing the DC and AC internal services installation • constructions and architecture works • achieving the 400 kV Țânțăreni OHTL connection Starting year: 2014 Commissioning year: 2018 Client: Transelectrica Romelectro: EPC Contractor PROJECTS › POWER TRANSMISSION & DISTRIBUTION Refurbishment of the 400/220/110 kV Bradu Substation PROJECTS > POWER TRANSMISSION & DISTRIBUTION
  • 35. Grid Connection of the Green Field 800 MW CCGT Brazi PROJECTS › POWER TRANSMISSION & DISTRIBUTION Scope of the project: the (400)/220/110 kV Banca Substation was conceived to evacuate in National Power Grid a power of approximately 406 MW generated by Ivesti, Falciu 1 and Falciu 2 Wind Farms. The characteristics of this projects are: • execution of a (400)/220/110 kV transformer substation • connection of the transformer substation in 220 kV DC Gutinaș-FAI and Gutinaș- Munteni OHTL (belonging to Transelectrica-ST Bacău) by means of an approximately 0.3 km 220 kV DC OHTL • regulating the coexistence of the 110 kV Bârlad- Roșiești OHTL (belonging to EoN Moldova) to the 220 kV OHTL in the Banca Substation; Starting year: 2012 Commissioning year: 2013 Client: Transelectrica Romelectro: EPC Contractor Connection of 300 MW Ivești, 88 MW Falciu 1 and 18 MW Falciu 2 Wind Power Plants to the National Power System through the new (400)/220/110 kV Banca Substation
  • 36. Grid Connection of the Green Field 800 MW CCGT Brazi PROJECTS › POWER TRANSMISSION & DISTRIBUTION Scope of the project: supplying and installing two new Overhead Transmission Lines in order to connect the Green Field 860 MW CCGT (Combined Cycle Gas Turbine) Brazi to the National Power System. Starting year: 2008 Commissioning year: 2010 Client: OMV Petrom Romelectro: EPC Contractor FACTS AND FIGURES Connection point: 400/220/110 kV Brazi West Substation Length: 3 km Voltage level: • 400 kV for the double circuit DONAU type towers • 220 kV for the simple circuit RODELTA type towers Distance between the axes: 80 m Grid Connection of the Green Field 860 MW CCGT Brazi PROJECTS > POWER TRANSMISSION & DISTRIBUTION
  • 37. 44 Years of Sustainable Development on Domestic and International Markets
  • 38. Project Client Contract performance period Execution of a Waste-to-Energy Plant and incorporating it within Timișoara Sud TPP International Recycling Timișoara (IRE) 2014 – 2016 Rehabilitation and modernization of 330 MW Power Unit No. 4 operating on lignite in SE Rovinari; Modernization of the electric power and automation plants Oltenia Energy Complex – SE Rovinari 2014 – 2014 Process water supply installation for the desulphurization plants related to power units no. 4 and 5 Oltenia Energy Complex – SE Rovinari 2014 – 2014 Execution of works for taking over the gypsum slurry from the flue gas desulphurization plant of unit no. 4 to the dense slurry plant related to unit no. 3 Oltenia Energy Complex – SE Rovinari 2014 – 2014 Automation Works - Interconnection of the dense slurry plant to the dry ash collecting and taking over plant of Cenextra related to the project: "Ash collecting, transport and automatic loading plant, unit no. 3 Oltenia Energy Complex – SE Turceni 2014 – 2014 Rehabilitation / Modernization of the electrostatic precipitator in power unit no. 7, execution and connection of the gas circuit between power unit no. 7 and desulphurization plant no. 6 Oltenia Energy Complex – SE Turceni 2014 – 2014 Interface execution between the dense slurry plant and the desulphurization plant Oltenia Energy Complex – SE Turceni 2012 – 2014 Flue gas desulphurization plants for power units no. 7 and no. 8 at Ișalniţa TPP Oltenia Energy Complex – SE Craiova 2012 – 2014 Modernization of the excitation system and protections of Unit 7 generator in Ișalnița TPP Oltenia Energy Complex – SE Craiova 2012 - 2014 Electrostatic precipitators modernization at Govora CHPP Govora CHPP 2012 – 2013 Projects in Romania THERMAL POWER PROJECTS
  • 39. Projects in Romania Proiect Client Contract performance period Solutions for discharge, transport and storage of the waste resulting from the coal firing process at Turceni TPP, using dense slurry technology Oltenia Energy Complex – SE Turceni 2009 – 2012 Modernization and retrofitting of firing systems of 4 x 320 t/h gas fired boilers at Iernut TPP, by implementation of low NOx burners and automatic BMS ELCEN București Iernut TPP 2009 – 2011 Modernization and retrofitting of firing systems of 5 x 420 t/h boilers at Galati CHPP, by implementation of low NOx burners and automatic BMS and DCS Electrocentrale Galați Galați CHPP 2008 – 2013 Investement for Combined Heat and Power Plant of 6 MWe and 80 Gcal in Buzău Ecogen Buzău (IPP) 2008 – 2009 Increasing the stability of the slag and ash storage of Ișalnița (2 x 315 MW), on the right and left banks of Jiu river, using dense fluid technology SE Craiova Ișalnița TPP 2008 – 2010 Refurbishment and upgrade of electrical and automation installation for 330 MW unit no. 6 at TPP Rovinari SE Rovinari 2008 – 2010 New ash and slag deposit in Gârla and new installations for collecting, preparation, discharge and storage of dense slurry in Rovinari TPP (4 x 330 MW) SE Rovinari 2008 – 2010 Increasing the stability of the Valea Mănăstirii slag and ash deposit by executing the installations for ash and slag dense fluid and by developing the storage for the first hightening SE Craiova Craiova II CHPP 2008 – 2010 Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP - boiler 2 ELCEN București Progresu CHPP 2007 – 2007 THERMAL POWER PROJECTS Projects in Romania
  • 40. Projects in Romania Project Client Contract performance period Rehabilitation of the 420 t/h CR 1737 type boilers in order to increase the safety in operation, especially on heavy fuel oil and for dual operation, including low NOx burners – Progresu CHPP, boilers 3 and 4 ELCEN București Progresu CHPP 2006 – 2007 Rehabilitation and modernizing of 315 MW unit no. 7 in Işalniţa TPP SE Craiova Ișalnița TPP 2005 - 2006 Rehabilitation of the firing installations for 525 t/h steam boiler no.2 in Bucureşti Vest CHPP and no. 5 and 6 in Bucureşti Sud CHPP, by replacing with modern low NOx burners ELCEN București 2004 – 2006 Refurbishment of 330 MW units no. 4 and 5 in Turceni TPP (Program A3) Turceni TPP 1995 – 2003 Refurbishment of 330 MW units no. 3 and 7 in Turceni TPP and no. 5 and 6 in Rovinari TPP (Program A2) Turceni TPP Rovinari TPP 1994 – 1998 Refurbishment of 330 MW units no. 2 and 6 in Turceni TPP and no. 3 and 4 in Rovinari TPP (Program A1) Turceni TPP Rovinari TPP 1991 - 1994 Projects in Romania HIDRO POWER PROJECTS Project Client Contract performance period Hydropower development of the Jiu River on the Livezeni – Bumbeşti strech, with the execution of 2 hydropower plants with an installed power of 60 MW Hidroelectrica 2004 – 2014 Rehabilitation of Voineasa Micro Hydro Power Plant, Voineasa I, II, III Romelectro 2009 – 2011 THERMAL POWER PROJECTS
  • 41. Projects in Romania Proiect Client Contract performance period Rehabilitation of the 400/220/110/20 kV Bradu Substation Transelectrica 2014 - 2018 Switching to a 400 kV voltage of the Porțile de Fier – Reșița – Timișoara – Sacalaz – Arad axis/Stage I: Extension of the 400 kV Porțile de Fier Substation Transelectrica Craiova Subsidiary 2013 - 2015 Rehabilitation of the 220/110 kV Barboși Substation Transelectrica 2012 - 2014 Turnkey (400)/220/110 kV Banca Substation Transelectrica 2012 - 2013 Refurbishment of the 400/110 kV Braşov Substation Transelectrica 2010 – 2013 Refurbishment and modernization of the 110 kV and 220 kV bays in FAI Substation Transelectrica Bacău Subsidiary 2007 - 2011 Extension and modernization aiming to increase the safety in operation of the 110/20 kV Dumbrava Sibiu Substation Electrica Transilvania Sud 2007 – 2009 Primary equipment upgrade in the 110/20 kV Petrila Substation Transelectrica 2007 – 2007 Refurbishment of the 220/110/20 kV Turnu Măgurele Substation Transelectrica 2006 - 2011 Modernization of the protection systems of 250 MVA transformer and 110 kV PDB in 400/110 kV Braşov, Dârste, Domneşti, Medgidia Sud, Pelicanu, Tulcea Vest, Smârdan, Drăgăneşti Olt Substations Transelectrica 2006 – 2009 Upgrade of the 110 kV bays in HPP Ciunget Substation Hidroelectrica Râmnicu Vâlcea Subsidiary 2006 – 2008 Modernization of the 110 kV Electrical Substation of Râmnicu Vâlcea HPP Hidroelectrica Râmnicu Vâlcea Subsidiary 2006 - 2007 ELECTRICAL SUBSTATIONS Projects in Romania
  • 42. Projects in Romania Proiect Client Contract performance period Modernization of the 110kV Electrical Substation of Govora HPP Hidroelectrica Râmnicu Vâlcea Subsidiary 2006 – 2007 Turnkey refurbishment of the 110/10 (20) kV Bucureşti Centru Substation Electrica Muntenia Sud 2005 – 2007 Refurbishment at the 110 kV bay – 220/110/20 kV Baia Mare Substation Transelectrica 2005 – 2005 Refurbishment of the 400/220 kV Roşiori Electrical Substation Transelectrica Cluj Subsidiary 2004 – 2006 Modernizing works at the 220/110 kV Vetiş Electrical Substation Transelectrica Cluj Subsidiary 2004 – 2006 Turnkey modernization of the 110/20 kV Electrical Substation Borsec Electrica Transilvania Sud 2003 – 2005 Turnkey modernization of the 110/10 kV Cluj Centru Electrical Substation Electrica Transilvania Nord 2003 - 2004 Turnkey refurbishment of the 6(20) kV Fileşti – Galaţi connection Substation Electrica Muntenia Nord 2002 – 2003 ELECTRICAL SUBSTATIONS Projects in Romania
  • 43. Projects in Romania Proiect Client Contract performance period Connection to the Electricity Transmission Network of 99 MW Dumești Wind Farm and 30 MW Românești Wind Farm, by executing a 110 kV line cell in the 220/110 kV Fai Substation Transelectrica Bacau Subsidiary 2013 - 2014 Coexistence conditions between the existing 110 kV Bârlad – Roșiori OHTL and new 220 kV OHTL connections for the (400)/220/110 kV Banca Substation for connecting 300 MW Ivești, 88 MW Falciu and 18 MW Falciu 2 Wind Farms to the electric grid Transelectrica 2012 - 2013 Top overhaul of 400 kV Mintia-Sibiu OHTL Transelectrica 2011 - 2014 Rehabilitation of the 220 kV OHTL Lotru - Sibiu Transelectrica 2007 – 2010 400 kV OHTL Oradea – Nadab – Békéscsaba, new interconnexion line with Hungary Transelectrica 2006 – 2008 Rehabilitation of the 400 kV Bucureşti South – Gura Ialomiţei OHTL Transelectrica 2006 - 2007 Execution of 220kV and 400 kV connections of Iernut Substations Transelectrica 2005 – 2006 Emergency works of the Sibiu – Țânțăreni 400 kV OHTL Transelectrica 2005 – 2005 Rehabilitation of 220 kV Brazi Vest – Târgovişte OHTL Transelectrica 2004 - 2005 Improving the dispatcher transmission system by executing the interconnecting of the data transmission system between the National Dispatch Centers in Romania and Bulgaria Transelectrica 2003 – 2004 Rehabilitation of 220 kV Borzeşti – Gutinaş OHTL Transelectrica 2003 – 2003 Projects in Romania OVERHEAD TRANSMISSION LINES
  • 44. Projects in RomaniaMajor Projects in Asia PHILIPPINES THAILAND Project Client Contract performance period 138 kV Compostela - Banilad OHTL Technical specification: Foundation pads and chimneys, double triangle hot zinc plated poles, active 2xACSR 400 mm2 Condor conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors. National Electric Power Corporation (NPC) 1994 – 1999 230 kV Talisay - Compostela OHTL Technical specifications: Foundation pads and chimneys, double triangle hot zinc-plated poles, active ACSR 772 mm2 MARTIN conductors, silicon rubber insulation, OPGW and AWG 7 and 6 safety conductors. National Electric Power Corporation (NPC) 1994 – 1999 Project Client Contract performance period 230 kV OHTL Phuket Junction - Phuket 2 Technical specifications: Foundation pads and chimneys, double triangle hot zinc plated poles, active 795 MCM ACSR/AW phase conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors. Electricity Generating Authority of Thailand (EGAT) 1998 – 2002 230 kV OHTL Phangnga - Phuket 2 Technical specifications: Foundation pads and chimneys, double triangle hot zinc plated poles, active 2x1272 MCM ACSR/AW PHEASANT conductors, porcelain insulation, OPGW and AWG 7 and 8 safety conductors. Electricity Generating Authority of Thailand (EGAT) 1998 – 2000
  • 45. Projects in RomaniaMajor Projects in Middle East JORDAN Project Client Project completion date D.C Bayader - Amman - Quatrana - Ghar Safi - Ma’an 132 kV OHTL (310 km) Jordan Electric Authority 1982 D.C. Ma’an - Aqaba and Amman – Sahab 132 kV OHTL (210 km) Jordan Electric Authority 1984 D.C. Irbid - Yarmouk University 33 kV OHTL (12 km) Yarmouk University 1984 D.C. Subeihi - 33kV OHTL King Talal dam (11 km) Yarmouk University 1986 D.C. Irbid - Wadi Arab 33 kV OHTL (25 km) Jordan Electric Authority 1986 846A JEPCO – Bringing electricity to 14 villages Jordan Electric Power Company 1986 Zarqa – Sabha 132 kV OHTL (40 km) National Electric Power Corporation 1995 25 / 84 – 33 kV and 11kV Medium Voltage OHTL (160 km) Jordan Electric Authority 1987 D.C. Ma’an - Esheidiyeh - Kharrana - Azraq - Rishah 132kV OHTL (327 km) Jordan Electric Authority 1988 Queen Alia International Airport – Sweima 132 kV OHTL (38 km) National Electric Power Corporation 2000 Subeihi - Waqqas 132 kV OHTL National Electric Power Corporation 2005
  • 46. Projects in RomaniaMajor Projects in Middle East IRAQ Project Client Project completion date 33 kV S.C. OHTL (Northern Area – 210 km; Central Area – 220 km; Western Area – 400 km) General Rural Electricity Department 1984 33 kV S.C. OHTL (Baghdad Area – 90 km) Baghdad Electrical Distribution 1986 400 kV D.C. OHTL Musaiyb - Baghdad South Musaiyb – Babylon (87.5 km) Major Electrical Projects Implementation Department 1988 400 kV D.C. OHTL Babylon – Qadisiya (101.5 km) Major Electrical Projects Implementation Department 1988 D.C. Tuba – 6.9 km; Hammar – 7.5 km; 132 kV OHTL; Ramadi – 11.1km Samadiya – 1.8 km; Mashtel – 0.4 km; Annah – 2.4 km Major Electrical Projects Implementation Department 1989 D.C. Arbil – Dokan 132 kV OHTL (83.8 km) Major Electrical Projects Implementation Department 1989 132 kV D.C. OHTL Darbandikhan - Sulaimaniya 111.5 km (Kirkuk Industries – 5 km; Tarmia - 14.8 km, Musaiyb - 42.2 km) Major Electrical Projects Implementation Department 1989
  • 47. Projects in RomaniaMajor Projects in Middle East ELECTRIC TRANSFORMERS & DISTRIBUTION SUBSTATION TECHNICAL ASSISTANCE, CONSULTING & EQUIPMENT SUPPLY Project Country Client Contract performance period Sheich Said -(Aleppo) Syria Sheich Said – Aleppo Cement Factory 1975 - 1977 Al Quaim Cement Plant 2X34 MVA; 33/6.6 kV Iraq Ministry of Industry and Minerals 1982– 1985 Sinjar Cement Plant S/S Iraq Ministry of Industry and Minerals 1982 – 1985 AL Quaim Limestone Quarry S/S Iraq Ministry of Industry and Minerals 1994 – 1999 Project Country Client Contract performance period Technical assistance and consulting on operating and repairing equipment Kuwait Ministry of Energy and Water 1991 - 1999 Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company 1998– 1998 Delivery of telecommunication poles Kuwait National Mobil Telecommunication Company 1999 – 1999 Technical assistance and consulting on operating and repairing equipment United Arab Emirates (Abu Dhabi) Technical assistance and consulting on operating and repairing equipment 1999 – 2001
  • 48. Projects in RomaniaMajor Projects in Middle East IRAN Turnkey execution of the Vafregan dam Short description of the objective Arch-shaped concrete dam, having an accumulation volume of 230 million cubic meters, which has been built with a view to ensuring water supply for the city of Saveh and also, to providing irrigation to an area of nearly 60.000 ha. At the same time, a hydroelectric plant has been built, having an overall installed capacity of 11 MW. Client Teheran Regional Water Board (TRWB) Location Iran, 200 km south of Teheran Project completion date 1992 Partnership RAH VA SAHTEMAN (MOLAVI) Teheran - associate partner
  • 49. Projects in RomaniaMajor Projects in North Africa ALGERIA Feasibility studies for the RAMDANE DJAMEL and ZAOUIA dams. Expertise of the Technical Project for the dams BOUGOUS and Bouhalloufa Description The core business of the contract consisted of Romelectro conducting the projects for the Ramdane Djamel and Zaouia dams in the Feasibility Study stage. According to the Special Prescription Book, the services were provided in the following 5 stages: Stage 1: Defining the options and the reconaissance program Stage 2: Hydrological study Stage 3: Geological and geo-technical study Stage 4: Solution study Stage 5: Feasibility study and bid documents Also, for the same client, Agence Nationale des Barrages et Transfert (ANBT), the expertise of the technical project for Bouhalloufa and Bougous was conducted. The core business of the contract was for the APD study expertise to be conducted APD according to the Special Prescription Book. Project starting date November 2002 (Ramdane and Zaouia) May 2001 (Bougous) April 2002 (Bouhalloufa) Project completion date November 2003 (Ramdane and Zaouia) April 2002 (Bougous) September 2002 (Bouhalloufa)
  • 50. Projects in RomaniaMajor Projects in North Africa ALGERIA EL-Fakia dam execution Short description of the objective Dam made of rock blocks piles endowed with a clay core, 49 m high and a 390m crown, which has been built with a view to ensuring water supply for the city of M’Sila and also, to irrigating 80.000 ha of farm land. Client: Directorate for Hydraulic Projects and Works (DHPW) Location: Algeria, 30 km from M’Sila Project completion date: 1985 SONAGHTER - associate local partner Turnkey heightening of the Ksob dam Short description of the objective Romelectro has conducted the works aimed at heightening the existing dam by 10m by means of a turnkey contract. It is a complex project which has called for rock excavations of over 37.000 cm, casings of over 100.000 mp and nearly 2.500 tones of metallic partners. Client: Directorate for Hydraulic Projects (DHP) Location: Algeria, Pre-Sahara area, 30 km from the city of M’Sila Project completion date: 1976 SONAGHTER -associate local partner
  • 51. 1. Performance of studies, designs and technical assistance Morocco Sidi - Benour Substation Kenya Kinogoni Mining Complex Substation China Sini - Veni TPP Peru various locations 2. Turnkey projects: Bangladesh 21 sets of 33/11 kV 2.5 and 5 MWA transformer substations 25 sets of 11/0.4 kV 100-200 kVA transformer substations Pakistan The Lasbella 132/63 kV 2x25 MWA transformer substation Iraq The Al Qaim 33/6.6 kV 2x34 MWA + 132/6.6 10 MWA transformer substation The Sinjar 33/6.6 kV 3x34 MWA transformer substation Transformers and Distributions Substations Other projects abroad
  • 52. Client Country Project Type Scope of supply Consulting Engineer Year JEPCO Jordan Turnkey GLST - 132 kV T/L NEPA 2000 NAPOCOR Philippines Turnkey GLST, assembling elements - 500 kV Edwin Ladingnon 2000 Intracom SA Greece, Intrarom SA Romania Romania Supply Hot dip galvanised tubular steel antenna towers - 30, 50 m high Intrarom SA 2000 NMTC Kuwait Turnkey Lattice steel antenna towers - 70 m high NMTC 2000 Hayat Kuwait Supply Lattice steel antenna towers - 64 m high NMTC 2000 NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae - 40, 75, 100 m high MTCo 2000 NMTC Kuwait Supply Hot dip galvanized tubular steel towers for antennae - 25, 30, 40, 75 m high MTCo 1999 MEM Peru Design, Testing, Supply GLST - 220 kV MEM 1999 JEPCO Jordan Turnkey GLST, assembling elements - 132 kV NEPA 1998 Other projects abroad
  • 53. Major Export Projects Client Country Project Type Scope of Supply Consulting Engineer Year MEM Peru Design, Testing, Supply GLST - 138 kV MEM 1998 ONUR CIVATA Turkey Supply Fittings 1998 JEPCO Jordan Supply, Erection GLST - 132 kV NEPCO 1998 Consorcio GyM Cosapi Peru Supply GLST - 220 kV MEM 1998 Consorcio Cosapi -Abengoa Peru Supply GLST - 220 kV MEM 1998 Consorcio Cosapi -Balarezo Peru Supply GLST - 138 kV MEM 1998 EGAT Thailand Design, Testing, Supply GLST, assembling elements - 115, 230 kV EGAT 1997 MEM Peru Design, Testing, Supply GLST, assembling elements - 60-138 kV MEM 1997 Mobifon Romania Supply Hot dip galvanized lattice steel towers for telecommunications - 40 m high MOBIFON 1997 Other projects abroad
  • 54. Client Country Project Type Scope of Supply Consulting Engineer Year National Mobile Telecommunication Co. (NMTC) Kuwait Supply Steel lattice towers for antennae - 70 m high MTCo 1997 TREC Iran Design, Testing, Supply GLST, assembling elements - 230 kV Moshanir 1997 EEA Egypt Supply Fittings EEA 1997 NAPOCOR Philippines Turnkey GLST - 138, 230 kV Sweed Power & EEDD-NPC 1997 Public Establishment for Distribution and Exploitation of Electric Energy Syria Supply Gantry towers for transformer station, clamps & fittings - 66/20 kV PEDEEE 1996 National Electric Power Authority Nigeria Supply GLST, lighting poles, gantry towers for 132/33 kV substation NEPA 1996 Avangan Iran Design, Testing GLST - 230 kV Moshanir 1996 Ministry of Energy and Mines (MEM) Peru Supply GLST - 60 kV MEM 1995, 1996 National Power Corporation (NAPOCOR) Philippines Turnkey GLST, clamps, fittings, composite insulator strings, power conductors, OHGW, OPGW - 132, 230 kV Sweed Power 1995 Major Export ProjectsOther projects abroad
  • 55. Client Country Project Type Scope of Supply Consulting Engineer Year Power Generation and Transmission Co. - Ramin Iran Design, Testing, Supply GLST, assembling elements - 230 kV Ghods Niroo 1995 K.E.SH. - Tirana Albania Supply Clamps & fittings - 132 kV K.E.SH. 1995 Moshanir P.E. Co. Iran Design, Testing GLST - 230 kV Moshanir 1995 Tavanir Iran Design, Testing GLST - 63 kV MATN 1995 TREC Iran Design, Testing, Supply GLST - 400 kV Moshanir 1993 TREC Iran Design, Testing, Supply GLST, assembling elements - 230 kV Moshanir 1993 AREC Iran Design, Testing, Supply Clamps & fittings - 154, 132, 230 kV Moshanir 1993 KWPA Iran Supply AAAC conductor Moshanir 1993 National Iranian Copper Industry Co. - Sirjan Iran Design, Testing, Supply GLST, clamps, OHGW – 230 kV Moshanir 1993 Major Export ProjectsOther projects abroad
  • 56. Major Export Projects Client Country Project Type Scope of Supply Consulting Engineer Year Ministry of Energy and Water Kuwait Supply Steelworks, assembling elements MEW 1993 JEA Jordan Turnkey GLST - 132 kV JEA 1993 BREC Iran Design, Testing, Supply Clamps - 230 kV Moshanir 1993 West Regional Electric Co. (WREC) Iran Design, Testing, Supply Clamps & fittings – 63, 132 kV Gharb Niroo 1993 Bakhtaran Regional Electric Co. (BREC) Iran Design, Testing, Supply GLST, clamps, assembling elements - 230 kV Moshanir 1993 BREC Iran Design, Testing, Supply GLST, assembly elements – 400 kV Moshanir 1993 WREP Iran Design, Testing, Supply GLST - 132 kV Gharb Niroo 1992 JEA Jordan Design, Supply, Erection GLST - 132 kV JEA 1992, 1994 KWPA Iran Design, Testing, Supply GLST, clamps & fittings, assembling elements, insulators - 400 kV Ghods Niroo 1992 Other projects abroad
  • 57. Major Export Projects Client Country Project Type Scope of Supply Consulting Engineer Year WREP Iran Design, Testing, Supply GLST, assembling elements - 63 kV Moshanir 1992 Guilan Regional Electric Co. (GREC) Iran Design, Testing, Supply GLST, assembling elements - 230 kV Moshanir 1992 Avangan Co. Iran Supply Galvanized bolts & nuts 1992 AREC Iran Design, Testing, Supply GLST, assembling elements - 230, 400 kV Mona Co. 1992 Tehran Regional Electric Co. (TREC) Iran Design, Testing, Supply GLST, assembling elements - 400 kV Moshanir 1992 EAC Cyprus Supply GLST - 132 kV, tower cross arms EAC 1992 Telecommunications Co. of Iran Iran Supply Assembling elements 1992 AREC Iran Design, Testing, Supply GLST, assembling elements, clamps & fittings, insulators - 230 kV Moshanir 1991 Electrification of a railway station – Salonic Idomeni Greece Supply Lattice horizontal galvanized girders Odon Odostromaton 1991 Other projects abroad
  • 58. Client Country Project Type Scope of Supply Consulting Engineer Year EAC Cyprus Supply Galvanized steel cross arms EAC 1991 AREC Iran Supply GLST, clamps and fittings insulators and earth system - 63,132, 230 kV Moshanir 1991 AREC Iran Design, Testing, Supply GLST, assembly elements, clamps - 132/154 kV interconnection Moshanir 1991 Azerbaijan Regional Electric Co. (AREC) Iran Supply GLST - 400 kV Moshanir 1990 EAC Cyprus Supply GLST - 132 kV EAC 1990 Boyer Tirana Albania Supply Clamps & fittings, insulators Boyer 1990 EEA Egypt Design, Supply GLST and assembling elements - 220 kV EEA 1990 WREP Iran Turnkey GLST - 63, 132 kV Mahab Ghodss 1989 EAC Cyprus Design, Supply GLST - 132 kV EAC 1989 Major Export ProjectsOther projects abroad
  • 59. Client Country Project Type Scope of Supply Consulting Engineer Year DGMPRE Iraq Design, Testing, Supply Conductors - 400 kV DGMPRE 1988 JEA Jordan Turnkey GLST -132 kV JEA 1987 Electricity Authority of Cyprus (EAC) Cyprus Design, Supply GLST - 132 kV EAC 1987 DGMPRE Iraq Turnkey GLST - 132 kV DGMPRE 1986, 1987 DGMPRE Iraq Design, Supply Materials - 132 kV DGMPRE 1986 EEA Egypt Turnkey GLST - 220 kV EEA 1986 EEA Egypt Design, Supply Clamps & fittings, insulators - 220 kV EEA 1986 DGMPRE Iraq Turnkey GLST - 400 kV DGMPRE 1985 Public Corporation for Electric Power South Yemen Design, ErectionWooden poles – 11, 33 kV Ewbank 1984 Major Export ProjectsOther projects abroad
  • 60. Client Country Project Type Scope of Supply Consulting Engineer Year Egyptian Electricity Authority (EEA) Egypt Turnkey GLST - 220 kV EEA 1984 JEPCO Jordan Turnkey Spun concrete poles - 11, 33 kV JEA and JEPCO 1984 Jordan Valley Authority Jordan Turnkey GLST - 33 kV Stanley Consultants Inc. + Harza Eng. (USA) 1983, 1984 DGMPRE Iraq Turnkey GLST - 63 kV DGMPRE 1983 West Regional Electric Power (WREP) Iran Turnkey GLST - 63 kV Mahab Ghodss 1983 WREP Iran Turnkey GLST - 132 kV Mahab Ghodss 1983 Electricity Board of the States of Malaya Malaysia Turnkey GLST - 132 kV Crown Agency 1983 Yarmouk University Jordan Turnkey GLST - 33 kV Preece, Cardew & Rider 1982 KWPA Iran Design, Supply GLST - 132, 230 kV Motor Columbus 1982 Major Export ProjectsOther projects abroad
  • 61. Client Country Project Type Scope of Supply Consulting Engineer Year Directorate General Of Minor Projects & Rural Electrification Baghdad Electricity Distribution (DGMPRE) Iraq Turnkey GLST - 33 kV DGMPRE 1981 JEPCO Jordan Turnkey GLST - 132 kV Ewbank (GB) 1981 Jordan Electricity Authority (JEPCO) Jordan Turnkey GLST - 132 kV Preece, Cardew 1979 Azerbaidjan Regional Electric Co. (AREC) Iran Turnkey GLST - 63 kV Mahab Ghodss 1978 TAVANIR Iran Turnkey GLST - 230 kV Motor Columbus (Switzerland) 1977, 1982 KWPA Iran Turnkey GLST - 230 kV Development & Resources 1975 Khuzestan Water and Power Authority (KWPA) Iran Turnkey GLST - 132 kV Development & Resources (USA) 1975 Electricité du Liban Lebanon Turnkey GLST - 150 kV Surveillance de Geneve (Switzerland) 1975 Electricité du Liban Lebanon Turnkey GLST - 66 kV Lebanon Electricity 1972 Major Export ProjectsOther projects abroad
  • 62. Contact Romelectro Address: 1-3 Lacul Tei Blvd. 020371 Bucharest, Romania Phone: 004 021 2004 305 office@romelectro.ro www.romelectro.ro Contact